RNS Number : 8666H
  European Goldfields Ltd
  11 November 2008
   

    Suite 200, Financial Plaza
    204 Lambert Street
    Whitehorse, Yukon
    Canada Y1A 3T2


    RESULTS FOR Q3 2008
    CERTEJ PROJECT CONTINUES TO ADVANCE 
    PROFIT SUSTAINED AT STRATONI

    11 November 2008 - European Goldfields Limited (AIM: EGU / TSX: EGU) ("European Goldfields" or the "Company") today reports its results
for the quarter to 30 September 2008. Highlights are:

    Financial highlights:
    * Working capital of $208.6 million as at 30 September 2008
    * Stratoni operation remains cash flow positive despite significantly lower metal prices
    * Actively reducing costs and preserving cash

    Operational highlights:
    * Stratoni: Higher production levels sustained and costs contained
    * Skouries: Ball mill shell complete and ready for shipment
    * Olympias: Plans for Phase Two of the project approach completion
    * Certej: New mining permit awarded
    * Certej: Further drilling and pit re-evaluation indicate extension of mine life to 15 years
    * Certej: Project moves from feasibility to basic and detailed engineering
    * Exploration in Greece: EM survey highlights additional 4 target areas 

    Commenting on the results, David Reading, Chief Executive Officer of European Goldfields, said:

"Our fundamental strengths remain key to our future success in the economic downturn. We have a strong cash position, no debt and sustained
cash generation at our high grade zinc, lead and silver mine. Our development projects remain robust even at lower metal prices. We have the
means both to deliver continued progress and develop new opportunities in changing market conditions".



    Conference Call & Webcast - 11 November 2008 at 10am ET / 3pm BST 

    European Goldfields will host a conference call on Tuesday 11 November 2008 at 10:00 a.m. ET / 3:00 pm (London, UK time) to update
investors and analysts on its results.

    Participants may join the call by dialing one of the three following numbers, approximately 10 minutes before the start of the call.

    From North America: (Local) 416-644-3423 or (toll free): 1-800-731-6941
    From the UK, Austria, Belgium, Denmark, France, Germany, Ireland, Italy, Netherlands, Norway, Sweden & Switzerland (toll free):
00-800-2288-3501

    A live audio webcast of the call will be available on: 
http://www.newswire.ca/en/webcast/viewEvent.cgi?eventID=2462900

    For those unable to join the live conference call, a replay will be available until Tuesday November 18, 2008 at midnight by dialing
(toll free) 1-877-289-8525 or 1-416-640-1917, Passcode 21287694�.
      SELECTED FINANCIAL DATA

                                                                                                   Three months ended 30 September
 (in thousands of US dollars,        2008    2007
 except per share amounts)              $       $
 Statement of profit and loss
 Sales                             16,101  21,663
 Gross profit                       1,393  11,273
 Profit/(loss) before income tax  (4,859)  15,268
 Profit/(loss) after income tax   (5,310)  12,504
 Non-controlling interest             267   (348)
 Profit/(loss) for the period     (5,043)  12,156
 Earnings/(loss) per share         (0.03)    0.07



                               30 September 2008  30 September 2007
 (in thousands of US dollars)                  $                  $
 Balance sheet
 Working capital                         208,609            224,289
 Total assets                            775,369            744,998

    European Goldfields' unaudited consolidated financial statements and management's discussion and analysis for the three-month periods
ended 30 September 2008 and 2007 are filed on SEDAR at www.sedar.com.

    Year on year revenues have decreased as a result of the fall in metal prices, although this has been offset by the company's lead
hedging programme which became effective in 2008 and yielded additional income of $1.4 million in Q3 2008. The company's working capital has
declined slightly as a consequence of continued capital expenditure as well as funding the advancement of our Greek and Romanian projects.  
 





    STRATONI OPERATIONS (GREECE) 

    Highlights:
    * Higher production levels sustained
    * Unit operating costs contained
    * Process plant operated at full capacity in August

    Higher production levels sustained

    The Company's 95% owned Stratoni lead-zinc-silver operation in Northern Greece mined 69,847 wet tonnes of ore and processed 63,040
tonnes of ore in Q3 2008.  Mining production, year to date, remains 4% over budget whilst zinc and lead metal production has exceeded year
to date target by over 7% and 1% respectively. During Q3 Hellas Gold sold eight shipments of base metal concentrates, five shipments of zinc
and three of lead/silver. 
    Summary production and sales were as follows: 
                                           Q3 2008  Q3 2007
 Production
 Ore mined (wet tonnes)                     69,847   56,075
 Ore processed (dry tonnes)                 63,040   54,499
 Zinc concentrate                           10,451    8,506
 - Containing:     Zinc metal (tonnes)       5,132    4,194
 Lead concentrate                            5,531    5,586
 - Containing: Lead metal (tonnes)           3,726    3,781
 Silver (ounces)                           280,305  297,059
 Sales
 Zinc concentrate (tonnes)                  14,033    5,710
 - Containing payable:     Zinc (tonnes)*    5,818    2,364
 Lead concentrate (tonnes)                   5,475    5,694
 - Containing payable:     Lead (tonnes)*    3,495    3,759
 Silver (oz)*                              263,464  297,321

 Inventory (end of period)
 Ore mined (wet tonnes)                      6,489    4,868
 Zinc concentrate (tonnes)                   2,078    2,797
 Lead/Silver concentrate (tonnes)            1,294    2,042
    *    Net of smelter payable deductions,
    before deduction of smelting and refining charges

    Ore production rates underground increased to 1,150 tonnes per day with daily production rates in Q3 peaking at 1,400. An additional
lower level has been planned for 'large stope' drifting and the access designed accordingly. 

    Unit operating costs contained

    Unit costs of EUR109 per tonne were maintained at just below Q1 levels. Since quarter end, the Euro has weakened considerably against
the US Dollar, which will lower Dollar operating costs and increase the mine's operating margin. This exchange rate shift will help offset
the impact of lower Dollar commodity prices.

    In the current market environment, Hellas Gold has already taken steps to minimise all non-essential capital expenditure, with large
amounts of budgeted capital expenditure remaining unspent and uncommitted. As part of the annual budget process, the management team is
conducting a fundamental review of all costs with a view to reducing any costs which neither contribute to productive capacity nor represent
an obligation under our existing mining permits.

    Whilst further weak prices have been experienced since the period end, the Company is benefitting from its lead hedging programme and
will continue to do so until the end of 2009. Including the lead hedge, Stratoni remains cash flow positive at the operating level.



    Process plant operated at full capacity in August

    The plant continues to operate at around 1,200 tonnes per day and again operated at full capacity in August. High metal recoveries have
been maintained and the plant continues to operate at high levels of efficiency. 



    SKOURIES PROJECT (GREECE)

    Highlights:
    * Ball Mill Shell ready for shipment

    Continued progress on engineering 

    The basic engineering package for the Skouries project has been submitted to the company by Outotec and the project design is being
advanced. The fabrication of the SAG and ball mills, also by Outotec, continues to be on schedule: the ball mill shell has been completed
and is ready for shipment, the SAG mill shell will be completed in Q4 2008. The remaining components are all due for delivery to site in Q3
2009.

    Orders for the long lead items outside of Outotec's scope are being prepared by the local engineering consultants, ENOIA, and include a
primary crusher, pebble crushers, transformers and switch gear. Detailed fabrication engineering drawings for the flotation tank cells are
well advanced in readiness for order placement. Offers for fabrication of those cells in Greece have been received and are under evaluation
with the intention of placing orders by year end. 

    The Greek civil engineering company, MHXME S.A, has been appointed to carry out the civil design of the Skouries Project. Kion
Architects of Athens have been appointed to provide the architectural designs for the project.

    Greek geotechnical consultants Omicron Kappa have completed the detailed design of the open pit and submitted their engineering work for
the roads network, both of which are being reviewed.

    A hydrogeological investigation has been completed and a draft report has been received which is to be finalised by the end of
November.

    Continued progress on project engineering and design allows for the scheduled start up of the Skouries project in late 2010. 



    OLYMPIAS PROJECT (GREECE)

    Highlights: 
    * Plans for Phase Two of the Olympias project approach completion

    Phase Two Planning

    Mine schedules, plant refurbishment plans and cost studies for the second phase of the Olympias project approach completion. In Q2 2008
the company submitted an Environmental Impact Study ("EIS") to allow the early processing of existing tailings, which will produce
additional gold concentrate and allow the rehabilitation of a significant area of the Olympias valley. It is planned that this re-processing
will commence in parallel with refurbishment of the plant lines for run of mine production and the necessary underground development to
recommence production in Phase Two. The Company has received expressions of interest for the detailed design phase from Greek engineering
companies which are currently being evaluating pending the outcome of the Olympias EIS application.


    Continued sale of gold concentrates

    The Olympias project benefits from an existing stockpile of gold-bearing pyrite concentrates which represented, at 31 December 2007, a
reserve of approximately 172,000 tonnes grading 23.5 g/t gold (containing 130,000 oz of gold), in addition to substantial underground
reserves of gold, lead, zinc and silver. 

    Sales of pyrite concentrates in the quarter were as follows:
                                Q3 2008  Q3 2007
 Sales
 Gold concentrate (dry tonnes)   12,710   28,393


    Hellas Gold has now secured the sale of the entire stockpile to at least six different purchasers, thereby effectively creating a market
for its gold concentrates which did not exist prior to 2007. 

    Delays at the ports of Piraeus and Thessaloniki persist as a work to rule remains in force by dock workers. The major shipping companies
are re-routing lines which has exacerbated the existing shortage of containers in both ports. The company is working closely with local and
international shipping companies to address the issue and has met with some success. 



    PERMITTING PROCESS (SKOURIES & OLYMPIAS PROJECTS)

    Progress in permitting process 

    The Company continues to receive the support of the Greek Ministry of Development for its Business Plan and its preliminary
environmental impact study ("PEIS").

    As reported previously, approval of the PEIS had been delayed due to specific delays in other ministerial input into the final report.
This affected a large number of projects, public and private, in Greece. Progress has continued and the remaining administrative procedures
to finalise approval are in process. A site visit by a team of specialists from the Ministry of Culture took place in early October and it
is not anticipated that this visit will elicit any new concerns.

    The political situation in Greece is widely reported and has slowed all decision making but the Company remains confident of a positive
outcome. It has not been advised of any specific delays or new issues. The administrative process has proven lengthier than first
anticipated due to a scale of project development that has not been permitted before. Previous permits issued in Greece were all for
individual projects, not a business plan.

    Approval of the PEIS by the Ministry of Environment will be expressed as a Project Pre-Approval from the Greek State with an invitation
to the Company to submit its final EIS to allow public consultation. On approval of the EIS, the environmental permits for Skouries and
Olympias will be issued.

    The Company will then submit to the Greek government a final technical report on the Skouries and Olympias projects, which will restate
the principles of the business plan and take into account any conditions detailed in the environmental permit. The mining permits are
expected to be issued on approval of the technical report by the Greek government.



    EXPLORATION IN GREECE

    Geophysical survey highlights four additional targets

    The completion of processing the airborne geophysical survey carried out in late 2007 has revealed four new zones of conductive rocks
with electromagnetic ("EM") signatures typical for massive sulphides such as the known mineralisation at Stratoni, Olympias and Piavitsa.
All the zones are located within the northern part of Hellas Gold's permit area in Greece, where marble units host polymetallic massive
sulphide. The new zones are distinct from any known mineralisation and represent some 20 kilometres of potential strike. Each anomalous area
will now be investigated in the field with mapping, geochemistry and possibly follow-up ground geophysics in order to define future drill
targets.  

    The EM survey had already successfully confirmed an anomaly extending eight kilometres of strike at the Piavitsa massive sulphide
target. Two kilometres of this strike length have massive sulphide drill intercepts which correspond exactly with the EM anomaly.

    In total, the EM survey has now identified or confirmed a total of 28 kilometres of conductive anomalies, some of which host known
mineralisation. To put this in context, the massive sulphide reserves at Stratoni and Olympias have a strike extent totalling two
kilometres.

    In addition, the magnetic component of the survey has already identified a 17 kilometre by six kilometre belt of porphyry intrusives
over which a three dimensional model has been completed defining two other major targets. Follow-up reconnaissance mapping on the ground has
confirmed the presence of porphyry style mineralisation. 

    An EIS has been prepared which will allow drill testing of these exciting targets later in the year or early 2009.



    CERTEJ PROJECT (ROMANIA)

    Highlights:
    * New mining permit awarded
    * Tailings site selection optimised in same valley as mine and plant
    * Project progresses to basic and detailed engineering phases
    * Potential to extend life of mine to 15 years

    New mining permit awarded

    An important milestone in the permitting process was achieved in July when the National Agency of Mineral Resources ("NAMR") approved
the Technical Feasibility Report ("TFS"). Acceptance of the TFS is a key requirement, along with the EIS, in order to apply for the
Construction Permit. At the same time, NAMR awarded a new mining permit incorporating the new Certej reserves.

    A new Urbanisation Certificate for the Certej project was granted by Hunodoara County Council in August. This is valid for two years and
if necessary an extension can be applied for. However it is expected that the present certificate will be valid for the construction phase.

    Following the new Tailings Management Facility ("TMF") site optimisation, a revision of the Zonal Urbanisation Plan ("PUZ") was
completed and submitted in August 2008. The first meeting with the Technical Committee for the PUZ was held in mid-September which went well
and without opposition. A public consultation meeting will take place this month and a final decision on the PUZ is expected in November.
The process is anticipated to proceed smoothly due to strong local support at Certej. Once the PUZ approval is granted, the submitted EIS
will be reviewed by the Regional Department of the Environment in Timisoara. This will culminate in a series of public meetings in Q1 2009
and once the EIS approval is received, Deva Gold will apply for the Construction Permit.

    Tailings site selection optimised in same valley as mine and plant

    As part of the EIS requirements it was necessary to include three options for the location of the TMFs. The three sites were evaluated
with regards to cost and environmental factors and based on these, the valley adjacent to the Certej main infrastructure was selected. This
site has the advantage of being much closer to the process plant and in the same watershed as the rest of the operation.  It will have lower
pumping costs, will avoid the need to excavate a 990 metre long tunnel (as required for the Voia site) and will utilise the existing road
network. The initial capital expenditure of the new TMF site will be similar to that of the original site. The new site, which is in the
same water catchment area as the rest of the project, has strong community support and will be easier to permit. Golder Associates (UK) are
currently working on a detailed design for the new site.

    Project moves towards basic and detailed engineering phases

    The Aker Kvaerner Cost & Definition Study and the subsequent in house Definitive Feasibility Study ("DFS") demonstrated that the project
was viable and robust at a gold price of $650/oz. The DFS was completed at peak input prices for steel and fuel. The steel industry has
already been forced to start reducing prices in the face of falling demand which, along with lower fuel prices, will enhance project
returns. The weaker Euro will also reduce operating costs and capital costs in US Dollars. At current exchange rates, the US Dollar capital
requirement has fallen over 15% to approximately US$180 million.

    The project has now moved into the engineering phase.  Invitations to Bid have been distributed to companies of international repute,
all of whom have expressed an interest in carrying out the basic and detailed engineering design. 

    Potential to extend life of mine to 15 years

    The potential to increase the life of the Certej project is being pursued. The current reserve is defined at metal prices of $425 per
ounce of gold and $7 per ounce of silver. The open pit shell used to define the reserve has a natural depth limit due to the shape of the
orebody. Re-scheduling has shown there is a significant quantity of material within the designed open pit that would be economic at higher
metal prices, which is expected to add an additional three years to the existing mine life. Since this material was mined as waste in the
original pit schedule, the only requirement is for the processing costs to be covered in order to add to the value of the project.

    Drilling and surface channel sampling of the existing Certej open pit dumps is nearing completion, with an estimate to be released in
early 2009. Additional dump material at Sacaramb, approximately four kilometres by road from Certej processing plant, is currently
considered to be economic and at present this material will be factored into the operations schedule. It is expected that the existing dumps
at Certej and Sacaramb will add an additional year of feed to the Certej project. 

    Drilling of the nearby limestone resource is complete and has confirmed the suitability of the rock for neutralisation purposes in the
gold recovery process. Sufficient resources are available to supply the operation at proposed production rates for more than 15 years.

    Exploration

    Data acquisition and geological modelling along the whole of the Certej-Brad belt and adjacent zones has allowed European Goldfields to
identify prospective new targets for permit acquisition in this exciting area.  This belt hosts several known major epithermal and porphyry
deposits, some of which were major historic gold producers. The Company expects to be granted the new prospecting permits by the end of 2008
and will commence a programme of mapping, geochemistry and geophysics in order to test targets identified by generative data interpretation,
and to define new targets with more regional work.



    TURKEY

    Significant progress has been made both in assessing the properties within the JV and in identifying new areas for acquisition following
four months of exploration.

    Mapping and lithological sampling of the advanced Ardala porphyry target has confirmed the extents of the various porphyry types and
alteration phases. Further work is required to integrate historic drill data before a new geological model is created prior to drill targets
being identified. The initial field programme will be completed by the end of the year.

    Sampling and mapping work on the other JV concessions is ongoing together with the generative programme that has so far identified
several prospective areas for new ground acquisition. A regional geological model for the Eastern Pontides Belt of Turkey is being
produced.

    The Company continues to look for new opportunities in Turkey and the exploration team has conducted a number of exploration site visits
to various portfolios, properties and deposits, both within the JV area of interest and elsewhere in Turkey.




    For further information please contact:
 European Goldfields:            e-mail: info@egoldfields.com
 David Reading, Chief Executive  Tel: +44 (0)20 7408 9534
 Officer
 Buchanan Communications:        e-mail: bobbym@buchanan.uk.com
 Bobby Morse / Ben Willey        Tel: +44 (0)20 7466 5000

 Renmark Financial
 Communication:                  e-mail: hperron@renmarkfinancial.com
 Henri Perron                    e-mail: jboidman@renmarkfinancial.com 
 John Boidman                    e-mail: ejura@renmarkfinancial.com 
 Media: Eva Jura
                                 Tel: +1 514 939-3989
                                 Fax: +1 514-939-3717
 www.renmarkfinancial.com 
 RBC Capital Markets:            e-mail: andrew.smith@rbccm.com
 Andrew K Smith / Sarah Wharry   e-mail: sarah.wharry@rbccm.com
                                 Tel: +44 (0)20 7653 4804

    Resources & reserves parameters

    For additional information on the resource and reserve estimates quoted in this news release, please refer to the Company's Resources &
Reserves Declaration at www.egoldfields.com/goldfields/resources.jsp. Patrick Forward, General Manager, Exploration of the Company, was the
Qualified Person under Canadian National Instrument 43-101 responsible for reviewing the disclosure of resource and reserve estimates quoted
in this news release.

    Forward-looking statements

    Certain statements and information contained in this document, including any information as to the Company's future financial or
operating performance and other statements that express management's expectations or estimates of future performance, constitute
forward-looking information under provisions of Canadian provincial securities laws. When used in this document, the words "anticipate",
"expect", "will", "intend", "estimate", "forecast", "planned" and similar expressions are intended to identify forward-looking statements or
information. Forward-looking statements include, but are not limited to, the estimation of mineral reserves and resources, the timing and
amount of estimated future production, costs and timing of development of new deposits, permitting time lines and expectations regarding
metal recovery rates. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered
reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The Company cautions the reader that such forward-looking statements involve
known and unknown risks, uncertainties and other factors that may cause the actual financial results, performance or achievements of the
Company to be materially different from its estimated future results, performance or achievements expressed or implied by those
forward-looking statements and the forward-looking statements are not guarantees of future performance. These risks, uncertainties and other
factors include, but are not limited to: changes in the price of gold, base metals or certain other commodities (such as fuel and
electricity) and currencies; uncertainty of mineral reserves, resources, grades and recovery estimates; uncertainty of future production,
capital expenditures and other costs; currency fluctuations; financing and additional capital requirements; the successful and timely
permitting of the Company's Skouries, Olympias and Certej projects; legislative, political, social or economic developments in the jurisdictions in which the Company carries on business; operating or technical
difficulties in connection with mining or development activities; the speculative nature of gold and base metals exploration and
development, including the risks of diminishing quantities or grades of reserves; the risks normally involved in the exploration,
development and mining business; and risks associated with internal control over financial reporting. For a more detailed discussion of such
risks and material factors or assumptions underlying these forward-looking statements, see the Company's Annual Information Form for the
year ended 31 December 2007, filed on SEDAR at www.sedar.com. The Company does not intend, and does not assume any obligation, to update or
revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

This information is provided by RNS
The company news service from the London Stock Exchange
 
  END 
 
QRTURVBRWKRAAAA

European Gold (LSE:EGU)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more European Gold Charts.
European Gold (LSE:EGU)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more European Gold Charts.