Prime Mining Corp. (“Prime” or the
“Company”) (TSX: PRYM, OTCQX: PRMNF, Frankfurt: 04V3)
announces that shareholder voting at the Company's Annual General
and Special Meeting of shareholders held on June 19, 2024 has
resulted in the election of all the directors listed as nominees in
management's information circular dated May 3, 2024, as well as the
approval of all matters presented. Summaries of the results of
voting are provided below.
Prime is focused on the exploration and
development of its wholly owned Los Reyes Gold-Silver Project in
Sinaloa State, Mexico (“Los Reyes” or the “Project”). Recent
highlights include:
- Cash balance of C$28 million as at
March 31, 2024
- Publication of the Company’s second
annual Environmental, Social and Corporate Governance report,
available at
https://www.primeminingcorp.ca/sustainability/overview/
- Extension of high-grade gold and
silver mineralization at Guadalupe East (see news release May 28,
2024).
- Discovery of 11.8 grams per tonne
gold-equivalent over 3.0 metres at Las Primas (see news release
April 17, 2024).
- Discovery of new high-grade shoot
at Z-T containing 7.68 grams per tonne gold-equivalent over 7.7
metres (see news release April 10, 2024).
A total of 99,577,591 common shares were
represented at the Meeting, representing 68.955% of the issued and
outstanding common shares of the Company at the record date.
Setting the Number of
Directors
Voting results for the resolution to set the
number of directors to be elected at eight (8) are as follows:
Votes For |
% For |
Votes Against |
% Against |
99,391,956 |
99.814% |
185,626 |
0.186% |
Election of Directors
Voting results for the resolution approving the
appointment of nominees are as follows:
Nominee |
Votes For |
% For |
Votes Withheld |
% Withheld |
Murray John |
91,492,959 |
92.913% |
6,978,196 |
7.087% |
Scott Hicks |
95,670,635 |
97.156% |
2,800,520 |
2.844% |
Paul Sweeney |
98,431,162 |
99.959% |
39,993 |
0.041% |
Andrew Bowering |
93,672,605 |
95.127% |
4,798,550 |
4.873% |
Edie Hofmeister |
66,416,889 |
67.448% |
32,054,266 |
32.552% |
Marc Prefontaine |
96,428,693 |
97.926% |
2,042,462 |
2.074% |
Chantal Gosselin |
98,443,798 |
99.972% |
27,357 |
0.028% |
Kerry Sparkes |
93,651,421 |
95.105% |
4,819,734 |
4.895% |
Appointment of Auditors
Voting results for the resolution to approve
Davidson & Company LLP, Chartered Professional Accounts as
auditor of the Company, and to authorize the directors to fix the
remuneration are as follows:
Votes For |
% For |
Votes Withheld |
% Withheld |
99,565,164 |
99.988% |
12,427 |
0.012% |
Amended Articles
Voting results for the resolution to approve an
amendment to the Articles of the Company, as further described in
the Circular, are as follows:
Votes For |
% For |
Votes Against |
% Against |
92,228,570 |
93.660% |
6,242,585 |
6.340% |
Majority Voting Policy
Voting results for the resolution to approve
adoption of a majority voting policy are as follows:
Votes For |
% For |
Votes Against |
% Against |
98,406,633 |
99.934% |
64,522 |
0.066% |
Omnibus Incentive Plan
Voting results for the resolution to approve the
adoption of a new omnibus incentive plan are as follows:
Votes For |
% For |
Votes Against |
% Against |
91,491,462 |
92.912% |
6,979,693 |
7.088% |
2024 Outlook
Prime has completed over 24,000 metres of its
targeted 40,000-metre 2024 drill program to-date (within budget)
and will continue to evaluate drilling plans using its
success-based approach. This evaluation will also include
prioritization of targets based on probability of resource
development and generative area discovery potential.
Four drill rigs are currently active on site at
Los Reyes, with 2024 exploration focused on:
- Extending the high-grade
Z-T Trend shoots that remain open at depth, as well as
along strike, both north and south.
- Expanding the known
high-grade mineralization at Guadalupe East.
- Increasing the Central
Trend resource through additions at Noche Buena and its
connection to San Miguel East.
- Generative target drilling
of high-grade intercepts at Las Primas, Mariposa,
Fresnillo, Mina and others to further develop the resource
potential at Los Reyes.
About the Los Reyes Gold and Silver
Project
Los Reyes is a rapidly evolving high-grade, low
sulphidation epithermal gold-silver project located in Sinaloa
State, Mexico. Since acquiring Los Reyes in 2019, Prime has spent
approximately CAD$52 million on direct exploration activities and
has completed over 185,000 metres of drilling (to March 31, 2024).
On May 2, 2023, Prime announced an updated multi-million-ounce
high-grade open pit constrained resource (see the May 2, 2023 press
release for more details).
May 2, 2023 Resource
Statement
Assurance Category |
Ore TonnesMt |
Average Gold Grade (g/t) |
Contained Gold(k ozs) |
Average Silver Grade (g/t) |
Contained Silver(k ozs) |
Average AuEq Grade(g/t) |
Contained AuEq(k ozs) |
Measured (M) |
- |
- |
- |
- |
- |
- |
- |
Indicated (I) |
27.2 |
1.16 |
1,013 |
40.40 |
35,263 |
1.68 |
1,470 |
M+I |
27.2 |
1.16 |
1,013 |
40.40 |
35,263 |
1.68 |
1,470 |
Inferred |
18.1 |
0.85 |
497 |
31.52 |
18,334 |
1.26 |
734 |
Drilling is ongoing and suggests that the three
known main deposit areas (Guadalupe, Central and Z-T) are larger
than previously reported. Potential also exists for new discoveries
where mineralized trends have been identified outside of the
currently defined resource areas.
Historic operating results indicate that an
estimated 1 million ounces of gold and 60 million ounces of silver
were recovered from five separate operations at Los Reyes between
1770 and 1990. Prior to Prime’s acquisition, recent operators of
Los Reyes had spent approximately US$20 million on exploration,
engineering, and prefeasibility studies.
QA/QC Protocols and Sampling
Procedures
Drill core at the Los Reyes project is drilled
in predominately HQ size (63.5 millimetre “mm”), reducing to NQ
(47.6 mm) when required. Drill core samples are generally 1.50 m
long along the core axis with allowance for shorter or longer
intervals if required to suit geological constraints. After logging
intervals are identified to be sampled, the core is cut and one
half is submitted for assay. RC drilling returns rock chips and
fines from a 133.35 mm diameter tricone bit. The returns are
homogenized and split into 2 halves, with one half submitted for
analysis and the other half stored.
Sample QA/QC measures include unmarked certified
reference materials, blanks, and field duplicates as well as
preparation duplicates are inserted into the sample sequence and
make up approximately 8% of the samples submitted to the laboratory
for each drill hole.
Samples are picked up from the Project by the
laboratory personnel and transported to their facilities in Durango
or Hermosillo Mexico, for sample preparation. Sample analysis is
carried out by Bureau Veritas and ALS Labs, with fire assay,
including over limits fire assay re-analysis, completed at their
respective Hermosillo, Mexico laboratories and multi-element
analysis completed in North Vancouver, Canada. Drill core sample
preparation includes fine crushing of the sample to at least 70%
passing less than 2 mm, sample splitting using a riffle splitter,
and pulverizing a 250-gram split to at least 85% passing 75
microns.
Gold in diamond drill core is analyzed by fire
assay and atomic absorption spectroscopy of a 30 g sample (code
FA430 or Au-AA23). Multi-element chemistry is analyzed by 4-Acid
digestion of a 0.25-gram sample split (code MA300 or ME-ICP61) with
detection by inductively coupled plasma emission spectrometer for a
full suite of elements.
Gold assay techniques FA430 and Au-AA23 have an
upper detection limit of 10 ppm. Any sample that produces an
over-limit gold value via the initial assay technique is sent for
gravimetric finish via method FA-530 or Au-GRA21. Silver analyses
by MA300 and ME-ICP61 have an upper limit of 200 ppm and 100 ppm,
respectively. Samples with over-limit silver values are re-analyzed
by fire assay with gravimetric finish FA530 or Au-GRA21.
Both Bureau Veritas and ALS Labs are ISO/IEC
accredited assay laboratories.
Additional Notes
Metres is represented by “m”; “etw” is
Estimated True Width and is based on drill hole geometry or
comparisons with other on-section drill holes; “Au” refers to gold,
and “Ag” refers to silver; “gpt” is grams per metric tonne; some
figures may not sum due to rounding; Composite assay grades
presented in summary tables are calculated using a Au grade minimum
average of 0.20 gpt or 1.0 gpt as indicated in “Au Cut-off” column
of Summary Tables. Maximum internal waste included in any reported
composite interval is 3.00 m. The 1.00 gpt Au cut-off is used to
define higher-grade “cores” within the lower-grade halo.
Gold equivalent grades are calculated based on
an assumed gold price of US$1,700 per ounce and silver price of $22
per ounce, based on the formula AuEq grade (gpt) = Au grade + (Ag
grade x ($22 / $1,700)). Metallurgical recoveries are not
considered in the in-situ grade estimate but are estimated to be
93% and 83% for gold and silver, respectively, when processed in a
mill, and 72% and 25% respectively when heap-leached. See the June
12, 2023 Los Reyes Technical Report for additional details.
Qualified Person
Scott Smith, P.Geo., Executive Vice President of
Exploration, is a qualified person for the purposes of National
Instrument 43-101 and has reviewed and approved the technical
content in this news release.
About Prime Mining
Prime is managed by an ideal mix of successful
mining executives, strong capital markets personnel and experienced
local operators all focused on unlocking the full potential of the
Los Reyes Project. The Company has a well-planned capital structure
with a strong management team and insider ownership. Prime is
targeting a material resource expansion at Los Reyes through a
combination of new generative area discoveries and growth, while
also building on technical de-risking activities to support
eventual project development.
For further information, please visit
https://primeminingcorp.ca/ or direct enquiries to:
Scott HicksCEO &
Director
Indi GopinathanVP Capital
Markets & Business Development
Prime Mining Corp.710 – 1030 West Georgia
St.Vancouver, BC V6E 2Y3 Canada+1(604)
238-1659info@primeminingcorp.ca
Cautionary Notes to U.S. Investors
Concerning Resource EstimatesThis news release has been
prepared in accordance with the requirements of the securities laws
in effect in Canada, which differ from the requirements of the U.S.
securities laws. In particular, and without limiting the generality
of the foregoing, the terms “mineral reserve”, “proven mineral
reserve”, “probable mineral reserve”, “inferred mineral resources,”
“indicated mineral resources,” “measured mineral resources” and
“mineral resources” used or referenced in this presentation are
Canadian mineral disclosure terms as defined in accordance with
National Instrument 43-101 – Standards of Disclosure for Mineral
Projects (“NI 43-101”) under the guidelines set out in the 2014
Canadian Institute of Mining, Metallurgy and Petroleum Standards
for Mineral Resources and Mineral Reserves, Definitions and
Guidelines, May 2014 (the “CIM Standards”). The CIM Standards
differ from the mineral property disclosure requirements of the
U.S. Securities and Exchange Commission (the “SEC”) in Regulation
S-K Subpart 1300 (the “SEC Modernization Rules”) under the U.S.
Securities Act of 1933, as amended (the “Securities Act”). As a
foreign private issuer that is eligible to file reports with the
SEC pursuant to the multijurisdictional disclosure system, the
Company is not required to provide disclosure on its mineral
properties under the SEC Modernization Rules and will continue to
provide disclosure under NI 43-101 and the CIM Standards.
Accordingly, the Company’s disclosure of mineralization and other
technical information may differ significantly from the information
that would be disclosed had the Company prepared the information
under the standards adopted under the SEC Modernization Rules.
Forward Looking Information
This news release contains certain
“forward-looking information” and “forward-looking statements”
within the meaning of Canadian securities legislation as may be
amended from time to time, including, without limitation,
statements regarding the perceived merit of the Company’s
properties, including additional exploration potential of Los
Reyes, potential quantity and/or grade of minerals, the potential
size of the mineralized zone, metallurgical recoveries, and the
Company’s exploration and development plans in Mexico.
Forward-looking statements are statements that are not historical
facts which address events, results, outcomes, or developments that
the Company expects to occur. Forward-looking statements are based
on the beliefs, estimates and opinions of the Company’s management
on the date the statements are made, and they involve several risks
and uncertainties. Certain material assumptions regarding such
forward-looking statements were made, including without limitation,
assumptions regarding the price of gold, silver and copper; the
accuracy of mineral resource estimations; that there will be no
material adverse change affecting the Company or its properties;
that all required approvals will be obtained, including concession
renewals and permitting; that political and legal developments will
be consistent with current expectations; that currency and exchange
rates will be consistent with current levels; and that there will
be no significant disruptions affecting the Company or its
properties. Consequently, there can be no assurances that such
statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such
statements. Forward-looking statements involve significant known
and unknown risks and uncertainties, which could cause actual
results to differ materially from those anticipated. These risks
include, but are not limited to: risks related to uncertainties
inherent in the preparation of mineral resource estimates,
including but not limited to changes to the cost assumptions,
variations in quantity of mineralized material, grade or recovery
rates, changes to geotechnical or hydrogeological considerations,
failure of plant, equipment or processes, changes to availability
of power or the power rates, ability to maintain social license,
changes to interest or tax rates, changes in project parameters,
delays and costs inherent to consulting and accommodating rights of
local communities, environmental risks, title risks, including
concession renewal, commodity price and exchange rate fluctuations,
risks relating to COVID-19, delays in or failure to receive access
agreements or amended permits, risks inherent in the estimation of
mineral resources; and risks associated with executing the
Company’s objectives and strategies, including costs and expenses,
as well as those risk factors discussed in the Company's most
recently filed management's discussion and analysis, as well as its
annual information form dated March 25, 2024, available on
www.sedarplus.ca. Except as required by the securities disclosure
laws and regulations applicable to the Company, the Company
undertakes no obligation to update these forward-looking statements
if management’s beliefs, estimates or opinions, or other factors,
should change.
Prime Mining (TSX:PRYM)
Historical Stock Chart
From Oct 2024 to Nov 2024
Prime Mining (TSX:PRYM)
Historical Stock Chart
From Nov 2023 to Nov 2024