Azucar Reports Drilling Results from Lithocap Target, El Cobre Project, Mexico
November 24 2022 - 7:30AM
Azucar Minerals Ltd. ("Azucar" or the "Company")
(TSX-V: AMZ; OTCQB: AXDDF) is pleased to announce that it has
received and compiled results from the two holes completed into the
large lithocap target first discussed in its press release of March
10, 2022. Both holes passed through typical clay dominant lithocap
alteration into phyllic alteration. Large intervals of brecciated
rock were intersected possibly reflecting a diatreme like body that
may have disrupted any earlier porphyry alteration zonation in this
area. Alteration data was collected from the core using a Terraspec
infrared spectrometer along with the samples for assay. No
significant intervals of porphyry mineralisation were intersected
however the second hole intersected a late sulphide vein that
returned 0.70 metres of 0.95% copper and 0.42 g/t gold. At present
the Company is reviewing how best to further explore this lithocap
target as well as other zones on the project and will update
shareholders once this is complete.
J.D. Poliquin, Chairman of Azucar Minerals
stated, “These two holes were the first to be drilled into this
newly defined alteration target. It is important to remind
shareholders that this zone is one of many porphyry targets and
centres on the project. We have defined a preliminary resource on
the most explored Norte Zone, and we intend to continue our
exploration on this project to further unlock the potential of the
multiple zones and targets which are yet to be fully tested.”
About the El Cobre ProjectA
detailed summary of the project is provided on the Company’s
website but in brief the El Cobre project covers a 5 km trend of
porphyry copper-gold associated alteration and mineralisation along
which five separate zones have now been identified and explored in
past drilling campaigns (see Figure 1). On September 29, 2020, the
Company released an initial mineral resource estimate on the
project from only the Norte Zone. The base case resource estimate
(using a net smelter return cutoff of US$12/tonne) for the Norte
Zone is comprised of an indicated resource of 1.2 Moz
AuEq (47.2 million tonnes grading 0.49 g/t Au, 0.21% Cu
and 1.4 g/t Ag) and an inferred resource of 1.4 Moz
AuEq (64.2 million tonnes grading 0.42 g/t Au, 0.18% Cu
and 1.3 g/t Ag). Further details of the resource estimate are
provided below.
Past drilling campaigns have returned
significant porphyry copper and gold assays from multiple targets.
High grade intersections from these targets highlight the potential
for significant mineral endowment and for higher grade porphyry
mineralisation including those tabularised below (see Figure 1 for
locations). The known targets include the Villa Rica, Porvenir,
Encinal and Primo Zones. At the Villa Rica Zone, located about 1.8
km south of the Norte Zone, initial drilling in 2017 (on the Raya
Tembrillo Target area) intersected two styles of mineralisation;
hypogene copper-gold porphyry mineralisation (115.00 metres of 0.57
g/t gold and 0.27% copper, see press release of November 28, 2017)
and near surface enriched copper mineralisation with an apparent
tabular distribution (94.00 metres of 1.36% copper; see press
release of December 13, 2017). At the Encinal Zone, located 4.3
kilometres to the southeast of the Norte Zone, Azucar reported (see
press release of June 29, 2017) the results of initial drilling on
an exposed stockwork zone (Hole EC-17-025) that returned results
including 34.47 metres grading 0.73 g/t Au and 0.20% Cu. The
Company continues to review the geology and past exploration
results in order to plan future exploration programs.
Norte Zone
Hole |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
Cu (%) |
EC-17-018 |
222.40 |
334.50 |
112.10 |
1.35 |
0.48 |
EC-17-026 |
543.45 |
609.90 |
66.45 |
2.41 |
0.61 |
Including |
543.45 |
569.45 |
26.00 |
4.15 |
1.00 |
EC-17-029 |
204.15 |
314.15 |
110.00 |
1.87 |
0.48 |
Including |
208.15 |
240.15 |
32.00 |
2.57 |
0.57 |
and |
264.15 |
300.15 |
36.00 |
2.02 |
0.51 |
Raya Tembrillo (1.8km South of Norte)
Hole |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
Cu (%) |
EC-17-037 |
302.00 |
320.00 |
18.00 |
1.25 |
0.52 |
Primo Zone (1.4km South of Raya Tembrillo)
Hole |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
Cu (%) |
EC-19-086 |
868.40 |
918.00 |
49.60 |
0.99 |
0.61 |
Including |
878.40 |
914.40 |
36.00 |
1.10 |
0.68 |
Porvenir Zone (2.5 km SE of Norte, 1.0 km west
of Primo
Hole |
From (m) |
To (m) |
Interval (m) |
Au (g/t) |
Cu (%) |
EC-17-040 |
243.00 |
255.00 |
12.00 |
2.43 |
0.82 |
EC-18-056 |
381.50 |
408.00 |
26.50 |
1.72 |
0.34 |
More information on El Cobre is available on the
Azucar website at http://www.azucarminerals.com.
Technical Details and the El Cobre NI
43-101 Technical Report
For details on the estimation of mineral
resources, including the key assumptions, parameters and methods
used to estimate the Mineral Resources at the El Cobre property,
Canadian investors should refer to the report dated effective
November 13, 2020, and titled “NI 43-101 Technical Report Mineral
Resource Estimate on the El Cobre Copper-Gold-Silver Property,
Veracruz State, Mexico” which is available under Azucar Minerals’
profile on SEDAR (www.sedar.com) and on the Company’s website. The
Technical Report was authored by Kris Raffle, P.Geo. of APEX
Geoscience Ltd., and Sue Bird, M.Sc., P.Eng. of Moose Mountain
Technical Services. The NSR and AuEq values were calculated using
US$1,500/oz gold, US$3.00/lb copper and US$18/oz silver, and using
metallurgical recoveries of 88% for gold and copper, and 70% for
silver.
Mr. Norm Dircks, a Certified Professional
Geologist (AIPG, CPG-11938) is a Qualified Person as defined by
National Instrument 43-101 ("NI 43-101") and has reviewed and
approved the other technical information in this news release. The
porphyry mineralisation and past drilling results discussed and
reviewed in this news release are associated with broad areas of
alteration and stockwork and sheeted porphyry style veining. True
widths cannot be determined at this time. The analyses reported
were carried out at ALS Global Laboratories of North Vancouver
using industry standard analytical techniques. For gold, samples
are first analysed by fire assay and atomic absorption spectroscopy
(“AAS”). Samples that return values greater than 10 g/t gold using
this technique are then re-analysed by fire assay but with a
gravimetric finish. For copper, samples are first analysed by
Inductively Coupled Plasma – Atomic Emission Spectroscopy
(“ICP-AES”), with four acid digestion. Samples that return values
greater than 10000 g/t copper using this technique are then
re-analysed by HF-HNO3-HCLO4 digestion with HCL leach and ICP-AES
finish. Blanks, field duplicates and certified standards were
inserted into the sample stream as part of Azucar’s quality
assurance and control program which complies with National
Instrument 43-101 requirements.
About Azucar
Azucar is an exploration company exploring the
El Cobre project in Veracruz, Mexico, which covers multiple
gold-rich porphyry targets, as demonstrated by past drilling.
Azucar holds a 100% interest in the El Cobre project, subject to
net smelter returns (“NSR”) royalty interests, assuming production
from the property exceeds 10,001 tonnes per day of ore, totaling
2.25% which can be reduced to 2.0% though the payment of US$3.0
million.
On behalf of the Board of Directors,
“J. Duane Poliquin” J. Duane Poliquin,
P.Eng. Chairman Azucar Minerals Ltd.
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
This news release includes forward-looking
statements that are subject to risks and uncertainties. All
statements within it, other than statements of historical fact, are
to be considered forward looking. Although the Company believes the
expectations expressed in such forward-looking statements are based
on reasonable assumptions, such statements are not guarantees of
future performance and actual results or developments may differ
materially from those in forward-looking statements. Factors that
could cause actual results to differ materially from those in
forward-looking statements include market prices, exploitation and
exploration successes, continued availability of capital and
financing, and general economic, market or business conditions.
There can be no assurances that such statements will prove accurate
and, therefore, readers are advised to rely on their own evaluation
of such uncertainties. We do not assume any obligation to update
any forward-looking statements, other than as required pursuant to
applicable securities laws.
Contact Information:
Azucar Minerals Ltd.Tel. 604.689.7644Email:
info@azucarminerals.comhttp://www.azucarminerals.com/
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/3cc1508f-55e6-419a-a909-892788d5e644
Azucar Minerals (TSXV:AMZ)
Historical Stock Chart
From Nov 2024 to Dec 2024
Azucar Minerals (TSXV:AMZ)
Historical Stock Chart
From Dec 2023 to Dec 2024