Stroud Resources Cuts Multiple Intersections of High-Grade Silver Including 9.95 m of 371.6 g/t AgEq and 1.0 m of 1,187 g/t AgEq, Santo Domingo Project, Mexico
January 12 2022 - 1:55PM
Stroud Resources Ltd. (TSXV:SDR) (“
Stroud” or the
“
Company”) is pleased to report on results from 9
of 21 holes completed at its Santo Domingo Silver Property (“Santo
Domingo” or the “Property”), located in Hostotipaquillo, State of
Jalisco, Mexico. Several drill holes intersected silver grades
exceeding 100 g/t Ag including drill hole SD-21-81 which returned
1.0 metres grading 1,187 g/t silver equivalent (“AgEq”) within an
intersection of 9.95 metres grading 371.60 g/t AgEq (Table 1).
In its 2021 exploration drilling program, the
Company completed 7,703 metres in 21 diamond drill holes with
results of core assays to date summarized in Table 1. Parameters
for the 21 drill holes completed in 2021 are available on the
Company website.
Highlights
- Discovery of a third mineralized
trend located about 400 metres west of the Guadalupe Vein System.
The “New Vein System” appears to run N-S and is about 500 metres
east of the historical Santa Fe adits (Figure 1). Initial results
from the New Vein System suggest it is about 10 metres wide with
grades exceeding 300 g/t AgEq at the top end of the vein.
- The New Vein System was intersected
by hole SD-21-81 at the top end and continues for over 80 metres to
hole SD-21-58, the last hole drilled in 2021. Mineralization in
Hole SD-21-58 is visible over 25 metres and the Company is eagerly
awaiting the assay results from this hole.
- Hole SD-21-81: returned 372 g/t
AgEq over 9.95 m, including 1,187 g/t AgEq over 1.0 metre.
- Hole SD-21-71: drilled into the La
Raya Vein System, returned strong mineralization over 20.0 m with
two intercepts of 618 g/t AgEq over 1.05 metres and 575 g/t AgEq
over 1.10 metres.
- Several intercepts, at the south
extension of La Raya Vein System, of high-grade base metals
accompanied high-grade silver including hole SD-21-50 which
returned 1.40 m grading 336 g/t Ag, 6.57% Zn and 2.01% Pb. Fe-poor
sphalerite and galena occur within the quartz veining.
The 2021 drilling program was designed to
explore the extent of known vein system-hosted silver
mineralization on the Property and identify additional silver
mineralized zones and vein systems which appear to strike parallel
to the existing La Raya and Guadalupe silver vein systems (Figure
1).
Table 1. Summary of results from drill core
assays received to date.
Drill Hole |
From (m) |
To (m) |
Length (m)1 |
Au (g/t) |
Ag (g/t) |
Zn (%) |
Pb (%) |
Cu (%) |
AgEq2 |
SD-21-46 |
148.15 |
149.30 |
1.15 |
0.43 |
53.10 |
0.073 |
0.035 |
0.006 |
85.35 |
and |
160.80 |
162.70 |
1.90 |
0.73 |
101.79 |
0.036 |
0.014 |
0.003 |
156.42 |
and |
236.30 |
236.70 |
0.40 |
2.17 |
243.00 |
0.070 |
0.053 |
0.007 |
405.75 |
SD-21-50 |
10.65 |
21.00 |
10.35 |
1.22 |
138.48 |
2.319 |
0.718 |
0.051 |
229.88 |
Incl. |
12.00 |
13.40 |
1.40 |
3.91 |
209.00 |
4.920 |
1.715 |
0.124 |
502.25 |
incl. |
13.40 |
14.80 |
1.40 |
0.97 |
336.00 |
6.570 |
2.010 |
0.076 |
408.75 |
SD-21-69 |
97.30 |
98.30 |
1.00 |
0.16 |
37.50 |
0.038 |
0.114 |
0.003 |
49.50 |
and |
99.40 |
101.60 |
2.20 |
0.12 |
36.30 |
0.102 |
0.039 |
0.004 |
45.30 |
and |
109.55 |
110.70 |
1.15 |
0.21 |
111.00 |
0.164 |
0.164 |
0.006 |
126.75 |
and |
128.55 |
129.70 |
1.15 |
0.18 |
39.70 |
0.066 |
0.035 |
0.002 |
53.20 |
SD-21-69 |
148.10 |
161.35 |
13.25 |
1.05 |
80.86 |
0.010 |
0.006 |
0.002 |
159.98 |
incl. |
152.90 |
158.90 |
6.00 |
1.45 |
122.18 |
0.013 |
0.009 |
0.003 |
230.78 |
incl. |
152.90 |
154.10 |
1.20 |
2.76 |
171.00 |
0.014 |
0.008 |
0.005 |
378.00 |
SD-21-69 |
165.25 |
166.45 |
1.20 |
0.07 |
51.00 |
0.111 |
0.069 |
0.006 |
56.25 |
and |
170.15 |
172.65 |
2.50 |
0.08 |
127.05 |
0.086 |
0.058 |
0.002 |
133.05 |
SD-21-71 |
16.80 |
41.00 |
24.20 |
0.31 |
201.14 |
0.278 |
0.336 |
0.018 |
224.10 |
incl. |
19.00 |
37.30 |
18.30 |
0.34 |
248.57 |
0.340 |
0.431 |
0.021 |
273.81 |
incl. |
21.40 |
22.45 |
1.05 |
0.48 |
582.00 |
0.641 |
1.080 |
0.066 |
618.00 |
incl. |
26.70 |
27.80 |
1.10 |
0.25 |
557.00 |
0.572 |
1.250 |
0.024 |
575.75 |
incl. |
31.20 |
34.60 |
3.40 |
0.20 |
206.00 |
0.226 |
0.172 |
0.009 |
221.00 |
SD-21-71 |
108.50 |
120.65 |
12.15 |
0.30 |
60.58 |
0.050 |
0.034 |
0.004 |
83.09 |
incl. |
109.60 |
110.70 |
1.10 |
1.16 |
140.00 |
0.042 |
0.043 |
0.006 |
227.00 |
incl. |
119.50 |
120.65 |
1.15 |
0.34 |
101.00 |
0.117 |
0.125 |
0.005 |
126.50 |
SD-21-75 |
65.10 |
68.55 |
3.45 |
1.31 |
71.07 |
0.889 |
1.745 |
0.087 |
169.07 |
incl. |
65.10 |
66.25 |
1.15 |
0.54 |
103.00 |
1.505 |
1.685 |
0.099 |
143.50 |
SD-21-75 |
69.70 |
72.00 |
2.30 |
0.28 |
44.15 |
1.209 |
1.452 |
0.042 |
64.78 |
SD-21-75 |
75.15 |
77.55 |
2.40 |
1.81 |
48.13 |
1.069 |
0.135 |
0.016 |
183.78 |
SD-21-75 |
80.25 |
99.80 |
19.55 |
1.31 |
76.50 |
2.363 |
0.441 |
0.034 |
174.53 |
incl. |
81.65 |
82.65 |
1.00 |
2.17 |
114.00 |
2.970 |
0.495 |
0.014 |
276.75 |
incl. |
86.80 |
87.85 |
1.05 |
1.03 |
120.00 |
2.970 |
0.171 |
0.007 |
197.25 |
incl. |
91.45 |
93.55 |
2.10 |
0.55 |
111.50 |
0.108 |
0.056 |
0.007 |
152.38 |
incl. |
95.75 |
97.10 |
1.35 |
0.85 |
169.00 |
4.750 |
2.830 |
0.230 |
232.75 |
SD-21-80 |
264.00 |
264.35 |
0.35 |
0.51 |
24.80 |
1.820 |
6.920 |
0.236 |
63.05 |
SD-21-81 |
175.15 |
185.10 |
9.95 |
1.51 |
258.42 |
0.023 |
0.015 |
0.008 |
371.60 |
incl. |
176.05 |
181.10 |
5.05 |
2.05 |
391.53 |
0.028 |
0.022 |
0.012 |
545.14 |
incl. |
176.05 |
177.05 |
1.00 |
4.71 |
834.00 |
0.040 |
0.025 |
0.015 |
1,187.25 |
incl. |
184.20 |
185.10 |
0.90 |
3.17 |
319.00 |
0.004 |
0.004 |
0.002 |
556.75 |
SD-21-81 |
198.70 |
201.60 |
2.90 |
0.48 |
148.14 |
0.048 |
0.023 |
0.006 |
184.26 |
incl. |
200.80 |
201.60 |
0.80 |
0.63 |
198.00 |
0.027 |
0.031 |
0.008 |
245.25 |
SD-21-81 |
295.85 |
297.95 |
2.10 |
0.19 |
38.40 |
1.287 |
2.088 |
0.062 |
52.65 |
SD-21-82 |
247.80 |
248.95 |
1.15 |
0.54 |
37.90 |
0.036 |
0.018 |
0.003 |
78.40 |
SD-21-84 |
330.70 |
332.25 |
1.55 |
0.14 |
50.80 |
0.071 |
0.028 |
0.015 |
61.30 |
1Drill core lengths are not true widths and are reported as core
intervals.2AgEq calculated using a silver to gold ratio of 75:1 and
assuming recoveries of 100%.
The Company’s current Drilling Permit covers 13
drill pads (drill setups) located across the Property and from
which 50 diamond drill holes were planned (see news release dated
February 18, 2021). A second drilling permit will be submitted
seeking additional drill pad locations to facilitate further
delineation of the three mineralized vein systems. In addition to
the 21 drill holes completed in the 2021 program, another five
holes were abandoned due to poor ground conditions or after
encountering historical mine workings (Figure 1).
The Company is currently updating its planned
drilling program for 2022 and will refine the program as the
balance of assay results are received. Remaining assays from the
2021 drilling program will be reported as they continue to be
released from the laboratory. Drilling is expected to start before
the end of January 2022, with at least 3,500 metres planned to be
completed by the end of Q1 2022.
Figure 1 is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/6d3d5d7f-24bd-4a04-8fad-c9271151967c
Dr. Scott Jobin-Bevans (P.Geo.), President and a
Director of Stroud, is the Qualified Person as defined by National
Instrument 43-101 and is responsible for the technical information
contained in this news release.
About Stroud Resources
Ltd.Stroud Resources is a TSXV listed company (TSXV:SDR)
focused on the exploration and development of its Santo Domingo
epithermal silver project in central Mexico.
For more information, please
visit www.stroudsilver.com or contact Mirsad Jakubovic,
Chief Financial Officer, Stroud Resources Ltd., Tel:
1-416-888-8731, mirsad@cpamba.ca.
THE TSX VENTURE EXCHANGE HAS NOT
REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY
FOR THE ADEQUACY OR ACCURACY OF
THIS RELEASE.
The information contained herein contains
"forward-looking statements" within the meaning of
applicable securities legislation. Forward-looking statements
relate to information that is based on assumptions
of management, forecasts of future results, and estimates of
amounts not yet determinable. Any statements that express
predictions, expectations, beliefs, plans, projections, objectives,
assumptions or future events or performance are not statements of
historical fact and may be “forward-looking statements”.
Forward-looking statements are subject to a
variety of risks and uncertainties which could cause actual
events or results to differ from those reflected in the
forward-looking statements, including, without limitation, risks
and uncertainties relating to the interpretation of the drill
results, geology, grade and continuity of mineral
deposits.Should one or more of these risks and
uncertainties materialize, or should underlying assumptions prove
incorrect, actual results may vary materially from those
described in forward-looking statements. Investors are cautioned
against attributing undue certainty to forward-looking statements. These
forward-looking statements are made as of the date hereof and the
Company does not assume any obligation to update or revise them to
reflect new events or circumstances. Actual events or results could
differ materially from the Company’s expectations or
projections.
Stroud Resources (TSXV:SDR)
Historical Stock Chart
From Nov 2024 to Dec 2024
Stroud Resources (TSXV:SDR)
Historical Stock Chart
From Dec 2023 to Dec 2024