UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
under the Securities Exchange Act of 1934

For the month of: January 2024

Commission File Number: 001-33562

PLATINUM GROUP METALS LTD.

Suite 838 - 1100 Melville Street, Vancouver BC, V6E 4A6, CANADA
Address of Principal Executive Office

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F
or Form 40-F.

Form 20-F [  ] Form 40-F [X]


SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  PLATINUM GROUP METALS LTD.
   
  /s/ Frank Hallam                                            
Date: January 12, 2024 Frank Hallam
  President and Chief Executive Officer


EXHIBIT INDEX

EXHIBITS 99.1 AND 99.2 INCLUDED WITH THIS REPORT ARE HEREBY INCORPORATED BY REFERENCE INTO THE REGISTRANT'S REGISTRATION STATEMENT ON FORM F-10 (FILE No. 333-265633), AS AMENDED AND SUPPLEMENTED (THE "REGISTRATION STATEMENT"), AND TO BE A PART THEREOF FROM THE DATE ON WHICH THIS REPORT IS SUBMITTED, TO THE EXTENT NOT SUPERSEDED BY DOCUMENTS OR REPORTS SUBSEQUENTLY FILED OR FURNISHED, AND EXHIBIT 99.3 IS HEREBY INCORPORATED BY REFERENCE AS AN EXHIBIT TO SUCH REGISTRATION STATEMENT.

Exhibit Description
   
99.1 Condensed Consolidated Interim Financial Statements for the Period Ended November 30, 2023
   
99.2 Management's Discussion and Analysis for the Period Ended November 30, 2023
   
99.3 Consent of Rob van Egmond
   
99.4 Form 52-109F2 - Certification of Interim Filings - CEO
   
99.5 Form 52-109F2 - Certification of Interim Filings - CFO
   
99.6 News Release dated January 12, 2024



 

 

 

Platinum Group Metals Ltd.

Interim Condensed Consolidated Financial Statements

(Expressed in thousands of United States Dollars unless otherwise noted)
For the period ended November 30, 2023

 

 

Filed: January 12, 2024

 

 

 


PLATINUM GROUP METALS LTD.
Interim Consolidated Statements of Financial Position
(in thousands of United States Dollars)

     November 30,
2023 
    August 31,
2023
 
ASSETS            
             
Current            
Cash and cash equivalents $ 7,105   $ 6,989  
Amounts receivable   178     215  
Prepaid expenses   234     348  
Total current assets   7,517     7,552  
             
Performance bonds and other assets   247     235  
Mineral properties (Note 3)   42,582     41,614  
Property, equipment and other   594     620  
Total assets $ 50,940   $ 50,021  
             
LIABILITIES            
             
Current            
Accounts payable and accrued liabilities $ 661   $ 1,367  
Total current liabilities   661     1,367  
             
Asset retirement obligation   91     91  
Share based liabilities (Note 5)   888     872  
Lease liability   302     317  
Total liabilities $ 1,942   $ 2,647  
             
SHAREHOLDERS' EQUITY            
Share capital (Note 5) $ 939,451   $ 937,040  
Contributed surplus   34,264     33,761  
Accumulated other comprehensive loss   (170,429 )   (170,337 )
Deficit   (776,420 )   (774,735 )
Total shareholders' equity attributable to shareholders of Platinum Group Metals Ltd. $ 26,866   $ 25,729  
             
Non-controlling interest   22,132     21,645  
Total shareholders' equity $ 48,998   $ 47,374  
Total liabilities and shareholders' equity $ 50,940   $ 50,021  
             

Contingencies and Commitments (Note 7)

 

Approved by the Board of Directors and authorized for issue on January 12, 2024


/s/ Stuart Harshaw   /s/ Diana Walters
Stuart Harshaw, Director   Diana Walters, Director

 


PLATINUM GROUP METALS LTD.
Interim Condensed Consolidated Statements of Loss and Comprehensive Loss
(in thousands of United States Dollars except share and per share data))

    Period Ended  
    November
30, 2023
    November
30, 2022
 
             
Expenses            
General and administrative $ 1,090   $ 1,173  
Foreign exchange gain   (37 )   (251 )
Share of joint venture expenditures - Lion Battery (Note 4)   181     -  
Stock based compensation expense   459     830  
  $ 1,693   $ 1,752  
             
Other Income            
Interest income $ (135 ) $ (138 )
Loss for the period $ 1,558   $ 1,614  
             
Items that may be subsequently reclassified to net loss:            
Currency translation adjustment $ 92   $ 92  
             
Comprehensive loss for the period $ 1,650   $ 1,706  
             
Net loss attributable to:            
Shareholders of Platinum Group Metals Ltd. $ 1,558   $ 1,614  
  $ 1,558   $ 1,614  
             
Comprehensive loss attributable to:            
Shareholders of Platinum Group Metals Ltd. $ 1,650   $ 1,706  
  $ 1,650   $ 1,706  
             
Basic and diluted loss per common share $ 0.02   $ 0.02  
             
Weighted average number of common shares outstanding:            
Basic and diluted   101,957,602     99,129,851  

 


PLATINUM GROUP METALS LTD.
Interim Consolidated Statements of Changes in Equity
(in thousands of United States Dollars, except # of Common Shares)

 
 
 
  # of Common
Shares
    Share
Capital
    Contributed
Surplus
    Accumulated
Other
Comprehensive
Income (loss)
    Deficit     Attributable to
Shareholders
of the Parent
Company
    Non-
Controlling
Interest
    Total  
Balance August 31, 2022   98,952,372   $ 934,976   $ 32,077   $ (166,155 ) $ (768,397 ) $ 32,501   $ 19,054   $ 51,555  
                                                 
Stock based compensation   -     -     667     -     -     667     -     667  
Share issuance - financing   717,138     1,294     -     -     -     1,294     -     1,294  
Share issuance costs   -     (69 )   -     -     -     (69 )   -     (69 )
Contributions of Waterberg JV Co.   -     -     -     -     (138 )   (138 )   529     391  
Currency translation adjustment   -     -     -     (92 )   -     (92 )   -     (92 )
Net loss for the period   -     -     -     -     (1,614 )   (1,614 )   -     (1,614 )
Balance November 30, 2022   99,669,510   $ 936,201   $ 32,744   $ (166,247 ) $ (770,149 ) $ 32,549   $ 19,583   $ 52,132  
                                                 
Stock based compensation   -     -     1,512     -     -     1,512     -     1,512  
Restricted share units redeemed   155,488     409     (449 )   -     -     (40 )   -     (40 )
Share options exercised   60,667     128     (46 )   -     -     82     -     82  
Share issuance - financing   372,365     681     -     -     -     681     -     681  
Share issuance costs   -     (379 )   -     -     -     (379 )   -     (379 )
Contributions of Waterberg JV Co.   -     -     -     -     (537 )   (537 )   2,062     1,525  
Currency translation adjustment   -     -     -     (4,090 )   -     (4,090 )   -     (4,090 )
Net loss for the period   -     -     -     -     (4,049 )   (4,049 )   -     (4,049 )
Balance August 31, 2023   100,258,030   $ 937,040   $ 33,761   $ (170,337 ) $ (774,735 ) $ 25,729   $ 21,645   $ 47,374  
                                                 
Stock based compensation   -     -     503     -     -     503     -     503  
Share issuance - financing   2,118,645     2,500     -     -     -     2,500     -     2,500  
Share issuance costs         (89 )   -     -     -     (89 )   -     (89 )
Contributions of Waterberg JV Co.   -     -     -     -     (127 )   (127 )   487     360  
Currency translation adjustment   -     -     -     (92 )   -     (92 )   -     (92 )
Net loss for the period   -     -     -     -     (1,558 )   (1,558 )   -     (1,558 )
Balance November 30, 2023   102,376,675   $ 939,451   $ 34,264   $ (170,429 ) $ (776,420 ) $ 26,866   $ 22,132   $ 48,998  


PLATINUM GROUP METALS LTD.
Interim Consolidated Statements of Cash Flows
 (in thousands of United States Dollars)

    For the period ended       
    November
30, 2023
    November
30, 2022
 
             
             
OPERATING ACTIVITIES            
Loss for the period $ (1,558 ) $ (1,614 )
             
Add items not affecting cash / adjustments:            
Depreciation   18     22  
Unrealized foreign exchange gain   (62 )   (336 )
Stock compensation expense   459     830  
Share of joint venture expenditures   182     -  
Directors' fees paid in deferred share units   45     44  
Net change in non-cash working capital (Note 8)   (1 )   (852 )
  $ (917 ) $ (1,906 )
             
FINANCING ACTIVITIES            
Proceeds from issuance of equity $ 2,500   $ 1,294  
Equity issuance costs   (89 )   (69 )
Lease payments made   (22 )   (21 )
Cash received from Waterberg partners   -     357  
  $ 2,389   $ 1,561  
             
INVESTING ACTIVITIES            
Performance bonds $ (17 ) $ (14 )
Investment in Lion   (182 )   -  
Expenditures incurred on Waterberg Project   (1,202 )   (553 )
  $ (1,401 ) $ (567 )
             
Net increase (decrease) in cash   71     (912 )
Effect of foreign exchange on cash   45     148  
Cash, beginning of period   6,989     12,330  
             
Cash, end of period $ 7,105   $ 11,566  
             


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

1. NATURE OF OPERATIONS

Platinum Group Metals Ltd. (the "Company") is a British Columbia, Canada company formed by amalgamation on February 18, 2002. The Company's shares are publicly listed on the Toronto Stock Exchange in Canada and the NYSE American, LLC ("NYSE American") in the United States of America.  The Company is a development stage company conducting work on mineral properties it has staked or acquired by way of option agreements in the Republic of South Africa.  Key metals of economic interest on the Company's mineral properties include platinum, palladium, rhodium, gold, copper, and nickel.

The Company's head office and principal place of business is located at Suite 838-1100 Melville Street, Vancouver, British Columbia, Canada, V6E 4A6.  The Company's registered and records office is located at Suite 2300, 550 Burrard Street, Vancouver, British Columbia, Canada V6C 2B5.

These financial statements consolidate the accounts of the Company and its subsidiaries.  Lion Battery Technologies Inc. ("Lion") is accounted for using the equity method as the Company jointly controls Lion despite owning a majority of Lion's shares.  The Company's subsidiaries, associates and joint ventures as at November 30, 2023 are as follows:

    Place of
incorporation
and
operation
Proportion of ownership
interest and voting power held
Name of subsidiary Principal activity November 30,
2023
August 31,
2023
         
Platinum Group Metals (RSA) (Pty) Ltd.  Development South Africa     100.00%     100.00%
Mnombo Wethu Consultants (Pty) Limited(1) Development South Africa   49.95% 49.95%
Waterberg JV Resources (Pty) Ltd.(1),(2) Development South Africa 37.05% 37.05%
Lion Battery Technologies Inc. Research Canada 52.30% 52.30%
 

Notes:

(1) The Company controls and consolidates Mnombo Wethu Consultants (Pty) Limited ("Mnombo") and Waterberg JV Resources (Pty) Ltd. ("Waterberg JV Co.") for accounting purposes.

(2) Effective ownership of Waterberg JV Co is 63.05% when Mnombo's ownership portion is combined with Platinum Group Metals (RSA) (Pty) Ltd. ("PTM RSA") ownership portion. 

2. BASIS OF PRESENTATION AND MATERIAL ACCOUNTING POLICIES

These interim condensed consolidated financial statements have been prepared in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board, applicable to the preparation of interim financial statements including International Accounting Standard International Accounting Standard 34 Interim Financial Reporting ("IAS34").  The Company's material accounting policies and critical accounting estimates applied in these interim financial statements are the same as those applied in Note 2 of the Company's annual consolidated financial statements as at and for the year ended August 31, 2023.

Presentation Currency

The Company's presentation currency is the United States Dollar ("USD").

Foreign Exchange Rates Used
   
Rand/USD  
Period-end rate: R18.8718 (August 31, 2023 - R18.8507)
Period-average rate: R18.8412 (November 30, 2022 - R16.3704)
   
CAD/USD  
Period-end rate: C$1.3582 (August 31, 2023 - C$1.3531)
Period-average rate: C$1.3655 (November 30, 2022 - C$1.3488)


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

3. MINERAL PROPERTIES

Since mid-2017, the Company's only active mineral property has been the Waterberg Project located on the Northern Limb of the Bushveld Igneous Complex. 

Total capitalized costs for the Waterberg Project are as follows:

       
Balance August 31, 2022 $ 40,373  
Additions   4,900  
Foreign currency translation adjustment   (3,659 )
Balance August 31, 2023 $ 41,614  
Additions   1,022  
Foreign currency translation adjustment   (54 )
Balance November 30, 2023 $ 42,582  

Waterberg Project

Ownership

On September 21, 2017, Waterberg JV Co. issued shares to acquire all existing Waterberg partner joint venture interests, resulting in 100% of the Waterberg prospecting rights being owned by Waterberg JV Co.  Impala Platinum Holdings Ltd. ("Implats") subsequently acquired a 15% interest in Waterberg JV Co. on November 6, 2017 by way of the Implats Transaction (as defined below).  Later, in March 2019 Japan Organization for Metals and Energy Security (formerly Japan Oil, Gas and Metals National Corporation) ("JOGMEC") completed the sale of a 9.755% interest in Waterberg JV Co. to Hanwa Co., Ltd ("Hanwa").  In June 2023 JOGMEC and Hanwa reported the establishment of a special purpose company, HJ Platinum Metals Ltd. ("HJM"), to hold and fund their future equity interests in the Waterberg Project. The combined interests of JOGMEC and Hanwa have been consolidated into a 21.95% interest for HJM going forward, with JOGMEC to fund 75% of future equity investments into HJM and Hanwa the remaining 25%.

The Company currently holds a controlling 50.02% interest in Waterberg JV Co., comprised of a direct 37.05% interest and an indirect 12.97% interest by way of its 49.9% shareholding in Black Economic Empowerment ("BEE") partner Mnombo.  Mnombo owns a 26.0% direct interest in Waterberg JV Co., Implats a 15.0% direct interest, and HJM a 21.95% direct interest.

Mining Right

On January 28, 2021, the South African Department of Mineral Resources and Energy ("DMRE") issued a letter to Waterberg JV Co. notifying the Company that a mining right (the "Waterberg Mining Right") had been granted over the Waterberg Project area as applied for in 2018.  The Waterberg Mining Right was notarially executed on April 13, 2021, was registered at the Mineral and Petroleum Titles Registration Office on July 6, 2021 and currently remains active.

Project Area and Location

At November 30, 2023, the Waterberg Project consisted of an active prospecting right, applied for prospecting rights and the Waterberg Mining Right with a combined active project area of 29,161 hectares, located on the Northern Limb of the Bushveld Igneous Complex, approximately 85 km north of the town of Mokopane.  Of the total project area, 20,482 hectares are covered by the Waterberg Mining Right.  On March 9, 2022, Waterberg JV Co. passed a resolution to apply for closure on 50,951 gross hectares of prospecting rights, of which 14,209 hectares are now held within the granted mining right, leaving a net 36,742 hectares of uneconomic prospecting rights closed or in process of being closed. 


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

Appeals and Legal Matters

On and following March 5, 2021, three notices of appeal were filed by individual appellants against the January 28, 2021 granting of the Waterberg Mining Right.  Waterberg JV Co. filed formal rebuttals to each action.  On October 13, 2022, the Minister of the DMRE ruled to dismiss all these appeals.  In his ruling the Minister provided the regulatory reasons why each appeal was denied and also confirmed the DMRE's assessment that Waterberg JV Co. has complied with BEE requirements and social and labour plan community consultation procedures.

On May 7, 2021, an opposition group filed an application for an order in the High Court of South Africa to review and set aside the decision by the Minister of the Department of Forestry, Fisheries and the Environment to refuse condonation for the late filing of that group's appeal against the grant of an EA for the Waterberg Mine in November 2020.  The attorneys acting for Waterberg JV Co. filed a notice to oppose the application and required the group's legal counsel to file proof of the mandate to represent the appellant group.  Since filing their review application, the appellants have done nothing to progress their action and their legal counsel has not filed a proof of mandate.

On July 30, 2021, a group located near planned surface infrastructure filed an urgent interdict application.  Waterberg JV Co. promptly filed an answering affidavit denying urgency and arguing that the application was without merit.  The applicants did not respond and were obliged to remove their application from the urgent court roll.  Host community Ketting applied to join as an interested party to the application and another host community submitted a confirmatory affidavit, both communities being in support of the Waterberg Mine.  In July 2022 Waterberg JV Co. filed a Notice of Set Down with the High Court in Limpopo and a hearing to rule on the interdict application occurred on May 22, 2023, at which hearing the court dismissed the urgent interdict application and ordered the applicants to pay costs to the defendants.

Implats Transaction

On November 6, 2017, the Company and JOGMEC closed a transaction (the "Implats Transaction"), whereby Implats purchased an aggregate 15% equity interest in Waterberg JV Co. for $30 million.  The Company sold an 8.6% interest for $17.2 million and JOGMEC sold a 6.4% interest for $12.8 million.  As part of the transaction, Implats also acquired an option to increase its holdings in Waterberg JV Co. to 50.01% (the "Purchase and Development Option") in exchange for certain payments and project funding, and a right of first refusal to enter into an offtake agreement, on commercial arm's-length terms, for the smelting and refining of mineral products from the Waterberg Project ("Offtake ROFR") if Waterberg JV Co. proposes an offtake agreement with a third party.  JOGMEC or its nominee retains a right to direct the marketing of Waterberg concentrate and to receive, at market prices, platinum, palladium, rhodium, gold, ruthenium, iridium, copper and nickel in refined mineral products at the volumes produced from the Waterberg Project.

On June 15, 2020, Implats delivered a formal notice of their election not to exercise their Purchase and Development Option due to increased economic uncertainty and reduced risk appetite in the short, medium and long-term as a result of the COVID-19 pandemic.  At November 30, 2023 Implats retains a 15.0% direct participating interest in Waterberg JV Co. and the Offtake ROFR. 

Acquisition and Development of the Waterberg Project

In October 2009, PTM RSA, JOGMEC and Mnombo entered into a joint venture agreement regarding the Waterberg Project (the "JOGMEC Agreement").  Under the terms of the JOGMEC Agreement JOGMEC completed a $3.2 million work requirement to earn a 37% interest in the Waterberg JV property, leaving the Company with a 37% interest and Mnombo with a 26% interest.  Following JOGMEC's earn-in, the Company funded Mnombo's 26% share of costs, totalling $1.12 million, until the earn-in phase of the joint venture ended in May 2012.

On November 7, 2011, the Company entered an agreement with Mnombo to acquire 49.9% of the issued and outstanding shares of Mnombo in exchange for a cash payment of R1.2 million and the Company's agreement to pay for Mnombo's 26% share of costs on the Waterberg JV property until the completion of a feasibility study.  Mnombo's share of expenditures prior to this agreement, and Mnombo's share of expenditures post DFS, are still owed to the Company ($8.7 million at August 31, 2023, including accrued interest).  The portion of Mnombo not owned by the Company is accounted for as a non-controlling interest, calculated at $8.9 million at November 30, 2023 ($8.5 million - August 31, 2023).


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

To November 30, 2023, an aggregate total of $86.6 million has been funded by all parties for exploration and engineering on the Waterberg Project.  Until the Waterberg prospecting rights were transferred to Waterberg JV Co., all costs incurred by other parties were treated as cost recoveries by the Company.

4. LION BATTERY TECHNOLOGIES INC.

Lion was incorporated on June 17, 2019, with the objective to research new lithium battery technology utilizing platinum and palladium.  The Company received 400,000 common shares of Lion, valued at a price of $0.01 per share, as the original founder of Lion. On July 12, 2019, the Company and Anglo American Platinum Limited ("Amplats") entered investment, shareholder and research agreements to facilitate Lion's objectives.  Initially the Company and Amplats agreed to equally invest up to an aggregate of $4.0 million into Lion and on July 6, 2021 the Company and Amplats agreed to increase the planned funding to Lion by a further $2.73 million, to a total of up to $6.73 million, in order to allow the acceleration of certain research and commercialization activities (see below).  All agreed funding into Lion by the Company and Amplats is to be exchanged for preferred shares of Lion at a price of $0.50 per share over an approximate three to five year period.  Amplats and the Company have funded Lion equally for an aggregate $4.512 million as of November 30, 2023 as follows:

Date Gross Funding to Lion
July 2019 $1,100   
June 2020 $700
February 2021 $700
February 2022 $500
February 2023 $590
June 2023 $560
November 2023 $362
Total $4,512   

The Company accounts for Lion using equity accounting as Lion is jointly controlled with Amplats.  Lion pays a fee of $3 per month to the Company for general and administrative services. 

Research Program - Florida International University

On July 12, 2019, Lion entered into a Sponsored Research Agreement ("SRA") with Florida International University ("FIU") to fund a $3.0 million research program over approximately three years.  On July 6, 2021 Lion agreed to increase the planned amount of research funding to FIU by a further amount of $1.0 million, for a total of up to $4.0 million.  As the research developed and milestones were achieved further tranches have been forwarded to FIU with a seventh tranche of funding of $116,667 advanced in December 2023.  Lion has provided aggregate research funding and patent filing fees to FIU in the amount of $3.73 million as of November 30, 2023 and $3.85 million as of the date of these financial statements.

On August 4, 2020, the U.S. Patent and Trademark Office issued Patent No. 10,734,636 B2 entitled "Battery Cathodes for Improved Stability" to FIU. The patent includes the use of platinum group metals and carbon nanotubes and other innovations in a lithium battery.  A second patent related to this technology was issued in December 2020 and a third was issued in June 2021.  On October 4, 2022, a fourth patent No. 11,462,743 B2 was issued under the title "Battery comprising a metal interlayer" to FIU.  This fourth patent involves the use of palladium as interlayer in batteries to stabilize and enable lithium metal anodes in various existing and emerging lithium battery technologies.  On February 21, 2023, a fifth patent No. 11,588,144 B2 entitled "Battery Cathodes for Improved Stability" was issued to FIU.  The patent involves the fabrication of cathodes using palladium as a catalyst in carbon nanotubes.  Further patents are currently applied for.  Under the SRA, Lion has exclusive rights to all intellectual property being developed by FIU including patents granted.  Lion is also reviewing several additional and complementary opportunities focused on developing next-generation battery technology using platinum and palladium.


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

On June 21, 2023, the Company reported that Lion had engaged The Battery Innovation Center ("BIC") in Newberry, Indiana to help drive commercialization of its next generation lithium-sulfur and enhanced lithium-ion (NMC) technology using the unique catalytic properties of platinum and palladium.  Under an agreed scope of work (the "SOW"), during late calendar 2023 and early 2024 BIC is to conduct independent small scale and large scale trials to validate Lion's proprietary platinum and palladium based electrode composition, slurry, and films in both lithium-sulfur and lithium-ion (NMC811) coin and pouch cells. The SOW also includes additional research and development focused on improving performance and scale-up with the goal of creating prototypes for commercialization consideration.

5. SHARE CAPITAL

(a) Authorized

Unlimited common shares without par value.

(b) Shares Issued

Fiscal 2024

On September 18, 2023, the Company closed a non-brokered private placement with Deepkloof Limited ("Deepkloof"), a subsidiary of existing major shareholder Hosken Consolidated Investments Limited ("HCI") for 2,118,645 common shares at a price of $1.18 each for gross proceeds of $2.5 million returning HCI's ownership in the Company to approximately 27%.

Fiscal 2023

On July 27, 2022, the Company entered into an equity distribution agreement with BMO Nesbitt Burns Inc. as Canadian Agent, and BMO as U.S. Agent, for a new at-the-market equity program (the "2022 ATM") to distribute up to $50 million of common shares.  No common shares were sold pursuant to the 2022 ATM prior to August 31, 2022.  In the year ended August 31, 2023 the Company sold 1,089,503 shares at an average price of $1.81 for gross proceeds of $1.975 million and net proceeds of $1.527 million after share issuance costs of $0.448 million were deducted. 

(c) Incentive stock options

The Company has entered into Incentive share purchase option agreements under the terms of its share compensation plan with directors, officers, consultants and employees.  Under the terms of the share purchase option agreements, the exercise price of each option is set, at a minimum, at the fair value of the common shares at the date of grant.  Options of the Company are subject to vesting provisions.  All exercise prices are denominated in Canadian Dollars.

The following tables summarize the Company's outstanding share purchase options:

    Number of Share
Options
    Average Exercise
Price in CAD
 
Options outstanding at August 31, 2022   3,666,671   $ 3.45  
      Granted   1,358,000   $ 2.36  
      Forfeited   (170,167 ) $ 3.20  
      Exercised   (60,667 ) $ 1.81  
Options outstanding at August 31, 2023   4,793,837   $ 3.17  
      Granted   589,950   $ 1.52  
      Cancelled   (937,000 ) $ 6.58  
Options outstanding at November 30, 2023   4,446,787   $ 2.24  
             

In fiscal 2023, the weighted average share price when options were exercised was $2.31.


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)


  Number Outstanding
at November 30, 2023
    Number Exercisable
at November 30, 2023
    Exercise Price in
CAD
    Average Remaining
Contractual Life (Years)
 
  99,000     66,000   $ 3.90     2.69  
  42,000     28,000   $ 3.40     2.81  
  601,836     601,836   $ 2.61     0.36  
  21,000     7,000   $ 2.52     3.25  
  1,113,000     371,000   $ 2.37     3.84  
  1,135,000     378,333   $ 2.32     3.04  
  200,000     50,000   $ 2.28     4.44  
  645,001     645,001   $ 1.81     1.01  
  589,950     -   $ 1.52     4.84  
  4,446,787     2,147,170           2.88  

During the period ended November 30, 2023, the Company granted 589,950 share purchase options, which will vest in three tranches on the first, second and third anniversary of the grant. 

During the year ended August 31, 2023, the Company granted 1,158,000 share purchase options, which will vest in three tranches on the first, second and third anniversary of the grant.  A further 200,000 share purchase options were issued with 50,000 vesting September 8, 2023 and 150,000 vesting when certain performance conditions are met.

During the period ended November 30, 2023, the Company recorded $0.384 million of stock compensation expense (November 30, 2022 - $0.511 million) related to share purchase options, of which $0.371 million was expensed (November 30, 2022 - $0.472 million) and $13 was capitalized to mineral properties (November 30, 2022 - $39).

The Company used the Black-Scholes model to determine the grant date fair value of share purchase options granted.  The following assumptions were used in valuing share purchase options granted during the periods ended November 30, 2023 and August 31, 2023:

Period ended November 30, 2023 August 31, 2023
Risk-free interest rate 4.48% 3.45%
Expected life of options 4.1 years 3.9 years
Annualized volatility1 79% 89%
Forfeiture rate 0.9% 0.6%
Dividend rate 0.0% 0.0%
1The Company uses its historical volatility as the basis for the expected volatility assumption in the Black Scholes option pricing model.

(d) Deferred Share Units

The Company has established a deferred share unit ("DSU") plan for non-executive directors.  Each DSU has the same value as one Company common share.  DSUs must be retained until the director leaves the Board of Directors, at which time the DSUs are redeemed.

During the period ended November 30, 2023, director fees of $45 (November 30, 2022 - $44) were paid by the issuance of DSUs.  A recovery of $34 (November 30, 2022 - $0.267 million expense) was recorded in share based compensation for the revaluation of fully vested DSUs. 

At November 30, 2023 a total of 754,212 DSUs were issued and outstanding.

(e) Restricted Share Units

The Company has established a restricted share unit ("RSU") plan for officers and certain employees of the Company.  Each RSU represents the right to receive one Company common share following the attainment of vesting criteria determined at the time of the award.  RSUs vest over a three-year period.


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

During the period ended November 30, 2023, a stock compensation expense of $120 was recorded (November 30, 2022 - $155) of which $113 was expensed (November 30, 2022 - $138) and $7 was capitalized (November 30, 2022 - $17).  During the period ended November 30, 2023 the Company issued 297,099 RSUs which vest evenly on the first, second and third anniversary of issuance.  At November 30, 2023, 732,338 RSUs were issued and outstanding, with Nil being vested.

6. RELATED PARTY TRANSACTIONS 

All amounts receivable and amounts payable owing to or from related parties are non-interest bearing with no specific terms of repayment.  Transactions with related parties are in the normal course of business and are recorded at consideration established and agreed to by the parties.  Transactions with related parties are as follows:

(a) During the period ended November 30, 2023, $79 (November 30, 2022 - $75) was paid or accrued to independent directors for directors' fees and services.

(b) During the period ended November 30, 2023, the Company paid or accrued payments of $13  (November 30, 2022 - $13) from West Vault Mining Inc., for accounting and administrative services.  The Company and West Vault Mining have one officer in common.

(c) In May 2018, Deepkloof made a strategic investment in the Company by way of participation in a public offering and a private placement.  Through the terms of the May 2018 private placement, HCI acquired a right to nominate one person to the board of directors of the Company and a right to participate in future equity financings of the Company to maintain its pro-rata interest.  HCI has exercised its right to nominate one person to the board of directors. As of November 30, 2023, HCI's ownership of the Company was reported at 26,955,994 common shares, representing a 26.3% interest in the Company.  In September 2023, HCI subscribed to a private placement of 2,118,645 common shares at US$1.18 per share for gross proceeds to the Company of $2.5 million, (see Share Capital (Note 5) for further details).

7. CONTINGENCIES AND COMMITMENTS

The Company's remaining minimum payments under its office and equipment lease agreements in Canada and South Africa total approximately $0.528 million to February 2029.

From period end the Company's aggregate commitments are as follows:

Payments Due by Year
    < 1 Year     1 - 3 Years     4 - 5 Years     > 5 Years     Total  
Lease Obligations $ 118   $ 285   $ 125   $ -   $ 528  
Environmental Bonds   43     129     86     -     258  
Totals $ 161   $ 414   $ 211   $ -   $ 786  

Africa Wide Legal Action - Dismissed

On April 26, 2018 a transaction was completed selling 100% of the share interests in Maseve Investments 11 (Pty) Ltd. ("Maseve") to Royal Bafokeng Platinum Limited ("RBPlat") in a transaction valued at approximately US $74.0 million.  Maseve owned and operated the Maseve Mine.  Africa Wide Mineral Prospecting and Exploration Proprietary Limited ("Africa Wide") was required to simultaneously sell its 17.1% interest together with the Company's 82.9% interest in Maseve.

In September 2018, Africa Wide instituted legal proceedings in South Africa against PTM RSA, RBPlat and Maseve seeking to set aside the sale of Maseve.  A trial to hear evidence occurred in the High Court of South Africa in October, 2021.  On June 14, 2022, the High Court dismissed Africa Wide's challenge.  Africa Wide appealed the ruling, which was ultimately dismissed by the South Africa Supreme Court of Appeal on November 10, 2022.  Africa Wide was ordered to make payment of the defendants' costs.


PLATINUM GROUP METALS LTD.
Notes to the Condensed Consolidated Interim Financial Statements
For the period ended November 30, 2023
(in thousands of United States Dollars unless otherwise specified except share and per share data)

On July 10, 2023, Africa Wide applied to the President of the Supreme Court of Appeal for a reconsideration of the November 10, 2022 ruling of the Supreme Court of Appeal.  On October 6, 2023, the South African Supreme Court of Appeal dismissed Africa Wide's application.  Africa Wide was again ordered to pay costs.  On November 23, 2023, the High Court determined that Africa Wide owes the Company a total of $159 (R2.99 million) in costs.  On November 29, 2023, the Company served Africa Wide by sheriff a demand for payment.  The Company has made no accrual for the award of costs.

8. SUPPLEMENTARY CASH FLOW INFORMATION

Net change in non-cash working capital:

Year ended   November
30, 2023
    November
30, 2022
 
             
Amounts receivable, prepaid expenses and other assets $ 150   $ (505 )
Accounts payable and other liabilities   (151 )   (347 )
  $ (1 ) $ (852 )

9. SEGMENTED REPORTING

Segmented information is provided on the basis of geographical segments as the Company manages its business through two geographical regions - Canada and South Africa.  The Chief Operating Decision Maker ("CODM") reviews information from the below segments separately so the below segments are separated. 

The Company evaluates performance of its operating and reportable segments as noted in the following table:

At November 30, 2023   Assets     Liabilities  
             
Canada $ 6,903   $ 1,699  
South Africa   44,037     243  
             
  $ 50,940   $ 1,942  

At August 31, 2023   Assets     Liabilities  
             
Canada $ 5,787   $ 2,213  
South Africa   44,234     434  
             
  $ 50,021   $ 2,647  

Loss for the period ended   November 30, 2023     November 30, 2022  
             
Canada $ 175   $ 1,446  
South Africa   1,475     260  
             
  $ 1,650   $ 1,706  

 



 

 

 

Platinum Group Metals Ltd.

(A Development Stage Company)

Supplementary Information and Management's Discussion and Analysis

For the period ended November 30, 2023

 

This Management's Discussion and Analysis is prepared as of January 12, 2024

A copy of this report will be provided to any shareholder who requests it.

 

 

 


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

MANAGEMENT'S DISCUSSION AND ANALYSIS

This management's discussion and analysis ("MD&A") of Platinum Group Metals Ltd. ("Platinum Group", the "Company" or "PTM") is dated as of January 12, 2024, and focuses on the Company's financial condition, cash flows and results of operations as at and for the three month period ended November 30, 2023.  This MD&A should be read in conjunction with the Company's interim condensed consolidated financial statements for the period ended November 30, 2023, together with the notes thereto (the "Financial Statements").

The Company prepares its interim condensed consolidated financial statements in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board ("IFRS"), applicable to the preparation of interim financial statements including International Accounting Standard 34, Interim Financial Reporting ("IAS 34"). All dollar figures included therein and in the following MD&A are quoted in United States Dollars unless otherwise noted. All references to "U.S. Dollars", "$" or to "US$" are to United States Dollars. All references to "C$" are to Canadian Dollars. All references to "R" or to "Rand" are to South African Rand. The Company uses the U.S. Dollar as its presentation currency.

PRELIMINARY NOTES

Note Regarding Forward-Looking Statements 

This MD&A and the documents incorporated by reference herein contain "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation (collectively, "Forward-Looking Statements").  All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will, may, could or might occur in the future are Forward-Looking Statements.  The words "expects", "anticipate", "estimate", "forecast" "may", "could", "might", "will", "would", "should", "intend", "believe", "target", "budget", "plan", "strategy", "goals", "objectives", "projection" or the negative of any of these words and similar expressions are intended to identify Forward-Looking Statements, although these words may not be present in all Forward-Looking Statements. Forward-Looking Statements included or incorporated by reference in this MD&A may include, without limitation, statements related to:

 the timely completion of additional required financings and potential terms thereof;

 the completion of appropriate contractual smelting and/or refining arrangements with Impala Platinum Holdings Ltd. ("Implats") or another third-party smelter/refiner;

 completion of the Waterberg DFS Update (as defined below);

 the projections set forth or incorporated into, or derived from, the Waterberg DFS (as defined below), including, without limitation, estimates of mineral resources and mineral reserves, and projections relating to future prices of metals, commodities and supplies, currency rates, capital and operating expenses, production rate, grade, recovery and return, and other technical, operational and financial forecasts;

 the approval of a water use licence and environmental permits for, and other developments related to, a deposit area discovered by the Company on the Waterberg property (the "Waterberg Project") located on the Northern Limb of the Bushveld Igneous Complex in South Africa, approximately 85 km north of the town of Mokopane;

 the Company's expectations with respect to the outcome of a review application in the High Court of South Africa (the "High Court") to set aside a decision by the Minister of the Department of Forestry, Fisheries and the Environment ("DFFE") to refuse condonation for the late filing of the appeal by individuals from a community group against the grant of an Environmental Authorization ("EA") for the Waterberg Project;

 the negotiation and execution of long term access agreements, on reasonable terms, with communities recognized as titled landowners of three farms where surface and underground mine infrastructure is planned, and rezoning for mining use;

 the development of performance indicators to measure and monitor key environmental, social sustainability and governance activities at the Waterberg Project;

 the ability of state electricity utility ESKOM Holdings Limited ("ESKOM") to supply sufficient power to the Waterberg Project;


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

 risks related to geopolitical events and other uncertainties, such as Russia's invasion of Ukraine and conflict in the Middle East;

 the adequacy of capital, financing needs and the availability of and potential for obtaining further capital;

 revenue, cash flow and cost estimates and assumptions;

 future events or future performance;

 development of next generation battery technology by the Company's battery technology joint venture (described below);

 potential benefits of Lion Battery Technologies Inc. engaging The Battery Innovation Center;

 governmental and securities exchange laws, rules, regulations, orders, consents, decrees, provisions, charters, frameworks, schemes and regimes, including interpretations of and compliance with the same;

 developments in South African politics and laws relating to the mining industry;

 anticipated exploration, development, construction, production, permitting and other activities on the Company's properties;

 project economics;

 future metal prices and currency exchange rates;

 the identification of several large-scale water basins that could provide mine process and potable water for the Waterberg Project and local communities;

 the Company's expectations with respect to the outcomes of litigation;

 mineral reserve and mineral resource estimates;

 potential changes in the ownership structures of the Company's projects;

 the Company's ability to license certain intellectual property;

 the potential use of alternative renewable energy sources for the Waterberg Project; and

 future assistance from the Member of the Executive Committee ("MEC") for the Limpopo Department of Economic Development, Environment and Tourism Advancement in regard to the Company's engagements with local communities.

Forward-Looking Statements are subject to a number of risks and uncertainties that may cause the actual events or results to differ materially from those discussed in the Forward-Looking Statements, and even if events or results discussed in the Forward-Looking Statements are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company.  Factors that could cause actual results or events to differ materially from current expectations include, among other things:

 the Company's additional financing requirements;

 the effect of future debt financing on the Company and its financial condition;

 the Company's history of losses and expectations that will continue to incur losses until the Waterberg Project reaches commercial production on a profitable basis, which may never occur;

 the Company's negative operating cash flow;

 uncertainty of estimated mineral reserve and mineral resource estimates, production, development plans and cost estimates for the Waterberg Project;

 the Company's ability to bring properties into a state of commercial production;

 the potential impact of international conflict and geopolitical tensions and events on the Company;


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

 discrepancies between actual and estimated mineral reserves and mineral resources, between actual and estimated development and operating costs, between actual and estimated metallurgical recoveries and between estimated and actual production;

 fluctuations in the relative values of the U.S. Dollar, the Rand and the Canadian Dollar;

 volatility in metals prices;

 the possibility that the Company may become subject to the Investment Company Act of 1940, as amended;

 Implats or another third-party may not enter into appropriate contractual smelting and/or refining arrangements with Waterberg JV Resources Proprietary Limited ("Waterberg JV Co.");

 the ability of the Company to acquire the necessary surface access rights on commercially acceptable terms or at all;

 the ability of state electricity utility ESKOM to supply sufficient power to the Waterberg Project;

 the failure of the Company or the other shareholders of Waterberg JV Co. to fund their pro rata share of funding obligations for the Waterberg Project;

 any disputes or disagreements with the other shareholders of Waterberg JV Co. or Mnombo Wethu Consultants Proprietary Limited ("Mnombo"), a South African Broad-Based Black Economic Empowerment ("BEE") company;

 the Company is subject to assessment by various taxation authorities, who may interpret tax legislation in a manner different from the Company, which may negatively affect the final amount or the timing of the payment or refund of taxes;

 the Company's ability to attract and retain its key management employees;

 contractor performance and delivery of services, changes in contractors or their scope of work or any disputes with contractors;

 conflicts of interest among the Company's officers and directors;

 any designation of the Company as a "passive foreign investment company" for its current and future tax years and potential adverse U.S. federal income tax consequences for U.S. shareholders;

 litigation or other legal or administrative proceedings brought against or relating to the Company, including the review application to set aside a decision by the Minister of the DFFE to refuse condonation for the late filing of the appeal by individuals from a community group against the grant of an EA for the Waterberg Project;

 information systems and cyber security risks;

 actual or alleged breaches of governance processes or instances of fraud, bribery or corruption;

 exploration, development and mining risks and the inherently dangerous nature of the mining industry, including environmental hazards, industrial accidents, unusual or unexpected formations, safety stoppages (whether voluntary or regulatory), pressures, mine collapses, cave ins or flooding and the risk of inadequate insurance or inability to obtain insurance to cover these risks and other risks and uncertainties;

 property zoning and mineral title risks including defective title to mineral claims or property;

 changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada, South Africa or other countries in which the Company does or may carry out business in the future;

 equipment shortages and the ability of the Company to acquire the necessary infrastructure for its mineral properties;

 environmental regulations and the ability to obtain and maintain necessary permits, including environmental authorizations and water use licences;

 extreme competition in the mineral exploration industry;

 delays in obtaining, or a failure to obtain, permits necessary for current or future operations or failures to comply with the terms of such permits;


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

 any adverse decision in respect of the Company's mineral rights and projects in South Africa under the Mineral and Petroleum Resources Development Act of 2002 (the "MPRDA");

 risks of doing business in South Africa, including but not limited to, labour, economic and political instability and potential changes to and failures to comply with legislation;

 the failure to maintain or increase equity participation by historically disadvantaged South Africans in the Company's prospecting and mining operations and to otherwise comply with the Amended Broad-Based Socio-Economic Empowerment Charter for the South African Mining Industry, 2018 (the "Mining Charter 2018");

 certain potential adverse Canadian tax consequences for foreign-controlled Canadian companies that acquire common shares of the Company ("Common Shares");

 socio economic instability in South Africa or regionally, including risks of resource nationalism;

 labour disruptions and increased labour costs;

 interruptions, shortages or cuts in the supply of electricity or water;

 characteristics of and changes in the tax and royalties systems in South Africa;

 a change in community relations;

 South African foreign exchange controls impacting repatriation of profits;

 land restitution claims or land expropriation;

 restriction on dividend payments;

 the risk that the Common Shares may be delisted;

 volatility in the price of the Common Shares;

 the exercise or settlement of stock options, restricted share units, or warrants resulting in dilution to the holders of Common Shares;

 future sales of equity securities decreasing the value of the Common Shares, diluting investors' voting power, and reducing our earnings per share;

 enforcing judgements based on the civil liability provisions of United States federal securities laws;

 pandemics and other public health crises;

 global financial conditions;

 government imposed shutdowns or expense increases;

 water license risks; and

 other risks disclosed under the heading "Risk Factors" in this MD&A and in the Company's Annual Information Form for the year ended August 31, 2023 ("2023 AIF") and annual report on Form 40-F for the year ended August 31, 2023 as filed with the United States Securities and Exchange Commission ("2023 40-F").

These factors should be considered carefully, and investors should not place undue reliance on the Company's Forward-Looking Statements.  In addition, although the Company has attempted to identify important factors that could cause actual actions or results to differ materially from those described in Forward-Looking Statements, there may be other factors that cause actions or results not to be as anticipated, estimated or intended.

Any Forward-Looking Statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any Forward-Looking Statement, whether because of new information, future events or results or otherwise.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Legislation and Mining Charter 2018

The MPRDA, the Mining Charter 2018, and related regulations in South Africa required that Waterberg JV Co.'s BEE shareholders own a 26% equity interest in Waterberg JV Co. to qualify for the grant of a mining right. Within five years of the effective date of a mining right, this BEE shareholding must be increased to 30%.  The South African Department of Mineral Resources and Energy ("DMRE") had obtained an exemption from applying the generic BEE Codes of Good Practice ("Generic BEE Codes") under the Broad Based Black Economic Empowerment Act, 2003 until October 31, 2016, then extended until December 31, 2016.  No further exemption was obtained thereafter, and, as a matter of law, the Generic BEE Codes now apply to the issuance and maintenance of licenses and other authorizations.  As a matter of practice, the DMRE has continued to apply the provisions of Mining Charter 2018 rather than the Generic BEE Codes.

For a comprehensive discussion of Mining Charter 2018 and the Generic BEE Codes, please refer to the section entitled "Risk Factors" in the 2023 AIF and the separate 2023 40-F, which was also filed by the Company, as well as in the documents incorporated by reference therein.  The 2023 AIF and the 2023 40-F may be found on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.

Mineral Reserves and Resources

The mineral resource and mineral reserve figures referred to in this MD&A and the documents incorporated herein by reference are estimates and no assurances can be given that the indicated levels of platinum, palladium, rhodium and gold (collectively referred to as "4E", or "PGEs") will be produced.  Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices.  Valid estimates made at a given time may significantly change when new information becomes available.  By their nature, mineral resource and mineral reserve estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable.  Any inaccuracy or future reduction in such estimates could have a material adverse impact on the Company.

Note to U.S. Investors Regarding Reserve and Resource Estimates

Estimates of mineralization and other technical information included or incorporated by reference herein have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), which differs significantly from the requirements of the United States Securities and Exchange Commission (the "SEC") under subpart 1300 of Regulation S-K (the "SEC Modernization Rules").  The Company is not currently subject to the SEC Modernization Rules.  Accordingly, the Company's disclosure of mineralization and other technical information herein may differ significantly from the information that would be disclosed had the Company prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

Technical and Scientific Information

The technical and scientific information contained in this MD&A, including, but not limited to, all references to and descriptions of technical reports and studies, has been reviewed by an independent qualified person as defined in NI 43-101, Robert van Egmond, P.Geo., a consultant geologist to the Company and a former employee.  Mr. van Egmond is an independent "qualified person" as defined in NI 43-101 (a "Qualified Person").

Non-GAAP Measures

This MD&A may include certain terms or performance measures commonly used in the mining industry that are not defined under IFRS.  We believe that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate our performance.  The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.  Any such non-GAAP measures should be read in conjunction with our Financial Statements.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

1. DESCRIPTION OF BUSINESS

Overview

Platinum Group Metals Ltd. is a British Columbia, Canada company formed on February 18, 2002, pursuant to an order of the Supreme Court of British Columbia approving an amalgamation between Platinum Group Metals Ltd. and New Millennium Metals Corporation.  The Company is a platinum and palladium focused exploration and development company conducting work primarily on mineral properties it has staked or acquired by way of option agreements or applications in the Republic of South Africa.

The Company's business is currently focused on the engineering and development of the Waterberg Project, which hosts a PGE and base metal bearing deposit discovered in 2011 by the Company as a result of a regional exploration initiative targeting a previously unknown extension to the Northern Limb of the Bushveld Igneous Complex in South Africa. 

On September 21, 2017, Waterberg JV Co. issued shares to all existing Waterberg partners pro rata to their joint venture interests, resulting in the Company holding a 45.65% direct interest in Waterberg JV Co., Japan Organization for Metals and Energy Security (formerly Japan Oil, Gas and Metals National Corporation) ("JOGMEC") holding a 28.35% interest and Mnombo, as the Company's BEE partner, holding 26%.  Later, in March 2019, JOGMEC completed the sale of a 9.755% interest in the Waterberg JV Co. to Hanwa Co., Ltd. ("Hanwa"). 

On November 6, 2017, the Company, along with JOGMEC and Mnombo closed a strategic transaction to sell to Implats 15% of Waterberg JV Co. for $30 million (the "Implats Transaction").  The Company sold Implats an 8.6% interest for $17.2 million and JOGMEC sold a 6.4% interest for $12.8 million.  Implats also acquired an option to acquire a controlling interest in the Waterberg Project, which was later terminated in June 2020, as well as a right of first refusal to smelt and refine Waterberg Project concentrate (the "Offtake ROFR").  JOGMEC, or their nominee, retained a right to receive platinum, palladium, rhodium, gold, ruthenium, iridium, copper and nickel refined mineral products at the volumes produced from the Waterberg Project as well as a right to purchase or direct the sale of all or part of the project concentrate.  Hanwa became JOGMEC's "nominee" by way of their purchase of a 9.755% interest in Waterberg JV Co. in March 2019.  The Offtake ROFR and the right to purchase or direct the sale of concentrate remain current.

On September 24, 2019, the Company published the results of the definitive feasibility study for the Waterberg Project.  On October 7, 2019, the Company filed a technical report titled "Independent Technical Report, Waterberg Project Definitive Feasibility Study and Mineral Resource Update, Bushveld Complex, South Africa" (the "Waterberg DFS") on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.  The Waterberg DFS is dated October 4, 2019, and was prepared by Michael Murphy, P. Eng. of Stantec Consulting Ltd., Charles J Muller, B. Sc. (Hons) Geology, Pri. Sci. Nat. of CJM Consulting (Pty) Ltd., and Gordon I Cunningham, B. Eng. (Chemical), Pr. Eng., FSAIMM of Turnberry Projects (Pty) Ltd.  DRA Projects SA (Pty) Ltd., an experienced South African engineering and EPCM firm, provided the plant design and compiled the capital cost estimates for the Waterberg Project Qualified Persons.  The Waterberg DFS also supports the disclosure of an updated independent mineral resource estimate effective September 4, 2019.  On December 5, 2019, all of the Waterberg JV Co. shareholders approved the Waterberg DFS

The Waterberg DFS Update, which will include an update to the September 4, 2019 independent mineral resource and mineral reserve estimates, is currently in process and is described more fully below.

Implats currently retains a 15.0% participating project interest and the Offtake ROFR, whereby they hold a right to match concentrate offtake terms offered to Waterberg JV Co. by a bona fide third-party.  The Company retains a controlling 50.02% direct (37.05%) and indirect (12.97% through its 49.9% shareholding in Mnombo) interest in the Waterberg Project and remains the Manager of the Waterberg Project, as directed by the technical committee of Waterberg JV Co.  Mnombo retains a 26.0% direct interest in Waterberg JV Co., JOGMEC a 12.195% direct interest and Hanwa a 9.755% direct interest. In June 2023 JOGMEC and Hanwa reported the establishment of a special purpose company, HJ Platinum Metals Company Ltd. ("HJM"), to hold and fund their future equity interests in the Waterberg Project. Pursuant to their agreement, JOGMEC is expected to fund 75% of future equity investments into HJM and Hanwa the remaining 25%.  Consequently, JOGMEC and Hanwa's current shareholding percentages will dilute going forward as the combined funding obligations attributable to their aggregated shareholdings of 21.95% will be funded by HJM to which commensurate equity will be issued.  On or about May 15, 2023 the Waterberg JV Co. shareholders concluded a Shareholder Variation and Consent Letter Agreement to record the restructuring of the respective Japanese shareholder interests in Waterberg JV Co.  On July 7, 2023 HJM signed a Deed of Adherence, agreeing to be bound by the Waterberg JV Co, Shareholders' Agreement and Memorandum of Incorporation.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

The Company and Waterberg JV Co. are assessing commercial alternatives for mine development financing and concentrate offtake.  Obtaining reasonable terms for Waterberg concentrate offtake from an existing smelter/refiner in South Africa is considered the preferred option.  The Company is in discussion with several South African smelter operators, including Implats, with a view to establish formal concentrate offtake arrangements for the Waterberg Project.  Although discussions continue, to date no formal concentrate offtake terms have been achieved.  The Company is also assessing the possibility of constructing a smelter and base metal refinery ("BMR") for the processing of Waterberg Project concentrate to produce an upgraded product for sale in the market without the need for treatment by a third-party offtaker.  See more details at "Concentrate Offtake" below.

Lion Battery Technologies Inc.

On July 12, 2019, the Company, together with an affiliate of Anglo American Platinum Limited ("Amplats"), launched a venture through a jointly owned company, Lion Battery Technologies Inc. ("Lion"), to accelerate the development of next generation battery technology using platinum and palladium.  The Company received 400,000 common shares of Lion, valued at a price of $0.01 per share, as the original founder of Lion.  Under the terms of an investment agreement, both the Company and Amplats were to equally invest up to an aggregate of $4.0 million into Lion, of which approximately $1.0 million would be for general and administrative expenses and the commercialization of the technology developed, subject to certain conditions.  On July 6, 2021, the Company and Amplats agreed to increase the planned funding to Lion by a further $2.7 million, to a total of up to $6.7 million, in order to allow the acceleration of certain research and commercialization activities.  All agreed funding into Lion by the Company and Amplats is to be in exchange for preferred shares of Lion at a price of $0.50 per share over an approximate three to five year period. 

On July 12, 2019, the Company and Amplats each invested $550,000 as a first tranche of funding into Lion in exchange for 1,100,000 Lion preferred shares each. In addition to the $1.1 million initial investment, over the next five years to November 30, 2023, a further $3.41 million was invested by the Company and Amplats ($1.706 million each) with 9.024 million preferred shares in aggregate issued to the Company and Amplats (4.512 million preferred shares each).  During the first quarter of fiscal 2024, and included in the preceding, the Company and Amplats each invested $181,000 for 362,000 preferred shares each.  At November 30, 2023, the Company owned a 52.12% interest in Lion.  If the Company should fail to contribute its share of a required subscription to Lion, it would be in breach of its investment agreement with Lion and Amplats and its interest in Lion may be subject to dilution.

On July 12, 2019, Lion entered into an agreement (the "Sponsored Research Agreement") with Florida International University ("FIU") to fund a $3.0 million research program over approximately a three-year period utilizing platinum and palladium to unlock the potential of Lithium Air and Lithium Sulphur battery chemistries to increase their discharge capacities and cyclability.  On July 6, 2021, Lion agreed to increase the planned amount of research funding to FIU by a further amount of $1.0 million, for a total of up to $4.0 million.  Under the Sponsored Research Agreement, Lion will have exclusive rights to all intellectual property developed and will lead all commercialization efforts.  Since 2019 to date Lion has funded FIU a total of $3.85 million, of which $116,667 was funded in December 2023.

On August 4, 2020, the U.S. Patent and Trademark Office issued Patent No. 10,734,636 B2 titled "Battery Cathodes for Improved Stability" to FIU. The patent includes the use of platinum group metals and carbon nanotubes and other innovations in a lithium battery.  A second patent related to this work was issued in December 2020 and a third was issued on June 15, 2021.  On October 4, 2022, the U.S. Patent and Trademark Office issued Patent No. 11,462,743 B2 titled "Battery comprising a metal interlayer" to FIU.  The patent involves the use of palladium as interlayer in batteries to stabilize and enable lithium metal anodes in various existing and emerging lithium battery technologies.  On February 21, 2023 the U.S. Patent and Trademark Office issued FIU a fifth patent No. 11,588,144 B2 titled "Battery Cathodes for Improved Stability".  This patent involves the fabrication of cathodes using palladium as a catalyst in carbon nanotubes.  Further patents are currently applied for.  Under the Sponsored Research Agreement, Lion has exclusive rights to all intellectual property being developed by FIU including patents granted.  Lion is also reviewing several additional and complementary opportunities focused on developing next-generation battery technology using platinum and palladium.

During calendar year 2022 and into 2023, Company and FIU personnel held discussions with industry recognized third party battery specialists regarding Lion's intellectual property and patented technology.  On June 21, 2023, the Company reported that Lion had engaged The Battery Innovation Center ("BIC") in Newberry, Indiana to help drive commercialization of its next generation lithium-sulfur and enhanced lithium-ion (NMC) technology using the unique catalytic properties of platinum and palladium.  Under an agreed scope of work (the "SOW"), during late calendar 2023 and early 2024 BIC is to conduct independent small scale and large scale trials to validate Lion's proprietary platinum and palladium based electrode composition, slurry, and films in both lithium-sulfur and lithium-ion (NMC811) coin and pouch cells. The SOW also includes additional research and development focused on improving performance and scale-up with the goal of creating prototypes for commercialization consideration. 


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Personnel

The Waterberg Project is operated by the Company primarily utilizing its own staff and personnel.  Contract drilling, geotechnical, engineering and support services are also utilized as required.  The Company's complement of managers, staff, and technical personnel currently consists of 8 individuals in South Africa and 5 individuals in Canada.  Platinum Group Metals (RSA) Proprietary Limited, the wholly owned South African subsidiary of the Company ("PTM RSA") and Waterberg JV Co. also utilize contract services from a professional security firm as well as consultants and temporary workers from time to time.  At present, in addition to the 8 individuals described above, two specialized consultants are currently engaged in South Africa to assist with the implementation and execution of the Waterberg Social and Labour Plan ("Waterberg SLP") as well as community communication and engagement activities.

2. PROPERTIES

Under IFRS, the Company capitalizes all acquisition, exploration and development costs related to mineral properties. The recoverability of these amounts is dependent upon the existence of economically recoverable mineral reserves, the ability of the Company to obtain the necessary financing to complete the development of the property, and any future profitable production, or alternatively upon the Company's ability to dispose of its interests on an advantageous basis.  The Company evaluates the carrying value of its property interests on a regular basis.  Management is required to make significant judgements to identify potential impairment indicators.  Any properties that management deems to be impaired are written down to their estimated net recoverable amount. 

For more information on mineral properties, see below and Note 4 of the Financial Statements.

WATERBERG PROJECT

Recent Activities 

During the period ended November 30, 2023, approximately $1.0 million in expenditures were capitalized at the Waterberg Project for work carried out pursuant to the Stage Two Budget (as defined below). This work included mineral resource geology, feasibility engineering, infrastructure engineering and surveying.  Baseline environmental monitoring studies continue.  Work is also being carried out to identify, delineate and assess local deposits of calcrete and other aggregate materials ("Construction Aggregate") that may be suitable for road building and infrastructure pad foundations.  Work on community engagement and components of the Waterberg SLP are also underway.

As of November 30, 2023, $42.6 million in accumulated net costs had been capitalized to the Waterberg Project.  Total expenditures on the property since inception from all investor sources to November 30, 2023 are approximately $86.6 million. 

On October 20, 2022, the Company announced that Waterberg JV Co. had approved in principle a $21 million preconstruction work program ("Work Program") for the Waterberg Project, focused on early infrastructure, de-risking and project optimization.  Specific work items to be scheduled over approximately a two year period include infill and exploration drilling, initial road access, water supply, essential site facilities, a first phase accommodation lodge, a site construction power supply from state utility ESKOM, and advancement of the Waterberg SLP. 

An initial budget for the first $2.5 million of the Work Program (the "Initial Budget"), for the period up to March 31, 2023 has been completed.  Infill drilling ("Infill Drill Program") comprised most of this work.  The budget for the second stage of the Work Program (the "Stage Two Budget") for a further $3.6 million up to August 31, 2023 was unanimously approved on March 24, 2023 by the Waterberg JV Co Board of Directors.  Budgeted activities in the Stage Two Budget included geotechnical drilling, an exploration borehole, mineral resource estimation, Waterberg DFS Update engineering, pre-construction engineering, electrical power supply engineering and the permitting and licensing of Construction Aggregate borrow pits at locations identified near the planned Waterberg mine site.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

An update to the Waterberg DFS (the "Waterberg DFS Update"), including updated mineral resource and mineral reserve estimates, is currently in process under the Work Program.  Planned work is to include a review of cut-off grades, mining methods, geotechnical considerations, sub-level spacing, infrastructure plans, scheduling, concentrate offtake, dry stack tailings, costing and other potential revisions to the project's financial model. 

As a precursor to the Waterberg DFS Update, the Infill Drilling Program commenced in early November 2022 targeting near surface, modelled inferred mineral resource blocks that had good potential for conversion to higher confidence levels, which might allow them to be added to early mine plans, potentially reducing early capital expenditure and the period to first mining.  The Infill Drill Program was successfully completed in February 2023 and consisted of 16 T Zone NQ boreholes and 16 F Zone NQ boreholes.  Details and assay results from the Infill Drill Program can be found in news releases dated January 26, 2023 and March 30, 2023 respectively.  Mineralized material recovered from the Infill Drill Program was assayed and also utilized to produce a sample concentrate for further metallurgical study.  The waste rock material remaining after assaying and sample concentrate production has been processed to determine dry-stack tailings characteristics.  If dry stack tailings methods are implemented in the Waterberg DFS Update, estimated mine water consumption could be reduced by 40% to 50%.

During May 2023, Waterberg JV Co. also completed the drilling of one exploration borehole WE153 on the prospecting right owned by Waterberg JV Co. located adjacent to the north of the Waterberg Mining Right (as defined below).  The borehole collar was positioned along a projected strike line approximately 16 km north from the area of delineated T Zone mineral resources and approximately 8 km north from the area of delineated F Zone mineral resources.  Borehole WE153 was drilled to a depth of 2,044.35 meters.  At a depth of 1,272.98 meters WE153 intercepted 7.02 meters of mineralized T Zone displaying approximately 2% to 4% blebby copper, nickel, and iron sulphides.  At a depth of 1,972.19 meters WE153 intercepted an F Zone intercept of 9.42 meters displaying approximately 2% to 4% blebby copper, nickel, and iron sulphides. After a depth of 1,981.61 meters, only sporadic sulphides were observed.  Before closing the hole one T Zone deflection D1 was also drilled.  The drill core was logged, and the mineralized intercepts recovered were sampled and sent for assay by Intertek Genalysis Minerals in Australia.

Assay results for borehole WE153 were reported in a news release dated May 17, 2023.  Results from borehole WE153 for the T Zone were strong and for the F Zone were weak but do indicate the F Zone is present. The results from borehole WE153 support the hypothesis that the T Zone and F Zone continue for a significant distance northward from the known southern deposit area, indicating a future opportunity to delineate additional mineral resources that may be accessible from planned underground mine development.

On December 11, 2023, the board of directors of Waterberg JV Co. and its shareholders approved a work program in the amount of R29.8 million (approximately $1.62 million) for a third stage of work (the "Stage Three Budget") covering approximately a six month period from September 2023 to February 2024.  The Stage Three Budget is intended to fund work activities currently underway, including completion of the Waterberg DFS Update, and normal project maintenance.  In conjunction with its approval of the Stage Three Budget, Implats advised that due to its own internal cost savings efforts, it would not be funding its 15% share of the Stage Three Budget, which will result in a 0.049% dilution to their position in Waterberg JV Co.  Shareholders of Waterberg JV Co. have the right to contribute the cash contribution shortfall of any diluting shareholder, pro rata to the aggregate shareholding of all shareholders who elect to fund such shortfall.  Platinum Group alone has elected to fund all Implats funding shortfall for the Stage Three Budget.  Impala stated that it would consider the funding of subsequent cash calls as future circumstances allowed.  Funding for the balance of the Work Program is to be considered as a stage four budget in February or March 2024, after the Waterberg DFS Update has been assessed in the context of prevailing market conditions in 2024. 

History of Acquisition

In 2007, PTM RSA began the application process for prospecting rights over the Waterberg area located on the Northern Limb of the Bushveld Igneous Complex, approximately 70 km north of the town of Mokopane, eventually acquiring prospecting rights over two adjacent areas known as the Waterberg JV Property and the Waterberg Extension Property.  In September 2009, PTM RSA, JOGMEC and Mnombo entered a joint venture agreement whereby JOGMEC could earn up to a 37% participating interest in the Waterberg JV Property while at the same time Mnombo could earn a 26% participating interest in exchange for matching JOGMEC's expenditures on a 26/74 basis.  On November 7, 2011, the Company executed an agreement with Mnombo's shareholders to acquire 49.9% of the issued and outstanding shares of Mnombo.  Effective in May 2015, the Waterberg JV Property and the Waterberg Extension Property were consolidated into the singular Waterberg Project and in September, 2017 the Waterberg Project prospecting rights were transferred into Waterberg JV Co.  On November 6, 2017, the Company and JOGMEC closed the Implats Transaction and Implats acquired a 15% interest in Waterberg JV Co. and the right to match third-party offtake terms under the Offtake ROFR.  In March 2019, JOGMEC completed a transfer of 9.755% of its 21.95% interest in Waterberg JV Co. to Hanwa.  Under the terms of the transaction, Hanwa also acquired the exclusive right to purchase some, or all of the metals produced from the Waterberg Project at market prices.  On May 10, 2022, JOGMEC confirmed and later announced its intention to maintain JOGMEC's interests in the Waterberg Project and to support funding contributions for project development to the extent possible.  On June 9, 2023, it was announced that JOGMEC and Hanwa established HJM to hold and fund their future equity interests in the Waterberg Project.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

In calendar year 2021, Waterberg JV Co. filed for the closure of several uneconomic prospecting rights.  Afterwards, in early 2022, the Waterberg Project comprised an aggregate of approximately 65,903 hectares of active prospecting rights and rights under application, including 20,482 hectares covered by the Waterberg Mining Right.  During 2022, Waterberg JV Co. filed for closure on further 50,951 gross hectares of prospecting rights, of which 14,209 hectares were held within the granted mining right, leaving a net 36,742 hectares of uneconomic prospecting rights to be terminated.  Once all the closure applications become effective, the project area will cover approximately 29,161 hectares, being comprised of the Waterberg Mining Right covering 20,482 hectares, 4,190 hectares in an active prospecting right and 4,489 hectares of rights under application. 

Concentrate Offtake and Processing

Before a construction decision can be undertaken arrangements will be required for Waterberg Project concentrate offtake or processing.  The Company and Waterberg JV Co. are assessing commercial alternatives for mine development financing and concentrate offtake.    Obtaining reasonable terms for Waterberg concentrate offtake from an existing smelter/refiner in South Africa is considered the preferred option.  The Company is in discussion with several South African smelter operators, including Implats, with a view to establishing formal concentrate offtake arrangements for the Waterberg Project.  Although discussions continue, to date no formal concentrate offtake terms have been achieved.  The Offtake ROFR would allow Implats the opportunity to match concentrate offtake terms offered to Waterberg JV Co. by a bona fide third-party. 

As an alternative to a traditional concentrate offtake arrangement, the Company is also assessing the possibility of constructing a matte furnace and BMR for the processing of Waterberg Project concentrate to produce an upgraded product for sale in the market without the need for treatment by a third-party offtaker.  The Waterberg DFS stated that "Additional smelting capacity may need to be constructed in the industry to be able to treat the flotation concentrate from Waterberg and the other potential Platreef miners."  Any transaction for concentrate offtake between Waterberg JV Co. and an entity involving any one or more shareholders must be entered into on a bona fide arms-length basis and for fair value.

The Company has conducted internal research and formal studies to evaluate the economic feasibility of establishing a smelter and BMR business, jointly with third-party investors or partners, capable of processing Waterberg concentrate.  Conceptually, a Waterberg matte furnace and BMR would be operated as a separate business from the Waterberg Project.  Such a facility could provide fair market offtake terms to Waterberg JV Co., and possibly to other PGE miners, allowing for the production of an upgraded product for sale in the market without the need for treatment by a third-party smelter operator. 

An internal pre-feasibility study for a Waterberg matte furnace in South Africa was completed for the Company by industry experts in late calendar 2021.  The pre-feasibility study assessed the construction and operation of a 20 MW smelting furnace with two off air-blown converters capable of producing a matte suitable as feed to a standard BMR in South Africa or elsewhere.  In 2022, the Company completed a scope of work for a smelter and BMR definitive feasibility study examining plant and infrastructure requirements, down stream beneficiation, optimal location analysis, as well as down stream marketing considerations, permitting and power and water requirements.  Submission of tenders for specific technical components of the engineering work were requested from industry recognized engineering firms in late calendar 2022 and early 2023 and were received in 2023.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

The Company is also assessing the economic feasibility of constructing a smelter and BMR outside of South Africa to process Waterberg concentrate.  On December 20, 2023, the Company announced a Cooperation Agreement with Ajlan & Bros Mining and Metals Co. ("Ajlan") to study the establishment of a stand-alone platinum group metals smelter and BMR in Saudi Arabia.  The Cooperation Agreement encompasses three phases; a global PGE concentrate market study, a definitive feasibility study for the construction and operation of PGE smelter and BMR in Saudi Arabia ("Smelter DFS"), and an option to form an incorporated 50:50 joint venture following the completion of the Smelter DFS. The Smelter DFS will assume the export of PGE concentrate from the Waterberg Project in South Africa to a port facility in Saudi Arabia.  The Company believes that Saudi Arabia offers an attractive investment climate that includes highly competitive energy costs, a lower taxation rate, and significant government financing incentives.  An initial trade-off study has been completed to determine the viability of exporting PGE concentrate from South Africa to Saudi Arabia. Shipping costs are expected to be generally offset by lower energy costs and water costs.  The proposed smelter facility may also benefit from existing infrastructure. 

In order to minimize the risk of sourcing concentrate from only one project, and to attain scale, the Company expects to commission a third-party market study (the "Market Study") to identify potential global sources of PGE concentrate that could augment the processing of Waterberg concentrate in Saudi Arabia.  There are currently several PGE and base metal projects globally seeking offtake and beneficiation solutions.

Upon the completion of the Market Study, and assuming a favourable outcome, Ajlan and the Company may together commission the Smelter DFS for the construction of a PGE smelter and BMR to process Waterberg concentrate and other concentrate feed in Saudi Arabia.  The estimated cost for the Smelter DFS is approximately $4.0 million.  The scope for the Smelter DFS will encompass options related to infrastructure, location, technical specifications, capital, and operating costs.  All expenses related to the study are to be split on a 50:50 basis between Platinum Group and Ajlan, including certain costs already incurred by Platinum Group in previous beneficiation studies as described above.

Upon completion of the Smelter DFS, the Cooperation Agreement gives Platinum Group and Ajlan the option to form an incorporated joint venture on a 50:50 basis, on terms to be mutually agreed, for the purpose of financing, constructing, and operating smelting and refining facilities as contemplated in the Smelter DFS.  The Company believes that Saudi Arabia offers significant investment incentives and expects the incorporated joint venture would apply for these incentives. Upon formation, the incorporated joint venture would then be in a position to offer concentrate offtake terms to Waterberg JV Resources (Pty) Limited, the owner and operator of the Waterberg Project.

A key requirement would be to secure a long-term permit for the export of unrefined precious metals in concentrate. Platinum Group is working with the Government of South Africa to identify local beneficiation opportunities and to analyze the possible impact of exporting concentrate on the value chain.

Waterberg DFS

On September 24, 2019, the Company published the results of the Waterberg DFS.  Waterberg JV Co. shareholders approved the Waterberg DFS on December 5, 2019.  Highlights of the Waterberg DFS include:

  • A significant increase in Mineral Reserves from the Waterberg Project's 2016 Pre-Feasibility Study for a large-scale, shallow, decline-accessible, mechanised, PGE mine.  Use of backfill in the Waterberg DFS design lowers risk and increases mined ore extraction rates.

  • Annual steady state production rate of 420,000 4E ounces.  Estimated mine life of 45 years on current reserves.  The planned production rate is by careful design in order to reduce capital costs and simplify construction and ramp-up.

  • After-tax net present value ("NPV") of $982 million, at an 8% real discount rate, using spot metal prices as at September 4, 2019 (Incl. $1,546 Pd/oz) ("Spot Prices").

  • After-tax NPV of US$333 million, at an 8% real discount rate, using three-year trailing average metal prices up until September 4, 2019 (Incl. $1,055 Pd/oz) ("Three Year Trailing Prices").

  • After-tax internal rate of return of 20.7% at Spot Prices and 13.3% at Three Year Trailing Prices.

  • Estimated project capital of approximately $874 million, including $87 million in contingencies. Peak project funding estimated at $617 million.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023
  • On site life of mine average cash cost (inclusive of by-product credits and smelter discounts) for the spot metal price scenario equates to $640 per 4E ounce.

  • Updated measured and indicated mineral resources of 242 million tonnes at 3.38g/t 4E for 26.4 million 4E ounces (using 2.5 g/t 4E cut-off) and the deposit remains open on strike to the north and below an arbitrary depth cut-off of 1,250-meters.

  • Proven and probable mineral reserves of 187 million tonnes at 3.24 g/t 4E for 19.5 million 4E ounces (using 2.5 g/t 4E cut-off).

The mineral resources for the Waterberg Project increased slightly based on in-fill drilling done during preparation of the Waterberg DFS.  The mineral resources have been estimated based on 441 diamond drill holes and 583 deflections and has been stated at a 2.5 g/t 4E cut-off (the base-case).  In the Waterberg DFS, a 2.5 g/t 4E cut-off grade has been applied to the mineral resource model as an input into the mine design.  At the 2.5 g/t 4E cut-off grade, the total measured and indicated mineral resources are estimated at 242 million tonnes grading 3.38 g/t 4E for an estimated 26.4 million ounces 4E. Total mineral reserves at a 2.5 g/t 4E grade cut-off are estimated at 187 million tonnes for 19.5 million ounces 4E.

The mineral reserves are a subset of the mineral resource envelope at a 2.5 g/t 4E cut-off, and they include only measured and indicated mineral resources with dilution and stope shapes considered.  A minimum mining thickness of 2.4 meters and sublevel planning of 20 meters to 40 meters was considered in the mine plan for mineral reserves.

The mineral resources for the Waterberg Project are categorized and reported in terms of NI 43-101 and are tabulated below.

Mineral Resource Estimate at 2.5 g/t 4E cut-off, effective September 4, 2019 on 100% Project basis

T Zone at 2.5 g/t (4E) Cut-off
Mineral
Resource
Category
Cut-off Tonnage Grade Metal
4E Pt Pd Rh Au 4E Cu Ni 4E
g/t Tonnes g/t g/t g/t g/t g/t % % Kg Moz
Measured 2.5 4,443,483 1.17 2.12 0.05 0.87 4.20 0.150 0.080 18,663 0.600
Indicated 2.5 17,026,142 1.37 2.34 0.03 0.88 4.61 0.200 0.094 78,491 2.524
M+I 2.5 21,469,625 1.34 2.29 0.03 0.88 4.53 0.189 0.091 97,154 3.124
Inferred 2.5 21,829,698 1.15 1.92 0.03 0.76 3.86 0.198 0.098 84,263 2.709

F Zone at 2.5 g/t (4E) Cut-off
Mineral
Resource
Category
Cut-off Tonnage Grade Metal
4E Pt Pd Rh Au 4E Cu Ni 4E
g/t Tonnes g/t g/t g/t g/t g/t % % Kg Moz
Measured 2.5 54,072,600 0.95 2.20 0.05 0.16 3.36 0.087 0.202 181,704 5.842
Indicated 2.5 166,895,635 0.95 2.09 0.05 0.15 3.24 0.090 0.186 540,691 17.384
M+I 2.5 220,968,235 0.95 2.12 0.05 0.15 3.27 0.089 0.190 722,395 23.226
Inferred 2.5 44,836,851 0.87 1.92 0.05 0.14 2.98 0.064 0.169 133,705 4.299


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Waterberg Aggregate Total 2.5 g/t (4E) Cut-off
Mineral
Resource
Category
Cut-off Tonnage Grade Metal
4E Pt Pd Rh Au 4E Cu Ni 4E
g/t Tonnes g/t g/t g/t g/t g/t % % Kg Moz
Measured 2.5 58,516,083 0.97 2.19 0.05 0.21 3.42 0.092 0.193 200,367 6.442
Indicated 2.5 183,921,777 0.99 2.11 0.05 0.22 3.37 0.100 0.177 619,182 19.908
M+I 2.5 242,437,860 0.98 2.13 0.05 0.22 3.38 0.098 0.181 819,549 26.350
Inferred 2.5 66,666,549 0.96 1.92 0.04 0.34 3.27 0.108 0.146 217,968 7.008

Mineral Resource
Category
Prill Split Waterberg Project Aggregate
Pt Pd Rh Au
% % % %
Measured 28.2 64.4 1.5 5.9
Indicated 29.4 62.6 1.5 6.5
M+I 29.1 63.0 1.5 6.4
Inferred 29.5 58.9 1.2 10.4

Notes:

(1) 4E elements are platinum, palladium, rhodium and gold.

(2) Cut-offs for mineral resources were established by a QP after a review of potential operating costs and other factors.

(3) Conversion factor used for kilograms ("kg") to ounces ("oz") is 32.15076.

(4) A 5% and 7% geological loss was applied to the measured/indicated and inferred mineral resources categories, respectively.

(5) The mineral resources are classified in accordance with NI 43-101. Mineral resources that are not mineral reserves do not have demonstrated economic viability and inferred mineral resources have a high degree of uncertainty.

(6) The mineral resources are provided on a 100% Project basis, inferred and indicated categories are separate and the estimates have an effective date of September 4, 2019.

(7) Mineral resources were completed by Mr. CJ Muller of CJM Consulting.

(8) Mineral resources were estimated using kriging methods for geological domains created in Datamine from 441 mother holes and 583 deflections. A process of geological modelling and creation of grade shells using indicating kriging was completed in the estimation process.

(9) The mineral resources may be materially affected by metal prices, exchange rates, labour costs, electricity supply issues or many other factors detailed in the Company's 2023 AIF.

(10) The data that formed the basis of the mineral resources estimate are the drill holes drilled by Platinum Group as project operator, which consist of geological logs, drill hole collars surveys, downhole surveys and assay data. The area where each layer was present was delineated after examination of the intersections in the various drill holes.

(11) Numbers may not add due to rounding.

Proven Mineral Reserve Estimate at 2.5 g/t 4E cut-off, effective September 4, 2019 on 100% Project basis

Proven Mineral Reserve Estimate at 2.5 g/t 4E cut-off
    Pt Pd Rh Au 4E Cu Ni 4E Metal
Zone Tonnes (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) Kg Moz
T Zone 3,963,694 1.02 1.84 0.04 0.73 3.63 0.13 0.07 14,404 0.463
F Central 17,411,606 0.94 2.18 0.05 0.14 3.31 0.07 0.18 57,738 1.856
F South - - - - - - - - - -
F North 16,637,670 0.85 2.03 0.05 0.16 3.09 0.10 0.20 51,378 1.652
F Boundary North 4,975,853 0.97 2.00 0.05 0.16 3.18 0.10 0.22 15,847 0.509
F Boundary South 5,294,116 1.04 2.32 0.05 0.18 3.59 0.08 0.19 19,020 0.611
F Zone Total 44,319,244 0.92 2.12 0.05 0.16 3.25 0.09 0.20 143,982 4.629
Waterberg Project Total 48,282,938 0.93 2.10 0.05 0.20 3.28 0.09 0.19 158,387 5.092


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Probable Mineral Reserve Estimate at 2.5 g/t 4E cut-off, effective September 4, 2019 on 100% Project basis

Probable Mineral Reserve Estimate at 2.5 g/t 4E cut-off
    Pt Pd Rh Au 4E Cu Ni 4E Metal
Zone Tonnes (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) Kg Moz
T Zone 12,936,870 1.23 2.10 0.02 0.82 4.17 0.19 0.09 53,987 1.736
F Central 52,719,731 0.86 1.97 0.05 0.14 3.02 0.07 0.18 158,611 5.099
F South 15,653 ,961 1.06 2.03 0.05 0.15 3.29 0.04 0.13 51,411 1.653
F North 36,984,230 0.90 2.12 0.05 0.16 3.23 0.09 0.20 119,450 3.840
F Boundary North 13,312,581 0.98 1.91 0.05 0.17 3.11 0.10 0.23 41,369 1.330
F Boundary South 7,616,744 0.92 1.89 0.04 0.13 2.98 0.06 0.18 22,737 0.731
F Zone Total 126,287,248 0.91 2.01 0.05 0.15 3.12 0.08 0.18 393,578 12.654
Waterberg Project Total 139,224,118 0.94 2.02 0.05 0.21 3.22 0.09 0.18 447,564 14.390

Proven & Probable Mineral Reserve Estimate at 2.5 g/t 4E cut-off, effective September 4, 2019 on 100% Project basis

Total Estimated Mineral Reserve at 2.5 g/t 4E cut-off
    Pt Pd Rh Au 4E Cu Ni 4E Metal
Zone Tonnes (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) Kg Moz
T Zone 16,900,564 1.18 2.04 0.03 0.80 4.05 0.18 0.09 68,391 2.199
F Central 70,131,337 0.88 2.02 0.05 0.14 3.09 0.07 0.18 216,349 6.956
F South 15,653,961 1.06 2.03 0.05 0.15 3.29 0.04 0.13 51,411 1.653
F North 53,621,900 0.88 2.09 0.05 0.16 3.18 0.10 0.20 170,828 5.492
F Boundary North 18,288,434 0.98 1.93 0.05 0.17 3.13 0.10 0.23 57,216 1.840
F Boundary South 12,910,859 0.97 2.06 0.05 0.15 3.23 0.07 0.19 41,756 1.342
F Zone Total 170,606,492 0.91 2.04 0.05 0.15 3.15 0.08 0.19 537,560 17.283
Waterberg Project Total 187,507,056 0.94 2.04 0.05 0.21 3.24 0.09 0.18 605,951 19.482

Notes:

(1) The estimated mineral reserves have an effective date of September 4, 2019.

(2) A 2.5 g/t 4E stope cut-off grade was used for mine planning for the T Zone and the F Zone mineral reserves estimate.  The cut-off grade considered April 2018 metal spot prices.

(3) Tonnes and grade estimates include planned dilution, geological losses, external overbreak dilution, and mining losses.

(4) 4E elements are platinum, palladium, rhodium and gold.

(5) Numbers may not add due to rounding.

The Waterberg Project financial performance has been estimated both at Spot Prices and at Three Year Trailing Prices as set out in the table below. The long-term real US$/Rand exchange rate for the Spot Price scenario is set at 15.00, which is based on an intra-day traded spot rate as of September 4, 2019. The US$/Rand exchange rates for the Three-Year Trailing Price scenario, is based on Bloomberg's nominal consensus forward-curve as at June 2019, which translates into a long-term real US$/Rand rate of 15.95. The price deck assumptions for each scenario are tabled below.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Waterberg DFS Price Deck Assumptions in US$

Parameter Unit Spot Prices
(Sept 4, 2019)
Three Year
Trailing Prices
(Sept 4, 2019)
US$ / Rand (Long-term Real) US$/Rand (Real July 2019) 15.00 15.95
Platinum
Palladium
Gold
Rhodium
Basket Price (4E)

Copper
Nickel
US$/oz (Real July 2019)
US$/oz (Real July 2019)
US$/oz (Real July 2019)
US$/oz (Real July 2019)
US$/oz (Real July 2019)

US$/lb (Real July 2019)
US$/lb (Real July 2019)
980
1,546
1,548
5,036
1,425

2.56
8.10
931
1,055
1,318
1,930
1,045

2.87
5.56
Smelter Payability: 4E Metal
Smelter Payability: Copper
Smelter Payability: Nickel
% Gross Sale Value
% Gross Sale Value
% Gross Sale Value
85%
73%
68%
85%
73%
68%

Readers are directed to review the full text of the Waterberg DFS, available for review under the Company's profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov for additional information.

The declared deposit strike length on the Waterberg Project is 13 km long so far, remains open along strike and begins from a depth of 140 meters vertical.  The Waterberg DFS mine plan covers a strike length of approximately 8.5 km.  The Waterberg Project and the deposit is still open for expansion.  Based on borehole intercepts, the deposit is known to continue down dip below the arbitrary 1,250 meter cut off depth applied to the deposit for resource estimation purposes.  Based on airborne geophysical information and recent exploration borehole WE153 (as described above), the deposit is believed to continue for several kilometres on strike to the north.

As a result of its shallow depth, good grade and a fully mechanized mining approach, the Waterberg Project can be a safe mine within the lowest quartile of the Southern Africa platinum group element industry cost curve. 

The Waterberg DFS mine plan models production at 4.8 million tonnes of ore per annum and 420,000 4E ounces per year in concentrate.  The mine initially accesses the orebody using two sets of twin decline tunnels with mining by fully mechanised long hole stoping methods and paste backfill. Paste backfill allows for a high mining extraction ratio as mining can be completed next to backfilled stopes without leaving internal pillars.  Maintaining safety and reliability were key mine design criteria.  As a result of the scale of the orebody, bulk mining on 20 to 40 meter sublevels with large underground equipment and conveyors for ore and waste transport provides high efficiency.  Many of the larger successful underground mines in the world use the same method of mining with backfill and estimated costs were benchmarked against many of these operations.

Waterberg DFS Update

The Waterberg DFS Update is currently in process and is expected to be completed in early to mid 2024.  At the time of writing this MD&A the Company's engineers and geologists, along with the joint venture partners, are in process to optimize and finalize mine scheduling and capital allocation within the DFS Update financial model.  Once completed, it is expected that the Waterberg DFS Update will supersede the Waterberg DFS.  A construction decision has not yet occurred and although some pre-production work is underway on the Waterberg project, a formal start date has not yet been declared as of the date of this MD&A.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Mining Right Grant

A formal mining right application ("MRA") for the Waterberg Project, including the Waterberg SLP, was accepted for filing by the DMRE on September 14, 2018.  The Company held local public participation meetings on numerous occasions in advance of the MRA.  A program of public consultation as part of the formal MRA and EA application for the Waterberg Project was completed in August 2019.  An Environmental Impact Assessment ("EIA") and Environmental Management Program ("EMP") were filed with the DMRE on August 15, 2019.  An EA was granted for the Waterberg Project on August 12, 2020, subject to a public notice period and finalization of issues raised by affected parties, which process was completed with the issue of the final EA on November 10, 2020.

On January 28, 2021, the DMRE issued a letter to Waterberg JV Co. notifying the Company that a mining right for the Waterberg Project (the "Waterberg Mining Right") had been granted.  Public disclosure and notice of the Waterberg Mining Right grant was promulgated by the Company and Waterberg JV Co. as required under South African legislation. The Waterberg Mining Right was notarially executed on April 13, 2021, was registered at the Mineral and Petroleum Titles Registration Office on July 6, 2021 and remains active.

On and following March 5, 2021, the Company received several notices of appeal, filed with the DMRE by individual appellants from local communities, against the January 28, 2021 decision of the DMRE granting the Waterberg Mining Right.  One group filed an application for an order in the High Court to review and set aside the decision by the Minister of the DFFE to refuse condonation for the late filing of the group's appeal against the grant of an EA for the Waterberg Project in November 2020.  The attorneys acting for Waterberg JV Co. filed a notice to oppose the application and required the group's legal counsel to file proof of the mandate to represent the appellant group. Since filing their review application, the appellants have done nothing to progress their action and their legal counsel has not filed a proof of mandate.

On July 30, 2021, Waterberg JV Co. received an urgent interdict application to the High Court seeking to restrain the activities of Waterberg JV Co. on certain surface rights over a portion of the project area.  The appellants claimed to be interested and affected parties located near planned surface infrastructure.  Waterberg JV Co. promptly filed an answering affidavit denying urgency and providing arguments why the application was without merit. The appellants did not respond.  On November 16, 2021 the host Ketting community filed an application to join as a respondent and documenting their support for the Waterberg Mine.  Once again, the appellants did not respond.  To force the interdict application to a conclusion, in July 2022 Waterberg JV Co. filed a Notice of Set Down with the High Court in Limpopo.  A hearing to rule on the interdict application occurred on May 22, 2023, at which the court dismissed the urgent interdict application and ordered the applicants to pay costs to the defendants.

On October 13, 2022, the Minister of the DMRE ruled to dismiss all appeals to the grant of the Waterberg Mining Right filed with the DMRE.  In his ruling the Minister provided the regulatory reasons why each appeal was denied and also confirmed the DMRE's assessment that Waterberg JV Co. has complied with Broad-Based Black Economic Empowerment requirements and social and labour plan community consultation processes.

The Company believes that all requirements specified under the National Environmental Management Act, the MPRDA and other applicable legislation have been complied with and that the DFFE correctly approved and the DMRE correctly issued the EA and the Waterberg Mining Right.  Based on long term consultation and dialogue with local communities, the Company also believes that the leadership and the majority of residents in the host communities support the Waterberg Project. 

The MEC is aware of disagreements between Waterberg JV Co. and certain members of the local communities.  Since late 2021 the MEC has hosted several meetings and engagements and facilitated mediation sessions with representatives of Waterberg JV Co. and community leaders to assist with the reconciliation of concerns.  The most recent meeting occurred on March 28, 2023.  Advancement has been made and many community concerns have been addressed.  The MEC has stated its intention to assist all stakeholders so that further investment by Waterberg JV Co. may occur.

Waterberg JV Co. remains committed to engaging and working with all host communities to ensure that all legitimate concerns are addressed, and mining operations are conducted in a harmonious and respectful manner.  Waterberg JV Co. aims to optimize the Waterberg Project for the benefit of all stakeholders. 


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Community Considerations

Training for a new mechanised mining workforce is an important component of the Waterberg Project life of mine plan and the Waterberg SLP.  Planning for training programs has been undertaken with the assistance of global mine training leader, NORCAT, of Sudbury, Ontario.  The Waterberg DFS modelled a significant investment in training, focussed on the immediate area of the Waterberg Project, working in cooperation with local communities, colleges and facilities. 

Water supply and delivery are important issues affecting local communities near the Waterberg Project.  Detailed hydrological work studying the utilization of known sources for significant volumes of groundwater has been conducted.  In 2018, a cooperation agreement was entered into between Waterberg JV Co. and the Capricorn District Municipality for the development of water resources to the benefit of local communities and the mine.  Hydrological work has identified several large-scale water basins that are likely able to provide mine process and potable water for the Waterberg Project and local communities.  Test drilling of these water basins has been completed resulting in the identification of sufficient water supplies.  Earlier drilling programs conducted by the Capricorn District Municipality identified both potable and high mineral unpotable water resources in the district.  Drilling by Waterberg JV Co. has identified some potable water resources.  Several boreholes proximal to the Waterberg Project identified large volumes of high mineral, unpotable water not suitable for agriculture.  Hydrological and mill process specialists have tested the use of this water as mine process water.  In general, ground water resources identified proximal to the Waterberg Project have the potential for usage by both the mine and local communities.

The establishment of servitudes for power line routes and detailed planning and permitting with ESKOM are also advancing.  Power line environmental and servitude work is being completed by TDx Power in coordination with ESKOM.  TDx Power has progressed electrical power connection planning for approximately a 70 km, 132MvA line to the Waterberg Project.  Engineering refinement of steady state power requirements has resulted in a reduced demand of approximately 90MvA at steady state.  Bulk power design and costing work for steady state requirements has commenced.  ESKOM is engaged with project engineers to determine electrical power sources and availability.  A temporary power line for the construction period from the nearby grid at Bochum is being designed and costed.  Community engagement regarding power line routes and completion of an EIA for the power line routes is in process.  ESKOM is experiencing power generation constraints leading to load-shedding, being the deliberate and scheduled shutdown of electric power in parts of its power-distribution network, when the demand strains the capacity of the system.

Alternative renewable energy sources are also being considered for the Waterberg Project.  One such option envisages a solar panel farm, including battery storage, to be built by a third party operator at a suitable location near the Waterberg Project.  The cost of construction would be carried by the third party operator and the power provided would be charged to Waterberg JV Co. at rates that would include a return of capital to the third party operator.

Social and Labour Plans

The Waterberg SLP was developed pursuant to DMRE guidelines for social and labour plans and has been submitted in accordance with section 46 of the MPRDA together with the Waterberg Mining Right application, which right was granted on January 28, 2021, and registered on July 6, 2021.  The objective of the Waterberg SLP is to align the Company's social and labour principles with the related requirements established under the Mining Charter, as applicable from time to time.  These requirements include promoting employment and avoiding retrenchments, advancement of the social and economic welfare of all South Africans, contributing toward the transformation of the mining industry and contributing towards the socio-economic development of the communities proximal to the Waterberg Project.  Contractors will be required to comply with the Waterberg SLP and policies, including commitment to employment equity and BEE, proof of competence in terms of regulations, commitment to undertake training programs, compliance with all policies relating to recruitment, training, health and safety, etc.  In terms of human resources training, the Waterberg SLP will establish objectives for adult-based education training, learnerships and development of the skills required by mining industry, portable skills training for transition into industries other than mining, education bursaries and internships.  The Waterberg SLP also envisages a plan to establish local economic development objectives for projects such as infrastructure and educational support to local schools, the equipping and extension of a clinic/health facility, water and reticulation projects, housing development, and various other localized programs for small scale industry, agriculture, entrepreneurship and health and education.

To support the Waterberg SLP for affected communities near the Waterberg Project, we have budgeted expenditures amounting to an aggregate R428.9 million (approx. $22.73 million at November 30, 2023) over a five-year period.  Expenditures are subject to the grant of all required permits and the commencement of development activities on site.  At the end of each five-year period a new social and labour plan will be established, considering actual expenditures to date and changes to adjust for community feedback, needs and preferences.  The Waterberg SLP includes the following provisions:


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023
  • Human Resource Development

Waterberg JV Co. is aware of the importance of human resources to accomplish its business objectives.  Skills development is the foundation for attaining competent and productive employees who can contribute to meeting the mine's business objectives and contribute to the upliftment of their communities through their own personal economic success.  The skills development plan for the Waterberg Project budgets R13.3 million ($0.70 million at November 30, 2023) for the achievement of future career development opportunities within the mining industry and beyond the needs of the mine's operational requirements.  The skills development plan seeks to achieve portable skills through accredited qualification by certified training providers and programmes.  Emphasis is to be applied to employment equity and to participation by historically disadvantaged South Africans and women.  Learnership, internship, bursary and youth training programs are planned.  Targets have been established for procurement and employment levels for women and for people from the local community.

  • Local Economic Development

The Local Economic Development ("LED") program will seek to enable local communities to become economically stronger by improving infrastructure, business skills, entrepreneurship, job creation and income.  An amount of R405.6 million ($21.49 million at November 30, 2023) has been budgeted for LED projects seeking to amplify opportunities as well as alleviate poverty within the surrounding communities of the mine.  Programmes are to include infrastructure and educational support to local schools, mine and community bulk water supply and reticulation, extension and equipping of existing clinic/health facilities, and road construction.

  • Transferrable Skills Management

A budget of R10.0 million ($0.53 million at November 30, 2023) has been established for training and skills development.  We conducted a social audit and needs and skills assessment of the communities near the Waterberg Project to learn about these communities and to help direct our efforts towards the matters of importance to them.  This work will guide our long-term training programs intended to increase skilled employment opportunities for local community members.  Investment in human resource development and facilitation of training during the lifetime of the Waterberg Project intends to provide sustainable skills that will support employment for workers beyond the life of the mine.  The mine intends to comply with the Basic Conditions of Employment Act, No. 75 of 1997 and the Social and Labour Plan Guidelines with the goal of establishing skills that will be of value to employees at a future time of downscaling and retrenchment.

Environmental, Social and Governance ("ESG")

Being a responsible corporate citizen means protecting the natural environment associated with its business activities, providing a safe workplace for its employees and contractors, and investing in infrastructure, economic development, and health and education in the communities where the Company operates so that it can enhance the lives of those who work and live there beyond the life of such operations. The Company takes a long-term view of its corporate responsibility, which is reflected in the policies that guide its business decisions, and in its corporate culture that fosters safe and ethical behaviour across all levels of Platinum Group. The Company's goal is to ensure that its engagement with its stakeholders, including its workforce, industry partners, and the communities where it operates, is continued, mutually beneficial and transparent. By building such relationships and conducting ourselves in this manner, the Company can address specific concerns of its stakeholders and work cooperatively and effectively towards achieving this goal.

  • ESG Approach and Objectives

The Company and Waterberg JV Co. are committed to conducting business in a responsible and sustainable manner. Our core ESG values are:


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023
  • maximizing the positive effect of our projects and operations for all stakeholders;

  • caring for the environment in which we operate;

  • contributing to both the short-term and long-term development of our host communities;

  • ensuring safe and secure workplaces for our employees;

  • contributing to the welfare of our employees and local communities; and

  • promoting good corporate governance, through openness, transparency, and accountability;

We continue to work on enhancements to our community engagement processes for all our mining and environmental matters.  We consider all stakeholders and confirm our commitment to the health and safety of our employees and surrounding communities.  Health and safety also remain a top priority.  Our ESG objectives include:

  • reducing planned water consumption;

  • attaining full compliance with regulations and reporting of greenhouse gas emissions;

  • achieving minimum impact on vegetation and supporting and enabling local biodiversity;

  • reducing planned industrial waste;

  • resolving individual community member grievances;

  • continuing and improving stakeholder communication and engagement programmes; and

  • achieving zero significant environmental incidents.

  • ESG Reporting and Assessment

The Company's ongoing ESG analysis continues to refine the set of performance indicators to measure and monitor key environmental, social sustainability and governance activities at the Waterberg Project. We wish to achieve a high level of understanding and commitment from those who carry out our day-to-day activities.  Our social performance indicators aim to cover social risk management, grievance management, community investment and human rights.  Our environmental performance indicators aim to cover environmental impact mitigation, audits, water, energy, greenhouse gas emissions and environmental remediation and rehabilitation.  Health and safety performance indicators are also to be recorded and monitored.

The Company has worked with Digbee Ltd. ("Digbee") since 2021 to independently assess its ESG development and disclosure at both the corporate and project level as it moves toward the construction phase of the Waterberg Project.  The Digbee ESG platform is aligned with over 25 global reporting standards to generate an appropriate ESG score for development stage mining companies and address real risk. 

As part of the Waterberg Mining Right application process the Company developed a wide ranging set of studies and plans in relation to potential ESG impacts.  These studies and plans were leveraged to form the basis of the Digbee ESG assessment and subsequent outcomes.

For 2023, an independent team of ESG experts evaluated the Company's ESG submission against a set of rigorous and standardized scoring criteria.  To ensure accuracy and credibility, these scores were finalized after being peer reviewed.  Platinum Group achieved an overall score of BBB with a range of C to AAA based on the information provided.  The BBB score is an improvement from the BB score achieved in 2022.  The total score shown below reflects the calculated average of the average corporate and project scores awarded.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Awarded ESG Ratings (September 2023) 

High Level Positive Outcomes

  • The Waterberg Project is finalizing the Waterberg DFS Update and has approved in principle the budget for infrastructure for roads, power and water.  ESG is taken into consideration in the Waterberg DFS Update, in particular a reduced TSF footprint.

  • The ESG component in the strategy was augmented in 2023 to include better understanding of ESG threats and opportunities than has been presented in previous years.

  • ESG key performance indicators were introduced in the 2023 fiscal year and expanded in 2023 for the 2024 fiscal year.

  • Understanding of the local surroundings has been improved, this includes updated detailed studies on the underground water environment and enhanced relations with the local community with a relevant picture of skills needs and requirements.

High Level Potential Risks and Opportunities

  • Diversity of the workforce (both employees and contractors) has improved; however, these are primarily only gender focused rather than inclusive of broader diversity such as ethnicity.

  • No formal risk management framework to identify and manage risks and opportunities is as yet in place, though it should be noted that publicly available documentation suggests that integrated risk management is taking place with the corporate.

  • The plan for continuity of decision making from project to operational phase is yet to be drafted, in part due to the timeline anticipated; however, it might be expected that the current workforce plan would detail how this handover will take place in the future.

  • ESG - Environmental

We have commissioned independent environmental site inspections and environmental management program compliance assessments at the Waterberg Project for all our mining and prospecting right areas.  Baseline environmental studies for air quality and water quality are currently underway over the Waterberg Project area.  Annual environmental reports are filed with regulators.  To date, there have been no significant environmental incidents at our Waterberg operation since exploration began on the property in 2011.  As a requirement to the grant of the Waterberg Mining Right an EIA and EMP were filed with governmental regulators after a comprehensive consultation process with communities, regulators, environmental institutions, and other stakeholders over the last ten years.  Several independent, third-party specialist consultants completed component studies as a part of the application process. The EIA and EMP were subsequently approved by the relevant regulators.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

The Company has carried on advancing the Waterberg DFS Update into 2024.  The upcoming Waterberg DFS Update will take into consideration studies completed in 2020-2021 on the use of battery electric equipment for the Waterberg Project and the use of dry stacking solutions for tailings to reduce water use.

Since its initiation in 2023, environmental monitoring has advanced in the areas of climatic data, surface water chemistry, groundwater and air quality.  As the Waterberg Project develops, environmental monitoring will be expanded to include monitoring of noise and biodiversity.  In line with this, environmental management and mitigation measures will be implemented accordingly.

Furthermore, the mineral resources targeted at the Waterberg Project are mineable platinum group metals, being mainly palladium, platinum, and rhodium.  These metals are important elements in terms of reducing harmful emissions from internal combustion engines.  Platinum is a critical element in fuel cells and the "hydrogen economy" in general, highlighting the mine's potential to contribute to a cleaner future.

  • ESG - Social

To date, work at the Waterberg Project has been related to exploration and engineering activities.  Overall safety performance has been very good and strict safety protocols are followed.

We maintain an open communication policy with communities near the Waterberg Project.  We responded to concerns raised by individuals regarding water resources, roadways, heritage sites and planned infrastructure locations by thoroughly investigating each reported concern or claim.  Meetings were held with community leaders and site inspections occurred with local community members accompanied by independent consultants, NGOs, government agencies and regulators.  Although no material issues or events of regulatory non-compliance by the Company have been identified after these investigations, the Company remains committed to operating in a responsible manner and continues to work with local community leadership to ensure any identified issues are resolved in an appropriate and professional manner and in compliance with governing regulations.  The Company is in the process of developing a more formalized grievance mechanism that will be accessible to all community members.

In 2023 the Company has continued working with local communities to create community trusts.  To ensure communities are well represented, the Company is covering the costs of legal representation for the communities.  The Limpopo Provincial Government and the Regional DMRE Office in Limpopo are preparing to facilitate workshops with community leadership and other stakeholders to support and build their understanding of the mining legal framework and their rights and obligations in respect thereto.  The Company intends to benefit from these efforts.

The Company has further supported a local skills audit and the development of profiles of our local communities.  These reports will help the Company better understand and respond to the needs of our local community members.  The Company has also appointed two additional consultants to work with our local communities at the Waterberg Project.  These consultants are assisting with community engagement and the implementation of the Social and Labour Plan.  This year, the Company has granted bursaries to local youth and provided portable skills training to local community members.

Based on community meetings and direct feedback, and in part due to the Company's efforts to engage and support local communities, we believe local community residents support the development of the Waterberg Project and understand the expected economic benefits. 

  • ESG - Governance

In keeping with its dedication to maintaining the highest standards of governance, the Company has implemented an Environmental, Health, Safety and Technical Advisory Committee, a Governance and Nomination Committee and a number of policies to help create secure work environments that prioritize equality, integrity and respect for all. 

Environmental, Health, Safety and Technical Advisory Committee

As part of its mandate to assist the Board in its oversight of capital projects and material transactions undertaken by the Company, its subsidiaries or its affiliates from an environmental, technical, financial and scheduling perspective, the Environmental, Health, Safety and Technical Advisory Committee (the "EHST Committee") is responsible for developing and monitoring standards for ensuring a safe and healthy work environment and to promote sustainable development.  The EHST Committee is also responsible for providing oversight of the Environmental, Health, Safety, and Social Responsibility Policies (the "EHSSR Policies"), the Human Rights Policy, and for monitoring the Company's practices in these areas, including the monitoring of (a) risks, challenges and opportunities to the Company's business associated with environmental, health, safety and social responsibility matters; (b) the Company's sustainability conduct, including environmental, health, safety and social policies and programs and overseeing performance in such areas; (c) the Company's compliance and applicable legal and regulatory requirements associated with environmental, health, safety, and community conduct; and (d) the Company's external reporting in relation to health, safety, environmental and community conduct. 


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Governance and Nomination Committee

The Governance and Nomination Committee of the Board also plays an important role in assisting the Board with its oversight of ESG matters.  The Governance and Nomination Committee is responsible for developing and implementing governance guidelines and principles, providing governance leadership to the Company and monitoring governance programs and policies, including without limitation, the Code of Business and Conduct and the Commitment to Anti-Bribery Conduct.  The Governance and Nomination Committee reviews the Company's policies to ensure compliance with the applicable rules and regulations, and where necessary or desirable on account of governance trends that are appropriate for the Company, recommends changes, or the adoption of further policies, to the Board for approval.

Environmental, Health, Safety, and Social Responsibility Policies

The EHSSR Policies supplement the requirements, guidelines, and standards of conduct specified in Platinum Group's other policies and affirm the Company's commitment to health and safety, social license and sustainable development, environmental stewardship, and human rights.  The EHSSR Policies are intended to be a component of the flexible governance framework within which the Board, assisted by its committees, directs the affairs of Platinum Group.  The EHSSR Policies outline the Company's ESG expectations for all employees, directors, contractors, and consultants performing services for or on behalf of the Company. 

Human Rights Policy

Along with integrating human rights into its risk assessment and due diligence processes, the Company is dedicated to fostering a culture of respect for human rights in the workplace.  It also actively seeks out positive interactions and collaborations with stakeholders who are impacted by its operations.  The EHST Committee assists the Board in the oversight of the Human Rights Policy including, reviewing the effectiveness and compliance of this policy on a regular basis, monitoring the Company's performance, challenges and commitments in the prevention or mitigation of any human rights issues, and reviewing the proposed public disclosure of any Company human rights matters.

The Company has also adopted a Code of Business Conduct and Ethics, a Commitment to Anti-Bribery Conduct, a Clawback Policy, and a Whistleblower Policy, amongst other customary policies.  Copies of the policies and committee charters may be found on the Company's website at www.platinumgroupmetals.net. 

We also adhere to the corporate governance policies of the Toronto Stock Exchange and the NYSE American, LLC.

On February 28, 2023, the Company held its Annual General Meeting.  All resolutions were passed in the form proposed by an affirmative vote of the shareholders.

3. DISCUSSION OF OPERATIONS AND FINANCIAL CONDITION

(A) Liquidity and Capital Resources

Recent Equity Financings

On June 21, 2022, the Company filed a new final short form base shelf prospectus (the "Shelf Prospectus") with the securities regulatory authorities in each of the provinces and territories of Canada and a corresponding registration statement on Form F-10 (the "Registration Statement") with the SEC under the Multijurisdictional Disclosure System established between Canada and the United States.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

Pursuant to the Shelf Prospectus and the Registration Statement, the Company may offer and sell in Canada or the United States, Common Shares, debt securities, warrants, subscription receipts, or a combination thereof up to an aggregate initial offering price of $250 million from time to time, separately or together, in amounts, at prices and on terms to be determined based on market conditions at the time of the offering and as set out in an accompanying prospectus supplement, during the 25-month period that the Shelf Prospectus and the Registration Statement remain effective. 

On July 27, 2022, the Company filed a supplement to the Shelf Prospectus and announced a new equity distribution agreement with BMO Capital Markets and BMO Nesbitt Burns Inc. whereby the Company can sell its Common Shares from time to time until July 21, 2024 for up to $50 million in aggregate sales proceeds in "at the market" transactions (the "2022 ATM").  No Common Shares were sold pursuant to the 2022 ATM prior to August 31, 2022.  For the year ended August 31, 2023, the Company sold 1,089,503 shares at an average price of US$1.81 for gross proceeds of $1.97 million and net proceeds of $1.5 million after deducting fees and expenses including $0.05 paid to BMO Capital Markets.  No shares were sold during the three month period ended November 30, 2023. 

On September 18, 2023, the Company completed a non-brokered private placement with Deepkloof where the Company issued 2,118,645 common shares at US$1.18 per share for gross proceeds to the Company of $2.5 million.

Proceeds from offerings above have been and will be used for the advancement of the Waterberg Property and general corporate purposes.

Liquidity

The Company currently has limited financial resources and does not generate revenue from the Waterberg Project.  Current cash on hand ($7.1 million at November 30, 2023) is projected to be sufficient to cover the Company's budgeted expenditures over the next 12 months.  Should the Company decide to begin construction of the Waterberg Mine in the next 12 months additional financing would be required.

Rising global inflation and increased potential supply chain disruptions could have a significant impact on the Company's operations and costs.

Contractual Obligations

The following table discloses the Company's contractual obligations as at November 30, 2023 (in thousands of dollars):

Payments Due by Year
    < 1 Year     1 - 3 Years     4 - 5 Years     > 5 Years     Total  
Lease Obligations $ 118   $ 285   $ 125   $ -   $ 528  
Environmental Bonds   43     129     86     -     258  
Totals $ 161   $ 414   $ 211   $ -   $ 786  

Other contingencies: Refer to section 8 below - Risk Factors.

Accounts Receivable and Payable

Accounts receivable at November 30, 2023, totaled $0.2 million (August 31, 2023 - $0.2 million) being comprised mainly of South African value added taxes. 

Accounts payable and accrued liabilities at November 30, 2023, totaled $0.7 million (August 31, 2023 - $1.4 million).


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

(B) Results of Operations

Period Ended November 30, 2023

For the period ended November 30, 2023, the Company incurred a net loss of $1.6 million (November 30, 2022 - $1.6 million loss).  General and administrative expenses totaled $1.1 million (November 30, 2022 - $1.2 million) with the decrease primarily due to reduced legal fees incurred in the current period.  Joint Venture expenditures for Lion totaled $0.2 million (November 30, 2022 - $Nil).  During the period, $1.0 million was spent at the Waterberg Project (August 31, 2022 - $3.0 million).

Quarterly Financial Information

The following tables set forth selected quarterly financial data for each of the last eight quarters (In thousands of dollars, except for share data):

Quarter ended   Nov. 30, 2023     Aug. 31, 2023     May 31, 2023     Feb. 28, 2023  
Net finance income(1) $ 135   $ 119   $ 144   $ 183  
Net loss(2)   1,558     1,614     1,236     1,199  
Basic loss per share(3)   0.02     0.02     0.01     0.01  
Total assets   50,940     50,021     48,169     51,150  
Quarter ended   Nov. 30, 2022     Aug. 31, 2022     May 31, 2022     Feb. 28, 2022  
Net finance income(1) $ 138   $ 85   $ 40   $ 26  
Net loss(2)   1,614     990     1,310     2,634  
Basic loss per share(3)   0.02     0.01     0.01     0.03  
Total assets   54,545     53,679     58,246     53,859  

Notes:

(1) The Company earns income from interest bearing accounts and deposits. Rand balances earn higher rates of interest than can be earned at present in Canadian or U.S. Dollars. Interest income varies relative to cash on hand.

(2) The Company fully repaid its outstanding loan and convertible debt in the quarter ended February 28, 2022, thus eliminating interest expenses and reducing net losses from the quarter ended February 28, 2022 onwards.

(3) Basic loss per share is calculated using the weighted average number of common shares outstanding. The Company uses the treasury stock method to calculate diluted earnings per share. Diluted per share amounts reflect the potential dilution that could occur if securities or other contracts to issue common shares were exercised or converted to common shares. In periods when a loss is incurred, the effect of share issuances under options would be anti-dilutive, resulting in basic and diluted loss per share being the same.

4. DIVIDENDS

The Company has never declared nor paid dividends on its Common Shares. The Company has no present intention of paying dividends on its Common Shares, as it anticipates that in the foreseeable future all available funds will be invested to finance its business.  The Company plans to consider a dividend policy upon the establishment of positive cash flow.

5. RELATED PARTY TRANSACTIONS

All amounts receivable and accounts payable owing to or from related parties are non-interest bearing with no specific terms of repayment.  All related party transactions are in the normal course of business and are recorded at consideration established and agreed to by the parties.  Transactions with related parties are as follows (in thousands of dollars):

(i) During the period ended November 30, 2023, an amount of $79 (November 30, 2022 - $75) was paid or accrued to independent directors for directors' fees and services.

(ii) During the period ended November 30, 2023, the Company was paid or accrued payments of $13 (November 30, 2022 - $13) from West Vault Mining Inc., a company with one officer in common, for accounting and administrative services.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

(iii) In fiscal 2018, Deepkloof made a strategic investment in the Company by way of a private placement.  Through the terms of the May 2018 private placement, HCI acquired a right to nominate one person to the board of directors of the Company and a right to participate in future equity financings of the Company to maintain its pro-rata interest.  HCI has exercised its right to nominate one person to the board of directors. As of November 30, 2023, HCI's ownership of the Company was reported at 26,955,994 common shares, representing a 26.3% interest in the Company.  In September 2023, Deepkloof subscribed to a private placement of 2,118,645 common shares at US$1.18 per share for gross proceeds to the Company of $2.5 million.

6. OFF-BALANCE SHEET ARRANGEMENTS

The Company does not have any special purpose entities nor is it party to any off-balance sheet arrangements.

7. OUTSTANDING SHARE DATA

The Company has an unlimited number of Common Shares authorized for issuance without par value.  At November 30, 2023, there were 102,376,675 Common Shares, 4,446,787 incentive stock options and 732,338 restricted share units outstanding.  At January 12, 2024, there were 102,480,148 Common Shares, 4,446,787 incentive stock options and 533,327 restricted share units outstanding.

8. RISK FACTORS

The Company is subject to a number of risks and uncertainties, each of which could have an adverse effect on results, business prospects or financial position.  For a comprehensive list of the risks and uncertainties affecting our business, please refer to the section titled "Risk Factors" in the 2023 AIF and 2023 40-F, and the documents incorporated by reference therein.  The Company's 2023 AIF and 2023 40-F may be found on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.  Certain risk factors are discussed below in more detail.

International Conflicts

International conflict and other geopolitical tensions and events, including war, military action, terrorism, trade disputes, and international responses thereto have historically led to, and may in the future lead to, uncertainty or volatility in global energy, supply chain and financial markets. Russia's 2022 invasion of Ukraine has led to sanctions being levied against Russia by the international community and may result in additional sanctions or other international action, any of which may have a destabilizing effect on commodity prices, supply chain and global economies more broadly. Volatility in commodity prices and supply chain disruptions may adversely affect the Company's business and financial condition.

The extent and duration of the current Russian-Ukrainian conflict and related international action cannot be accurately predicted at this time and the effects of such conflict may magnify the impact of the other risks identified in this MD&A, including those relating to commodity price volatility and global financial conditions. The situation is rapidly changing, and unforeseeable impacts may materialize, and may have an adverse effect on the Company's business, results of operations and financial condition.

Africa Wide Legal Action

On April 26, 2018, a transaction was completed selling 100% of the share interests in Maseve Investments 11 (Pty) Ltd. ("Maseve") to Royal Bafokeng Platinum Limited ("RBPlat") in a transaction valued at approximately $74.0 million.  Maseve owned and operated the Maseve Mine.  Africa Wide Mineral Prospecting and Exploration Proprietary Limited ("Africa Wide") was required to simultaneously sell its 17.1% interest together with the Company's 82.9% interest in Maseve.

In September 2018, Africa Wide instituted legal proceedings in South Africa against PTM RSA, RBPlat and Maseve seeking to set aside the sale of Maseve.  A trial to hear evidence occurred in the High Court in October, 2021.  On June 14, 2022, the High Court dismissed Africa Wide's challenge and awarded costs to the defendants.  Africa Wide appealed the ruling, which was later dismissed by the South Africa Supreme Court of Appeal on November 10, 2022.  Africa Wide was again ordered to make payment of the defendants' costs. 


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

On July 10, 2023, Africa Wide applied to the President of the Supreme Court of Appeal for a reconsideration of the November 10, 2022 ruling of the Supreme Court of Appeal.  On October 6, 2023, the South African Supreme Court of Appeal dismissed Africa Wide's application.  Africa Wide was again ordered to pay costs.  On November 23, 2023 the High Court determined that Africa Wide owes the Company a total of R2.99 million ($154,000) in costs.  On November 29, 2023, the Company served Africa Wide by sheriff a demand for payment.  Further necessary steps are being taken to recover the costs.  The Company has made no accrual for the award of costs. 

9. OUTLOOK

The Company's key business objective is to advance the Waterberg Project to a development and construction decision.  Before a construction decision can be undertaken arrangements will be required for project financing and concentrate offtake or processing.  The Company and Waterberg JV Co. are assessing commercial alternatives for mine development, concentrate offtake and financing. 

The Work Program now underway (described above) is planned to focus on initial road access, water supply, essential site facilities, a first phase accommodation lodge, a site construction power supply from ESKOM and advancement of the Waterberg SLP.  Under the Work Program, the Waterberg DFS Update is also underway, including a review of cut-off grades, mining methods, infrastructure plans, scheduling, concentrate offtake, dry stack tailings, costing and other potential revisions to the project's financial model.  Once complete, the Waterberg DFS Update and associated work will provide updated mineral resource estimates, reserve estimates, estimates of project capital requirements and peak funding.

As discussed above, the Company is conducting research and formal studies to evaluate the economic feasibility of establishing a smelter and BMR business, jointly with third-party investors, capable of processing Waterberg concentrate as an alternative to a traditional concentrate offtake arrangement.  Discussions are also underway with existing smelter/refinery operators in South Africa who may be interested to enter formal concentrate offtake arrangements for the Waterberg Project. 

Project financing to meet peak funding requirements for the Waterberg Project as estimated in the Waterberg DFS is currently envisaged to be provided by approximately $200 million in equity from Waterberg JV Co. shareholders, approximately $300 million from a metal stream arrangement, and approximately $100 to $150 million from a secured loan facility.  Discussions and negotiations with potential financiers on the foregoing are underway.  Capital cost estimates as described above are subject to market conditions, which have been generally inflationary, and will be updated as a component to the Waterberg DFS Update.

Notwithstanding some weakness during 2020 due to the economic effects of the COVID-19 pandemic, the markets for PGEs generally improved over the preceding several years until peaking in 2021/22.  Since 2021, PGE prices have been somewhat volatile, due in part to geopolitical tensions caused by the threat of Russian PGE exports being cut back or sanctioned, representing a significant supply risk.  Notwithstanding this volatility, in general PGE prices have been declining since their peak in 2021/22 due to global economic uncertainty.  In the months and years ahead, a prolonged period of falling PGE prices may result in the closure of uneconomic PGE mines or cause the delayed startup of new PGE projects.  In response to lower PGE prices many of the South African PGE producers are already reporting cost saving measures and the closure of uneconomic operations.  Major South African PGE producers are currently operating under recent wage settlement agreements. Supply risk due to union strike action at present appears to be unlikely.  Power shortages due to rolling blackouts implemented by South African power utility ESKOM are beginning to negatively impact PGE production in South Africa.  The projected market penetration of battery electric vehicles in the future could soften the market for palladium in the longer term as demand for internal combustion engines with catalytic converters is potentially reduced.  Other metals to be produced at Waterberg, being platinum, rhodium, gold, copper and nickel, are projected to see strong future demand and prices in the longer term.  Copper and nickel are important metals for battery electric vehicles and other electrical equipment.  Platinum is projected to see strong pricing looking forward due to supply constraints and increased demand for utilization in hydrogen fuel cells and the equipment used to produce hydrogen.

As the world seeks to decarbonize and look for solutions to climate change, the unique properties of PGEs as powerful catalysts are being applied to various technologies as possible solutions for more efficient energy generation and storage.  The Company's battery technology initiative through Lion with Amplats represents a new opportunity in the high-profile lithium battery research and innovation field.  The investment in Lion creates a potential vertical integration with a broader industrial market development strategy to bring new technologies to market which use palladium and platinum.  Research and development efforts by FIU on behalf of Lion continue.  Technical results from Lion's research may have application to most lithium-ion battery chemistries and the scope of Lion's research work is being expanded.  Senior officers of the Company and Lion partner Amplats spent time together at FIU in 2022 to review progress by the Lion research team and plan for the possible future commercialization of Lion's technology.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

As well as the discussions within this MD&A, the reader is encouraged to also see the Company's disclosure made under the heading "Risk Factors" in the 2023 AIF and separate 2023 40-F.

10. CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS 

The preparation of the Company's consolidated financial statements in conformity with IFRS required management to use estimates and assumptions that affect the reported amounts of assets and liabilities, as well as income and expenses.  The Company's accounting policies are described in Note 2 of the Company's audited financial statements for the year ended August 31, 2023.

Assessment of Impairment for Mineral Properties

The Company applies judgment to assess whether there are impairment indicators present that give rise to the requirement to conduct an impairment test. Events or changes in circumstances that could trigger an impairment test include; (i) significant adverse changes in the business climate including changes in forecasted future metal prices; (ii) significant changes in the extent or manner in which the assets are being used or their physical condition including significant decreases in mineral reserves; and (iii) significant decreases in the market price of the assets.

Assumption of control of Mnombo and Waterberg JV Co. for accounting purposes

The Company has judged that it controls Mnombo for accounting purposes as it owns 49.9% of the outstanding shares of Mnombo and has contributed all material capital to Mnombo since acquiring its 49.9% share.  From inception to date, the Company has funded both the Company's and Mnombo's share of expenditures on the Waterberg Project.  At August 31, 2023, Mnombo owed the Company approximately $8.7 million for funding provided.  Currently there are no other sources of funding known to be available to Mnombo.  If in the future Mnombo is not deemed to be controlled by the Company, the assets and liabilities of Mnombo would be derecognized at their carrying amounts.  Amounts recognized in other comprehensive income would be transferred directly to retained earnings.  If a retained interest remained after the loss of control, it would be recognized at its fair value on the date of loss of control.  Although the Company controls Mnombo for accounting purposes, it does not have omnipotent knowledge of Mnombo's other shareholders activities.  Mnombo's 50.01% shareholders are historically disadvantaged South Africans.  The Company also determined that it controls Waterberg JV Co. given its control over Mnombo as well as its power over the investee.

11. DISCLOSURE CONTROLS AND INTERNAL CONTROL OVER FINANCIAL REPORTING

The Company maintains a set of disclosure controls and procedures designed to ensure that information required to be disclosed in filings made pursuant to both the SEC and Canadian Securities Administrators requirements are recorded, processed, summarized and reported in the manner specified by the relevant securities laws applicable to the Company.  Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the applicable securities legislation is accumulated and communicated to the issuer's management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

Changes in Internal Controls over Financial Reporting

Management is responsible for establishing and maintaining adequate internal controls over financial reporting.  Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. There has been no change in our internal control over financial reporting during the period ended November 30, 2023, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.


PLATINUM GROUP METALS LTD.
(A Development Stage Company)
Supplementary Information and MD&A
For the period ended November 30, 2023

12.  OTHER INFORMATION

Additional information relating to the Company for the year ended August 31, 2023, may be found on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. Readers are encouraged to review the Company's audited financial statements for the year ended August 31, 2023 together with the notes thereto as well as the Company's 2023 40-F and separate 2023 AIF filed in Canada.

13. LIST OF DIRECTORS AND OFFICERS

Directors   Officers
Diana Walters Stuart Harshaw Frank R. Hallam (President & CEO)
Frank R. Hallam John Copelyn Greg Blair (CFO)
Timothy Marlow Mpho Makwana Kris Begic (VP, Corporate Development)
    Mimy Fernandez-Maldonado (Corporate Secretary)



Exhibit 99.3

CONSENT OF EXPERT

The undersigned hereby consents to the inclusion in the Management's Discussion and Analysis (the "MD&A") of Platinum Group Metals Ltd. (the "Company") for the period ended November 30, 2023 of references to the undersigned as an independent qualified person and the undersigned's name with respect to the disclosure of technical and scientific information contained in the MD&A (the "Technical Information"). The undersigned further consents to the incorporation by reference in the Company's Registration Statement on Form F-10 (File No. 333-265633) filed with the United States Securities and Exchange Commission, of the references to the undersigned's name and the Technical Information in the MD&A.

 

/s/ Rob van Egmond                  

Rob van Egmond, P.Geo.

Date: January 12, 2024



FORM 52-109F2
CERTIFICATION OF INTERIM FILINGS
FULL CERTIFICATE

I, Frank R. Hallam, Chief Executive Officer of Platinum Group Metals Ltd., certify the following:

1. Review:  I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Platinum Group Metals Ltd. (the "issuer") for the interim period ended November 30, 2023.

2. No misrepresentations:  Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3. Fair presentation:  Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4. Responsibility:  The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.

5. Design:  Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings

(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.

5.1 Control framework:  The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is the Internal Control - Integrated Framework (COSO Framework) prepared by the Committee of Sponsoring Organizations of the Treadway Commission ("COSO").


- 2 -

5.2 ICFR - material weakness relating to design:  N/A

5.3 Limitation on scope of design:  N/A

6. Reporting changes in ICFR:  The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on September 1, 2023 and ended on November 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.

Date:  January 12, 2024

/s/ Frank Hallam
Frank R. Hallam
Chief Executive Officer



FORM 52-109F2
CERTIFICATION OF INTERIM FILINGS
FULL CERTIFICATE

I, Gregory Blair, Chief Financial Officer of Platinum Group Metals Ltd., certify the following:

1. Review:  I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Platinum Group Metals Ltd. (the "issuer") for the interim period ended November 30, 2023.

2. No misrepresentations:  Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3. Fair presentation:  Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4. Responsibility:  The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.

5. Design:  Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings

(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and

(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.

5.1 Control framework:  The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is the Internal Control - Integrated Framework (COSO Framework) prepared by the Committee of Sponsoring Organizations of the Treadway Commission ("COSO").


- 2 -

5.2 ICFR - material weakness relating to design:  N/A

5.3 Limitation on scope of design:  N/A

6. Reporting changes in ICFR:  The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on September 1, 2023 and ended on November 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.

Date:  January 12, 2024

 

/s/ Gregory Blair
Gregory Blair
Chief Financial Officer



838 – 1100 Melville Street
Vancouver, BC V6E 4A6
P: 604-899-5450
F: 604-484-4710

News Release No. 24-474
January 12, 2024

Platinum Group Metals Ltd. Reports First Quarter Results

(Vancouver/Johannesburg) Platinum Group Metals Ltd. (PTM:TSX; PLG:NYSE American) ("Platinum Group", "PTM" or the "Company") reports the Company's financial results for the three months ended November 30, 2023, and provides an update and outlook.  The Company is focussed on advancing the Waterberg Project located on the Northern Limb of the Bushveld Complex in South Africa (the "Waterberg Project").  The Waterberg Project is planned as a fully mechanised, shallow, decline access palladium, platinum, gold and rhodium ("4E") mine and is projected to be one of the largest and lowest cost underground platinum group metals ("PGM" or "PGMs") mines globally. 

The Company's near-term objectives are to advance the Waterberg Project to a development and construction decision including the arrangement of construction financing and concentrate offtake agreements.  The Company is also advancing an initiative through Lion Battery Technologies Inc. ("Lion") using platinum and palladium in lithium battery technologies in collaboration with Anglo American Platinum Limited ("Amplats") and Florida International University ("FIU"). 

For details of the condensed consolidated interim financial statements for the three months ended November 30, 2023 (the "Financial Statements") and Management's Discussion and Analysis ("MD&A") for the three months ended November 30, 2023 please see the Company's filings on SEDAR+ (www.sedarplus.ca) or on EDGAR (www.sec.gov).  Shareholders are encouraged to visit the Company's website at www.platinumgroupmetals.net.  Shareholders may receive a hard copy of the complete Financial Statements and MD&A from the Company free of charge upon request. 

All amounts herein are reported in United States dollars unless otherwise specified.  The Company holds cash in Canadian dollars, United States dollars and South African Rand.  Changes in exchange rates may create variances in the cash holdings or results reported.

Recent Events

On December 20, 2023, the Company announced a Cooperation Agreement (the "Cooperation Agreement") with Ajlan & Bros Mining and Metals Co. ("Ajlan") to study the establishment of a stand-alone PGM smelter ("PGM Smelter") and base metal refinery ("BMR") in Saudi Arabia.  Ajlan is a subsidiary of Ajlan & Bros Holdings, one of the largest private sector diversified conglomerates in the Middle East.  The Cooperation Agreement encompasses three phases: a global PGM concentrate market study (the "Market Study"), a Definitive Feasibility Study for the construction and operation of the PGM Smelter and BMR in Saudi Arabia (the "Smelter DFS"), and an option to form an incorporated 50:50 joint venture following the completion of the Smelter DFS. 


PLATINUM GROUP METALS LTD. ...2

The Market Study will seek to identify potential global sources of PGM concentrate that could augment the processing of the Waterberg Project concentrate in Saudi Arabia and minimize the risk of sourcing concentrate from only one project.

Upon the completion of the Market Study, and assuming a favourable outcome, Ajlan and the Company may together commission the Smelter DFS at an estimated cost for the study of approximately US$4.0 million. The Smelter DFS will assume the export of PGM concentrate from the Waterberg Project in South Africa to a port facility in Saudi Arabia and will encompass options related to infrastructure, location, technical specifications, capital, and operating costs. All expenses related to the Smelter DFS are to be split on a 50:50 basis between Platinum Group and Ajlan, including certain costs already incurred by Platinum Group in previous independent beneficiation studies.

The Company believes Saudi Arabia offers an attractive investment climate that includes highly competitive energy costs, a lower taxation rate, and significant government financing incentives.  An initial trade-off study has been completed to determine the viability of exporting PGM concentrate from South Africa to Saudi Arabia.  Shipping costs are generally offset by lower energy costs and water costs.  The PGM Smelter and BMR would benefit from existing infrastructure.  A key requirement would be to secure a long-term permit for the export from South Africa of unrefined precious metals in concentrate.

On December 11, 2023, the directors, and shareholders of Waterberg JV Resources (Pty) Ltd. ("Waterberg JV Co.") unanimously approved a stage three budget of $1.62 million (the "Stage Three Budget") for continued work on the Waterberg Project.  The Stage Three Budget, covering the period from September 2023 to approximately February 2024, is a subcomponent of the $21 million Work Program (as defined below) approved in principle on October 18, 2022.  In conjunction with its approval of the Stage Three Budget, Impala Platinum Holdings Ltd. ("Implats") advised that due to its own internal cost savings efforts, it would not be funding its 15% share of the Stage Three Budget, which will result in a 0.049% dilution to their current 15% position in Waterberg JV Co.  Shareholders of Waterberg JV Co. have the right to contribute the cash contribution shortfall of any diluting shareholder, pro rata to the aggregate shareholding of all shareholders who elect to fund such shortfall.  Platinum Group alone has elected to fund all Implats funding shortfall for the Stage Three Budget.  Implats stated they would consider the funding of subsequent cash calls as future circumstances allowed. 

On September 18, 2023, the Company reported the closing of a non-brokered private placement of common shares at a price of $1.18 per common share.  An aggregate of 2,118,645 common shares were subscribed for and issued to existing major beneficial shareholder, Hosken Consolidated Investments Limited ("HCI") through its subsidiary Deepkloof Limited, resulting in gross proceeds to the Company of approximately $2.5 million (the "Private Placement").  Closing of the Private Placement allowed HCI to return to more than a 26% interest in the Company.


PLATINUM GROUP METALS LTD. ...3

On June 21, 2023, the Company reported that Lion Battery Technologies Inc. ("Lion") had engaged the Battery Innovation Center ("BIC") in Newberry, Indiana, to help drive commercialization efforts for its next generation platinum and palladium based battery chemistries.  Lion is advancing both proprietary lithium-sulfur and enhanced lithium-ion (NMC) technology using the unique catalytic properties of platinum and palladium.  Under a scope of work, BIC is to conduct independent small and large scale trials to validate Lion's proprietary platinum and palladium based electrode composition, slurry, and films in both lithium-sulfur and lithium-ion (NMC811) coin and pouch cells.  Collaboration with BIC will also include additional research and development focused on improving performance and scale-up with the goal of creating prototypes for commercialization consideration in 2024.  Lion's target is to develop batteries with specific energies that are 20% to 100% higher than current technologies while meeting or exceeding their present cycle lives.

On June 9, 2023, the Company reported that the Japan Organization for Metals and Energy Security ("JOGMEC") and Hanwa Co. Ltd. ("Hanwa") had established a special purpose company, HJ Platinum Metals Ltd. ("HJM"), to hold and fund their future equity interests in the Waterberg Project.  The combined interests of JOGMEC (12.195%) and Hanwa (9.755%) were consolidated into a 21.95% interest for HJM going forward, with JOGMEC to fund 75% of future equity investments into HJM and Hanwa the remaining 25%.

On May 17, 2023, the Company reported that exploration borehole WE153 had intercepted platinum group metals mineralization consistent with both the T Zone and F Zone as found within the mineral resources and reserves of the Waterberg Project.  Borehole WE153 was collared on prospecting rights owned by Waterberg JV Co. located adjacent to the north of the Waterberg Project mining right.  See the Company's May 31, 2023 MD&A for full details and assay results for borehole WE153.

On March 30, 2023, the Company reported positive results from a completed infill drill campaign at the Waterberg Project.  Assay results for sixteen planned F Zone boreholes were disclosed.  During February 2023, recovered drill cores were logged and mineralized intercepts were sampled and sent for assay by Intertek Genalysis Minerals in Australia ("Intertek").  Results will be incorporated into a definitive feasibility study update now underway and described more fully below.  See the Company's news release dated March 30, 2023 for full details and assay results for all F Zone boreholes completed under the infill drill campaign.

On March 24, 2023, the directors, and shareholders of Waterberg JV Co. approved a stage two budget in the amount of $3.6 million (the "Stage Two Budget") for continued work on the Waterberg Project.  The Stage Two Budget, covering the period from April 1, 2023 to August 31, 2023, is a subcomponent of the $21 million Work Program (as defined below) approved in principle on October 18, 2022.  Work pursuant to the Stage Two Budget was substantially completed in October 2023.


PLATINUM GROUP METALS LTD. ...4

On February 21, 2023, the U.S. Patent and Trademark Office issued FIU a fifth patent, No. 11,588,144 B2, entitled "Battery Cathodes for Improved Stability".  The patent involves the fabrication of cathodes using palladium as a catalyst in carbon nanotubes.  The carbon structure provides a barrier between the catalyst and the electrolyte, thereby increasing the stability of the electrolyte during charging and discharging of a battery.  Further patents are currently applied for.  Under a sponsored research agreement between Lion and FIU, Lion has exclusive rights to all intellectual property being developed by FIU including the patents granted.

On January 26, 2023, the Company reported positive results from an active infill drill campaign at the Waterberg Project.  Assay results for sixteen planned T Zone boreholes and one of sixteen planned F Zone boreholes were disclosed.  Recovered drill cores were logged and mineralized intercepts were sampled and sent for assay by Intertek.  Results will be incorporated into a definitive feasibility study update now underway and described more fully below.  See the Company's news release dated January 26, 2023 for details and assay results for all sixteen T Zone boreholes completed under the infill drill campaign.

On November 10, 2022, the South African Supreme Court of Appeal (the "Supreme Court") dismissed an August 31, 2022 application by Africa Wide Mineral Prospecting and Exploration Proprietary Limited ("Africa Wide") seeking leave to appeal the June 14, 2022 South African High Court (the "High Court") ruling dismissing their challenge to the 2018 sale of the Maseve Mine.  On July 10, 2023, the Company received notice that Africa Wide had applied for a reconsideration of the ruling of to the President of the Supreme Court.  On October 6, 2023 the Supreme Court ordered that Africa Wide's application for reconsideration be denied.  On November 23, 2023, the High Court determined that Africa Wide owes the Company a total of $0.154 million (R2.99 million) in costs.  On November 29, 2023, the Company served Africa Wide by sheriff with a demand for payment.  Further necessary steps are being taken to recover the costs.  The Company has made no accrual for the award of costs.

On October 18, 2022, the directors and shareholders of Waterberg JV Co. approved in principle a pre-construction work program (the "Work Program") for the Waterberg Project amounting to approximately $21.0 million over a two year period.  From the Work Program an initial budget (the "Initial Budget") of approximately $2.5 million was approved for expenditure by March 31, 2023, and this work is now complete. 

Results For The Three Months Ended November 30, 2023

During the three months ended November 30, 2023, the Company incurred a net loss of $1.56 million (November 30, 2022 - net loss of $1.61 million). General and administrative expenses during the period were lower at $1.09 million (November 30, 2022 - $1.17 million). Stock based compensation was also lower at $0.46 million (November 30, 2022 - $0.83 million). The foreign exchange gain recognized in the current period was $0.04 million (November 30, 2022 - $0.25 million gain) due primarily to the to the U.S. Dollar increasing in value relative to the Canadian Dollar during the period.


PLATINUM GROUP METALS LTD. ...5

At November 30, 2023, finance income consisting of interest earned in the three month period amounted to $0.14 million (November 30, 2022 - $0.14 million).  Basic and diluted loss per share for the year amounted to $0.02, which was also $0.02 per share for the comparable period ended November 30, 2022. 

Accounts receivable at November 30, 2023 totalled $0.18 million (August 31, 2023 - $0.22 million) while accounts payable and other liabilities amounted to $0.66 million (August 31, 2023 - $1.37 million).  Accounts receivable was comprised primarily of value added taxes repayable to the Company in South Africa.  Accounts payable consisted primarily of payables related to project engineering and maintenance costs on the Waterberg Project.

On July 27, 2022, the Company entered into an Equity Distribution Agreement with BMO Nesbitt Burns Inc. and BMO Capital Markets for a new at-the-market equity program (the "2022 ATM") to distribute up to $50.0 million (or the equivalent in Canadian dollars) of common shares of the Company.  No Common Shares were sold pursuant to the 2022 ATM prior to August 31, 2022.  As of August 31, 2023, the Company had issued 1,089,503 Common Shares, through BMO Capital Markets on the NYSE American pursuant to the 2022 ATM, at an average price of $1.81, for gross proceeds of $1.97 million.  Directly attributable expenses and legal fees to maintain the 2022 ATM in good standing, and for commissions on equity sales, totaled $0.45 million during fiscal 2023.  No Common Shares have been sold to date in fiscal 2024 pursuant to the 2022 ATM.

Total expenditures on the Waterberg Project, before partner reimbursements, for the three months ended November 30, 2023 were approximately $1.0 million (November 30, 2022 - $1.06 million).  At period end, $42.6 million in accumulated net costs were capitalized to the Waterberg Project.  Total expenditures on the property since inception to November 30, 2023 are approximately $86.6 million. 

For more information on mineral properties, see Note 4 of the Financial Statements.

Outlook

The Company's primary business objective is to advance the Waterberg Project to a development and construction decision.  PTM is the operator of the Waterberg Project as directed by a technical committee comprised of representatives from joint venture partners Implats, Mnombo Wethu Consultants Proprietary Limited ("Mnombo"), and HJM.  Before project financing and a construction decision can be undertaken, arrangements will be required for project concentrate offtake or processing. 

On October 18, 2022, Waterberg JV Co. approved in principle the pre-construction Work Program (as described above).  The Work Program includes proposed work on project infrastructure including initial road access, water supply, essential site facilities, a first phase accommodation lodge, a site construction power supply from state utility Eskom and advancement of the Waterberg Social & Labour Plan.  Work to prepare an update to the 2019 Waterberg Definitive Feasibility Study (the "DFS Update"), including updated mineral resource and mineral reserve estimates, was also approved and is currently in process.  The DFS Update is to include a review of cut-off grades, mining methods, infrastructure plans, scheduling, concentrate offtake, dry stack tailings, costing and other potential revisions to the project's financial model.  The DFS Update is expected to be completed in early to mid 2024.


PLATINUM GROUP METALS LTD. ...6

The Company continues to work closely with regional and local communities and their leadership on mine development plans to achieve optimal outcomes and best value to all stakeholders.

Before project financing and a construction decision can be undertaken, arrangements will be required for project concentrate offtake or processing.  In addition to seeking reasonable terms for Waterberg concentrate offtake from an existing smelter/refiner in South Africa, the Company must also consider alternatives.  As described above, the Company is studying the economic feasibility of constructing a PGM Smelter and BMR to process the Waterberg Project concentrate. 

As the world seeks to decarbonize and look for solutions to climate change, the adoption of battery electric vehicles is forecast to reduce the future demand for PGMs used in autocatalysis.  The unique properties of PGMs as powerful catalysts are being applied to various technologies as possible solutions for more efficient energy generation and storage, which may create new demand for PGMs.  The Company's battery technology initiative through Lion with partner Amplats represents one such new opportunity in the high-profile lithium battery research and innovation field.  The investment in Lion creates a potential vertical integration with a broader industrial market development strategy to bring new technologies to market which use palladium and platinum.  Research and development efforts by FIU on behalf of Lion continue.  Technical results from Lion's research may have application to most lithium-ion battery chemistries and the scope of Lion's research work is being expanded.

Environmental, Social and Governance

Platinum Group recently received its third annual Environmental, Social and Governance ("ESG") disclosure report from Digbee Ltd. ("Digbee"), a United Kingdom based company that has developed an industry standard ESG disclosure framework for the mining sector providing a right-sized, future looking set of frameworks against which they can credibly disclose, track, compare and improve their ESG performance.  For 2023, Platinum Group achieved an overall score of BBB with a range of C to AAA based on the information provided.  This score is an improvement from the BB score achieved in 2022.  Digbee ESG has been developed in consultation with mining companies, ESG specialists and capital providers and is endorsed by leading financial institutions, producing mining companies and other industry stakeholders.  Digbee's reporting framework is aligned with global standards, including the Equator Principles.  For more details about the Company's 2023 Digbee ESG Report please refer to the Company's MD&A, AIF and Form 40-F.


PLATINUM GROUP METALS LTD. ...7

Regulatory

As well as the discussions within this news release, the reader is encouraged to also see the Company's disclosure made under the heading "Risk Factors" in the Company's current AIF and Form 40-F.

Qualified Person

Rob van Egmond, P.Geo., a consultant geologist to the Company and a former employee, is an independent qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").  Mr. van Egmond has reviewed, validated and approved the scientific and technical information contained in this news release and has previously visited the Waterberg Project site.

About Platinum Group Metals Ltd. and the Waterberg Project

Platinum Group Metals Ltd. is the operator of the Waterberg Project, a bulk underground palladium and platinum deposit located in South Africa.  The Waterberg Project was discovered by Platinum Group and is being jointly developed with Implats, Mnombo, JOGMEC and Hanwa.

On behalf of the Board of

Platinum Group Metals Ltd.

Frank R. Hallam

President, CEO and Director

For further information contact:

 Kris Begic, VP, Corporate Development

 Platinum Group Metals Ltd., Vancouver

 Tel: (604) 899-5450 / Toll Free: (866) 899-5450

 www.platinumgroupmetals.net

Disclosure

The TSX and the NYSE American have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.


PLATINUM GROUP METALS LTD. ...8

This news release contains forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws (collectively "forward-looking statements"). Forward-looking statements are typically identified by words such as: "believe", "expect", "anticipate", "intend", "estimate", "may", "plans", "postulate" and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Forward-looking statements in this news release include, but are not limited to, statements regarding the success of the Company's objective to advance the Waterberg Project to a development and construction decision, the approval and completion of the various phases of the Work Program, the planned DFS Update, the plan for and development of the Waterberg Project and the potential benefits and results thereof including that it is projected to become one of the largest and lowest cost underground PGM mines globally, financing and mine development of the Waterberg Project, potential commercial alternatives for mine development, obtaining concentrate offtake, the size and cost of the Waterberg Project, the economic feasibility of establishing a new PGM smelter and BMR, the planned Smelter DFS, work with local communities, the development of new battery technologies and the potential benefits of utilizing palladium and platinum therein, the commercialization thereof and Lion's development of next generation battery technology, the success of Lion's and FIU's research and development efforts, the expansion of Lion's research work into additional battery chemistries, the ability of the Company to obtain all required permitting, surface access, and infrastructure servitudes, the effect of battery electric vehicles on the market for PGMs, the use of PGMs in solutions to climate change, and the Company's other future plans and expectations. Although the Company believes any forward-looking statements in this news release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct.

The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance and that actual results may differ materially from those in forward-looking statements as a result of various factors, including the Company's inability to generate sufficient cash flow or raise additional capital, and to comply with the terms of any new indebtedness; additional financing requirements; and any new indebtedness may be secured, which potentially could result in the loss of any assets pledged by the Company; the Company's history of losses and negative cash flow; the Company's properties may not be brought into a state of commercial production; uncertainty of estimated production, development plans and cost estimates for the Waterberg Project; discrepancies between actual and estimated mineral reserves and mineral resources, between actual and estimated development and operating costs, between actual and estimated metallurgical recoveries and between estimated and actual production; fluctuations in the relative values of the U.S. Dollar, the Rand and the Canadian Dollar; volatility in metals prices; the uncertainty of alternative funding sources for Waterberg JV Co.; the Company may become subject to the U.S. Investment Company Act; the failure of the Company or the other shareholders to fund their pro rata share of funding obligations for the Waterberg Project; any disputes or disagreements with the other shareholders of Waterberg JV Co. or Mnombo; the ability of the Company to retain its key management employees and skilled and experienced personnel; conflicts of interest; litigation or other administrative proceedings brought against the Company; actual or alleged breaches of governance processes or instances of fraud, bribery or corruption; exploration, development and mining risks and the inherently dangerous nature of the mining industry, and the risk of inadequate insurance or inability to obtain insurance to cover these risks and other risks and uncertainties; property and mineral title risks including defective title to mineral claims or property; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada and South Africa; equipment shortages and the ability of the Company to acquire necessary access rights and infrastructure for its mineral properties; environmental regulations and the ability to obtain and maintain necessary permits, including environmental authorizations and water use licences; extreme competition in the mineral exploration industry; delays in obtaining, or a failure to obtain, permits necessary for current or future operations or failures to comply with the terms of such permits; risks of doing business in South Africa, including but not limited to, labour, economic and political instability and potential changes to and failures to comply with legislation; pandemics and other public health crises; the Company's common shares may be delisted from the NYSE American or the TSX if it cannot maintain compliance with the applicable listing requirements; and other risk factors described in the Company's most recent AIF and Form 40-F annual report, other filings with the SEC and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedarplus.ca, respectively. Proposed changes in the mineral law in South Africa, if implemented as proposed, may have a material adverse effect on the Company's business and potential interest in projects. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether because of new information, future events or results or otherwise.


PLATINUM GROUP METALS LTD. ...9

The technical and scientific information contained herein has been prepared in accordance with NI 43-101, which differs from the standards adopted by the SEC. Accordingly, the technical and scientific information contained herein, including any estimates of mineral reserves and mineral resources, may not be comparable to similar information disclosed by U.S. companies subject to the disclosure requirements of the SEC.



Platinum Group Metals (AMEX:PLG)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more Platinum Group Metals Charts.
Platinum Group Metals (AMEX:PLG)
Historical Stock Chart
From Apr 2023 to Apr 2024 Click Here for more Platinum Group Metals Charts.