Arizona Sonoran Copper Company Inc. (TSX:ASCU |
OTCQX:ASCUF) (“ASCU” or the “Company”), an emerging copper
developer and near-term producer, drills initial 13 infill holes
from the high grade core of the Parks/Salyer deposit demonstrating
continuity of grade and mineralized widths at 125 ft (38 m) drill
spacing (see FIGURES 1-15). A total of 29,036 ft (8,850.2 m)
has now been drilled within the overall 105,000 ft (32,000 m)
infill to measured drilling program over the Cactus Project
deposits. This program is being undertaken to upgrade parts of the
current mineral resources to the measured category for a definitive
feasibility study (“DFS”) in late 2024.
Drilling Highlights:
- Drilling replicating high grade-thicknesses from prior
drill programs, including 5 new intervals in the top 10 grade
thickness intervals at Parks/Salyer (see FIGURE
4)
- In July and August, 2 drill rigs focused in the eastern
section, interpreted to be the high grade core of the
deposit
- ECP-145: 937 ft (285.8 m) @ 1.41% CuT of continuous
mineralization
- 639 ft (194.8 m) @ 1.78% CuT, 1.37% Cu TSol, 0.016% Mo
(enriched)
- Incl 78 ft (23.8 m) @ 4.10% CuT, 2.96% Cu TSol, 0.013% Mo
- ECP-147: 1,023 ft (312 m) @ 1.05% CuT of continuous
mineralization
- 935 ft (285.2 m) @ 1.02% CuT, 0.63% Cu TSol, 0.014% Mo
(enriched)
- Incl 202 ft (61.6 m) @ 2.03% CuT, 1.28% Cu TSol, 0.016% Mo
- ECP-162: 1,132 ft (344.9 m) @ 1.23% CuT of continuous
mineralization
- 597 ft (181.8 m) @ 1.49% CuT, 1.44% Cu TSol, 0.019% Mo
(enriched)
- And 170 ft (51.8 m) @ 1.92% CuT, 1.88% Cu TSol, 0.023% Mo
- ECP-169: 880.2 ft (268.3 m) @ 1.13% CuT of continuous
mineralization
- 519 ft (158.2 m) @ 1.49% CuT, 1.09% Cu TSol, 0.011% Mo
(enriched)
- Incl 158ft (48.2m) @ 2.16% CuT, 2.10% Cu TSol, 0.004% Mo
- ECP-152: 1,011 ft (308.2 m) @ 0.78% CuT of continuous
mineralization
- 674 ft (205.6 m) @ 1.0% CuT, 0.94% Cu TSol, 0.020% Mo
(enriched)
- Incl 125 ft (38.3 m) @ 2.18% CuT, 2.13% Cu TSol, 0.017% Mo
NOTE: True widths are not known, see PR
dated September 28, 2022 for the P/S mineral resource
George Ogilvie, Arizona Sonoran President and CEO
commented, “The team continues to execute and deliver solid
results as we advance our Cactus and Parks/Salyer projects. The
proven continuity of the Parks/Salyer mineralization within the
deposit continues to support our vision of a top tier asset within
a tier 1 jurisdiction. Additionally, with the recent option of
MainSpring, the Parks/Salyer southern extension, we see a
tremendous opportunity to continue building the Parks/Salyer
mineral resource beyond the current 2.9 billion pounds at 1.015%
total copper inferred resource.”
Drilling Recap
A total of 26 infill-to-measured core holes (of a planned
47-hole program) have been drilled at 125 ft (38m) drill centers in
the eastern half of the Parks/Salyer mineral resource area since
April 1st, 2023. We continue to focus on defining the high-grade
core of the mineral resource, with encouraging and consistent
intervals of mineralization as the geological team continues to
work toward completing the drilling that will be needed for a
measured resource for the Definitive Feasibility Study in 2024. As
shown in FIGURE 4, holes ECP-145 and ECP-162 demonstrate the
overall continuity of width and grade predicted by the earlier 250
ft (76m) infill-to-indicated drill program, especially in the
center of the previously defined thicker areas of higher grade
copper, where both thickness and average grades continue to be
defined by the latest infill drilling. Completed drilling that is
pending results will help to further define the characteristics and
boundaries of these two high grade centers of mineralization.
TABLE 1: Parks/Salyer Drilling Highlights
Hole Id
Zone
Feet
Metres
Grade
From
To
Length
From
To
Length
CuT
TSol
Mo
ECP-132
oxide
1,535.5
1,586.9
51.4
468.0
483.7
15.7
0.95
0.94
0.011
enriched
1,586.9
1,816.0
229.1
483.7
553.5
69.8
1.02
0.95
0.007
including
1,586.9
1,634.7
47.8
483.7
498.3
14.6
1.52
1.45
0.012
and
1,678.0
1,708.0
30.0
511.5
520.6
9.1
1.24
1.20
0.005
and
1,752.6
1,804.0
51.4
534.2
549.9
15.7
1.17
1.03
0.005
primary
1,816.0
2,246.0
430.0
553.5
684.6
131.1
0.21
0.02
0.004
including
1,843.0
1,896.0
53.0
561.7
577.9
16.2
0.36
0.05
0.002
ECP-138
enriched
1,041.4
1,159.0
117.6
317.4
353.3
35.8
1.58
1.54
0.010
including
1,068.0
1,108.0
40.0
325.5
337.7
12.2
2.52
2.51
0.007
enriched
1,268.0
1,313.3
45.3
386.5
400.3
13.8
0.96
0.93
0.028
enriched
1,376.2
1,497.7
121.5
419.5
456.5
37.0
1.00
0.78
0.016
including
1,386.0
1,451.0
65.0
422.5
442.3
19.8
1.39
1.30
0.016
primary
1,497.7
2,115.8
618.1
456.5
644.9
188.4
0.49
0.05
0.013
including
1,597.0
1,657.3
60.3
486.8
505.1
18.4
0.65
0.07
0.016
and
1,798.5
2,008.3
209.8
548.2
612.1
63.9
0.69
0.05
0.020
ECP-145
enriched
1,064.0
1,703.0
639.0
324.3
519.1
194.8
1.78
1.37
0.016
including
1,074.0
1,152.0
78.0
327.4
351.1
23.8
4.10
2.96
0.013
primary
1,703.0
2,001.5
298.5
519.1
610.1
91.0
0.62
0.05
0.033
including
1,703.0
1,733.0
30.0
519.1
528.2
9.1
0.96
0.09
0.010
and
1,852.0
1,882.0
30.0
564.5
573.6
9.1
0.86
0.07
0.020
ECP-147
enriched
1,000.3
1,936.0
935.7
304.9
590.1
285.2
1.02
0.63
0.014
including
1,145.0
1,347.0
202.0
349.0
410.6
61.6
2.03
1.28
0.016
and
1,397.0
1,427.0
30.0
425.8
434.9
9.1
1.75
1.29
0.021
primary
1,936.0
2,024.0
88.0
590.1
616.9
26.8
0.62
0.05
0.013
ECP-152
oxide
1,042.0
1,062.3
20.3
317.6
323.8
6.2
1.00
0.97
0.018
enriched
1,272.0
1,946.7
674.7
387.7
593.4
205.6
1.00
0.94
0.020
including
1,293.4
1,419.0
125.6
394.2
432.5
38.3
2.18
2.13
0.017
and
1,674.0
1,724.0
50.0
510.2
525.5
15.2
1.33
1.31
0.028
and
1,892.0
1,916.0
24.0
576.7
584.0
7.3
1.68
1.65
0.032
primary
1,946.7
2,283.0
336.3
593.4
695.9
102.5
0.35
0.04
0.016
including
1,946.7
2,075.0
128.3
593.4
632.5
39.1
0.54
0.05
0.017
ECP-155
oxide
1,072.0
1,140.0
68.0
326.7
347.5
20.7
0.72
0.70
0.018
oxide
1,223.5
1,315.0
91.5
372.9
400.8
27.9
0.87
0.85
0.018
enriched
1,315.0
1,887.6
572.6
400.8
575.3
174.5
1.04
0.92
0.023
including
1,322.0
1,347.0
25.0
402.9
410.6
7.6
2.20
2.17
0.031
and
1,510.0
1,620.0
110.0
460.2
493.8
33.5
1.29
1.06
0.028
and
1,690.0
1,730.0
40.0
515.1
527.3
12.2
1.41
1.31
0.021
primary
1,887.6
2,290.0
402.4
575.3
698.0
122.7
0.23
0.02
0.011
including
1,988.0
2,017.0
29.0
605.9
614.8
8.8
0.87
0.06
0.017
ECP-156
enriched
1,118.9
1,756.0
637.1
341.0
535.2
194.2
0.81
0.57
0.010
including
1,366.0
1,566.0
200.0
416.4
477.3
61.0
1.33
1.21
0.009
primary
1,756.0
2,081.6
325.6
535.2
634.5
99.2
0.52
0.05
0.014
including
1,806.0
1,876.0
70.0
550.5
571.8
21.3
0.66
0.06
0.011
ECP-158
oxide
1,256.0
1,336.7
80.7
382.8
407.4
24.6
1.70
1.69
0.020
enriched
1,367.0
1,876.9
509.9
416.7
572.1
155.4
1.20
1.09
0.020
including
1,382.0
1,432.0
50.0
421.2
436.5
15.2
2.79
2.13
0.032
and
1,634.0
1,734.0
100.0
498.0
528.5
30.5
1.45
1.40
0.016
primary
1,876.9
2,311.0
434.1
572.1
704.4
132.3
0.27
0.03
0.011
including
1,897.0
1,969.4
72.4
578.2
600.3
22.1
0.42
0.04
0.009
and
2,240.0
2,300.0
60.0
682.8
701.0
18.3
0.41
0.03
0.011
ECP-159
enriched
1,493.0
1,823.2
330.2
455.1
555.7
100.6
1.27
0.77
0.015
including
1,503.0
1,587.0
84.0
458.1
483.7
25.6
1.84
1.35
0.012
primary
1,823.2
2,056.3
233.1
555.7
626.8
71.0
0.58
0.14
0.017
including
1,833.0
1,903.5
70.5
558.7
580.2
21.5
0.70
0.09
0.017
ECP-162
oxide
1,163.0
1,310.8
147.8
354.5
399.5
45.0
1.39
1.36
0.015
including
1,212.7
1,280.7
68.0
369.6
390.4
20.7
2.09
2.05
0.017
enriched
1,321.0
1,917.5
596.5
402.6
584.5
181.8
1.49
1.44
0.019
including
1,367.9
1,418.0
50.1
416.9
432.2
15.3
2.57
2.54
0.016
and
1,668.0
1,838.0
170.0
508.4
560.2
51.8
1.92
1.88
0.023
primary
1,917.5
2,304.9
387.4
584.5
702.5
118.1
0.30
0.03
0.010
including
1,917.5
1,978.4
60.9
584.5
603.0
18.6
0.41
0.05
0.006
and
2,059.0
2,079.0
20.0
627.6
633.7
6.1
0.56
0.06
0.008
ECP-165
oxide
1,357.0
1,386.0
29.0
413.6
422.5
8.8
1.72
1.71
0.033
enriched
1,429.5
1,598.0
168.5
435.7
487.1
51.4
1.49
1.46
0.012
including
1,437.0
1,487.0
50.0
438.0
453.2
15.2
2.29
2.20
0.013
enriched
1,748.0
1,884.0
136.0
532.8
574.2
41.5
1.08
1.05
0.009
including
1,758.2
1,788.0
29.8
535.9
545.0
9.1
1.60
1.58
0.010
primary
1,884.0
2,327.0
443.0
574.2
709.3
135.0
0.28
0.03
0.011
including
1,908.5
1,945.0
36.5
581.7
592.8
11.1
0.46
0.04
0.007
ECP-168
oxide
1,282.0
1,385.5
103.5
390.8
422.3
31.5
0.97
0.97
0.027
including
1,365.4
1,385.5
20.1
416.2
422.3
6.1
2.36
2.36
0.036
enriched
1,405.0
1,570.5
165.5
428.2
478.7
50.4
1.28
1.22
0.016
including
1,405.0
1,439.0
34.0
428.2
438.6
10.4
2.09
2.08
0.038
and
1,518.0
1,548.0
30.0
462.7
471.8
9.1
1.63
1.62
0.010
enriched
1,696.3
1,862.5
166.2
517.0
567.7
50.7
1.49
1.46
0.008
including
1,730.0
1,800.0
70.0
527.3
548.6
21.3
1.93
0.35
0.006
primary
1,862.5
2,300.4
437.9
567.7
701.2
133.5
0.25
0.03
0.010
including
1,862.5
1,960.0
97.5
567.7
597.4
29.7
0.44
0.06
0.012
ECP-169
enriched
693.3
730.0
36.7
211.3
222.5
11.2
0.79
0.79
0.007
enriched
1,028.1
1,547.0
518.9
313.4
471.5
158.2
1.49
1.09
0.011
including
1,036.0
1,194.0
158.0
315.8
363.9
48.2
2.16
2.10
0.004
primary
1,547.0
1,908.3
361.3
471.5
581.6
110.1
0.61
0.05
0.017
including
1,601.5
1,692.0
90.5
488.1
515.7
27.6
0.75
0.08
0.020
1.
Intervals are presented in core length and
are drilled with vertical, or steep dip angles.
2.
Drill assays assume a mineralized cut-off
grade of 0.5% CuT reflecting the potential for heap leaching of
underground material in the case of Oxide and Enriched or in the
case of Primary material, 0.1% CuT, to provide typical average
grades. Holes were terminated below the basement fault.
3.
Assay results are not capped. Intercepts
are aggregated within geological confines of major mineral
zones.
4.
True widths are not known.
Table 2: Drilling details
Hole
Easting (m)
Northing (m)
Elevation (ft)
TD (ft)
Azimuth
Dip
ECP-132
421884.8
3645378.0
1386.7
2430.0
235.0
-80.0
ECP-138
421775.2
3645055.4
1376.0
2248.0
115.0
-80.0
ECP-145
421948.2
3644932.1
1377.2
2011.6
0.0
-90.0
ECP-147
421897.2
3644937.9
1374.2
2219.9
0.0
-90.0
ECP-152
421876.6
3645214.3
1381.0
2315.0
0.0
-90.0
ECP-155
421843.8
3645229.5
1381.0
2315.4
0.0
-90.0
ECP-156
421919.7
3645022.2
1376.8
2103.0
0.0
-90.0
ECP-158
421876.6
3645251.8
1381.9
2347.2
0.0
-90.0
ECP-159
421960.0
3645022.5
1377.4
2077.0
0.0
-90.0
ECP-162
421945.2
3645277.4
1383.3
2323.0
0.0
-90.0
ECP-165
421921.3
3645307.7
1384.6
2373.0
0.0
-90.0
ECP-168
421884.6
3645283.8
1382.8
2360.1
0.0
-90.0
ECP-169
422007.8
3644902.1
1374.8
1912.8
0.0
-90.0
Quality Assurance / Quality Control
Drilling completed on the project between 2020 and 2022 was
supervised by on-site ASCU personnel who prepared core samples for
assay and implemented a full QA/QC program using blanks, standards,
and duplicates to monitor analytical accuracy and precision. The
samples were sealed on site and shipped to Skyline Laboratories in
Tucson AZ for analysis. Skyline’s quality control system complies
with global certifications for Quality ISO9001:2008.
Technical aspects of this news release have been reviewed and
verified by Allan Schappert – CPG #11758, who is a qualified person
as defined by National Instrument 43-101– Standards of Disclosure
for Mineral Projects.
Links from the Press Release
September 28, 2022:
https://arizonasonoran.com/news-releases/arizona-sonoran-doubles-global-leachable-resource-inventory-and-declares-maiden-mineral-resources-at-parks-salyer-of-2.92/
Figures 1-15:
https://arizonasonoran.com/projects/cactus-mine-project/press-release-images/
Neither the TSX nor the regulating authority has approved or
disproved the information contained in this press release.
About Arizona Sonoran Copper Company (www.arizonasonoran.com |
www.cactusmine.com)
ASCU’s objective is to become a mid-tier copper producer with
low operating costs and to develop the Cactus and Parks/Salyer
Projects that could generate robust returns for investors and
provide a long term sustainable and responsible operation for the
community and all stakeholders. The Company's principal asset is a
100% interest in the Cactus Project (former ASARCO, Sacaton mine)
which is situated on private land in an infrastructure-rich area of
Arizona. Contiguous to the Cactus Project is the Company’s
100%-owned Parks/Salyer deposit that could allow for a phased
expansion of the Cactus Mine once it becomes a producing asset. The
Company is led by an executive management team and Board which have
a long-standing track record of successful project delivery in
North America complemented by global capital markets expertise.
Forward-Looking Statements
Forward-looking statements involve known and unknown risks,
uncertainties and other factors which may cause the actual results,
performance or achievements of ASCU to be materially different from
any future results, performance or achievements expressed or
implied by the forward-looking statements. Factors that could
affect the outcome include, among others: future prices and the
supply of metals; the results of drilling; inability to raise the
money necessary to incur the expenditures required to retain and
advance the properties; environmental liabilities (known and
unknown); general business, economic, competitive, political and
social uncertainties; results of exploration programs; accidents,
labour disputes and other risks of the mining industry; political
instability, terrorism, insurrection or war; or delays in obtaining
governmental approvals, projected cash operating costs, failure to
obtain regulatory or shareholder approvals.
Although ASCU has attempted to identify important factors that
could cause actual actions, events or results to differ materially
from those described in forward-looking statements, there may be
other factors that cause actions, events or results to differ from
those anticipated, estimated or intended. Forward-looking
statements contained herein are made as of the date of this news
release and ASCU disclaims any obligation to update any
forward-looking statements, whether as a result of new information,
future events or results or otherwise, except as required by
applicable securities laws.
View source
version on businesswire.com: https://www.businesswire.com/news/home/20230912642817/en/
For more information Alison Dwoskin, Director, Investor
Relations 647-233-4348 adwoskin@arizonasonoran.com
George Ogilvie, President, CEO and Director 416-723-0458
gogilvie@arizonasonoran.com
Arizona Sonoran Copper (TSX:ASCU)
Historical Stock Chart
From Dec 2024 to Jan 2025
Arizona Sonoran Copper (TSX:ASCU)
Historical Stock Chart
From Jan 2024 to Jan 2025