Stroud Resources Discovers New Silver Vein System at its Santo Domingo Silver Project, Jalisco, Mexico
May 09 2023 - 5:36PM
Stroud Resources Ltd. (TSXV: SDR) (“
Stroud” or the
“
Company”) is pleased to provide a summary of its
2021-2022 drilling program, completed at its Santo Domingo Silver
Property (“Santo Domingo” or the “Property”), located in the
municipality of Hostotipaquillo, State of Jalisco, Mexico.
The 2021-2022 exploration drilling program
consisted of approximately 9,936 m in 32 diamond drill holes (Table
1) and selected results from this drilling are provided in Table 2.
The drilling program was designed to explore the extent of known
epithermal vein-hosted silver mineralization on the Property and to
begin to define additional silver-mineralized zones and vein
systems which were anticipated to run parallel to the existing La
Raya and Guadalupe silver vein systems. To date, the Santo Domingo
Project has approximately 85 drill holes totalling 18,184 metres
(Table 1).
Highlights:
- Discovery of
third silver-vein system (Zopilote Zone) parallel to the Guadalupe
and La Raya zones (Figure 1).
- SD-21-49: 625
g/t AgEq1 over 1.55 m (Guadalupe East Zone).
- SD-21-74: 680
g/t AgEq over 1.65 m (Guadalupe East Zone).
- SD-21-50: 230
g/t AgEq over 10.35 m (La Raya Zone).
- SD-21-71: 159
g/t AgEq over 36.80 m (La Raya Zone).
- SD-21-75: 152
g/t AgEq over 34.70 m (La Raya Zone).
- SD-21-52: 196
g/t AgEq over 15.10 m and 233 g/t AgEq over 6.45 m (La Raya
Zone).
- SD-21-58: 173
g/t AgEq over 1.05 m (Zopilote Zone).
- SD-21-81: 147
g/t AgEq over 32.15 m (Zopilote Zone).
(1AgEq is calculated using a silver to gold
ratio of 75:1, US$1,500/oz gold, US$20/oz silver, and recoveries of
100%.)
Figure 1 shows the new Zopilote vein system that
is west and parallel to the La Raya and Guadelupe zones. The La
Raya vein system is approximately 35 m wide by 300 m down-dip and
over 700 m along strike. The Guadalupe vein system is typically 15
to 30 m wide.
Hostotipaquillo Region,
Mexico
The Hostotipaquillo region has seen extensive
drilling over the last three years. In particular, GoGold Resources
Inc. (“GoGold”) has been drilling their Los Ricos South Project of
which their Jamaica II property is adjacent to Stroud’s Santo
Domingo Silver Property.
GoGold’s Los Ricos South Project has a mineral
resource estimate containing Measured & Indicated Mineral
Resources of 10.0M tonnes containing 63.7M ounces AgEq grading 199
g/t AgEq and an Inferred Mineral Resource of 3.3M tonnes containing
19.9M ounces AgEq grading 190 g/t AgEq (see GoGold news release
dated July 29, 2020).
The Company’s NI 43-101 Mineral Resource
Estimate and Technical Report on the Santo Domingo Property was
issued on November 20, 2017. It comprises Measured & Indicated
Resources of 6.0M tonnes containing 25.7M ounces AgEq grading 134
g/t AgEq and an Inferred Mineral Resource of 3.4M tonnes containing
13.3M ounces AgEq grading 120 g/t AgEq. The Mineral Resource
Estimate was calculated using a cut-off grade of 45 g/t AgEq over a
three-metre true width and a gold-silver ratio of 72:1 Continuity
of mineralization was established by drilling on 50 metre centres
and using a specific gravity of 2.65.
Table 1. Summary of diamond drilling completed to date on the
Santo Domingo Silver Project, Mexico.
Year |
Company |
Type of Drilling |
Drill HoleSeries |
No. Drill Holes |
Min. Depth (m) |
Max. Depth (m) |
Length(m) |
1999 |
Stroud |
DDH |
SD-99-01 to 04 |
4 |
18 |
125.5 |
382.5 |
2003 |
Stroud |
DDH |
SD-03-05 to 05B |
2 |
101 |
190 |
291 |
2005 |
Stroud |
DDH |
SD-05-06 to 09 |
5 |
49 |
235.2 |
702.5 |
2006 |
Stroud |
DDH |
SD-06-10 to 13 |
4 |
192.5 |
346.5 |
944 |
2007 |
Stroud |
DDH |
SD-07-14 to 19 |
7 |
71.7 |
349.4 |
1119 |
2008 |
Stroud |
DDH |
SD-08-20 to 30 |
13 |
17.1 |
374 |
2,331.7 |
2011 |
Stroud |
DDH |
SD-11-31 to 45 |
18 |
23.4 |
239.6 |
2,477.7 |
2021 |
Stroud |
DDH |
SD-21-46 to 84 |
26 |
55.5 |
552 |
8,090.9 |
2022 |
Stroud |
DDH |
SD-22-59 to 64 |
6 |
128 |
503 |
1,844.75 |
Total: |
85 |
|
|
18,184.05 |
Figure 1. Location of drill hole collars and
traces from the 2021 and 2022 diamond drilling and main silver vein
trends, overlain on a satellite image, Santo Domingo Silver Project
(Stroud Resources, 2021).
Drill Core Assay Results
Geological modelling of the Santo Domingo Silver
Project identified additional silver and base metal mineralized
zones running parallel to the previously announced Mineral Resource
Estimate on the La Raya Silver Vein System.
Focus of the 2021 drilling campaign was to
confirm the geological and mineral resource model for the La Raya
Silver Deposit, as well as deepen exploration drilling to test
expected mineralization of the La Raya vein beyond where historical
Spanish miners were active. The 2021 drilling campaign confirmed
the extension and geological interpretation of the La Raya and
Guadalupe vein systems and identified a new silver-vein system to
the west, named the Zopilote Zone.
The 2022 drilling campaign focused on the newly
discovered Zopilote silver-mineralized zone, primarily beginning to
test the extension, continuity and interpretation of the Zopilote
vein system. The location of drill hole collars was limited by the
previously approved drilling permit and its planned drill pads
which had not accounted for the discovery of the new Zopilote
Zone.
Table 2. Selected drill core assay results from the 2021-2022
diamond drilling program.
Drill Hole |
From (m) |
To (m) |
Length (m) |
AgEq1 (ppm) |
Ag (ppm) |
Au (ppm) |
Cu (ppm) |
Pb (ppm) |
Zn (ppm) |
Vein System |
SD-21-46 |
148.15 |
149.30 |
1.15 |
85 |
53 |
0.43 |
58 |
352 |
726 |
Guadalupe W |
SD-21-46 |
160.80 |
162.70 |
1.90 |
156 |
102 |
0.73 |
33 |
140 |
355 |
Guadalupe W |
SD-21-46 |
178.95 |
179.45 |
0.50 |
111 |
68 |
0.57 |
43 |
268 |
561 |
Guadalupe W |
SD-21-46 |
222.85 |
223.90 |
1.05 |
40 |
17 |
0.30 |
17 |
106 |
528 |
Guadalupe W |
SD-21-46 |
236.30 |
236.70 |
0.40 |
406 |
243 |
2.17 |
66 |
532 |
703 |
Guadalupe W |
SD-21-46 |
252.40 |
253.40 |
1.00 |
29 |
20 |
0.13 |
816 |
9,800 |
1,315 |
Guadalupe W |
SD-21-46 |
306.20 |
306.85 |
0.65 |
72 |
20 |
0.70 |
193 |
698 |
1,960 |
Guadalupe W |
SD-21-49 |
87.00 |
89.15 |
2.15 |
94 |
70 |
0.32 |
-- |
-- |
-- |
Guadalupe E |
SD-21-49 |
91.30 |
93.40 |
2.10 |
25 |
14 |
0.15 |
-- |
-- |
-- |
Guadalupe E |
SD-21-49 |
103.45 |
105.00 |
1.55 |
625 |
624 |
0.01 |
-- |
-- |
-- |
Guadalupe E |
SD-21-49 |
131.05 |
133.75 |
2.70 |
52 |
43 |
0.13 |
-- |
-- |
-- |
Guadalupe E |
SD-21-50 |
10.65 |
21.00 |
10.35 |
230 |
138 |
1.22 |
513 |
7,182 |
23,193 |
La Raya |
SD-21-50 |
67.80 |
71.50 |
3.70 |
133 |
62 |
0.95 |
784 |
13,338 |
29,892 |
La Raya |
SD-21-50 |
106.80 |
109.80 |
3.00 |
35 |
26 |
0.12 |
162 |
1,289 |
2,245 |
La Raya |
SD-21-50 |
112.80 |
113.60 |
0.80 |
35 |
25 |
0.13 |
959 |
1,010 |
1,175 |
La Raya |
SD-21-50 |
119.25 |
128.80 |
9.55 |
51 |
31 |
0.27 |
559 |
3,627 |
5,627 |
La Raya |
SD-21-50 |
168.00 |
168.40 |
0.40 |
75 |
50 |
0.33 |
4,150 |
38,100 |
132,500 |
La Raya |
SD-21-51 |
24.00 |
48.00 |
24.00 |
115 |
105 |
0.13 |
42 |
710 |
439 |
La Raya |
SD-21-51 |
57.00 |
58.50 |
1.50 |
51 |
45 |
0.09 |
27 |
196 |
457 |
La Raya |
SD-21-52 |
10.80 |
25.90 |
15.10 |
196 |
113 |
1.11 |
-- |
-- |
-- |
La Raya |
SD-21-52 |
53.10 |
54.95 |
1.85 |
81 |
68 |
0.18 |
-- |
-- |
-- |
La Raya |
SD-21-52 |
77.95 |
83.40 |
5.45 |
58 |
39 |
0.26 |
-- |
-- |
-- |
La Raya |
SD-21-52 |
100.50 |
106.95 |
6.45 |
233 |
181 |
0.69 |
-- |
-- |
-- |
La Raya |
SD-21-52 |
108.10 |
109.25 |
1.15 |
28 |
23 |
0.07 |
-- |
-- |
-- |
La Raya |
SD-21-52 |
113.95 |
114.25 |
0.30 |
109 |
82 |
0.37 |
-- |
-- |
-- |
La Raya |
SD-21-52 |
121.25 |
122.65 |
1.40 |
30 |
27 |
0.05 |
-- |
-- |
-- |
La Raya |
SD-21-57 |
6.00 |
20.70 |
14.70 |
224 |
165 |
0.78 |
-- |
-- |
-- |
La Raya |
SD-21-57 |
183.35 |
184.40 |
1.05 |
68 |
65 |
0.04 |
-- |
-- |
-- |
Guadalupe E |
SD-21-57 |
197.05 |
252.15 |
55.10 |
39 |
24 |
0.20 |
-- |
-- |
-- |
Guadalupe E |
SD-21-57 |
259.60 |
260.80 |
1.20 |
65 |
45 |
0.26 |
-- |
-- |
-- |
Guadalupe E |
SD-21-58 |
265.30 |
267.05 |
1.75 |
56 |
32 |
0.32 |
-- |
-- |
-- |
Zopilote |
SD-21-58 |
279.30 |
280.95 |
1.65 |
34 |
21 |
0.18 |
-- |
-- |
-- |
Zopilote |
SD-21-58 |
282.60 |
283.65 |
1.05 |
173 |
96 |
1.03 |
-- |
-- |
-- |
Zopilote |
SD-21-58 |
291.60 |
293.35 |
1.75 |
64 |
39 |
0.33 |
-- |
-- |
-- |
Zopilote |
SD-21-58 |
322.70 |
324.25 |
1.55 |
35 |
24 |
0.14 |
-- |
-- |
-- |
Zopilote |
SD-21-68A |
222.80 |
224.45 |
1.65 |
26 |
22 |
0.05 |
166 |
2,090 |
2,300 |
Guadalupe E |
SD-21-68A |
227.90 |
229.60 |
1.70 |
34 |
7 |
0.36 |
59 |
741 |
1,460 |
Guadalupe E |
SD-21-69 |
97.30 |
111.85 |
14.55 |
37 |
29 |
0.10 |
39 |
550 |
1,160 |
La Raya |
SD-21-69 |
125.00 |
173.90 |
48.90 |
72 |
41 |
0.42 |
17 |
169 |
402 |
Guadalupe E |
SD-21-71 |
4.20 |
41.00 |
36.80 |
159 |
141 |
0.23 |
130 |
2,297 |
1,967 |
La Raya |
SD-21-71 |
41.80 |
43.10 |
1.30 |
25 |
23 |
0.03 |
15 |
319 |
781 |
La Raya |
SD-21-71 |
49.60 |
50.95 |
1.35 |
28 |
21 |
0.09 |
16 |
218 |
662 |
La Raya |
SD-21-71 |
52.30 |
120.65 |
68.35 |
79 |
66 |
0.18 |
49 |
356 |
946 |
La Raya |
SD-21-71 |
130.60 |
133.00 |
2.40 |
37 |
28 |
0.12 |
-- |
-- |
-- |
La Raya |
SD-21-71 |
184.15 |
185.20 |
1.05 |
50 |
29 |
0.28 |
-- |
-- |
-- |
Guadalupe E |
SD-21-71 |
203.55 |
204.90 |
1.35 |
49 |
34 |
0.20 |
-- |
-- |
-- |
Guadalupe E |
SD-21-71 |
221.25 |
222.75 |
1.50 |
59 |
28 |
0.42 |
-- |
-- |
-- |
Guadalupe E |
SD-21-71 |
252.65 |
254.35 |
1.70 |
44 |
10 |
0.45 |
-- |
-- |
-- |
Guadalupe E |
SD-21-71 |
275.10 |
282.45 |
7.35 |
45 |
18 |
0.36 |
197 |
1,404 |
3,061 |
Guadalupe E |
SD-21-73 |
288.35 |
289.55 |
1.20 |
33 |
8 |
0.33 |
265 |
1,920 |
3,260 |
Guadalupe E |
SD-21-74 |
162.55 |
167.35 |
4.80 |
64 |
38 |
0.35 |
-- |
-- |
-- |
Guadalupe E |
SD-21-74 |
200.45 |
202.10 |
1.65 |
680 |
679 |
0.01 |
-- |
-- |
-- |
Guadalupe E |
SD-21-75 |
60.80 |
62.20 |
1.40 |
26 |
23 |
0.04 |
33 |
561 |
1,555 |
La Raya |
SD-21-75 |
65.10 |
99.80 |
34.70 |
152 |
60 |
1.23 |
356 |
5,751 |
18,551 |
La Raya |
SD-21-75 |
107.40 |
108.95 |
1.55 |
25 |
12 |
0.18 |
79 |
866 |
2,670 |
La Raya |
SD-21-75 |
264.90 |
265.25 |
0.35 |
43 |
13 |
0.41 |
1,190 |
2,760 |
45,000 |
Guadalupe E |
SD-21-80 |
264.00 |
264.35 |
0.35 |
63 |
25 |
0.51 |
2,360 |
69,200 |
18,200 |
Zopilote |
SD-21-81 |
170.65 |
202.80 |
32.15 |
147 |
106 |
0.55 |
52 |
133 |
242 |
Zopilote |
SD-21-81 |
237.00 |
237.50 |
0.50 |
45 |
34 |
0.14 |
-- |
-- |
-- |
Zopilote |
SD-21-81 |
295.85 |
320.70 |
24.85 |
56 |
45 |
0.14 |
236 |
7,718 |
4,857 |
Zopilote |
SD-21-81 |
335.85 |
336.65 |
0.80 |
53 |
30 |
0.30 |
-- |
-- |
-- |
Zopilote |
SD-21-81 |
389.30 |
391.20 |
1.90 |
74 |
46 |
0.37 |
-- |
-- |
-- |
Zopilote |
SD-21-81 |
396.90 |
402.60 |
5.70 |
83 |
74 |
0.12 |
-- |
-- |
-- |
Zopilote |
SD-21-81 |
408.70 |
409.05 |
0.35 |
47 |
27 |
0.27 |
-- |
-- |
-- |
Zopilote |
SD-21-81 |
413.30 |
413.90 |
0.60 |
35 |
17 |
0.24 |
-- |
-- |
-- |
Zopilote |
SD-21-82 |
247.80 |
248.95 |
1.15 |
78 |
38 |
0.54 |
26 |
175 |
364 |
Zopilote E |
SD-21-84 |
63.30 |
73.00 |
9.70 |
54 |
37 |
0.22 |
-- |
-- |
-- |
Guadalupe W |
SD-21-84 |
78.80 |
81.10 |
2.30 |
32 |
23 |
0.13 |
-- |
-- |
-- |
Guadalupe W |
SD-21-84 |
86.80 |
88.70 |
1.90 |
39 |
26 |
0.17 |
-- |
-- |
-- |
Guadalupe W |
SD-21-84 |
154.25 |
156.25 |
2.00 |
26 |
6 |
0.27 |
-- |
-- |
-- |
Guadalupe W |
SD-21-84 |
179.40 |
180.00 |
0.60 |
96 |
52 |
0.59 |
-- |
-- |
-- |
Guadalupe W |
SD-21-84 |
330.70 |
332.25 |
1.55 |
61 |
51 |
0.14 |
154 |
284 |
707 |
Zopilote E |
SD-22-60 |
54.45 |
56.00 |
1.55 |
26 |
21 |
0.07 |
-- |
-- |
-- |
Zopilote E |
SD-22-60 |
81.15 |
83.70 |
2.55 |
140 |
112 |
0.38 |
-- |
-- |
-- |
Zopilote E |
SD-22-61 |
84.05 |
88.70 |
4.65 |
60 |
52 |
0.11 |
-- |
-- |
-- |
Zopilote E |
SD-22-61 |
94.95 |
96.90 |
1.95 |
30 |
29 |
0.01 |
-- |
-- |
-- |
Zopilote E |
SD-22-61 |
104.00 |
104.40 |
0.40 |
61 |
15 |
0.62 |
-- |
-- |
-- |
Zopilote E |
SD-22-61 |
271.40 |
272.90 |
1.50 |
46 |
30 |
0.22 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
278.60 |
279.90 |
1.30 |
28 |
12 |
0.21 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
283.80 |
285.95 |
2.15 |
106 |
104 |
0.02 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
336.25 |
337.70 |
1.45 |
37 |
26 |
0.15 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
340.60 |
388.30 |
47.70 |
55 |
42 |
0.18 |
141 |
1,526 |
4,108 |
Zopilote |
SD-22-61 |
390.05 |
391.80 |
1.75 |
28 |
10 |
0.24 |
268 |
2,250 |
11,300 |
Zopilote |
SD-22-61 |
399.90 |
400.40 |
0.50 |
85 |
71 |
0.19 |
3,620 |
70,900 |
175,000 |
Zopilote |
SD-22-61 |
406.80 |
442.25 |
35.45 |
60 |
47 |
0.17 |
33 |
235 |
905 |
Zopilote |
SD-22-61 |
444.10 |
444.70 |
0.60 |
26 |
21 |
0.07 |
16 |
62 |
398 |
Zopilote |
SD-22-61 |
471.50 |
472.00 |
0.50 |
40 |
32 |
0.11 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
473.00 |
474.75 |
1.75 |
31 |
24 |
0.09 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
480.05 |
487.00 |
6.95 |
63 |
58 |
0.06 |
-- |
-- |
-- |
Zopilote |
SD-22-61 |
493.70 |
495.55 |
1.85 |
62 |
45 |
0.23 |
-- |
-- |
-- |
Zopilote |
SD-22-62 |
224.35 |
224.60 |
0.25 |
41 |
30 |
0.15 |
-- |
-- |
-- |
Zopilote |
SD-22-62 |
231.20 |
232.60 |
1.40 |
37 |
10 |
0.36 |
-- |
-- |
-- |
Zopilote |
SD-22-62 |
235.75 |
237.15 |
1.40 |
35 |
23 |
0.16 |
-- |
-- |
-- |
Zopilote |
SD-22-62 |
238.60 |
239.75 |
1.15 |
130 |
101 |
0.39 |
-- |
-- |
-- |
Zopilote |
SD-22-64 |
189.85 |
220.20 |
30.35 |
57 |
51 |
0.09 |
-- |
-- |
-- |
Zopilote |
SD-22-64 |
286.30 |
288.10 |
1.80 |
26 |
8 |
0.23 |
-- |
-- |
-- |
Zopilote |
SD-22-64 |
323.50 |
323.95 |
0.45 |
281 |
176 |
1.40 |
-- |
-- |
-- |
Zopilote |
SD-22-64 |
328.50 |
329.15 |
0.65 |
30 |
18 |
0.16 |
-- |
-- |
-- |
Zopilote |
SD-22-64 |
380.20 |
381.00 |
0.80 |
131 |
88 |
0.57 |
-- |
-- |
-- |
Zopilote |
Note: drill core intervals are not true widths
and are reported as core lengths; significant assays are considered
>25 g/t Ag over a >0.5 m interval.
Qualified Person
Dr Scott Jobin-Bevans, CEO and a Director of the
Company, is the Qualified Person as defined by National Instrument
43-101 and is responsible for the technical information contained
in this news release.
About Stroud Resources Ltd.
Stroud Resources is a TSXV listed company
focused on the exploration and development of its Santo Domingo
epithermal silver project in central Mexico.
THE TSX VENTURE EXCHANGE HAS NOT
REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF
THIS RELEASE.
The information contained herein contains
"forward-looking statements" within the meaning of
applicable securities legislation. Forward-looking statements
relate to information that is based on assumptions
of management, forecasts of future results, and estimates of
amounts not yet determinable. Any statements that express
predictions, expectations, beliefs, plans, projections, objectives,
assumptions or future events or performance are not statements of
historical fact and may be “forward-looking statements”.
Forward-looking statements are subject to a
variety of risks and uncertainties which could cause actual
events or results to differ from those reflected in the
forward-looking statements, including, without limitation, risks
and uncertainties relating to the interpretation of the drill
results, geology, grade and continuity of mineral
deposits.Should one or more of these risks and
uncertainties materialize, or should underlying assumptions prove
incorrect, actual results may vary materially from those
described in forward-looking statements. Investors are cautioned
against attributing undue certainty to forward-looking statements. These
forward-looking statements are made as of the date hereof and the
Company does not assume any obligation to update or revise them to
reflect new events or circumstances. Actual events or results could
differ materially from the Company’s expectations or
projections.
For more information, please
visit www.stroudsilver.com or contact Mirsad Jakubovic,
Chief Financial Officer, Stroud Resources Ltd., Tel: (416)
888-8731, mirsad@cpamba.ca
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/1fd120c6-694e-47f3-a3cd-bc65afc6cc21
Stroud Resources (TSXV:SDR)
Historical Stock Chart
From Nov 2024 to Dec 2024
Stroud Resources (TSXV:SDR)
Historical Stock Chart
From Dec 2023 to Dec 2024