UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of November 2, 2023

Commission File Number 001-34984

FIRST MAJESTIC SILVER CORP.
(Translation of registrant's name into English)

925 West Georgia Street, Suite 1800, Vancouver BC V6C 3L2
(Address of principal executive offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

[ ] Form 20-F   [x] Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [ ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [ ]



image0b31.gif

DOCUMENTS INCORPORATED BY REFERENCE

Exhibits 99.1 and 99.2 to this Report on Form 6-K are hereby incorporated by reference (i) as Exhibits to the Registration Statement on Form F-10 of First Majestic Silver Corp. (File No. 333-255798) and (ii) into the Registration Statement on Form S-8 of First Majestic Silver Corp. (File No. 333-258124).


DOCUMENTS FILED AS PART OF THIS FORM 6-K

Exhibits



SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
FIRST MAJESTIC SILVER CORP. 
  
By: 
  
/s/ Samir Patel 
Samir Patel 
General Counsel & Corporate Secretary 
  
November 2, 2023 












image0b34.gif


CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2023 AND 2022

(UNAUDITED)
















925 West Georgia Street, Suite 1800, Vancouver, B.C., Canada V6C 3L2
Phone: 604.688.3033 | Fax: 604.639.8873| Toll Free: 1.866.529.2807 | Email: info@firstmajestic.com
www.firstmajestic.com











image0b34.gif

Management’s Responsibilities over Financial Reporting


The condensed interim consolidated financial statements of First Majestic Silver Corp. (the “Company”) are the responsibility of the Company’s management. The condensed interim consolidated financial statements are prepared in accordance with International Accounting Standard 34, "Interim Financial Reporting", as issued by the International Accounting Standards Board and reflect management’s best estimates and judgment based on information currently available.

Management has developed and maintains a system of internal controls to ensure that the Company’s assets are safeguarded, transactions are authorized and properly recorded, and financial information is reliable.

The Board of Directors is responsible for ensuring management fulfills its responsibilities. The Audit Committee reviews the results of the condensed interim consolidated financial statements prior to their submission to the Board of Directors for approval.

The condensed interim consolidated financial statements have not been audited.




/s/ Keith Neumeyer /s/ David Soares
Keith Neumeyer David Soares, CPA, CA
President & CEOChief Financial Officer
November 1, 2023November 1, 2023







TABLE OF CONTENTS
CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
   
 
 
 
NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS 
   
General
Statements of Earnings (Loss)
Statements of Financial Position
Other items


CONDENSED INTERIM CONSOLIDATED STATEMENTS OF EARNINGS (LOSS)
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2023 AND 2022
Condensed Interim Consolidated Financial Statements - Unaudited(In thousands of US dollars, except share and per share amounts)








The Condensed Interim Consolidated Statements of Earnings (Loss) provide a summary of the Company’s financial performance and net earnings or loss over the reporting periods.
 Three Months Ended September 30,Nine Months Ended September 30,
 Note2023202220232022
Revenues$133,211 $159,751 $436,855 $476,032 
Mine operating costs
Cost of sales92,187 120,707 320,662 345,539 
Cost of sales - standby costs— — 13,438 — 
Depletion, depreciation and amortization
27,998 35,707 95,014 100,475 
120,185 156,414 429,114 446,014 
Mine operating earnings 13,026 3,337 7,741 30,018 
General and administrative expenses10,439 8,545 30,560 28,207 
Share-based payments 2,762 3,305 10,711 11,113 
Mine holding costs7,243 3,690 14,750 9,285 
Write down on asset held-for-sale— — 7,229 — 
Restructuring costs6,428 — 6,428 — 
Impairment (reversal) of non-current asset— — 125,200 (7,585)
Loss on sale of mining interest1,646 — 3,024 — 
Foreign exchange loss (gain) 2,642 3,076 (8,953)3,353 
Operating loss (18,134)(15,279)(181,208)(14,355)
Investment and other income (loss)1,275 360 8,144 (926)
Finance costs(6,739)(5,236)(19,688)(14,661)
Loss before income taxes (23,598)(20,155)(192,752)(29,942)
Income taxes
 
Current income tax (recovery) expense(178)14,270 5,235 51,212 
Deferred income tax expense (recovery) 3,729 (13,733)(52,644)16,303 
 3,551 537 (47,409)67,515 
Net loss for the period($27,149)($20,692)($145,343)($97,457)
Loss per common share 
     Basic
($0.09)($0.08)($0.52)($0.37)
     Diluted
($0.09)($0.08)($0.52)($0.37)
Weighted average shares outstanding
 
     Basic
286,921,720 262,865,860 280,758,404 261,925,327 
     Diluted
286,921,720 262,865,860 280,758,404 261,925,327 
Approved and authorized by the Board of Directors for issuance on November 1, 2023
/s/ Keith Neumeyer/s/ Colette Rustad
Keith Neumeyer, Director Colette Rustad, Director
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 1


CONDENSED INTERIM CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME (LOSS)
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2023 AND 2022
Condensed Interim Consolidated Financial Statements - Unaudited(In thousands of US dollars, except share and per share amounts)

The Condensed Interim Consolidated Statements of Comprehensive Income (Loss) provide a summary of total comprehensive earnings or loss and summarizes items recorded in other comprehensive income that may or may not be subsequently reclassified to profit or loss depending on future events.
 NoteThree Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Net loss for the period($27,149)($20,692)($145,343)($97,457)
Other comprehensive earnings    
Items that will not be subsequently reclassified to net loss:
Unrealized loss on fair value of investments in marketable securities, net of tax(10,449)(1,014)(25,346)(9,120)
Realized loss on investments in marketable securities, net of tax(579)— (579)482 
Other comprehensive loss(11,028)(1,014)(25,925)(8,638)
Total comprehensive loss($38,177)($21,706)($171,268)($106,095)

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 2


CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2023 AND 2022
Condensed Interim Consolidated Financial Statements - Unaudited(In thousands of US dollars)

The Condensed Interim Consolidated Statements of Cash Flows provide a summary of movements in cash and cash equivalents during the reporting periods by classifying them as operating, investing or financing activities.
  Three Months Ended September 30,Nine Months Ended September 30,
 Note2023202220232022
Operating Activities
     
Net loss for the period ($27,149)($20,692)($145,343)($97,457)
Adjustments for: 
Depletion, depreciation and amortization 28,363 36,127 96,158 101,707 
Share-based payments 2,793 3,305 10,470 11,113 
Income tax expense (recovery)3,551 537 (47,409)67,515 
Finance costs6,739 5,236 19,688 14,661 
Write down on asset held-for-sale— — 7,229 — 
Unrealized loss (gain) from marketable securities and silver futures derivatives254 152 (3,203)1,113 
Loss on sale of mining interest2,221 — 3,024 — 
Impairment (reversal) of non-current asset— — 125,200 (7,585)
Other(2,639)3,027 (2,937)4,958 
Operating cash flows before non-cash working capital and taxes 14,133 27,692 62,877 96,025 
Net change in non-cash working capital items7,967 43,004 (5,016)(1,261)
Income taxes paid (2,120)(4,713)(22,172)(61,018)
Cash generated by operating activities
 19,980 65,983 35,689 33,746 
Investing Activities
     
Expenditures on mining interests (23,584)(36,996)(95,633)(118,343)
Acquisition of property, plant and equipment (9,966)(19,495)(24,813)(43,939)
Deposits paid for acquisition of non-current assets  882 2,104 (2,250)(2,775)
Other25 344 211 4,186 
Cash used in investing activities
 (32,643)(54,043)(122,485)(160,871)
Financing Activities
 
Proceeds from prospectus offering, net of share issue costs(174)(315)92,092 30,265 
Proceeds from exercise of stock options 306 1,263 1,548 4,556 
Repayment of lease liabilities(4,104)(4,080)(11,061)(10,078)
Finance costs paid (2,827)(1,335)(6,564)(2,023)
Proceeds from debt facilities— 30,000 — 30,000 
Dividends declared and paid(1,466)(1,597)(4,550)(5,231)
Shares repurchased and cancelled— (655)— (655)
Cash (used in) provided by financing activities
 (8,265)23,281 71,465 46,834 
Effect of exchange rate on cash and cash equivalents held in foreign currencies (976)(3,524)2,228 (3,547)
(Decrease) increase in cash and cash equivalents(20,928)35,221 (15,331)(80,291)
Cash and cash equivalents, beginning of the period 160,239 117,721 151,438 237,926 
Cash and cash equivalent reclassified as held for sale— (599)— (5,269)
Cash and cash equivalents, end of period $138,335 $148,819 $138,335 $148,819 
Supplemental cash flow information
    
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 3


CONDENSED INTERIM CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
AS AT SEPTEMBER 30, 2023 AND DECEMBER 31, 2022
Condensed Interim Consolidated Financial Statements - Unaudited(In thousands of US dollars)
The Condensed Interim Consolidated Statements of Financial Position provides a summary of assets, liabilities and equity, as well as their current versus non-current nature, as at the reporting date.
 NoteSeptember 30, 2023December 31, 2022
Assets   
Current assets
   
Cash and cash equivalents $138,335 $151,438 
Trade and other receivables9,132 8,598 
Value added taxes receivable25,457 32,618 
Inventories60,563 64,761 
Other financial assets55,109 34,528 
Prepaid expenses and other 9,666 5,617 
Assets held-for-sale— 72,729 
Total current assets
 298,262 370,289 
Non-current assets
   
Mining interests1,001,972 1,061,124 
Property, plant and equipment406,491 451,335 
Right-of-use assets27,848 26,649 
Deposits on non-current assets 7,298 6,003 
Non-current restricted cash118,990 125,193 
Non-current value added taxes receivable13,575 12,354 
Deferred tax assets77,919 57,062 
Total assets
 $1,952,355 $2,110,009 
Liabilities and Equity
   
Current liabilities
   
Trade and other payables$79,411 $115,120 
Unearned revenue3,714 3,383 
Current portion of debt facilities567 551 
Current portion of lease liabilities16,756 13,827 
Liabilities relating to assets held-for-sale— 16,278 
Income taxes payable15 18,240 
Total current liabilities
 100,463 167,399 
Non-current liabilities
 
Debt facilities216,638 209,811 
Lease liabilities21,284 23,756 
Decommissioning liabilities155,199 149,017 
Other liabilities 6,182 5,655 
Non-current income taxes payable22,640 20,605 
Deferred tax liabilities90,368 122,468 
Total liabilities
 $612,774 $698,711 
Equity   
Share capital1,877,795 1,781,280 
Equity reserves 80,575 98,914 
Accumulated deficit (618,789)(468,896)
Total equity
 $1,339,581 $1,411,298 
Total liabilities and equity
 $1,952,355 $2,110,009 
Commitments (Note 15); Contingencies (Note 26); Subsequent event (Note 27)
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 4


CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2023 AND 2022
Condensed Interim Consolidated Financial Statements - Unaudited(In thousands of US dollars, except share and per share amounts)
The Condensed Interim Consolidated Statements of Changes in Equity summarizes movements in equity, including common shares, share capital, equity reserves and retained earnings or accumulated deficit.

 Share Capital Equity Reserves
Accumulated deficit
 Shares Amount
Share-based payments(a)
Other comprehensive income(loss)(b)
Equity component of convertible debenture(c)
Total equity reserves Total equity
Balance at December 31, 2021260,050,658 $1,659,781 $101,385 ($6,387)$3,945 $98,943 ($347,753)$1,410,971 
Net loss for the period— — — — — — (97,457)(97,457)
Other comprehensive loss— — — (8,638)— (8,638)— (8,638)
Total comprehensive loss   (8,638) (8,638)(97,457)(106,095)
Share-based payments— — 11,015 — — 11,015 — 11,015 
Shares issued for:
Prospectus offerings (Note 23(a))
2,318,497 30,265 — — — — — 30,265 
  Exercise of stock options (Note 23(b))
592,748 6,712 (2,156)— — (2,156)— 4,556 
Settlement of restricted share units (Note 23(c))
86,267 1,116 (1,370)— — (1,370)— (254)
Shares repurchased and cancelled (Note 23(f))
(100,000)(655)— — — — — (655)
Dividend declared and paid (Note 23(g))
— — — — — — (5,231)(5,231)
Balance at September 30, 2022262,948,170 $1,697,219 $108,874 ($15,025)$3,945 $97,794 ($450,441)$1,344,572 
Balance at December 31, 2022272,577,979 $1,781,280 $110,895 ($15,926)$3,945 $98,914 ($468,896)$1,411,298 
Net loss for the period— — — — — — (145,343)(145,343)
Other comprehensive loss— — — (25,925)— (25,925)— (25,925)
Total comprehensive loss   (25,925) (25,925)(145,343)(171,268)
Share-based payments— — 10,470 — — 10,470 — 10,470 
Shares issued for:
Prospectus offerings (Note 23(a))
13,919,634 92,092 — — — — — 92,092 
Exercise of stock options (Note 23(b))
242,500 2,308 (760)— — (760)— 1,548 
Settlement of restricted and deferred share units (Note 23(c) and 23(e))
192,998 2,115 (2,124)— — (2,124)— (9)
Dividend declared (Note 23(g))
— — — — — — (4,550)(4,550)
Balance at September 30, 2023286,933,111 $1,877,795 $118,481 ($41,851)$3,945 $80,575 ($618,789)$1,339,581 

(a)Share-based payments reserve records the cumulative amount recognized under IFRS 2 share-based payments in respect of stock options granted, restricted share units, deferred share units and shares purchase warrants issued but not exercised or settled to acquire shares of the Company.
(b)Other comprehensive income reserve principally records the unrealized fair value gains or losses related to fair value through other comprehensive income ("FVTOCI") of financial instruments and re-measurements arising from actuarial gains or losses and return on plan assets in relation to San Dimas' retirement benefit plan.
(c)Equity component of convertible debenture reserve represents the estimated fair value of its conversion option of $42.3 million, net of deferred tax effect of $11.4 million. This amount is not subsequently remeasured and will remain in equity until the conversion option is exercised, in which case, the balance recognized in equity will be transferred to share capital. Where the conversion option remains unexercised at the maturity date of the convertible note, the balance will remain in equity reserves.
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 5


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited(Tabular amounts are expressed in thousands of US dollars)

1. NATURE OF OPERATIONS

First Majestic Silver Corp. (the “Company” or “First Majestic”) is in the business of production, development, exploration, and acquisition of mineral properties with a focus on silver and gold production in North America. The Company owns three producing mines in Mexico consisting of the San Dimas Silver/Gold Mine, the Santa Elena Silver/Gold Mine and the La Encantada Silver Mine. The Company also owns the Jerritt Canyon Gold Mine in Nevada, USA which has been placed on temporary suspension as of March 20, 2023 to focus on exploration, definition, and expansion of the mineral resources and optimization of mine planning and plant operations. In addition, the Company owns two mines in suspension: the San Martin Silver Mine and the Del Toro Silver Mine, and several exploration stage projects.

First Majestic is incorporated in Canada with limited liability under the legislation of the Province of British Columbia and is publicly listed on the New York Stock Exchange under the symbol “AG”, on the Toronto Stock Exchange under the symbol “FR” and on the Frankfurt Stock Exchange under the symbol “FMV”. The Company’s head office and principal address is located at 925 West Georgia Street, Suite 1800, Vancouver, British Columbia, Canada, V6C 3L2.

2. BASIS OF PRESENTATION

These condensed interim consolidated financial statements have been prepared in accordance with International Accounting Standard (“IAS”) 34, “Interim Financial Reporting” of the International Financial Reporting Standards ("IFRS") as issued by the International Accounting Standards Board ("IASB"). These condensed interim consolidated financial statements should be read in conjunction with the Company’s audited consolidated financial statements as at and for the year ended December 31, 2022, as some disclosures from the annual consolidated financial statements have been condensed or omitted.

These condensed interim consolidated financial statements have been prepared on a historical cost basis except for certain items that are measured at fair value including derivative financial instruments (Note 24) and marketable securities (Note 13). All dollar amounts presented are in thousands of United States dollars unless otherwise specified.

These condensed interim consolidated financial statements incorporate the financial statements of the Company and its controlled subsidiaries. Control exists when the Company has the power, directly or indirectly, to govern the financial and operating policies of an entity so as to obtain benefits from its activities. The consolidated financial statements include the accounts of the Company and its subsidiaries. Intercompany balances, transactions, income and expenses are eliminated on consolidation.

These condensed interim consolidated financial statements were prepared using accounting policies consistent with those in the audited consolidated financial statements as at and for the year ended December 31, 2022 except as outlined in Note 3.

3. MATERIAL ACCOUNTING POLICIES, ESTIMATES AND JUDGMENTS

The Company’s management makes judgments in its process of applying the Company’s accounting policies in the preparation of its unaudited condensed interim consolidated financial statements. In addition, the preparation of the financial data requires that the Company’s management make assumptions and estimates of the impacts of uncertain future events on the carrying amounts of the Company’s assets and liabilities at the end of the reporting period, and the reported amounts of revenues and expenses during the reporting period. Actual results may differ from those estimates as the estimation process is inherently uncertain. Estimates are reviewed on an ongoing basis based on historical experience and other factors that are considered to be relevant under the circumstances. Revisions to estimates and the resulting impacts on the carrying amounts of the Company’s assets and liabilities are accounted for prospectively.

In preparing the Company’s unaudited condensed interim consolidated financial statements for the three and nine months ended September 30, 2023, the Company applied the accounting policies, critical judgments and estimates disclosed in Note 3 of its audited consolidated financial statements for the year ended December 31, 2022 and the following accounting policies, critical judgments and estimates in applying accounting policies:


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 6


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
3. MATERIAL ACCOUNTING POLICIES, ESTIMATES AND JUDGMENTS (continued)

Assets and liabilities held-for-sale:
Accounting Policy:
A non-current asset or disposal group of assets and liabilities ("disposal group") is classified as held-for-sale, if its carrying amount will be recovered principally through a sale transaction rather than through continuing use, and when the following criteria are met:
(i) The non-current asset or disposal group is available for immediate sale in its present condition subject only to terms that are usual and customary for sales of such assets or disposal groups; and
(ii) The sale of the non-current asset or disposal group is highly probable. For the sale to be highly probable:
The appropriate level of management must be committed to a plan to sell the asset or disposal group;
An active program to locate a buyer and complete the plan must have been initiated;
The non-current asset or disposal group must be actively marketed for sale at a price that is reasonable in relation to its current fair value;
The sale should be expected to qualify for recognition as a completed sale within one year from the date of classification as held for sale (with certain exceptions); and
Actions required to complete the plan should indicate that it is unlikely that significant changes to the plan will be made or that the plan will be withdrawn.

Non-current assets and disposal groups are classified as held for sale from the date these criteria are met and are measured at the lower of the carrying amount and fair value less costs to sell ("FVLCTS"). If the FVLCTS is lower than the carrying amount, an impairment loss is recognized in net earnings. Upon classification as held for sale, non-current assets are no longer depreciated.

Significant estimates and judgements:
In determining the probability of the sale being completed within a year, management has considered a number of factors including necessary approvals from management, the Board of Directors, regulators and shareholders.

Critical Judgements and Estimates
Investments in Associates and Joint Ventures

As a result of the sale of the La Guitarra Mine and the La Parrilla Mine, the Company is a material shareholder of Sierra Madre Gold and Silver Ltd. ("Sierra Madre") and of Golden Tag Resources Ltd. ("Golden Tag"). Judgement is needed to assess whether the Company’s interest in an investee meets the definition of having significant influence and therefore requires to be accounted for under the equity method.

In making a judgement of whether the Company has significant influence over the entity, management has evaluated the ownership percentage as well as other qualitative factors including but not limited to representation on the Board of Directors, participation in operational or financial policy-making processes, material transactions between the Company and the investee, interchange of managerial personnel, provision of technical information and the nature of potential voting rights.

As part of this assessment, management has considered that until such time that the Company holds less than 19.9% of the outstanding shares, the Company has agreed to vote in the manner recommended by the Board of Directors of each of Sierra Madre and Golden Tag.

Based on the qualitative factors noted above, the restrictions imposed on voting rights, and the lack of rights to have or appoint members to the Board, the Company has determined that significant influence does not exist despite holding a 48% interest in Sierra Madre and a 41% interest in Golden Tag. The Company began accounting for the shares received from Sierra Madre and the shares and warrants received from Golden Tag as an equity security at FVTOCI.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 7


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
3. MATERIAL ACCOUNTING POLICIES, ESTIMATES AND JUDGMENTS (continued)
Critical Judgements and Estimates (continued)
Impairment of non-current asset
Once an indicator of impairment is identified, significant judgement is required to determine the recoverable amounts of the Company's mining interests. Following the temporary suspension of operations at Jerritt Canyon, the Company has determined that there was an indicator of impairment. The Company determined that the value of the cash generating unit ("CGU") can be estimated using the market approach, based on the implied value per in-situ ounce of the property, rather than from the future cash flows from continuing operations.

In estimating the fair value less costs of disposal ("FVLCD"), the Company took into account the consideration paid in recent transactions for comparable Companies and benchmarked the value per in-situ ounce at Jerritt Canyon against these transactions. The Company concluded that the resulting measurement is more representative of the fair value of the CGU in the circumstances existing at the end of the current period.

New and amended IFRS standards that are effective for the current year:

In the current year, the Company has applied the below amendments to IFRS Standards and Interpretations issued by the IASB that were effective for annual periods that begin on or after January 1, 2023. Their adoption has not had any material impact on the disclosures or on the amounts reported in these financial statements.

Amendments to IAS 1 Presentation of Financial Statements and IFRS Practice Statement 2 Making Materiality Judgments—Disclosure of Accounting Policies

The amendments change the requirements in IAS 1 with regard to disclosure of accounting policies. The amendments replace all instances of the term "significant accounting policies" with "material accounting policy information." Accounting policy information is material if, when considered together with other information included in an entity’s financial statements, it can reasonably be expected to influence decisions that the primary users of general purpose financial statements make on the basis of those financial statements.

The supporting paragraphs in IAS 1 are also amended to clarify that accounting policy information that relates to immaterial transactions, other events or conditions is immaterial and need not be disclosed. Accounting policy information may be material because of the nature of the related transactions, other events or conditions, even if the amounts are immaterial. However, not all accounting policy information relating to material transactions, other events or conditions is itself material. The International Accounting Standards Board ("IASB") has also developed guidance and examples to explain and demonstrate the application of the ‘four-step materiality process’ described in IFRS Practice Statement 2.

The amendments were applied effective January 1, 2023 and did not have a material impact on the Company's interim consolidated financial statements.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 8


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
3. MATERIAL ACCOUNTING POLICIES, ESTIMATES AND JUDGMENTS (continued)
New and amended IFRS standards that are effective for the current year (continued)
Amendments to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors—Definition of Accounting Estimates

The amendments replace the definition of a change in accounting estimates with a definition of accounting estimates. Under the new definition, accounting estimates are “monetary amounts in financial statements that are subject to measurement uncertainty.”

The definition of a change in accounting estimates was deleted. However, the Board retained the concept of changes in accounting estimates in the Standard with the following clarifications:

• A change in accounting estimate that results from new information or new developments is not the correction of an
error

• The effects of a change in an input or a measurement technique used to develop an accounting estimate are changes
in accounting estimates if they do not result from the correction of prior period errors

The amendments were applied effective January 1, 2023 and did not have a material impact on the Company's interim consolidated financial statements.

Deferred Tax Related to Assets and Liabilities Arising from a Single Transaction (Amendments to IAS 12)
The amendments clarify that companies are required to recognize deferred taxes on transactions where both assets and liabilities are recognized, such as with leases and decommissioning liabilities. The amendments were applied effective January 1, 2023 and did not have a material impact on the Company's interim consolidated financial statements.

Future Changes in Accounting Policies Not Yet Effective in the Current Period

At the date of authorization of these financial statements, the Company has not applied the following new and revised IFRS Accounting Standards that have been issued but are not yet effective. Management does not expect that the adoption of the Standards listed below will have a material impact on the financial statements of the Company in future periods, except if indicated.

Classification of Liabilities as Current or Non-Current with Covenants (Amendments to IAS 1)

The amendments aim to promote consistency in applying the requirements by helping companies determine whether, in the statement of financial position, debt and other liabilities with an uncertain settlement date should be classified as current (due or potentially due to be settled within one year) or non-current.

In addition, the amendment requires entities to disclose information to enable users of the financial statements to understand the risk that non-current liabilities with covenants could become repayable within twelve months. The amendments are applied on or after the first annual reporting period beginning on or after January 1, 2024, with early application permitted. This amendment is not expected to have a material impact on the Company’s consolidated financial statements.

Lease Liability in a Sale and Leaseback (Amendments to IFRS 16)

The amendments require a seller-lessee to subsequently measure lease liabilities arising from a leaseback in a way that it does not recognize any amount of the gain or loss that relates to the right of use it retains. The new requirements do not prevent a seller-lessee from recognizing in profit or loss any gain or loss relating to the partial or full termination of a lease. A seller-lessee applies the amendments retrospectively in accordance with IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors to sale and leaseback transactions entered into after the date of initial application.

The amendments are effective for annual reporting periods beginning on or after January 1, 2024 although earlier application is permitted. This amendment is not expected to have a material impact on the Company's consolidated financial statements.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 9


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
4. SEGMENTED INFORMATION

All of the Company’s operations are within the mining industry and its major products are precious metals doré which are refined or smelted into pure silver and gold and sold to global metal brokers. Transfer prices between reporting segments are set on an arms-length basis in a manner similar to transactions with third parties. Coins and bullion cost of sales are based on transfer prices.

An operating segment is defined as a component of the Company that:

engages in business activities from which it may earn revenues and incur expenses;
whose operating results are reviewed regularly by the entity’s chief operating decision maker; and
for which discrete financial information is available.

For the nine months ended September 30, 2023, the Company's significant operating segments include its three operating mines in Mexico, the Jerritt Canyon Gold Mine in Nevada, United States and its "non-producing properties" in Mexico which include the Del Toro and San Martin mines, which have been placed on suspension. The Jerritt Canyon Gold mine has been placed on temporary suspension as of March 20, 2023 to focus on exploration, definition, and expansion of the mineral resources and optimization of mine planning and plant operations. “Others” consists primarily of the Company’s corporate assets including cash and cash equivalents, other development and exploration properties (Note 15), debt facilities (Note 21), coins and bullion sales, and corporate expenses which are not allocated to operating segments. The Company’s chief operating decision maker (“CODM”) evaluates segment performance based on mine operating earnings. Therefore, other income and expense items are not allocated to the segments.


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 10


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
4. SEGMENTED INFORMATION (continued)

Significant information relating to the Company’s reportable operating segments is summarized in the tables below:

Three Months Ended
September 30, 2023 and 2022
 RevenueCost of salesDepletion, depreciation, and amortizationMine operating earnings (loss)Capital expenditures
Mexico     
San Dimas2023$55,828 $43,903 $12,261 ($336)$13,547 
202262,781 33,676 12,290 16,815 11,626 
Santa Elena(2)
202361,313 31,441 10,398 19,474 12,287 
202253,156 30,288 7,805 15,063 9,594 
La Encantada202313,756 15,347 3,040 (4,631)1,614 
202214,817 12,088 2,241 488 2,240 
   Non-producing Properties2023  69 (69)373 
2022— — 95 (95)274 
United States
Jerritt Canyon(2)
2023706 580 1,602 (1,476)2,831 
202227,281 43,627 12,639 (28,985)28,570 
Others(1)
20231,608 916 628 64 1,551 
20225,387 3,445 637 1,305 5,819 
Intercompany elimination2023     
2022(3,671)(2,417)— (1,254)— 
Consolidated2023$133,211 $92,187 $27,998 $13,026 $32,203 
2022$159,751 $120,707 $35,707 $3,337 $58,123 
(1) The "Others" segment includes revenues of $1.6 million (2022 - $5.4 million) from coins and bullion sales of 61,444 silver ounces (2022 - 263,380) at an average price of $26.17 per ounce (2022 - $24.61).
(2) Santa Elena and Jerritt Canyon have incurred mine holding costs related to care and maintenance and temporary suspension activities (Note 8).

During the three months ended September 30, 2023, the Company had three (September 30, 2022 - three) customers that accounted for 99% (September 30, 2022 - 99%) of its sales revenue, with one major metal broker accounting for 94% of total revenue (September 30, 2022 - 93%).

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 11


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
4. SEGMENTED INFORMATION (continued)
Nine Months Ended September 30, 2023 and 2022 RevenueCost of salesDepletion, depreciation, and amortizationMine operating earnings (loss)Capital expenditures
Mexico     
San Dimas2023$183,973 $128,687 $37,888 $17,398 $35,844 
2022178,977 98,511 34,611 45,855 38,885 
Santa Elena(3)
2023152,810 84,180 28,852 39,778 39,245 
2022145,374 82,503 20,117 42,754 36,105 
La Encantada202351,789 42,244 9,058 487 5,489 
202251,647 33,819 6,353 11,475 7,178 
   Non-producing Properties2023  240 (240)627 
2022— — 303 (303)686 
United States
Jerritt Canyon (2)(3)
202340,475 74,294 17,006 (50,825)25,630 
2022100,565 130,981 37,061 (67,477)71,548 
Others(1)
20237,808 4,695 1,970 1,143 2,583 
202212,309 7,302 2,030 2,977 20,695 
Intercompany elimination2023     
2022(12,840)(7,577)— (5,263)— 
Consolidated2023$436,855 $334,100 $95,014 $7,741 $109,418 
2022$476,032 $345,539 $100,475 $30,018 $175,097 
(1) The "Others" segment includes revenues of $7.8 million (2022 - $12.3 million) from coins and bullion sales of 300,587 silver ounces (2022 - 512,078) at an average price of $25.97 per ounce (2022 - $24.04).
(2) Cost of Sales for Jerritt Canyon is inclusive of one time standby costs (Note 6).
(3) Santa Elena and Jerritt Canyon have incurred mine holding costs related to care and maintenance and temporary suspension activities (Note 8).

During the nine months ended September 30, 2023, the Company had three (September 30, 2022 - three) customers that accounted for 98% (September 30, 2022 - 97%) of its sales revenue, with one major metal broker accounting for 94% of total revenue (September 30, 2022 - 93%).




The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 12


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
4. SEGMENTED INFORMATION (continued)

At September 30, 2023 and
December 31, 2022
Mining InterestsProperty, plant and equipmentTotal
mining assets
 Total
assets
Total liabilities
ProducingExploration
Mexico       
San Dimas2023$232,774 $21,495 $90,013 $344,282 $568,098 $84,726 
2022211,658 38,831 94,377 344,866 489,970 76,835 
Santa Elena2023122,590 49,014 94,924 266,528 355,181 82,124 
2022110,094 41,731 99,979 251,804 295,489 79,295 
La Encantada202323,300 4,246 26,458 54,004 110,700 26,824 
202223,496 4,935 24,422 52,853 106,008 30,601 
   Non-producing Properties202362,414 14,394 17,909 94,716 142,679 17,374 
202262,414 13,781 18,195 94,390 206,796 33,391 
United States
Jerritt Canyon2023353,687 82,316 134,645 570,648 604,793 158,195 
2022425,158 93,680 166,778 685,617 756,062 226,814 
Others2023 35,742 42,543 78,285 170,904 243,531 
2022— 35,346 47,584 82,930 255,684 251,775 
Consolidated2023$794,765 $207,207 $406,491 $1,408,463 $1,952,355 $612,774 
2022$832,820 $228,304 $451,335 $1,512,459 $2,110,009 $698,711 

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 13


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
5. REVENUES

The majority of the Company’s revenues are from the sale of precious metals contained in doré form. The Company’s primary products are precious metals of silver and gold. Revenues from the sale of metal, including by-products, are recorded net of smelting and refining costs.

Revenues for the period are summarized as follows:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Gross revenue from payable metals:
    
   Silver$59,021 44 %$56,743 35 %$186,998 43 %$180,988 38 %
   Gold74,777 56 %103,736 65 %251,711 57 %297,073 62 %
Gross revenue133,798 100 %160,479 100 %438,709 100 %478,061 100 %
Less: smelting and refining costs(587)(728)(1,854)(2,029)
Revenues$133,211 $159,751 $436,855 $476,032 

As at September 30, 2023, the Company had $3.7 million of unearned revenue (December 31, 2022 - $3.4 million) that has not satisfied performance obligations.

(a)Gold Stream Agreement with Sandstorm Gold Ltd.
The Santa Elena mine is subject to a gold streaming agreement with Sandstorm Gold Ltd. (“Sandstorm”), which requires the Company to sell to Sandstorm 20% of its gold production over the life of mine from its leach pad and a designated area of its underground operations at the Santa Elena mine. The selling price to Sandstorm is the lesser of the prevailing market price or $450 per ounce, subject to 1% annual inflation. During the three and nine months ended September 30, 2023, the Company delivered nil and 1,071 ounces (2022 - 484 and 1,968 ounces) of gold to Sandstorm at an average price of $nil and $473 per ounce (2022 - $473 and $471 per ounce).

(b)    Net Smelter Royalty
The Santa Elena mine has a net smelter royalty ("NSR") agreement with Orogen Royalties Inc. that requires a 2% NSR from the production of the Ermitaño property. In addition, there is an underlying NSR royalty where Osisko Gold Royalties Ltd. retains a 2% NSR from the sale of mineral products extracted from the Ermitaño property. For the three and nine months ended September 30, 2023, the Company has incurred $2.3 million and $5.9 million (2022 - $1.6 million and $4.1 million) in NSR payments from the production of Ermitaño.
In 2022, the Company sold a portfolio of its existing royalty interests to Metalla Royalty and Streaming Limited. The agreement requires a 100% royalty for the first 1,000 ounces of gold produced annually from the La Encantada property. For the three and nine months ended September 30, 2023, the Company has incurred $0.2 and $0.4 million (2022 - $nil and $nil) in NSR payments from production at La Encantada.

(c) Gold Stream Agreement with Wheaton Precious Metals Corporation

In 2018, the San Dimas mine entered into a purchase agreement with Wheaton Precious Metals International ("WPMI"), a wholly owned subsidiary of Wheaton Precious Metals Corp., which entitles WPMI to receive 25% of the gold equivalent production (based on a fixed exchange ratio of 70 silver ounces to 1 gold ounce) at San Dimas in exchange for ongoing payments equal to the lesser of $600 (subject to a 1% annual inflation adjustment) and the prevailing market price for each gold equivalent ounce delivered. Should the average gold to silver ratio over a six-month period exceed 90:1 or fall below 50:1, the fixed exchange ratio would be increased to 90:1 or decreased to 50:1, respectively. The fixed gold to silver exchange ratio as of September 30, 2023, was 70:1.

During the three and nine months ended September 30, 2023, the Company delivered 9,695 and 31,700 ounces (2022 - 10,196 and 30,898 ounces) of gold to WPM at $631 and $628 per ounce (2022 - $624 and $622 per ounce).


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 14


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
6. COST OF SALES

Cost of sales excludes depletion, depreciation and amortization and are costs that are directly related to production and generation of revenues at the operating segments. Significant components of cost of sales are comprised of the following:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Consumables and materials$22,620 $27,831 $69,576 $79,738 
Labour costs47,427 57,976 164,118 168,584 
Energy8,810 14,354 32,786 40,447 
Maintenance1,725 2,301 4,995 7,301 
Assays and labwork765 1,659 2,506 4,451 
Insurance934 1,099 2,925 3,301 
Other costs(1)
2,041 7,770 11,982 16,635 
Production costs$84,322 $112,990 $288,888 $320,457 
Transportation and other selling costs533 761 2,337 2,045 
Workers' participation costs3,978 2,340 13,902 9,581 
Environmental duties and royalties3,153 2,777 9,142 8,424 
Finished goods inventory changes201 1,731 6,393 1,807 
Other(2)
— 108 — 3,225 
Cost of Sales$92,187 $120,707 $320,662 $345,539 
Cost of Sales - Standby Costs(3)
$— $— $13,438 $— 
(1) Other costs include inventory write-downs at La Encantada resulting from heightened costs due to lower grades, recoveries and throughput which lowered performance, stockpile and work-in-process inventory changes, land access payments as well as services related to travel and medical testing. The inventory write-downs during the three and nine months ended September 30, 2023 totaled $1.0 million and $14.8 million (2022 - $8.1 million and $14.4 million) and related to inventory at La Encantada during the quarter and both La Encantada and Jerritt Canyon during the year.
(2) Other includes $3.1 million in costs that were incurred during the second quarter of 2022 as a result of marginal ore material that was processed to keep the mill running at minimum feed requirements to perform government mandated air compliance test work at the Jerritt Canyon Gold mine.
(3) Cost of sales for the three and nine months ended September 30, 2023 included one time standby costs of $nil and $13.4 million primarily related to direct severance and demobilization costs at the Jerritt Canyon mine following the temporary suspension announced on March 20, 2023.

7. GENERAL AND ADMINISTRATIVE EXPENSES

General and administrative expenses are incurred to support the administration of the business that are not directly related to production. Significant components of general and administrative expenses are comprised of the following:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Corporate administration$2,178 $2,330 $6,761 $6,625 
Salaries and benefits4,827 3,930 14,609 13,116 
Audit, legal and professional fees2,725 1,306 7,015 5,941 
Filing and listing fees150 324 464 638 
Directors' fees and expenses194 235 567 655 
Depreciation365 420 1,144 1,232 
 $10,439 $8,545 $30,560 $28,207 



The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 15


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
8. MINE HOLDING COSTS

The Company’s mine holding costs are primarily comprised of labour costs associated with care and maintenance staff, electricity, security, environmental and community support costs for the following mines which are currently under temporary suspension:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
La Parrilla(1)
$564 $994 $3,477 $2,609 
Del Toro869 553 2,192 1,779 
San Martin170 1,177 813 2,763 
La Guitarra(1)
— 966 514 2,134 
Santa Elena (2)
930 — 2,182 — 
Jerritt Canyon4,710 — 5,572 — 
 $7,243 $3,690 $14,750 $9,285 
(1) The La Guitarra and the La Parrilla mines, previously classified as an asset held-for-sale ("AHFS"), were sold during the first quarter and the third quarter of 2023, respectively (Note 14).
(2) During 2023, the Company will be processing ore solely from the Ermitaño mine which is part of the Santa Elena operations. During the three and nine months ended September 30, 2023, the Company has incurred $0.9 million and $2.2 million (2022 - $nil and $nil) in holding costs relating to care and maintenance charges for the Santa Elena mine.

9. INVESTMENT AND OTHER INCOME (LOSS)

The Company’s investment and other income (loss) are comprised of the following:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Gain from investment in silver futures derivatives$434 $287 $4,825 $3,175 
Loss from investment in marketable securities (Note 13(a))
(685)(441)(1,619)(4,290)
Interest income and other1,526 514 4,938 189 
 $1,275 $360 $8,144 ($926)

10. FINANCE COSTS

Finance costs are primarily related to interest and accretion expense on the Company’s debt facilities, lease liabilities and accretion of decommissioning liabilities. The Company’s finance costs in the periods are summarized as follows:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Debt facilities(1) (Note 21)
$3,368 $2,735 $9,256 $7,624 
Accretion of decommissioning liabilities1,829 1,533 6,244 4,549 
Lease liabilities (Note 22)
660 571 1,944 1,612 
Silver sales and other882 397 2,244 876 
 $6,739 $5,236 $19,688 $14,661 
(1) During the three and nine months ended September 30, 2023, finance costs for debt facilities includes non-cash accretion expense of $2.4 million (2022 - $2.3 million) and $7.1 million (2022 - $6.5 million).


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 16


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
11. EARNINGS OR LOSS PER SHARE

Basic earnings or loss per share is the net earnings or loss available to common shareholders divided by the weighted average number of common shares outstanding during the periods. Diluted net earnings or loss per share adjusts basic net earnings or loss per share for the effects of potential dilutive common shares. The calculations of basic and diluted earnings or loss per share for the periods ended September 30, 2023 and 2022 are as follows:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Net loss for the period($27,149)($20,692)($145,343)($97,457)
Weighted average number of shares on issue - basic286,921,720 262,865,860 280,758,404 261,925,327 
Effect on dilutive securities:
Stock options— — — — 
Restricted, performance and deferred share units— — — — 
Weighted average number of shares on issue - diluted(1)
286,921,720 262,865,860 280,758,404 261,925,327 
Loss per share - basic and diluted($0.09)($0.08)($0.52)($0.37)
(1)For the three and nine months ended September 30, 2023, diluted weighted average number of shares excluded 7,812,410 and 7,010,717 (2022 - 4,833,635 and 4,295,386) options, 5,000,000 (2022 - 5,000,000) warrants, 1,766,714 restricted and performance share units (2022 - 1,285,161) and 13,888,895 common shares issuable under the 2021 convertible debentures (2022 - 13,888,895) (Note 21(a)) that were anti-dilutive.

12. INVENTORIES

Inventories consist primarily of materials and supplies and products of the Company’s operations, in varying stages of the production process, and are presented at the lower of weighted average cost or net realizable value.
 September 30,
2023
December 31,
2022
Finished goods - doré $5,110 $5,561 
Work-in-process8,315 9,176 
Stockpile3,585 4,825 
Silver coins and bullion4,284 8,001 
Materials and supplies39,269 37,198 
 $60,563 $64,761 

The amount of inventories recognized as an expense during the period is equivalent to the total of cost of sales plus depletion, depreciation and amortization for the period. As at September 30, 2023, mineral inventories, which consist of stockpile, work-in-process and finished goods includes a $1.0 million write down (December 2022 - $9.3 million) which was recognized in cost of sales during the quarter (Note 6).













The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 17


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
13. OTHER FINANCIAL ASSETS

As at September 30, 2023, other financial assets consists of the Company’s investment in marketable securities comprised of the following:
 September 30,
2023
December 31,
2022
FVTPL marketable securities (a)$5,664 $6,657 
FVTOCI marketable securities (b)49,445 27,871 
Total other financial assets$55,109 $34,528 

(a)Fair Value through Profit or Loss ("FVTPL") Marketable Securities
Loss on marketable securities designated as FVTPL for the three and nine months ended September 30, 2023 was $0.7 million (2022 - loss of $0.4 million) and $1.6 million (2022 - loss of $4.3 million) and was recorded through profit or loss.

(b)Fair Value through Other Comprehensive Income ("FVTOCI") Marketable Securities
Changes in fair value of marketable securities designated as FVTOCI for the three and nine months ended September 30, 2023 was a loss of $11.0 million (2022 - loss of $1.0 million) and $25.9 million (2022 - loss of $8.6 million), net of tax, and were recorded through other comprehensive income and will not be transferred into earnings or loss upon disposition or impairment.

14. DIVESTITURES

(a) La Guitarra Silver Mine

On May 24, 2022, the Company announced that it had entered into a share purchase agreement with Sierra Madre Gold and Silver Ltd. ("Sierra Madre"), to sell the Company's subsidiary La Guitarra Compañia Minera S.A. de C.V. ("La Guitarra"), which owns the La Guitarra Silver Mine, to Sierra Madre for total consideration of approximately $35 million, consisting of 69,063,076 Sierra Madre common shares at a deemed price of $0.51 per share. The closing of the transaction was subject to customary closing conditions including approval of the Sierra Madre shareholders (which was obtained in December 2022), regulatory approval and that Sierra Madre raise a minimum of $7.7 million (CAD $10 million) in a private placement concurrent or prior to the sale.

On June 30, 2022, the sale was considered highly probable; therefore, the assets and liabilities of La Guitarra were classified as assets and liabilities held for sale and presented separately under current assets and current liabilities, respectively. Immediately prior to the classification to assets and liabilities held for sale, the carrying amount of La Guitarra was remeasured to its recoverable amount, being its FVLCD, based on the expected proceeds from the sale. At December 31, 2022, the sale continued to be considered highly probable; therefore the assets and liabilities were presented as assets and liabilities held for sale and presented separately under current assets and current liabilities. During 2022, the Company recorded a reversal of impairment loss related to the La Guitarra assets of $12.3 million based on the recoverable amount implied by the share purchase agreement.

Out of the impairment reversal of $12.3 million related to La Guitarra, $8.2 million was allocated to depletable mining interest, $1.0 million was allocated to non-depletable mining interest with the remaining $3.1 million allocated to property, plant and equipment, resulting in an impairment reversal of $8.0 million, net of a $4.4 million adjustment to the deferred tax liability. The recoverable amount of La Guitarra, being its FVLCD, was $34.9 million based on the expected proceeds from the sale.

On March 29, 2023, the Company completed the sale of La Guitarra to Sierra Madre and received total consideration of $33.2 million net of transaction costs, before working capital adjustments. Pursuant to the share purchase agreement, the purchase price is increased to the extent the working capital of La Guitarra is greater than zero, and decreased to the extent the working capital is less than zero. Based on the carrying value of the asset at the time of disposal of $34.3 million, and the working capital adjustment of $0.2 million, the Company has recorded a loss on disposition of $1.4 million. The Company began accounting for the common shares received from Sierra Madre as an equity security at FVTOCI (Note 13).
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 18


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
14. DIVESTITURES (continued)

(b) La Parrilla Silver Mine

On December 7, 2022, the Company announced that it had entered into an asset purchase agreement with Golden Tag Resources Ltd. ("Golden Tag") to sell the La Parrilla Silver Mine for total consideration of up to $33.5 million, consisting of 143,673,684 common shares of Golden Tag at a deemed price of $0.16 per share, having an aggregate value as of the date of the sale agreement of $20 million, and up to $13.5 million in contingent consideration, in the form of three milestone payments payable in either cash or Golden Tag shares, out of which $2.7 million is payable no later than 18 months following the closing date. The Company has also agreed to purchase $2.7 million of Golden Tag securities in a future Golden Tag equity financing of up to CAD $7.2 million. Closing the transaction was subject to customary closing conditions, including completion of such financing and receipt of all necessary regulatory approvals (which were obtained in May 2023).

At December 31, 2022, the sale was considered highly probable; therefore, the assets of La Parrilla were classified as assets held for sale and presented separately under current assets. Immediately prior to the classification to assets held for sale, the carrying amount of La Parrilla was remeasured to its recoverable amount, being its FVLCD, based on the $20 million initial payment, and the first milestone payment of $2.7 million.

During 2022, the Company recorded an impairment loss related to the La Parrilla assets of $9.6 million based on the recoverable amount implied by the asset purchase agreement. Out of the impairment of $9.6 million related to La Parrilla, $5.7 million was allocated to depletable mining interest, $2.1 million was allocated to non-depletable mining interest with the remaining $1.7 million allocated to property, plant and equipment, resulting in an impairment of $9.6 million, net of a $nil adjustment to the deferred tax liability. The recoverable amount of La Parrilla, being its FVLCD, was $22.7 million, net of estimated transaction costs, based on the expected proceeds from the sale.

During the six months ended June 30, 2023, the Company recorded an additional write down on asset held-for-sale related to La Parrilla of $7.2 million, based on the change in value of Golden Tag's common shares at the end of the reporting period.

Out of the write down of $7.2 million related to La Parrilla, $3.7 million was allocated to depletable mining interest, $1.4 million was allocated to non-depletable mining interest with the remaining $2.1 million allocated to property, plant and equipment, resulting in a write down of $7.2 million, net of a $nil adjustment to the deferred tax liability. The recoverable amount of La Parrilla, being its FVLCD, was $14.9 million, net of estimated transaction costs, based on the expected proceeds from the sale.

On August 14, 2023, the Company completed the sale of La Parrilla to Golden Tag and received total consideration of $13.3 million net of transaction costs. Based on the price of Golden Tag's common shares at the time of closing the transaction, the Company has recorded a loss on disposition of $1.6 million. In addition, First Majestic participated in Golden Tag's offering of subscription receipts (the "Subscription Receipts") and purchased 18,009,000 Subscription Receipts at a price of CAD$0.20 per Subscription Receipt which, in accordance with their terms, have now converted into 18,009,000 Golden Tag common shares and 9,004,500 common share purchase warrants (the "Warrants"). Each Warrant is exercisable for one additional Golden Tag common share until August 14, 2026, at a price of CDN$0.34. The Company began accounting for the shares and warrants received from Golden Tag as an equity security at FVTOCI (Note 13).

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 19


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
14. DIVESTITURES (continued)

(b) La Parrilla Silver Mine (continued)

The components of assets and liabilities held for sale relating to La Guitarra and La Parrilla are as follows:
 As at
December 31, 2022
La Guitarra(1)
La Parrilla(2)
Assets:
Cash and cash equivalents$5,218 $— 
Trade and other receivables396 — 
Inventory437 876 
Prepaid expenses and other51 — 
Current assets$6,102 $876 
Non-Current Assets:
Mineral Interests - depletable30,193 13,758 
Mineral Interests - non-depletable3,917 5,252 
Property, plant and equipment4,004 7,821 
Right of use assets16 645 
Deposits on long-term assets26 117 
Total assets held-for-sale $44,258 $28,469 
Liabilities:
Trade payables and accrued liabilities$141 $— 
Current portion of lease obligations— 
Current Liabilities$149 $— 
Non-Current Liabilities:
Deferred tax liabilities6,894 1,667 
Lease obligations12 438 
Decommissioning liabilities2,951 4,167 
Total liabilities relating to assets held-for-sale $10,006 $6,272 
Net assets held for sale$34,252 $22,197 
(1) On March 29, 2023, the Company completed the sale of La Guitarra to Sierra Madre Gold and Silver Ltd. As such, the asset is no longer classified as held-for-sale, with the assets and liabilities derecognized after disposition.
(2) On August 14, 2023, the Company completed the sale of La Parrilla to Golden Tag Resources Ltd. As such, the asset is no longer classified as held-for-sale, with the asset derecognized after disposition.

The La Guitarra and La Parrilla mines are presented in the non-producing properties reportable segment up to the date of disposition (Note 4, 15 and 16 ).




The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 20


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
14. DIVESTITURES (continued)

(c) Sale of Royalty Portfolio

On December 21, 2022, the Company completed the sale of a portfolio of royalty interests to Metalla Royalty & Streaming Ltd. ("Metalla"), for total consideration of 4,168,056 Metalla shares with a fair value of $21.5 million based on a share price of $5.16 on the date of closing.

AssetOwnerLocationRoyaltyAllocated Value Total
La EncantadaFirst Majestic Silver Corp.Coahuila, Mexico
100% Gold Royalty(1)
$1,720,574 
La ParrillaGolden Tag Resources Ltd.Durango, Mexico2% Net Smelter Return$3,871,290 
Del ToroFirst Majestic Silver Corp.Zacatecas, Mexico2% Net Smelter Return$3,226,075 
San MartinFirst Majestic Silver Corp.Jalisco, Mexico2% Net Smelter Return$5,376,792 
La GuitarraSierra Madre Gold and Silver Ltd. Mexico, Mexico2% Net Smelter Return$3,011,004 
PlomosasGR Silver Mining Ltd.Sinaloa, Mexico2% Net Smelter Return$4,301,434 
La LuzFirst Majestic Silver Corp.San Luís Potosí, Mexico2% Net Smelter Return$— 
La JoyaSilver Dollar Resources Ltd.Durango, Mexico2% Net Smelter Return$— 
(1) Up to the first 1,000 payable ounces annually

The value of the consideration received was credited to mining interests for each property, resulting in a $3.0 million gain during the period ended December 31, 2022 derived from the disposal of the royalty in the Plomosas property, which had a carrying value of $nil.

With the exception of La Encantada, all mines included within the royalty portfolio are presented in the non-producing properties reportable segment (Note 4 and 15 ).

15. MINING INTERESTS

Mining interests primarily consist of acquisition, development, exploration and exploration potential costs directly related to the Company’s operations and projects. Upon commencement of commercial production, mining interests for producing properties are depleted on a units-of-production basis over the estimated economic life of the mine. In applying the units of production method, depletion is determined using quantity of material extracted from the mine in the period as a portion of total quantity of material, based on reserves and resources, considered to be highly probable to be economically extracted over the life of mine plan.

The Company’s mining interests are comprised of the following:
 September 30,
2023
December 31,
2022
Depletable properties$794,765 $832,820 
Non-depletable properties (exploration and evaluation costs, exploration potential)207,207 228,304 
 $1,001,972 $1,061,124 



The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 21


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
15. MINING INTERESTS (continued)

Depletable properties are allocated as follows:
Depletable propertiesSan DimasSanta ElenaLa EncantadaJerritt Canyon
Non-producing
Properties(1)
Total
Cost   
At December 31, 2021$286,196 $125,921 $122,735 $386,069 $494,568 $1,415,490 
Additions30,733 23,957 2,507 58,728 — 115,925 
Transfer to assets held-for-sale (Note 14)
— — — — (279,399)(279,399)

Change in decommissioning liabilities
  
(1,800)1,518 (879)1,241 (2,332)(2,252)
Disposal of royalty portfolio (Note 14)
— — (1,721)— — (1,721)
Transfer from non-depletable properties— — 2,098 30,503 — 32,601 
At December 31, 2022$315,129 $151,396 $124,740 $476,541 $212,838 $1,280,644 
Additions20,044 23,878 2,054 13,307 — 59,283 
Transfer from non-depletable properties26,426 1,896 2,021 — — 30,343 
At September 30, 2023$361,599 $177,170 $128,815 $489,848 $212,838 $1,370,270 
Accumulated depletion, amortization and impairment reversal  
At December 31, 2021($72,671)($28,650)($96,908)($23,258)($388,354)($609,841)
Depletion and amortization(30,800)(12,652)(4,336)(28,125)— (75,913)
Reversal of impairment (Note 14)
— — — — 8,203 8,203 
Transfer to assets held-for-sale (Note 14)
— — — — 235,448 235,448 
Impairment (Note 14)
— — — — (5,721)(5,721)
At December 31, 2022($103,471)($41,302)($101,244)($51,383)($150,424)($447,824)
Depletion and amortization(25,354)(13,278)(4,271)(6,650)— (49,552)
Impairment (Note 18)
— — — (78,128)— (78,128)
At September 30, 2023($128,825)($54,580)($105,515)($136,161)($150,424)($575,504)
Carrying values   
At December 31, 2022$211,658 $110,094 $23,496 $425,158 $62,414 $832,820 
At September 30, 2023$232,774 $122,590 $23,300 $353,687 $62,414 $794,766 
(1) Non-producing properties include the San Martin, Del Toro, La Parrilla and La Guitarra mines. La Guitarra and La Parrilla were classified as assets held-for-sale up to the date of disposition on March 29, 2023 and August 14, 2023, respectively. As of September 30, 2023, the assets and liabilities have been derecognized (the net carrying value of the disposal group at December 31, 2022 was $44.0 million) (Note 14).



















The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 22


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
15. MINING INTERESTS (continued)

Non-depletable properties costs are allocated as follows:
Non-depletable properties
San Dimas(a)
Santa Elena(b)
La Encantada(c) 
Jerritt Canyon(d)
Non-producing
Properties(1)
Exploration Projects(2)
Springpole
Stream(e)
Total
At December 31, 2021
$29,186 $31,067 $4,640 $104,431 $38,752 $22,948 $11,856 $242,881 
Exploration and evaluation expenditures9,645 10,664 2,393 19,752 771 694 — 43,919 
Change in decommissioning liabilities— — — — — (153)— (153)
Impairment (Note 14)
— — — — (2,132)— — (2,132)
Reversal of impairment— — — — 1,044 — — 1,044 
Metalla royalty— — — — (15,485)— — (15,485)
Transfer to assets held-for-sale (Note 14)
— — — — (9,169)— — (9,169)
Transfer to depletable properties— — (2,098)(30,503)— — — (32,601)
At December 31, 2022
$38,831 $41,731 $4,935 $93,680 $13,781 $23,489 $11,856 $228,304 
Exploration and evaluation expenditures9,090 9,179 1,332 6,024 613 592 — 26,829 
Impairment (Note 18)
— — — (17,388)— — (17,388)
Disposal of La Joya— — — — — (195)— (195)
Transfer to depletable properties(26,426)(1,896)(2,021)— — — — (30,343)
At September 30, 2023$21,495 $49,014 $4,246 $82,316 $14,394 $23,886 $11,856 $207,207 
(1) Non-producing properties include the San Martin, Del Toro, La Parrilla and La Guitarra mines. La Guitarra and La Parrilla were classified as assets held-for-sale up to the date of disposition on March 29, 2023 and August 14, 2023, respectively. As of September 30, 2023, the assets and liabilities have been derecognized (the net carrying value of the disposal group at December 31, 2022 was $9.2 million) (Note 14).
(2) Exploration projects include the La Luz, La Joya, Los Amoles, Jalisco Group of Properties and Jimenez del Tuel projects.

(a)San Dimas Silver/Gold Mine, Durango State, Mexico

The San Dimas Mine is subject to a gold and silver streaming agreement with WPMI which entitles WPMI to receive 25% of the gold equivalent production (based on a fixed exchange ratio of 70 silver ounces to 1 gold ounce) at San Dimas in exchange for ongoing payments equal to the lesser of $600 (subject to a 1% annual inflation adjustment commencing in May 2019) and the prevailing market price for each gold ounce delivered. Should the average gold to silver ratio over a six-month period exceed 90:1 or fall below 50:1, the fixed exchange ratio would be increased to 90:1 or decreased to 50:1, respectively. The fixed gold to silver exchange ratio as of September 30, 2023, was 70:1.

(b)Santa Elena Silver/Gold Mine, Sonora State, Mexico

The Santa Elena Mine is subject to a gold streaming agreement with Sandstorm, which requires the mine to sell 20% of its life of mine gold production from its leach pad and a designated area of its underground operations of the Santa Elena mine to Sandstorm. The selling price to Sandstorm is currently the lesser of $464 per ounce, subject to a 1% annual inflation increase every April, and the prevailing market price.

The Santa Elena mine has a net smelter royalty ("NSR") agreement with Orogen Royalties Inc. that requires a 2% NSR from the production of the Ermitaño property. In addition, there is an underlying NSR royalty where Osisko Gold Royalties Ltd. retains a 2% NSR from the sale of mineral products extracted from the Ermitaño property. During the three and nine months ended September 30, 2023, the Company has incurred $2.3 million and $5.9 million (2022 - $1.6 million and $4.1 million) in NSR payments from the production of Ermitaño.




The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 23


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
15. MINING INTERESTS (continued)

(c) La Encantada Silver Mine, Coahuila State, Mexico

In 2022, the Company sold a portfolio of its existing royalty interests to Metalla Royalty and Streaming Limited. Under the terms of the agreement, the Company is required to pay a 100% gross value royalty on the first 1,000 ounces of gold produced annually from the La Encantada property. For the three and nine months ended September 30, 2023, the Company has incurred $0.2 and $0.4 million (2022 - $nil) in royalty payments from gold production at La Encantada.

(d) Jerritt Canyon Gold Mine, Nevada, United States

The Jerritt Canyon Mine is subject to a 0.75% NSR royalty on production of gold and silver from the Jerritt Canyon mines and processing plant. The royalty is applied, at a fixed rate of 0.75%, against proceeds from gold and silver products after deducting treatment, refining, transportation, insurance, taxes and levies charges.

The Jerritt Canyon Mine is also subject to a 2.5% to 5% NSR royalty relating to the production of gold and silver within specific boundary lines at certain mining areas. The royalty is applied, at a fixed rate of 2.5% to 5.0%, against proceeds from gold and silver products.

As at September 30, 2023, total NSR royalty accrual outstanding was $0.6 million (December 31, 2022 - $0.8 million).

(e) Springpole Silver Stream, Ontario, Canada
In July 2020, the Company completed an agreement with First Mining Gold Corp. (“First Mining”) to purchase 50% of the life of mine payable silver produced from the Springpole Gold Project ("Springpole Silver Stream"), a development stage mining project located in Ontario, Canada. First Majestic agreed to pay First Mining consideration of $22.5 million in cash and shares, in three milestone payments, for the right to purchase silver at a price of 33% of the silver spot price per ounce, to a maximum of $7.50 per ounce (subject to annual inflation escalation of 2%, commencing at the start of the third anniversary of production). Commencing with its production of silver, First Mining must deliver 50% of the payable silver which it receives from the offtaker within five business days of the end of each quarter.

The transaction consideration paid and payable by First Majestic is summarized as follows:

The first payment of $10.0 million, consisting of $2.5 million in cash and $7.5 million in First Majestic common shares (805,698 common shares), was paid to First Mining on July 2, 2020;
The second payment of $7.5 million, consisting of $3.75 million in cash and $3.75 million in First Majestic common shares (287,300 common shares), was paid on January 21, 2021 upon the completion and public announcement by First Mining of the results of a Pre-Feasibility Study for Springpole; and
The third payment, consisting of $2.5 million in cash and $2.5 million in First Majestic common shares (based on a 20 day volume weighted average price), will be paid upon receipt by First Mining of a Federal or Provincial Environmental Assessment approval for Springpole, which has not yet been received.

In connection with the streaming agreement, First Mining also granted First Majestic 30.0 million common share purchase warrants of First Mining (the "First Mining Warrants"), each of which will entitle the Company to purchase one common share of First Mining at CAD$0.40 over a period of five years. As a result of the distribution by First Mining of shares and warrants of Treasury Metals Inc. that was completed by First Mining on July 15, 2021, pursuant to the adjustment provisions of the First Mining Warrants, the exercise price of these warrants was reduced from $0.40 to $0.37, and the number of these warrants was increased from 30.0 million to 32.1 million. The fair value of the warrants was measured at $5.7 million using the Black-Scholes option pricing model. First Mining shall have the right to repurchase 50% of the silver stream for $22.5 million at any time prior to the commencement of production at Springpole, and if such a repurchase takes place, the Company will be left with a reduced silver stream of 25% of life of mine payable silver production from Springpole. First Mining is a related party with two independent board members who are also directors and/or officers of First Majestic.






The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 24


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
16. PROPERTY, PLANT AND EQUIPMENT

The majority of the Company's property, plant and equipment is used in the Company's operating mine segments. Property, plant and equipment is depreciated using either the straight-line or units-of-production method over the shorter of the estimated useful life of the asset or the expected life of mine. Where an item of property, plant and equipment comprises of major components with different useful lives, the components are accounted for as separate items of property, plant and equipment. Assets under construction are recorded at cost and re-allocated to land and buildings, machinery and equipment or other when they become available for use.

Property, plant and equipment are comprised of the following: 
Land and Buildings(1)
Machinery and Equipment
Assets under Construction(2)
OtherTotal
Cost
At December 31, 2021$244,957 $624,462 $90,451 $33,583 $993,453 
Additions— 5,038 64,088 507 69,633 
Reclassification to assets held-for-sale (Note 14)
(30,903)(82,275)(176)(2,111)(115,465)
Transfers and disposals23,192 47,783 (80,436)4,772 (4,689)
At December 31, 2022$237,246 $595,008 $73,927 $36,751 $942,932 
Additions14 1,191 21,532 569 23,306 
Reclassification to asset held-for-sale (Note 14)
(14)26 — — 12 
Transfers and disposals4,439 29,497 (38,228)967 (3,325)
At September 30, 2023$241,685 $625,722 $57,231 $38,287 $962,925 
Accumulated depreciation, amortization and impairment reversal
At December 31, 2021($147,079)($374,879)$— ($22,258)($544,216)
Depreciation and amortization(12,016)(40,419)— (3,793)(56,228)
Impairment (Note 14)
(1,742)— — — (1,742)
Impairment reversal (Note 14)
3,076 — — — 3,076 
Reclassification to assets held-for-sale (Note 14)
20,774 80,964 — 1,902 103,640 
Transfers and disposals— 3,606 — 267 3,873 
At December 31, 2022($136,987)($330,728)$— ($23,882)($491,597)
Depreciation and amortization(9,909)(25,170)— (2,590)(37,669)
Impairment (Note 18)
(7,585)(21,979)— (120)(29,684)
Reclassification to asset held-for-sale (Note 14)
— (117)— — (117)
Transfers and disposals249 2,384 — — 2,633 
At September 30, 2023($154,232)($375,610)$— ($26,592)($556,434)
Carrying values
At December 31, 2022$100,259 $264,280 $73,927 $12,869 $451,335 
At September 30, 2023$87,453 $250,112 $57,231 $11,695 $406,491 

(1) Included in land and buildings is $11.2 million (2022 - $11.2 million) of land which is not subject to depreciation.
(2) Assets under construction includes certain innovation projects, such as high-intensity grinding ("HIG") mills and related modernization, plant improvements, other mine infrastructures and equipment overhauls.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 25


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
16. PROPERTY, PLANT AND EQUIPMENT (continued)

Property, plant and equipment, including land and buildings, machinery and equipment, assets under construction and other assets above are allocated by mine as follow:
 San DimasSanta ElenaLa EncantadaJerritt Canyon
Non-producing
Properties(1)
OtherTotal
Cost    
At December 31, 2021$158,528 $122,597 $150,718 $193,085 $285,806 $82,719 $993,453 
Additions (2)
6,985 13,093 5,325 16,297 98 27,835 69,633 
Reclassification to assets held-for-sale— — — — (115,465)— (115,465)
Transfers and disposals(717)31,852 1,880 367 (5,421)(32,650)(4,689)
At December 31, 2022$164,796 $167,542 $157,923 $209,749 $165,018 $77,904 $942,932 
Additions(2)
6,710 6,188 2,103 6,299 14 1,992 23,306 
Reclassification to asset held-for-sale (Note 14)
— — — — 12 — 12 
Transfers and disposals965 (1,435)3,773 (19)(1,025)(5,584)(3,325)
At September 30, 2023$172,471 $172,295 $163,799 $216,029 $164,019 $74,312 $962,925 
Accumulated depreciation, amortization and impairment
At December 31, 2021($53,055)($57,754)($130,038)($20,228)($258,626)($24,515)($544,216)
Depreciation and amortization(17,554)(10,058)(2,809)(22,747)(222)(2,838)(56,228)
Impairment— — — — (1,742)— (1,742)
Impairment reversal— — — — 3,076 — 3,076 
Reclassification to assets held-for-sale— — — — 103,640 — 103,640 
Transfers and disposals190 249 (654)7,051 (2,967)3,873 
At December 31, 2022($70,419)($67,563)($133,501)($42,971)($146,823)($30,320)($491,597)
Depreciation and amortization(11,900)(11,539)(3,423)(8,729)(127)(1,951)(37,669)
Impairment (Note 18)
— — — (29,684)— — (29,684)
Reclassification to asset held-for-sale (Note 14)
— — — — (117)— (117)
Transfers and disposals(139)1,731 (417)— 956 502 2,633 
At September 30, 2023($82,458)($77,371)($137,341)($81,384)($146,111)($31,769)($556,434)
Carrying values    
At December 31, 2022$94,377 $99,979 $24,422 $166,778 $18,195 $47,584 $451,335 
At September 30, 2023$90,013 $94,924 $26,458 $134,645 $17,908 $42,543 $406,491 

(1) Non-producing properties include the San Martin, Del Toro, La Parrilla and La Guitarra mines. La Guitarra and La Parrilla were classified as assets held-for-sale up to the date of disposition on March 29, 2023 and August 14, 2023, respectively. As of September 30, 2023, the assets and liabilities have been derecognized (the net carrying value of the disposal group at December 31, 2022 was $11.8 million).
(2) Additions classified in "Other" primarily consist of innovation projects and construction-in-progress.

17. RIGHT-OF-USE ASSETS

The Company entered into operating leases to use certain land, buildings, mining equipment and corporate equipment for its operations. The Company is required to recognize right-of-use assets representing its right to use these underlying leased assets over the lease term.




The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 26


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
17. RIGHT-OF-USE ASSETS (continued)

Right-of-use assets are initially measured at cost, equivalent to its obligation for payments over the term of the leases, and subsequently measured at cost less accumulated depreciation and impairment losses. Depreciation is recorded on a straight-line basis over the shorter period of lease term and useful life of the underlying asset.

Right-of-use assets are comprised of the following: 
Land and BuildingsMachinery and EquipmentOtherTotal
At December 31, 2021$8,302 $20,921 $2 $29,225 
Additions1,786 1,514 14 3,314 
Remeasurements578 2,239 (2)2,815 
Depreciation and amortization(1,608)(6,431)(5)(8,044)
Transfer to asset held-for-sale(634)(27)— (661)
At December 31, 2022$8,424 $18,216 $9 $26,649 
Additions1,719 575 — 2,294 
Remeasurements96 6,018 — 6,114 
Depreciation and amortization(1,318)(5,951)(9)(7,278)
Transfer to asset held-for-sale (Note 14)
47 10 — 57 
Disposals15 (3)— 12 
At September 30, 2023$8,983 $18,865 $— $27,848 

18. IMPAIRMENT OF NON-CURRENT ASSET

On March 20, 2023, the Company announced the temporary suspension of operations at the Jerritt Canyon Gold mine. Having considered the facts and circumstances including the temporary suspension of operations, heightened costs, and operating mine performance, the Company determined that impairment indicators existed for the Jerritt Canyon Gold mine. IFRS accounting standards require an entity to assess its assets for indicators of impairment at the cash-generating unit level based on their individual recoverable amounts. After the Company identified an indicator of impairment for Jerritt Canyon, the Company assessed the recoverable value of the Jerritt Canyon Gold Mine based on its FVLCD.

Key Assumptions

The FVLCD for Jerritt Canyon was determined using a multiple-based valuation method to estimate the value per in-situ ounce based on comparable market transactions. Valuation multiples applied to mineral resources and property, plant and equipment in the CGU, subject to impairment testing were determined as follows:

External valuation specialists were used to obtain a population of gold exploration, development and operating companies. The value of trading multiples for operating companies based on recent transactions was determined to be between $149 per ounce and $248 per ounce.
Management considered the $165 per ounce multiple to be the most reasonable estimate of the fair value of Jerritt Canyon, as companies in this range included companies in operations that had invested significantly in exploration, capital structure, an operating plant and had significant exploration potential.

The market approach used to determine FVLCD is significantly affected by changes in key assumptions of determining which population of comparable companies are most relevant and the price for these precedent transactions. In determining the comparability of public companies and precedent transactions, factors such as primary ore, location, stage of operations, reserves and resources, exploration potential, infrastructure, and accessibility for the underlying commodity were taken into consideration. The Company performed a sensitivity analysis on the key assumption being the population of comparable transactions and determined that a change in this assumption could lead to a different fair value of this asset. Management’s estimate of FVLCD is classified as a level 3 in the fair value hierarchy as the inputs are not based on observable market data.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 27


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
18. IMPAIRMENT OF NON-CURRENT ASSET (continued)

In prior periods, management utilized the discounted cash flow method as the valuation technique to determine the recoverable amount. Recoverable values were determined with internal discounted cash flow economic models projected using management’s best estimate of recoverable mineral reserves and resources, future operating costs, capital expenditures and long-term foreign exchange rates and corroborated by in situ value of its Reserves and Resources. As Jerritt Canyon does not currently have a mine plan to estimate future cash flows, the market approach was used during the current period to determine the FVLCD.

Based on the Company's assessment, the Company concluded that the carrying value of the Jerritt Canyon mine had an estimated recoverable value, based on its FVLCD, below its carrying value at March 31, 2023. As a result, the following impairment charge was recognized during the first quarter of 2023:

Nine Months Ended
September 30, 2023
Impairment of non-current asset$125,200 
Deferred income tax recovery(31,237)
Impairment of non-current asset, net of tax$93,963 

With the exception of La Parrilla (Note 14), the Company determined there were no significant events or changes in circumstances to indicate that the carrying amount of its other non-current assets may not be recoverable, nor indicators that the recoverable amount of its previously impaired assets will exceed its carrying value. As such, no other impairment or impairment reversal were recognized during the three and nine months ended September 30, 2023 (2022 - $7.6 million reversal of impairment).

The impairment charge recognized for the nine months ended September 30, 2023 with respect to the Jerritt Canyon operating segment, which was recorded during the first quarter of 2023, was allocated as follows:
Nine Months Ended
September 30, 2023
Mining interest - producing properties$78,128 
Mining interests - exploration properties (non-depletable)17,388 
Property, plant and equipment29,684 
Impairment of non-current asset$125,200 





















The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 28


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
19. RESTRICTED CASH

Restricted cash is comprised of the following:

 September 30,
2023
December 31,
2022
Nevada Division of Environmental Protection(1)
$18,169 $17,702 
Chartis Commutation Account(2)
— 28,365 
SAT Primero tax dispute(3)
100,821 79,126 
Non-Current Restricted Cash$118,990 $125,193 

1.On November 2, 2021, the Company executed an agreement with the Nevada Division of Environmental Protection ("NDEP") relating to funds required to establish a trust agreement to cover post-closure water treatment cost at Jerritt Canyon. During the year ended December 31, 2022, the Company funded $17.7 million into a trust; these amounts are included within non-current restricted cash.
2.The Company owns an environmental risk transfer program (the "ERTP") for Jerritt Canyon from American Insurance Group ("AIG"). As part of the ERTP, $28.7 million was on deposit in an interest-bearing account with AIG (the "Commutation Account"). The Commutation Account principal plus interest earned on the principal is used to fund ongoing reclamation and mine closure obligations. The Company elected to extinguish all rights under the policy releasing AIG from reclamation cost and financial assurance liabilities by replacing the policy with surety bonds on June 28, 2023. During the third quarter of 2023, the NDEP and the USDA Forest Services ("USFS") accepted replacement of the surety bonds and the Company has received total funds of $28.7 million.
3.In connection with the dispute between Primero Empresa Minera, S.A. de C.V. ("PEM") and the Servicio de Admistracion Tributaria ("SAT") in relation to the advanced pricing agreement (Note 26), the tax authority has frozen a PEM bank account with funds of $100.8 million (1,776 million MXN) as a guarantee against certain disputed tax assessments. This balance consists of Value Added Tax ("VAT") refunds that the Company has received which were previously withheld by the tax authority. The Company does not agree with SAT's position and has challenged it through the relevant legal channels.



20. TRADE AND OTHER PAYABLES

The Company’s trade and other payables are primarily comprised of amounts outstanding for purchases relating to mining operations, exploration and evaluation activities and corporate expenses. The normal credit period for these purchases is usually between 30 to 90 days.

Trade and other payables are comprised of the following items:
 September 30,
2023
December 31,
2022
Trade payables$22,119 $40,782 
Trade related accruals18,884 30,312 
Payroll and related benefits29,457 31,797 
Restructuring obligations1,840 — 
NSR royalty liabilities (Notes 15(b)(c))
2,519 1,518 
Environmental duty and net mineral sales proceeds tax2,215 3,570 
Other accrued liabilities2,377 7,141 
 $79,411 $115,120 









The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 29


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
21. DEBT FACILITIES

The movement in debt facilities during the nine months ended September 30, 2023 and year ended December 31, 2022, respectively, are comprised of the following:
Convertible Debentures
(a)
Revolving Credit Facility
(b)
Total
Balance at December 31, 2021$181,178 $56 $181,234 
Finance costs
Interest expense896 1,241 2,137 
Accretion8,673 — 8,673 
Proceeds from drawdown of revolving credit facility— 50,000 50,000 
Repayments of principal— (30,000)(30,000)
Payments of finance costs(505)(1,177)(1,682)
Balance at December 31, 2022$190,242 $20,120 $210,362 
Finance costs
Interest expense627 1,802 2,429 
Accretion6,827 — 6,827 
Payments of finance costs(862)(1,551)(2,413)
Balance at September 30, 2023$196,834 $20,371 $217,205 
Statements of Financial Position Presentation
Current portion of debt facilities$431 $120 $551 
Non-current portion of debt facilities189,811 20,000 209,811 
Balance at December 31, 2022$190,242 $20,120 $210,362 
Current portion of debt facilities$196 $371 $567 
Non-current portion of debt facilities196,638 20,000 216,638 
Balance at September 30, 2023$196,834 $20,371 $217,205 

(a)Convertible Debentures
Senior Convertible Debentures

On December 2, 2021, the Company issued $230 million of unsecured senior convertible debentures (the “Notes”). The Company received net proceeds of $222.8 million after transaction costs of $7.2 million. The Notes mature on January 15, 2027 and bear an interest rate of 0.375% per annum, payable semi-annually in arrears in January and July of each year.

The Notes are convertible into common shares of the Company at any time prior to maturity at a conversion rate of 60.3865 common shares per $1,000 principal amount of Notes converted, representing an initial conversion price of $16.56 per common share, subject to certain anti-dilution adjustments. In addition, if certain fundamental changes occur, holders of the Notes may be entitled to an increased conversion rate.

The Company may not redeem the Notes before January 20, 2025 except in the event of certain changes in Canadian tax law. At any time on or after January 20, 2025 and until maturity, the Company may redeem all or part of the Notes for cash if the last reported share price of the Company’s common shares for 20 or more trading days in a period of 30 consecutive trading days exceeds 130% of the conversion price in effect on each such trading day. The redemption price is equal to the sum of: (i) 100% of the principal amount of the Notes to be redeemed and (ii) accrued and unpaid interest, if any, to the redemption date.
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 30


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
21. DEBT FACILITIES (continued)

(a)Convertible Debentures (continued)

The Company is required to offer to purchase for cash all of the outstanding Notes upon a fundamental change, at a cash purchase price equal to 100% of the principal amount of the Notes to be purchased, plus accrued and unpaid interest, if any, to the fundamental change purchase date.

The component parts of the convertible debentures, a compound instrument, are classified separately as financial liabilities and equity in accordance with the substance of the contractual arrangement and the definitions of a financial liability and an equity instrument. A conversion option that will be settled by the exchange of a fixed amount of cash or another financial asset for a fixed number of the Company's own equity instrument is an equity instrument.

At initial recognition, net proceeds of $222.8 million from the Notes were allocated into its debt and equity components. The fair value of the debt portion was estimated at $180.4 million using a discounted cash flow model method with an expected life of five years and a discount rate of 4.75%. This amount is recorded as a financial liability on an amortized cost basis using the effective interest method at an effective interest rate of 5.09% until extinguished upon conversion or at its maturity date.

The conversion option is classified as equity and was estimated based on the residual value of $42.3 million. This amount is not subsequently remeasured and will remain in equity until the conversion option is exercised, in which case, the balance recognized in equity will be transferred to share capital. Where the conversion option remains unexercised at the maturity date of the convertible note, the balance will remain in equity reserves. Deferred tax liability of $11.4 million related to taxable temporary difference arising from the equity portion of the convertible debenture was recognized in equity reserves.

Transaction costs of $7.2 million that relate to the issuance of the convertible debentures were allocated to the liability and equity components in proportion to the allocation of the gross proceeds. Transaction costs relating to the equity component are recognized directly in equity. Transaction costs relating to the liability component are included in the carrying amount of the liability component and are amortized over the life of the convertible debentures using the effective interest method.


(b)     Revolving Credit Facility

On June 29, 2023, the Company amended its senior secured revolving credit facility (the "Revolving Credit Facility") with the Bank of Montreal, BMO Harris Bank N.A., Bank of Nova Scotia, Toronto Dominion Bank, and National Bank of Canada ("syndicate") by extending the maturity date from March 31, 2025 to June 29, 2026 and increasing the credit limit from $100.0 million to $175.0 million. Interest on the drawn balance will accrue at the Secured Overnight Financing Rate ("SOFR") plus an applicable range of 2.25% to 3.5% per annum while the undrawn portion is subject to a standby fee with an applicable range of 0.563% to 0.875% per annum, dependent on certain financial parameters of First Majestic. As at September 30, 2023, the applicable rates were 2.50% and 0.625% per annum, respectively.


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 31


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
21. DEBT FACILITIES (continued)

(b) Revolving Credit Facility (continued)

These debt facilities are guaranteed by certain subsidiaries of the Company and are also secured by a first priority charge against the assets of the Company, and a first priority pledge of shares of the Company’s subsidiaries.

The Revolving Credit Facility includes financial covenants, to be tested quarterly on a consolidated basis, requiring First Majestic to maintain the following: (a) a leverage ratio based on net indebtedness to rolling four quarters adjusted EBITDA of not more than 3.00 to 1.00; and (b) an interest coverage ratio, based on rolling four quarters adjusted EBITDA divided by interest payments, of not less than 4.00 to 1.00. The debt facilities also provide for negative covenants customary for these types of facilities and allows the Company to enter into finance leases, excluding any leases that would have been classified as operating leases in effect immediately prior to the implementation of IFRS 16 - Leases, of up to $50.0 million. As at September 30, 2023 and December 31, 2022, the Company was in compliance with these covenants.

During the second quarter, as part of ongoing reclamation and mine closure obligations, the Company issued $25.4 million (2022 - $5.0 million) in letters of credit for a total outstanding commitment of $30.4 million. As at September 30, 2023 the undrawn portion of the Revolving Credit Facility totals $124.6 million (December 2022- $75.0 million).


22. LEASE LIABILITIES

The Company has finance leases, operating leases and equipment financing liabilities for various mine and plant equipment, office space and land. Finance leases and equipment financing obligations require underlying assets to be pledged as security against the obligations and all of the risks and rewards incidental to ownership of the underlying asset being transferred to the Company. For operating leases, the Company controls but does not have ownership of the underlying right-of-use assets.

Lease liabilities are initially measured at the present value of the lease payments that are not paid at the commencement date, discounted using the interest rate implicit in the lease or, if that rate cannot be readily determined, the Company's incremental borrowing rate. Lease liabilities are subsequently measured at amortized cost using the effective interest rate method.

Certain lease agreements may contain lease and non-lease components, which are generally accounted for separately. For certain equipment leases, such as vehicles, the Company has elected to account for the lease and non-lease components as a single lease component.






















The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 32


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
22. LEASE LIABILITIES (continued)

The movement in lease liabilities during the periods ended September 30, 2023 and December 31, 2022 are comprised of the following:
Finance Leases
Operating Leases(a)
Equipment Financing(b)
Total
Balance at December 31, 2021$5,253 $34,544 $64 $39,861 
Additions3,109 3,314 — 6,423 
Remeasurements— 2,815 — 2,815 
Finance costs237 1,894 — 2,131 
Repayments of principal(2,446)(10,959)(64)(13,469)
Payments of finance costs(210)— — (210)
Transfer to asset held-for-sale (Note 14)
— (458)— (458)
Foreign exchange— 490 — 490 
Balance at December 31, 2022$5,943 $31,640 $— $37,583 
Additions2,231 2,294 — 4,525 
Remeasurements— 6,114 — 6,114 
Disposals— (33)— (33)
Finance costs303 1,641 — 1,944 
Repayment of principal(2,611)(8,450)— (11,061)
Repayments of finance costs(303)(1,604)— (1,907)
Transfer to asset held-for-sale (Note 14)
— (82)— (82)
Foreign Exchange(26)983 — 957 
Balance at September 30, 2023$5,537 $32,503 $— $38,040 
Statements of Financial Position Presentation
Current portion of lease liabilities$2,801 $11,026 $— $13,827 
Non-current portion of lease liabilities3,142 20,614 — 23,756 
Balance at December 31, 2022$5,943 $31,640 $— $37,583 
Current portion of lease liabilities$3,323 $13,433 $— $16,756 
Non-current portion of lease liabilities2,214 19,070 — 21,284 
Balance at September 30, 2023$5,537 $32,503 $— $38,040 

(a) Operating leases
Operating leases primarily relate to equipment and building rental contracts, land easement contracts and service contracts that contain embedded leases for property, plant and equipment. These operating leases have remaining lease terms of one to ten years, some of which include options to terminate the leases within a year, with incremental borrowing rates ranging from 2.5% to 11.2% per annum.








The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 33


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
22. LEASE LIABILITIES (continued)

(b) Equipment financing
During 2017, the Company entered into a $7.9 million credit facility with repayment terms ranging from 12 to 16 equal quarterly installments in principal plus related interest. Proceeds from the equipment financing were primarily used for the purchase and rehabilitation of property, plant and equipment. The equipment financing is secured by certain equipment of the Company and is subject to various covenants, including the requirement for First Majestic to maintain a leverage ratio based on total debt to rolling four quarters adjusted EBITDA. As of September 30, 2023, the credit facility has expired. As of December 31, 2022, the Company was in compliance with these covenants.
As at September 30, 2023, the net book value of property, plant and equipment includes $nil (December 31, 2022 - $nil) equipment pledged as security for the equipment financing.

23. SHARE CAPITAL

(a)Authorized and issued capital

The Company has unlimited authorized common shares with no par value.

The movement in the Company’s issued and outstanding capital during the periods is summarized in the consolidated statements of changes in equity.
 Nine Months Ended September 30, 2023Nine Months Ended September 30, 2022
 Number of SharesNet ProceedsNumber of SharesNet Proceeds
ATM program(1)(2)(3)
13,919,634 $92,0922,318,497 $30,265 

(1) The Company files prospectus supplements to its short form base shelf prospectus, pursuant to which the Company may, at its discretion and from time-to-time, sell common shares of the Company. The sale of common shares is to be made through “at-the-market distributions” ("ATM"), as defined in the Canadian Securities Administrators’ National Instrument 44-102 Shelf Distributions, directly on the New York Stock Exchange. For the nine months ended September 30, 2022, the Company sold 2,318,497 common shares of the Company under the 2021 ATM program at an average price of $13.53 per common share for gross proceeds of $31.4 million, or net proceeds of $30.3 million.

(2) During the nine months ended September 30, 2023, the Company sold 1,719,634.00 (2022 - nil) common shares of the Company under the 2022 ATM program at an average price of $8.75 per common share (2022 - $nil) for gross proceeds of $15.0 million (2022 - $nil), or net proceeds of $14.4 million (2022 - $nil). At September 30, 2023, the Company incurred $0.6 million (2022 - $nil) in transaction costs in relation to the 2022 ATM.

(3) During the nine months ended September 30, 2023, the Company sold 12,200,000 (2022 - nil) common shares of the Company under the 2023 ATM program at an average price of $6.50 per common share (2022 - $nil) for gross proceeds of $79.3 million (2022 - $nil), or net proceeds of $77.7 million (2022 - $nil). At September 30, 2023, the Company incurred $1.6 million (2022 - $nil) in transaction costs in relation to the ATM.


On August 3, 2023, the Company filed a final short form base shelf prospectus in each province of Canada (other than Quebec), and a registration statement on Form F-10 in the United States, which will allow the Company to undertake offerings (including by way of ATM) under one or more prospectus supplements of various securities listed in the shelf prospectus, up to an aggregate total of $500.0 million, over a 25-month period commencing as of the filing date of the shelf prospectus.
(b)Stock options
On May 26, 2022, a new Long-Term Incentive Plan was adopted ("LTIP"). Under the terms of the Company’s LTIP, the maximum number of shares reserved for issuance under the LTIP is 6% of the issued shares on a rolling basis. Options may be exercisable over periods of up to ten years as determined by the Board of Directors of the Company and the exercise price shall not be less than the closing price of the shares on the day preceding the award date, subject to regulatory approval. All stock options granted are subject to vesting with 25% vesting on first anniversary from the date of grant, and 25% vesting each six months thereafter. Any options granted prior to May 26, 2022 will be governed by the 2017 Option Plan and the 2019 Long-Term Incentive Plans, respectively ("2017 Plan" and "2019 LTIP").

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 34


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
23. SHARE CAPITAL (continued)

(b)Stock options (continued)
The following table summarizes information about stock options outstanding as at September 30, 2023:
 
    Options Outstanding    
    Options Exercisable    
Exercise prices (CAD$)Number of
Options
Weighted Average Exercise Price (CAD $/Share)Weighted Average Remaining Life (Years)Number of
Options
Weighted Average Exercise Price (CAD $/Share)Weighted Average Remaining Life (Years)
5.01 - 10.002,662,693 8.44 7.06 1,476,795 8.66 5.10 
10.01 - 15.003,551,511 12.81 8.22 1,566,393 13.58 7.34 
15.01 - 20.001,053,982 16.42 7.08 830,082 16.34 6.91 
20.01 - 250.00487,250 21.62 7.68 352,730 21.62 7.67 
7,755,436 12.36 7.63 4,226,000 13.07 6.50 

The movements in stock options issued for the quarter ended September 30, 2023 and year ended December 31, 2022 are summarized as follows:
 Nine Months EndedYear Ended
 September 30, 2023December 31, 2022
 Number of
Options
Weighted Average Exercise Price (CAD $/Share)Number of
Options
Weighted Average Exercise Price (CAD $/Share)
Balance, beginning of the period7,275,744 13.19 5,638,383 13.29 
Granted1,791,297 9.25 3,107,500 12.96 
Exercised(242,500)8.52 (609,623)9.76 
Cancelled or expired(1,069,105)13.72 (860,516)15.44 
Balance, end of the period7,755,436 12.35 7,275,744 13.19 

During the nine months ended September 30, 2023, the aggregate fair value of stock options granted was $5.8 million (December 31, 2022 - $14.7 million), or a weighted average fair value of $3.24 per stock option granted (December 31, 2022 - $4.73).

During the nine months ended September 30, 2023, total share-based payments expense related to stock options was $5.7 million (December 31, 2022 - $9.0 million).

The following weighted average assumptions were used in estimating the fair value of stock options granted using the Black-Scholes Option Pricing Model:
  Nine Months EndedYear Ended
Assumption
Based on
September 30, 2023December 31, 2022
Risk-free interest rate (%)Yield curves on Canadian government zero- coupon bonds with a remaining term equal to the stock options’ expected life3.812.16
Expected life (years)Weighted average life of previously transacted awards3.915.91
Expected volatility (%)Historical volatility of the Company's stock59.3949.00
Expected dividend yield (%)Annualized dividend rate as of the date of grant0.35%1.64%


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 35


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
23. SHARE CAPITAL (continued)

(b) Stock options (continued)
The weighted average closing share price at date of exercise for the nine months ended September 30, 2023 was CAD$10.26 (December 31, 2022 - CAD$14.70).

(c) Restricted Share Units
On May 26, 2022, a new LTIP was adopted. The Company adopted the LTIP to allow the Company to grant to its directors, employees and consultants non-transferable Restricted Share Units ("RSU's") based on the value of the Company's share price at the date of grant. Unless otherwise stated, the awards typically have a graded vesting schedule over a three-year period and can be settled either in cash or equity upon vesting at the discretion of the Company. The Company intends to settle all RSU's in equity. Any RSU's granted prior to May 26, 2022 will be governed by the 2019 LTIP.

The associated compensation cost is recorded as share-based payments expense against equity reserves.

The following table summarizes the changes in RSU's for the nine months ended September 30, 2023 and the year ended December 31, 2022:
Nine Months Ended September 30, 2023Year Ended
December 31, 2022
Number of sharesWeighted
Average
Fair Value
(CAD$)
Number of sharesWeighted
Average
Fair Value
(CAD$)
Outstanding, beginning of the period652,339 14.35 400,549 16.77 
Granted768,066 10.9 498,740 13.18 
Settled(154,911)14.64 (159,016)16.57 
Forfeited(208,829)12.08 (87,934)14.74 
Outstanding, end of the period1,056,665 12.25 652,339 14.35 

During the nine months ended September 30, 2023, total share-based payments expense related to RSU's was $3.6 million (December 31, 2022 - $2.9 million).

(d) Performance Share Units
On May 26, 2022, a new LTIP was adopted. The Company adopted the LTIP to allow the Company to grant to its directors, employees and consultants non-transferable Performance Share Units ("PSU's"). The amount of units to be issued on the vesting date will vary from 0% to 200% of the number of PSU’s granted, depending on the Company’s total shareholder return compared to the return of a selected group of peer companies. Unless otherwise stated, the awards typically vest three years from the grant date. The fair value of a PSU is based on the value of the Company's share price at the date of grant and will be adjusted based on actual units issued on the vesting date. The Company intends to settle all PSU's in equity. Any PSU's granted prior to May 26, 2022 will be governed by the 2019 LTIP.

The following table summarizes the changes in PSU's granted to employees and consultants for the nine months ended September 30, 2023 and the year ended December 31, 2022:    










The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 36


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
23. SHARE CAPITAL (continued)
(d) Performance Share Units (continued)
Nine Months Ended September 30, 2023Year Ended
December 31, 2022
Number of sharesWeighted
Average
Fair Value
(CAD$)
Number of sharesWeighted
Average
Fair Value
(CAD$)
Outstanding, beginning of the period474,654 14.82 275,516 16.58 
Granted384,653 11.12 268,955 13.21 
Settled(38,087)15.47 — — 
Forfeited(161,772)13.77 (69,817)15.55 
Outstanding, end of the period659,448 12.88 474,654 14.82 

During the nine months ended September 30, 2023, total share-based payments expense related to PSU's was $1.2 million (year ended December 31, 2022 - $1.5 million).

(e)     Deferred Share Units
The Company adopted the 2019 LTIP to allow the Company to grant to its directors, employees and consultants non-transferrable Deferred Share Units ("DSU's"), in addition to options, RSU's and PSU's. Unless otherwise stated, the DSU awards typically vest immediately at the grant date. The fair value of a DSU is based on the value of the Company's share price at the date of grant. The Company intends to settle all DSU's under the 2019 LTIP in equity.

On March 23, 2022, a new DSU plan was adopted ("2022 DSU Plan"). All DSU's issued under the 2022 DSU Plan will be settled in cash. There were 53,189 DSU's granted under the 2022 plan during the nine months ended September 30, 2023 resulting in a total expense of $0.2 million. As at September 30, 2023, there were a total of 62,332 DSU's outstanding, with a total liability of $0.3 million.

The following table summarizes the changes in DSU's granted to directors for the nine months ended September 30, 2023 and the year ended December 31, 2022 under the 2019 DSU plan:    
Nine Months Ended September 30, 2023Year Ended
December 31, 2022
Number of sharesWeighted
Average
Fair Value
(CAD$)
Number of sharesWeighted
Average
Fair Value
(CAD$)
Outstanding, beginning of the period50,601 15.83 25,185 18.31 
Granted— — 37,312 14.07 
Settled— — (11,896)15.55 
Outstanding, end of the period50,601 15.83 50,601 15.83 

During the nine months ended September 30, 2023, total share-based payments expense related to DSU's was $0.2 million (year ended December 31, 2022 - $0.3 million).


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 37


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
23. SHARE CAPITAL (continued)
(f)     Share Repurchase Program and Share Cancellation
The Company has an ongoing share repurchase program to repurchase up to 5,000,000 of the Company's issued and outstanding shares up to March 31, 2024. The normal course issuer bid will be carried out through the facilities of the Toronto Stock Exchange and alternative Canadian marketplaces. All common shares, if any, purchased pursuant to the share repurchase program will be cancelled. The Company believes that from time to time, the market price of its common shares may not fully reflect the underlying value of the Company's business and its future business prospects. The Company believes that at such times, the purchase of common shares would be in the best interest of the Company. During the nine months ended September 30, 2023, the Company repurchased an aggregate of nil common shares (December 2022 - 100,000) at an average price of $nil per share as part of the share repurchase program (December 2022 - $8.52) for total proceeds of $nil (December 2022 - $0.7 million), net of transaction costs.


(g)     Dividends

The Company declared the following dividends during the nine months ended September 30, 2023:
Declaration DateRecord DateDividend per Common Share
February 23, 2023March 10, 2023$0.0054
May 4, 2023May 18, 2023$0.0057
August 3, 2023August 16, 2023$0.0051
November 1, 2023(1)
November 15, 2023$0.0046

(1) These    dividends    were declared subsequent to the period end and have not been recognized as distributions to owners during the period presented.


24. FINANCIAL INSTRUMENTS AND RELATED RISK MANAGEMENT

The Company’s financial instruments and related risk management objectives, policies, exposures and sensitivity related to financial risks are summarized below.

(a)     Fair value and categories of financial instruments

Financial instruments included in the consolidated statements of financial position are measured either at fair value or amortized cost. Estimated fair values for financial instruments are designed to approximate amounts for which the instruments could be exchanged in an arm’s-length transaction between knowledgeable and willing parties.

The Company uses various valuation techniques in determining the fair value of financial assets and liabilities based on the extent to which the fair value is observable. The following fair value hierarchy is used to categorize and disclose the Company’s financial assets and liabilities held at fair value for which a valuation technique is used.

Level 1: Unadjusted quoted prices in active markets that are accessible at the measurement date for identical assets or liabilities.
Level 2: All inputs which have a significant effect on the fair value are observable, either directly or indirectly, for substantially the full contractual term.
Level 3: Inputs which have a significant effect on the fair value are not based on observable market data.

During the nine months ended September 30, 2023, marketable securities valued at $19.4 million have been transferred from Level 3 to Level 1 (there were no transfers between levels 1, 2, and 3 for the year ended December 31, 2022) due to the resumption of trading of Sierra Madre shares on the TSX Venture on June 5, 2023. Level 1 assets include those assets in which unadjusted quoted prices in active markets are accessible to the Company at the measurement date.






The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 38


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
24. FINANCIAL INSTRUMENTS AND RELATED RISK MANAGEMENT (continued)

(a)     Fair value and categories of financial instruments (continued)

The table below summarizes the valuation methods used to determine the fair value of each financial instrument:
Financial Instruments Measured at Fair ValueValuation Method
Marketable securities - common sharesMarketable securities and silver future derivatives are valued based on quoted market prices for identical assets in an active market (Level 1) as at the date of statements of financial position. Marketable securities - stock warrants are valued using the Black-Scholes model based on the observable market inputs (Level 2).
Marketable securities - stock warrants
Silver futures derivatives
  
Financial Instruments Measured at Amortized CostValuation Method
Cash and cash equivalentsApproximated carrying value due to their short-term nature
Restricted cash
Trade and other receivables 
Trade and other payables 
Debt facilitiesApproximated carrying value as discount rate on these
instruments approximate the Company's credit risk.


The following table presents the Company’s fair value hierarchy for financial assets and financial liabilities that are measured at fair value:
 September 30, 2023December 31, 2022
  Fair value measurement Fair value measurement
 Carrying valueLevel 1Level 2Carrying valueLevel 1Level 2
Financial assets      
Marketable securities (Note 13)
$55,109 $54,503 $606 $34,528 $33,426 $1,102 

The Company’s objectives when managing capital are to maintain financial flexibility to continue as a going concern while
optimizing growth and maximizing returns of investments from shareholders.

In 2022, an impairment reversal and impairment were recorded for the La Guitarra and La Parrilla mines, respectively, bringing the carrying value of the asset to its recoverable amount, being its FVLCD. The valuation technique used in the calculation of this fair value is categorized as Level 2 as it is based on the implied selling price within the purchase agreement (Note 14). During the three months ended March 31, 2023, an impairment was recorded for the Jerritt Canyon mine bringing the carrying value of the asset to its recoverable amount, being its FVLCD (Note 18). Management’s estimate of FVLCD is classified as a level 3 in the fair value hierarchy as the inputs are not based on observable market data. During the period ended June 30, 2023, an additional write down was recorded for the La Parrilla mine, bringing the carrying value of the asset to its recoverable amount, being its FVLCD. The valuation technique used in the calculation of the fair value of consideration receivable, was categorized as Level 2 as it is based on the selling price in the market (Note 14).

(b) Capital risk management

The Company monitors its capital structure and based on changes in operations and economic conditions, may adjust the structure by repurchasing shares, issuing new shares, issuing new debt or retiring existing debt. The Company prepares annual budget and quarterly forecasts to facilitate the management of its capital requirements. The annual budget is approved by the Company’s Board of Directors.

The capital of the Company consists of equity (comprising of issued capital, equity reserves and retained earnings or accumulated deficit), debt facilities, lease liabilities, net of cash and cash equivalents as follows:

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 39


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
24. FINANCIAL INSTRUMENTS AND RELATED RISK MANAGEMENT (continued)

(b) Capital risk management (continued)

 September 30,
2023
December 31,
2022
Equity$1,339,581 $1,411,298 
Debt facilities217,205 210,362 
Lease liabilities38,040 37,583 
Less: cash and cash equivalents(138,335)(151,438)
 $1,456,491 $1,507,805 

The Company’s investment policy is to invest its cash in highly liquid short-term investments with maturities of 90 days or less, selected with regards to the expected timing of expenditures from operations. The Company expects that its available capital resources will be sufficient to carry out its development plans and operations for at least the next 12 months.

The Company is not subject to any externally imposed capital requirements with the exception of complying with covenants under the debt facilities (Note 21(b)) and lease liabilities (Note 22(b)). As at September 30, 2023 and December 31, 2022, the Company was in compliance with these covenants.

(c) Financial risk management
The Company thoroughly examines the various financial instruments and risks to which it is exposed and assesses the impact and likelihood of those risks. These risks may include credit risk, liquidity risk, currency risk, commodity price risk, and interest rate risk. Where material, these risks are reviewed and monitored by the Board of Directors.

Credit Risk
Credit risk is the risk of financial loss if a customer or counterparty fails to meet its contractual obligations. The Company’s credit risk relates primarily to chartered banks, trade receivables in the ordinary course of business, value added taxes receivable and other receivables.

As at September 30, 2023, net VAT receivable was $39.0 million (December 31, 2022 - $44.9 million), of which $25.0 million (December 31, 2022 - $21.6 million) relates to Minera La Encantada S.A. de C.V. ("MLE") and $22.3 million (December 31, 2022 - $17.7 million) relates to PEM, offset by VAT payable balances.

The Company sells and receives payment upon delivery of its silver doré and by-products primarily through three international customers. All of the Company's customers have good ratings and payments of receivables are scheduled, routine and fully received within 60 days of submission; therefore, the balance of trade receivables owed to the Company
in the ordinary course of business is not significant.

The carrying amount of financial assets recorded in the condensed consolidated financial statements represents the Company’s maximum exposure to credit risk. With the exception to the above, the Company believes it is not exposed to significant credit risk.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 40


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
24. FINANCIAL INSTRUMENTS AND RELATED RISK MANAGEMENT (continued)

Liquidity Risk

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they arise. The Company manages liquidity risk by monitoring actual and projected cash flows and matching the maturity profile of financial assets and liabilities. Cash flow forecasting is performed regularly to ensure that there is sufficient capital in order to meet short-term business requirements, after taking into account cash flows from operations and our holdings of cash and cash equivalents.

The following table summarizes the maturities of the Company’s financial liabilities as at September 30, 2023 based on the undiscounted contractual cash flows:
 Carrying Amount
Contractual
Cash Flows
Less than
1 year
2 to 3
years
4 to 5
years
After 5 years
Trade and other payables$79,411 $79,411 $79,411 $— $— $— 
Debt facilities217,205 258,409 2,901 25,292 230,216 — 
Lease liabilities38,040 42,050 16,956 20,230 4,061 803 
Other liabilities6,182 5,898 — — 5,898 — 
Commitments4,269 4,269 4,269 — — — 
 $345,107 $390,037 $103,537 $45,522 $240,175 $803 

At September 30, 2023, the Company had working capital of $197.8 million (December 31, 2022 – $202.9 million). Total available liquidity at September 30, 2023 was $322.4 million (December 31, 2022 - $277.9 million), including $124.6 million of undrawn revolving credit facility (December 31, 2022 - $75.0 million).

The Company believes it has sufficient cash on hand, combined with cash flows from operations, to meet operating requirements as they arise for at least the next 12 months. If the Company needs additional liquidity to meet obligations, the Company may consider drawing on its debt facility, securing additional debt financing and/or equity financing.


The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 41


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
24. FINANCIAL INSTRUMENTS AND RELATED RISK MANAGEMENT (continued)

Currency Risk

The Company is exposed to foreign exchange risk primarily relating to financial instruments that are denominated in Canadian dollars or Mexican pesos, which would impact the Company’s net earnings or loss. To manage foreign exchange risk, the Company may occasionally enter into short-term foreign currency derivatives, such as forwards and options, to hedge its cash flows.

The sensitivity of the Company’s net earnings or loss and comprehensive income or loss due to changes in the exchange rates of the Canadian dollar and the Mexican peso against the U.S. dollar is included in the table below:
 September 30, 2023
 Cash and cash equivalentsRestricted cashValue added taxes receivableOther financial assetsTrade and other payablesForeign exchange derivativeNet assets (liabilities) exposureEffect of +/- 10% change in currency
Canadian dollar$15,433 $— $— $1,587 ($4,850)$— $12,170 $1,217 
Mexican peso22,191 100,821 39,032 — (51,201)430 111,273 11,127 
 $37,624 $100,821 $39,032 $1,587 ($56,051)$430 $123,443 $12,344 

From time to time, the Company utilizes certain derivatives to manage its foreign exchange exposures to the Mexican Peso. During the three and nine months ended September 30, 2023, the Company had an unrealized gain of $0.4 million (2022 - no gain or loss) on fair value adjustments to its foreign currency derivatives. As at September 30, 2023, the Company holds $0.4 million in foreign currency derivatives (December 31, 2022- $nil).

Commodity Price Risk

The Company is exposed to commodity price risk on silver and gold, which have a direct and immediate impact on the value of its related financial instruments, non-financial items and net earnings. The Company’s revenues are directly dependent on commodity prices that have shown volatility and are beyond the Company’s control. The Company does not use long-term derivative instruments to hedge its commodity price risk to silver or gold.

The following table summarizes the Company’s exposure to commodity price risk and their impact on net earnings:
 September 30, 2023
 Effect of +/- 10% change in metal prices
 SilverGoldTotal
Metals in doré inventory$999 $644 $1,643 
 $999 $644 $1,643 

Interest Rate Risk
The Company is exposed to interest rate risk on its short-term investments, debt facilities and lease liabilities. The Company monitors its exposure to interest rates and has not entered into any derivative contracts to manage this risk. The Company’s interest-bearing financial assets comprise of cash and cash equivalents which bear interest at a mixture of variable and fixed rates for pre-set periods of time.

As at September 30, 2023, the Company’s exposure to interest rate risk on interest bearing liabilities is limited to its debt facilities and lease liabilities. Based on the Company’s interest rate exposure at September 30, 2023, a change of 25 basis points increase or decrease of market interest rate does not have a significant impact on net earnings or loss.






The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 42


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
25. SUPPLEMENTAL CASH FLOW INFORMATION
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Other adjustments to investing activities:
Purchase of marketable securities$— ($309)($1,065)($1,728)
Proceeds from disposal of marketable securities25 — 1,276 2,739 
Cash received on settlement of silver futures— 653 — 3,175 
$25 $344 $211 $4,186 
Net change in non-cash working capital items:
    
(Increase) decrease in trade and other receivables($3,873)$807 ($534)$1,941 
Decrease (increase) in value added taxes receivable3,198 (1,318)5,940 5,898 
(Increase) decrease in inventories(2,464)1,814 2,514 (2,139)
(Increase) decrease in prepaid expenses and other(646)1,216 (4,049)(5,122)
(Decrease) increase in income taxes payable(860)(308)629 134 
(Decrease) increase in trade and other payables(14,448)365 (15,719)(28,367)
  Decrease in restricted cash (Note 19)
27,060 40,428 6,203 26,394 
 $7,967 $43,004 ($5,016)($1,261)
Non-cash investing and financing activities:
    
   Shares received from disposition of mining interest $13,822 $— $47,569 $— 
   Disposition of La Guitarra and La Parrilla(16,043)— (50,593)— 
Transfer of share-based payments reserve upon settlement of RSU's137 30 2,124 1,370 
Transfer of share-based payments reserve upon exercise of options152 626 760 2,156 
Assets acquired by finance lease— (539)(2,231)(2,349)
  ($1,932)$117 ($2,371)$1,177 

As at September 30, 2023, cash and cash equivalents include $1.5 million (December 31, 2022 - $1.4 million) that are held in-trust as bonds for tax audits in Mexico.
The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 43


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
26. CONTINGENCIES AND OTHER MATTERS
Due to the size, complexity and nature of the Company’s operations, various legal and tax matters arise in the ordinary course of business. The Company accrues for such items when a liability is probable and the amount can be reasonably estimated.

(a) Claims and Legal Proceedings Risks
The Company is subject to various claims and legal proceedings covering a wide range of matters that arise in the ordinary course of business activities. Each of these matters is subject to various uncertainties and it is possible that some of these other matters may be resolved in a manner that is unfavourable to the Company which may result in a material adverse impact on the Company's financial performance, cash flow or results of operations. First Majestic carries liability insurance coverage and establishes provisions for matters that are probable and can be reasonably estimated, however there can be no guarantee that the amount of such coverage is sufficient to protect against all potential liabilities. In addition, the Company may in the future be subjected to regulatory investigations or other proceedings and may be involved in disputes with other parties in the future which may result in a significant impact on our financial condition, cash flow and results of operations.

(b) Primero Tax Rulings
When Primero, the previous owner of San Dimas acquired the San Dimas Mine in August 2010, it assumed the obligations under a Silver Purchase Agreement (“Old Stream Agreement”) that required its subsidiary PEM to sell exclusively to Wheaton Precious Metals ("WPMI") up to 6 million ounces silver produced from the San Dimas Mine, and 50% of silver produced thereafter, at the lower of: (i) the spot market price and (ii) $4.014 per ounce plus an annual increase of 1% (“PEM Realized Price”). In May 2018, the Old Stream Agreement was terminated between WPMI and STB in connection with the Company entering into a new stream agreement with WPMI concurrent with the acquisition of Primero by the Company.

In order to reflect the commercial terms and the effects of the Old Stream Agreement, for Mexican income tax purposes, PEM recognized the revenue on these silver sales based on the PEM Realized Price instead of at spot market prices.

To obtain tax and legal assurance that the Mexican tax authority, Servicio de Administración Tributaria ("SAT") would accept the PEM Realized Price as the transfer price to calculate Mexican income taxes payable by PEM, a mutually binding Advance Pricing Agreement (“APA”) was entered into with the SAT for taxation years 2010 to 2014. On October 4, 2012, the SAT confirmed that based on the terms of the APA, the PEM Realized Price could be used as PEM’s basis for calculating taxes owed for the silver sold under the Old Stream Agreement.

In February 2015, the SAT commenced a legal process seeking to retroactively nullify the APA.

In 2019, the SAT issued reassessments for the 2010 to 2012 tax years in the total amount of $339.3 million (5,978 million MXN) inclusive of interest, inflation, and penalties. In 2021, the SAT also issued a reassessment against PEM for the 2013 tax year in the total amount of $179.3 million (3,158 million MXN) (collectively, the "Reassessments"). In 2023, the SAT issued reassessments for the 2014 and 2015 tax years in the total amount of $363.8 million (6,409 million MXN) inclusive of interest, inflation, and penalties. The Company believes that the Reassessments fail to recognize the applicability of a valid transfer pricing methodology. The major items in the Reassessments include determination of revenue based on silver spot market prices, denial of the deductibility of interest expense and service fees, SAT technical error related to double counting of taxes, and interest and penalties.



The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 44


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
26. CONTINGENCIES AND OTHER MATTERS (continued)

(b) Primero Tax Rulings (continued)
The Company continues to defend the APA in domestic legal proceedings in Mexico, and the Company has also requested resolution of the transfer pricing dispute pursuant to the Mutual Agreement Procedure (“MAP”), under the relevant avoidance of double taxation treaties, between the competent tax authorities of Mexico, Canada, Luxembourg and Barbados. The SAT has refused to take the necessary steps under the MAP process contained in the three tax treaties. The Company believes that by its refusal, Mexico is in breach of its international obligations regarding double taxation treaties. Furthermore, the Company continues to believe that the APA remains valid and legally binding on the SAT.

The Company continues to pursue all available domestic and international remedies under the laws of Mexico and under the relevant tax treaties. Furthermore, as discussed further below, it has also made claims against Mexico under Chapter 11 of the North American Free Trade Agreement (“NAFTA”) for violation of its international law obligations.

Domestic Remedies

In September 2020, the Company was served with a decision of the Federal Court seeking to nullify the APA granted to PEM. The Federal Court’s decision directs SAT to re-examine the evidence and basis for the issuance of the APA with retroactive effect, for the following key reasons:
(i) SAT’s errors in analyzing PEM’s request for the APA and the evidence provided in support of the request; and
(ii) SAT’s failure to request from PEM certain additional information before issuing the APA.

The Company filed an appeal of the decision to the Mexican Circuit Courts on November 30, 2020. As two writs of certiorari were filed by the Company before the Mexican Supreme Court of Justice, on April 15, 2021, the Plenary of the Supreme Court i) admitted one of those writs, ii) requested the Circuit Court to send the appeal file to them, and iii) assigned such writ to the Second Chamber of the Supreme Court for issuing the corresponding decision. Both writs of certiorari were withdrawn in December 2022. The challenge filed by the Company has been returned to the Mexican Circuit Courts and a decision may be issued by the end of 2023.

International Remedies

i. NAFTA APA Claim
On March 2, 2021, the Company submitted a Request for Arbitration to the International Centre for Settlement of Investment Disputes ("ICSID"), on its own behalf and on behalf of PEM, based on Chapter 11 of NAFTA. On March 31, 2021, the Notice of Registration of the Request for Arbitration was issued by the ICSID Secretariat. Once the NAFTA Arbitration Panel (the “Tribunal”) was fully constituted on August 20, 2021 by the appointment of all three panel members, the NAFTA Arbitration Proceedings (the “NAFTA Proceedings”) were deemed to have been fully commenced. The first session of the Tribunal was held by videoconference on September 24, 2021 to decide upon the procedural rules which will govern the NAFTA Proceedings. The Tribunal issued Procedural Order No. 1 on October 21, 2021. Thereafter, on April 26, 2022, the Company submitted its Claimant’s Memorial including expert reports and witness statements to the Tribunal, and on November 25, 2022, Mexico submitted its Counter-Memorial. On January 4, 2023, the Company submitted a Request for Provisional Measures (the “PM Request”) to the Tribunal. Following a reply that was filed by Mexico on February 16, 2023, a hearing regarding the request took place on March 13, 2023. On May 26, 2023, the Tribunal made its decision on the PM Request, partially granting the provisional measures set out in the request (the "PM Decision"). On June 15, 2023, the Company requested Mexico to comply with the Tribunal’s decision, and in response, on June 19, 2023, Mexico filed a Revocation Request against the PM Decision.

On July 21, 2023, the Company filed its response to Mexico’s Revocation Request. On September 1, 2023, after receiving the Company's submissions opposing the Revocation Request, the Tribunal issued its decision dismissing the Revocation Request, and confirming that the PM Decision stands and that the Government of Mexico is obligated to comply with the PM Decision.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 45


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
26. CONTINGENCIES AND OTHER MATTERS (continued)
(b) Primero Tax Rulings (continued)
On July 28, 2023, the Government of Mexico filed a Preliminary Objection to Jurisdiction and Request for Bifurcation in which it has requested that the Tribunal should stay the merits phase of the international arbitration commenced in 2021, and instead proceed to examine on a preliminary basis, under what is commonly called a bifurcated procedure, whether the Company’s commencement of the new NAFTA Chapter 11 proceeding limited to the recovery of PEM’s VAT refunds impinges on the Tribunal’s jurisdiction. The Company filed its initial response on September 1, 2023, objecting to the Request for Bifurcation, and will be making an additional submission by November 6, 2023. The Company expects a decision on the Request for Bifurcation to be rendered by the Tribunal before the end of this year.

Subsequent to the end of the quarter, on October 10, 2023, the Government of Mexico filed its reply to the Company's response on Mexico's bifurcation request. The Company will file its rejoinder on the jurisdictional objection that has been made by Mexico on November 6, 2023, and the Company anticipates the Tribunal will render its decision on the bifurcation request by the end of 2023.

If the SAT’s attempts to retroactively nullify the APA are successful, the SAT can be expected to enforce any Reassessments for 2010 through 2014 against PEM in respect of its sales of silver pursuant to the Old Stream Agreement. Such an outcome would likely have a material adverse effect on the Company’s results of operations, financial condition and cash flows. Should the Company ultimately be required to pay tax on its silver revenues based on spot market prices without any mitigating adjustments, the incremental income tax for the years 2010-2019 would be approximately $296.1 million (5,217 million MXN), before taking into consideration interest or penalties.

Based on the Company’s consultation with third party advisors, the Company believes PEM filed its tax returns in compliance with applicable Mexican law and that the APA is valid, therefore, at this time, no liability has been recognized in the financial statements with respect to this matter.

To the extent it is ultimately determined that the pricing for silver sales under the Old Stream Agreement is significantly different from the PEM Realized Price, and while PEM would have rights of appeal in connection with any reassessments, it is likely to have a materially adverse effect on the Company’s business, financial position and results of operations.

ii. NAFTA VAT Claim
On March 31, 2023, the Company filed a new Notice of Intent on its own behalf and on behalf of PEM under Chapter 11 of NAFTA to invite the Government of Mexico to engage in discussions to resolve the dispute regarding the ongoing denial of access to PEM’s VAT refunds ("NAFTA VAT Claim") within the stipulated 90-day consultation period. On June 29, 2023, the Company submitted its Request for Arbitration for the NAFTA VAT Claim to ICSID in order to preserve its legacy claim within NAFTA's applicable limitation period. The Request for Arbitration was registered by ICSID on July 21, 2023, and the Tribunal was to be constituted by October 19, 2023. The Company named its nominee to the Tribunal by this date, but Mexico has yet to appoint its nominee. In the event Mexico fails to put forward its nominee, procedures exist under the rules for a Tribunal consisting of a Chair and two members to be constituted, at the request of the Company.
While the Company remains confident in its position with regards to its two NAFTA filings, it continues to engage the Government of Mexico in consultation discussions so as to amicably resolve these disputes.
(c) La Encantada Tax Re-assessments

In December 2019, as part of the ongoing annual audits of the tax returns of Minera La Encantada S.A. de C.V. and Corporacion First Majestic S.A. de C.V., the SAT issued tax assessments for fiscal 2012 and 2013 for corporate income tax in the amount of $40.01 million (705 million MXN) and $29.0 million (512 million MXN) including interest, inflation and penalties, respectively. In December 2022, the SAT issued tax assessments to Minera La Encantada, S.A. de C.V. for fiscal years 2014 and 2015 for corporate income tax in the amount of $18.40 million (317 million MXN) and $226.7 million (3,995 million MXN). The major items relate to forward silver purchase agreement and denial of the deductibility of mine development costs and service fees. The Company continues to defend the validity of the forward silver purchase agreement and will vigorously dispute the assessments that have been issued. The Company, based on advice from legal and financial advisors, believes MLE’s tax filings were appropriate and its tax filing position is correct, therefore no liability has been recognized in the financial statements.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 46


NOTES TO CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Condensed Interim Consolidated Financial Statements - Unaudited
(Tabular amounts are expressed in thousands of US dollars)
26. CONTINGENCIES AND OTHER MATTERS (continued)
(d) San Martin Tax Re-assessments

In 2023, as part of the ongoing annual audits of the tax returns of Minera El Pilon S.A. de C.V. ("MEP"), the SAT issued tax assessments for fiscal 2014 and 2015 for corporate income tax in the total amount of $23.8 million (420 million MXN) including interest, inflation and penalties. The major items relate to forward silver purchase agreement and denial of the deductibility of mine development costs. The Company continues to defend the validity of the forward silver purchase agreement and will vigorously dispute the assessments that have been issued. The Company, based on advice from legal and financial advisors, believes MEP’s tax filings were appropriate and its tax filing position is correct, therefore no liability has been recognized in the financial statements.

(e) La Parrilla Tax Re-assessments

In 2023, as part of the ongoing annual audits of the tax returns of First Majestic Plata S.A. de C.V. ("FMP"), the SAT issued tax assessment for fiscal 2014 for corporate income tax in the total amount of $25.2 million (443 million MXN) including interest, inflation and penalties. The major items relate to forward silver purchase agreement and denial of the deductibility of mine development costs. The Company continues to defend the validity of the forward silver purchase agreement and will vigorously dispute the assessments that have been issued. The Company, based on advice from legal and financial advisors, believes FMP’s tax filings were appropriate and its tax filing position is correct, therefore no liability has been recognized in the financial statements.

(f) First Silver Litigation

In April 2013, the Company received a positive judgment on the First Silver litigation from the Supreme Court of British Columbia (the “Court”), which awarded the sum of $93.8 million in favour of First Majestic against Hector Davila Santos (the “Defendant”) in connection with a dispute between the Company and the Defendant and his private company involving a mine in México (the “Bolaños Mine”) as set out further below. The Company received a sum of $14.1 million in June 2013 as partial payment of the judgment, leaving an unpaid amount of approximately $64.3 million (CAD$81.5 million). As part of the ruling, the Court granted orders restricting any transfer or encumbrance of the Bolaños Mine by the Defendant and limiting mining at the Bolaños Mine. The orders also require the Defendant to preserve net cash flow from the Bolaños Mine in a holding account and periodically provide to the Company certain information regarding the Bolaños Mine. After many years of domestic Mexican litigation, the enforceability of the British Columbia judgment was finally recognized by the Mexican Supreme Court in a written judgment on November 11, 2022. The Company has commenced collection actions in Mexico against the Defendant’s assets and continues to seek recovery of the balance against one of the Defendant’s assets located in the United States. Nonetheless, there can be no guarantee that the remainder of the judgment amount will be collected. Therefore, as at September 30, 2023, the Company has not accrued any of the remaining $64.3 million (CAD$81.5 million) unrecovered judgment in favour of the Company.

27. SUBSEQUENT EVENTS

Declaration of Quarterly Dividend
On November 1, 2023, the Company's Board of Directors approved the declaration of its quarterly common share dividend of $0.0046 per share, payable on or after November 30, 2023, to common shareholders of record at the close of business on November 15, 2023. This dividend was declared subsequent to the quarter-end and has not been recognized as a distribution to owners during the period ended September 30, 2023.

The accompanying notes are an integral part of the condensed interim consolidated financial statements
First Majestic Silver Corp. 2023 Third Quarter Report
Page 47








image0b33a.gif


MANAGEMENT’S DISCUSSION AND ANALYSIS

FOR THE QUARTER ENDED SEPTEMBER 30, 2023







925 West Georgia Street, Suite 1800, Vancouver, B.C., Canada V6C 3L2
Phone: 604.688.3033 | Fax: 604.639.8873| Toll Free: 1.866.529.2807 | Email: info@firstmajestic.com
www.firstmajestic.com



TABLE OF CONTENTS
OVERVIEW OF OPERATING RESULTS
OVERVIEW OF FINANCIAL PERFORMANCE
OTHER DISCLOSURES
 


First Majestic Silver Corp. 2023 Third Quarter Report
Page 2
              


MANAGEMENT’S DISCUSSION AND ANALYSIS OF RESULTS OF OPERATIONS AND FINANCIAL CONDITION

This Management’s Discussion and Analysis of Results of Operations and Financial Condition (“MD&A”) should be read in conjunction with the unaudited condensed interim consolidated financial statements of First Majestic Silver Corp. (“First Majestic” or the "Company”) for the three and nine months ended September 30, 2023 which are prepared in accordance with International Accounting Standard ("IAS") 34, "Interim Financial Reporting", and the audited consolidated financial statements of the Company as at and for the year ended December 31, 2022, as some disclosures from the annual consolidated financial statements have been condensed or omitted in this MD&A. All dollar amounts are expressed in United States (“US”) dollars and tabular amounts are expressed in thousands of US dollars, unless otherwise indicated. Certain amounts shown in this MD&A may not add exactly to total amounts due to rounding differences.

This MD&A contains references to certain non-GAAP measures, as explained below under "Non-GAAP Measures" and also contains “forward-looking statements” that are subject to risk factors set out in a cautionary note contained at the end of this MD&A. All information contained in this MD&A is current and has been approved by the Board of Directors of the Company as of November 1, 2023 unless otherwise stated.

COMPANY OVERVIEW

First Majestic is a multinational mining company headquartered in Vancouver, Canada, focused on primary silver and gold production in North America, pursuing the exploration and development of its existing mineral properties and acquiring new assets. The Company owns three producing mines in Mexico consisting of the San Dimas Silver/Gold Mine, the Santa Elena Silver/Gold Mine and the La Encantada Silver Mine. The Company also owns the Jerritt Canyon Gold Mine in Nevada, USA which has been placed on temporary suspension as of March 20, 2023 to focus on exploration, definition, and expansion of the mineral resources and optimization of mine planning and plant operations. In addition, the Company owns two mines currently in care and maintenance in Mexico: the San Martin Silver Mine and the Del Toro Silver Mine, as well as several exploration projects.

First Majestic is publicly listed on the New York Stock Exchange ("NYSE") under the symbol “AG”, on the Toronto Stock Exchange under the symbol “FR” and on the Frankfurt Stock Exchange under the symbol “FMV”.

fmscassetsa.jpg


First Majestic Silver Corp. 2023 Third Quarter Report
Page 3
              


2023 THIRD QUARTER HIGHLIGHTS
Key Performance Metrics2023-Q32023-Q2Change
Q3 vs Q2
2022-Q3Change Q3 vs Q32023-YTD2022-YTDChange
Operational
Ore Processed / Tonnes Milled670,203 733,170 (9 %)836,514 (20 %)2,249,241 2,617,423 (14 %)
Silver Ounces Produced2,461,868 2,633,411 (7 %)2,736,100 (10 %)7,638,339 8,125,355 (6 %)
Gold Ounces Produced46,720 45,022 %67,072 (30 %)152,336 185,354 (18 %)
Silver Equivalent Ounces Produced6,285,790 6,320,971 (1 %)8,766,192 (28 %)20,233,868 23,694,129 (15 %)
Cash Costs per Silver Equivalent Ounce (1)
$14.13 $15.58 (9 %)$13.34 %$14.97 $14.08 %
All-in Sustaining Cost per Silver Equivalent Ounce (1)
$19.74 $21.52 (8 %)$17.83 11 %$20.70 $19.44 %
Total Production Cost per Tonne(1)
$125.81 $128.21 (2 %)$135.07 (7 %)$128.44 $122.43 %
Average Realized Silver Price per Silver Equivalent Ounce (1)
$22.41 $24.95 (10 %)$19.74 14 %$23.03 $22.27 %
Financial (in $millions)
Revenues$133.2 $146.7 (9 %)$159.8 (17 %)$436.9 $476.0 (8 %)
Mine Operating Earnings$13.0 $1.1 NM$3.3 NM$7.7 $30.0 (74 %)
Net Loss($27.1)($17.5)55 %($20.7)31 %($145.3)($97.5)(49 %)
Operating Cash Flows before Non-Cash Working Capital and Taxes
$14.1 $26.9 (47 %)$27.7 (49 %)$62.9 $96.0 (35 %)
Cash and Cash Equivalents$138.3 $160.2 (14 %)$148.8 (7 %)$138.3 $148.8 (7 %)
Working Capital (1)
$197.8 $237.2 (17 %)$148.2 34 %$197.8 $148.2 34 %
Free Cash Flow (1)
$6.4 $7.4 (13 %)$45.3 (86 %)($12.9)($32.6)61 %
Shareholders
 (Loss) Earnings per Share ("EPS") - Basic($0.09)($0.06)(52 %)($0.08)(13 %)($0.52)($0.37)(39 %)
Adjusted EPS (1)
($0.04)($0.02)(100 %)($0.09)56 %($0.06)($0.13)58 %
NM - Not meaningful

(1)The Company reports non-GAAP measures which include cash costs per silver equivalent ounce produced, cash costs per gold ounce produced, all-in sustaining cost per silver equivalent ounce produced, all-in sustaining cost per gold ounce produced, total production cost per tonne, average realized silver price per silver equivalent ounce sold, average realized gold price per ounce sold, working capital, adjusted EPS and free cash flow. These measures are widely used in the mining industry as a benchmark for performance, but do not have a standardized meaning under the Company's financial reporting framework and the methods used by the Company to calculate such measures may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” on pages 36 to 45 for further details on these measures and a reconciliation of non-GAAP to GAAP measures.

Third Quarter Production SummarySan DimasSanta ElenaLa Encantada
Jerritt Canyon (1)
Consolidated
Ore Processed / Tonnes Milled213,681 226,292 230,230 — 670,203 
Silver Ounces Produced1,548,203 347,941 565,724 — 2,461,868 
Gold Ounces Produced17,863 28,367 94 396 46,720 
Silver Equivalent Ounces Produced3,010,458 2,669,411 573,458 32,463 6,285,790 
Cash Costs per Silver Equivalent Ounce$14.07 $11.72 $25.63 $18.08 $14.13 
All-in Sustaining Cost per Silver Equivalent Ounce$17.76 $14.68 $29.86 $21.16 $19.74 
Cash Cost per Gold OunceN/AN/AN/A$1,478 N/A
All-In Sustaining Costs per Gold OunceN/AN/AN/A$1,730 N/A
Total Production Cost per Tonne$193.41 $125.05 $61.35 $— $125.81 
(1) Jerritt Canyon production during the third quarter comprised of pouring residual work-in- process inventory. Refer to Jerritt Canyon operational highlights for further details.



First Majestic Silver Corp. 2023 Third Quarter Report
Page 4
              


Operational Highlights

Higher Q3 Silver Equivalent ("AgEq") Production from Mexican Operations: The Company's Mexican operations produced over 2.5 million ounces of silver and 46,324 gold ounces, or approximately 6.3 million AgEq ounces in the quarter. Silver equivalent production for the Mexican operations increased 5% over the prior quarter primarily due to higher tonnes, grades and recoveries at Santa Elena.
Continuous Metallurgical Success at Santa Elena: Metallurgical recoveries of Ermitaño’s ore achieved new record quarterly rates in the third quarter, with silver and gold recoveries averaging 64% and 95%, respectively. The higher recovery rates were facilitated by the operation of the new dual-circuit plant, which allows for finer grinding and full utilization of the High Intensity Grinding ("HIG") mill.

Opening of a Minting Facility: The Company announced the launch of its 100% owned and operated minting facility First Mint, LLC ("First Mint"). This facility will expand upon existing bullion sales through vertically integrating production of investment-grade fine silver bullion. This will allow First Majestic to sell a substantially greater portion of its silver production directly to its shareholders and bullion customers.
Central Lab Relocation: Completed the move of the ISO 9001:2015 certified Central Lab from Durango to Santa Elena. Major construction activities were completed in Q3 with the Lab expected to be fully operational in Q4 as planned.
Safety: In Q3 2023, the consolidated Total Reportable Incident Frequency Rate ("TRIFR") was 1.06 and the Lost Time Incident Frequency Rate (LTIFR) was 0.37. Year-to-date the Company has achieved improvements in all metrics of safety performance as compared to 2022.
Environment: In Q3 2023, the Company continued to successfully manage environmental permitting and meet its compliance requirements in Mexico and Nevada. Initiatives to actively manage water at the Jerritt Canyon Gold operation continued to advance positively.
Cash Cost per AgEq Ounce for the quarter was $14.13 per ounce, representing a 9% decrease from $15.58 per ounce in the previous quarter. The decrease in cash costs per ounce was primarily attributable to an increase in AgEq production at Santa Elena. Production at Santa Elena increased by 49%, compared to the prior quarter, as a direct result of processing higher grade silver and gold ore from the Ermitaño underground mine. Record recoveries were also achieved due to the recent addition of the Dual Circuit plant. Additionally, the Company has implemented numerous costs saving measures to help offset the strengthening of the Mexican Peso and to combat inflationary impacts primarily in energy, reagents, and other major consumables.
All-in Sustaining Cost ("AISC")1 per AgEq Ounce in the third quarter decreased 8% to $19.74 per ounce compared to $21.52 per ounce in the previous quarter. The decrease in AISC per AgEq ounce was primarily attributable to the lower cash costs along with a reduction in general and administrative costs as the Company has reduced its headcount across various corporate and operational departments.
16 Active Drill Rigs: The Company completed a total of 31,611 metres of drilling across its mines during the third quarter. Throughout the quarter, up to sixteen drill rigs were active consisting of twelve rigs at San Dimas, and four rigs at Santa Elena. Please refer to the Company's press release dated July 18, 2023, where the Company reported high-grade exploration results at the San Dimas, Santa Elena and Jerritt Canyon mines.
Financial Highlights
In the third quarter, the Company generated revenues of $133.2 million compared to $159.8 million in the third quarter of 2022. There was a 27% decrease in the total number of payable AgEq ounces sold compared to the third quarter of 2022 primarily due to the temporary suspension of production at Jerritt Canyon and slightly lower production at San Dimas and La Encantada. The decrease in payable AgEq ounces sold was offset by a 14% increase in the average realized silver price, which was $22.41 per ounce during the quarter, compared to $19.74 per ounce in the third quarter of 2022.
The Company realized mine operating earnings of $13.0 million compared to mine operating earnings of $3.3 million in the third quarter of 2022. The increase in mine operating earnings was primarily attributed to a decrease in cost of sales and depreciation and depletion compared to the prior year quarter, following the temporary suspension of mining activities at Jerritt Canyon in the first quarter of 2023.
1 This measure does not have a standardized meaning under the Company's financial reporting framework and the methods used by the Company to calculate this measure may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” on pages 36 to 45 for further details on these measures and a reconciliation of non-GAAP to GAAP measures.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 5
              


During the quarter, the Company incurred restructuring costs of $6.4 million as the Company continues to focus on optimizing its workforce primarily at San Dimas, as well as at the Durango regional office and Santa Elena.
Net loss for the quarter was $27.1 million (EPS of ($0.09)) compared to net loss of $20.7 million (EPS of ($0.08)) in the third quarter of 2022. The net loss for the quarter was driven by the restructuring costs, additional mine holding costs primarily related to the temporary suspension of Jerritt Canyon, and one-time loss on the sale of mining interest following the disposition of La Parrilla. This was offset by realized mine operating earnings of $13.0 million, compared to $3.3 million in the third quarter of 2022.
Adjusted net earnings (a non-GAAP measure)2 for the quarter, normalized for non-cash or non-recurring items such as gains and losses on disposition of non-current assets, write-downs on mineral inventory, restructuring costs, share-based payments, and unrealized gains on marketable securities for the quarter ended September 30, 2023, was ($10.9) million (Adjusted EPS of ($0.04)) compared to an adjusted net earnings of ($22.6) million (Adjusted EPS of ($0.09)) in the third quarter of 2022.
Operating cash flow before movements in working capital and taxes in the quarter was $14.1 million compared to $27.7 million in the third quarter of 2022.
As of September 30, 2023, the Company had a cash and restricted cash balance of $257.3 million consisting of $138.3 million of cash and cash equivalents and $119.0 million of restricted cash. In addition, the Company has a working capital balance of $197.8 million.


































2 This measure does not have a standardized meaning under the Company's financial reporting framework and the methods used by the Company to calculate this measure may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” on pages 36 to 45 for further details on these measures and a reconciliation of non-GAAP to GAAP measures.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 6
              


OVERVIEW OF OPERATING RESULTS

Selected Production Results for the Past Eight Quarters
202320222021
PRODUCTION HIGHLIGHTS
Q3(2)
Q2(2)
Q1(2)
Q4Q3Q2Q1Q4
Ore processed/tonnes milled
San Dimas213,681 227,065 219,367 210,108 185,126 197,102 195,300 206,738 
Santa Elena226,292 213,878 208,821 207,188 214,387 228,487 201,911 224,459 
La Encantada230,230 260,986 271,278 254,766 255,945 264,555 249,906 268,239 
Jerritt Canyon— 31,240 146,403 179,502 181,056 213,647 230,001 256,374 
Consolidated670,203 733,170 845,868 851,564 836,514 903,791 877,118 955,810 
Silver equivalent ounces produced
San Dimas3,010,458 3,372,418 3,296,367 3,054,098 3,776,124 3,046,664 3,080,940 4,015,346 
Santa Elena2,669,411 1,788,596 2,105,336 2,302,904 2,733,761 2,241,763 1,868,787 1,955,550 
La Encantada573,458 806,789 843,951 813,649 788,872 871,365 651,875 768,796 
Jerritt Canyon32,463 353,168 1,381,452 1,388,140 1,467,435 1,546,143 1,620,400 1,821,331 
Consolidated6,285,790 6,320,971 7,627,105 7,558,791 8,766,192 7,705,935 7,222,002 8,561,023 
Silver ounces produced
San Dimas1,548,203 1,690,831 1,602,483 1,392,506 1,649,002 1,527,465 1,632,117 2,174,353 
Santa Elena347,941 142,037 104,129 199,388 308,070 384,953 337,201 426,870 
La Encantada565,724 800,543 836,448 804,802 779,028 863,510 644,009 757,586 
Consolidated2,461,868 2,633,411 2,543,059 2,396,696 2,736,100 2,775,928 2,613,327 3,358,809 
Gold ounces produced
San Dimas17,863 20,509 20,124 20,257 23,675 18,354 18,528 23,795 
Santa Elena28,367 20,073 24,039 25,830 26,989 22,309 19,556 19,810 
Jerritt Canyon396 4,364 16,341 16,845 16,299 18,632 20,707 23,660 
Consolidated46,626 44,946 60,504 62,932 66,963 59,295 58,791 67,265 
Cash cost per Ounce(1)
San Dimas (per AgEq Ounce)$14.07 $12.07 $10.86 $11.54 $8.25 $10.41 $9.41 $7.98 
Santa Elena (per AgEq Ounce)$11.72 $14.45 $11.93 $11.20 $10.37 $12.34 $12.96 $11.56 
La Encantada (per AgEq Ounce)$25.63 $16.90 $15.48 $15.48 $15.55 $14.09 $16.41 $14.51 
Jerritt Canyon (per Au Ounce)1,478 $4,181 $2,540 $2,519 $2,767 $1,989 $2,120 $1,674 
Consolidated (per AgEq Ounce)14.13 $15.58 $15.16 $15.36 $13.34 $14.12 $14.94 $12.32 
All-in sustaining cost per Ounce(1)
San Dimas (per AgEq Ounce)$17.76 $15.89 $14.67 $16.79 $10.97 $14.97 $12.98 $11.29 
Santa Elena (per AgEq Ounce)$14.68 $18.00 $15.18 $12.75 $12.29 $15.34 $16.31 $14.02 
La Encantada (per AgEq Ounce)$29.86 $19.83 $18.64 $19.39 $18.61 $16.65 $19.63 $19.41 
Jerritt Canyon (per Au Ounce)$1,730 $4,205 $3,055 $2,865 $3,317 $2,429 $2,488 $2,077 
Consolidated (per AgEq Ounce)$19.74 $21.52 $20.90 $20.69 $17.83 $19.91 $20.87 $17.26 
Production cost per tonne
San Dimas$193.41 $173.62 $157.39 $162.68 $161.41 $155.09 $143.66 $146.30 
Santa Elena$125.05 $109.88 $108.74 $114.29 $124.94 $109.50 $111.36 $93.78 
La Encantada$61.35 $49.91 $46.27 $47.69 $46.29 $44.58 $41.43 $39.70 
Jerritt Canyon$— $577.83 $278.57 $233.39 $245.66 $169.16 $187.15 $151.23 
Consolidated$125.81 $128.21 $130.71 $131.41 $135.07 $114.55 $118.51 $105.37 
1) These measures do not have a standardized meaning under the Company's financial reporting framework and the methods used by the Company to calculate these measures may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” on pages 36 to 45 for further details on these measures and a reconciliation of non-GAAP to GAAP measures.
2) At Jerritt Canyon, the Company incurred costs related to mining activities for only 79 days during the first quarter. Jerritt Canyon production during the second quarter comprised of processing most of its remaining ore stockpiles and work-in-process ("WIP") inventory throughout April and May. Jerritt Canyon production during the third quarter comprised of pouring ounces from its process inventory. Refer to Jerritt Canyon operational highlights for further details.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 7
              


Operating Results – Consolidated Operations
CONSOLIDATED2023-Q32023-Q22023-Q12023-YTD2022-YTD Change
Q3 vs Q2
 Change
'23 vs '22
Ore processed/tonnes milled670,203733,170845,8682,249,2412,617,423(9 %)(14 %)
Production
Silver ounces produced2,461,8682,633,4112,543,0597,638,3398,125,355(7 %)(6 %)
Gold ounces produced 46,72045,02260,594152,336185,354%(18 %)
Silver equivalent ounces produced6,285,7906,320,9717,627,10520,233,86823,694,129(1 %)(15 %)
Cost
Cash cost per AgEq Ounce(1)
$14.13$15.58$15.16$14.97$14.08(9 %)%
All-in sustaining costs per AgEq Ounce(1)
$19.74$21.52$20.90$20.70$19.44(8 %)%
Total production cost per tonne(1)
$125.81$128.21$130.71$128.44$122.43(2 %)%
Underground development (m)7,7228,68710,96227,37135,799(11 %)(24 %)
Exploration drilling (m)31,61142,28536,688110,584232,039(25 %)(52 %)
1) These measures do not have a standardized meaning under the Company's financial reporting framework and the methods used by the Company to calculate these measures may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” on pages 36 to 45 for further details on these measures and a reconciliation of non-GAAP to GAAP measures.

Production
Total production, including Jerritt Canyon, in the third quarter of 2023 was 6.3 million AgEq ounces consisting of 2.5 million ounces of silver and 46,720 ounces of gold, representing a 7% decrease and 4% increase, respectively, compared to the previous quarter. The Company's Mexican operations produced over 2.5 million ounces of silver and 46,324 gold ounces, or approximately 6.3 million AgEq ounces in the quarter. Silver equivalent production for the Mexican operations increased 5% over the prior quarter primarily due to higher tonnes, grades and recoveries at Santa Elena.

Total ore processed amounted to 670,203 tonnes during the quarter, representing a 9% decrease compared to the prior quarter, primarily driven by the temporary suspension of processing activities at Jerritt Canyon and lower tonnes processed at La Encantada due to water availability as disclosed previously.



First Majestic Silver Corp. 2023 Third Quarter Report
Page 8
              


Cash Cost and All-In Sustaining Cost per Ounce

Cash cost per AgEq ounce for the quarter was $14.13 per ounce, representing a 9% decrease from $15.58 per ounce in the previous quarter.The decrease in cash costs per ounce was primarily attributable to an increase in AgEq production at Santa Elena. Production at Santa Elena increased by 49%, compared to the prior quarter, as a direct result of processing higher grade silver and gold ore from the Ermitaño underground mine. Record recoveries were also achieved due to the recent addition of the Dual Circuit plant. Additionally, the Company has implemented numerous costs saving measures to help offset the strengthening of the Mexican Peso and to combat inflationary impacts primarily in energy, reagents, and other major consumables.

All-in Sustaining Cost per AgEq ounce in the third quarter decreased 8% to $19.74 per ounce compared to $21.52 per ounce in the previous quarter. The decrease in AISC per AgEq ounce was primarily attributable to the lower cash costs along with a reduction in general and administrative costs as the Company has reduced its headcount across various corporate and operational departments.

Management has developed a series of cost reduction initiatives across the organization aimed at improving efficiencies, lowering production costs, capital spending, care and maintenance holding costs and corporate G&A costs while also increasing production which includes:

Renegotiating certain contracts and reducing the use of external consultants;
Restructuring to optimize the workforce and reduce labour costs;
Optimizing use of reagent consumption;
Optimizing mobile fleet and plant maintenance programs;
Efficiently managing energy costs by reducing plant operations during peak rate periods;
Improving dilution controls at San Dimas and Santa Elena by implementing long hole and cut & fill quality control programs, adopting alternative blasting optimization practices, and providing hanging wall support where needed which is expected to improve ore grade and production;
Improving shift line-up procedures and work management control practices to gain more productive time on face in San Dimas;
Advancing mining at La Encantada towards the Ojuelas and Beca-Zone orebodies to extract higher-grade ores; and
Lower holding costs at the Company's suspended operations including Jerritt Canyon Gold.

Development and Exploration
During the quarter, the Company completed 7,722 metres of underground development and 31,611 metres of exploration drilling, compared to 8,687 metres and 42,285 metres, respectively, in the previous quarter. Throughout the quarter, up to sixteen drill rigs were active consisting of twelve rigs at San Dimas, and four rigs at Santa Elena. Exploration activities in Jerritt Canyon consisted of surface mapping and sampling, seismic survey and permitting in support of the planned 2024 exploration program.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 9
              


San Dimas Silver/Gold Mine, Durango, Mexico

The San Dimas Silver/Gold Mine is located approximately 130 kilometres northwest of the city of Durango, Durango State, Mexico and consists of 71,868 hectares of mining claims located in the states of Durango and Sinaloa, Mexico. San Dimas is one of the country’s most prominent silver and gold mines and the largest producing underground mine in the state of Durango with over 250 years of operating history. The San Dimas operating plan involves processing ore from several underground mining areas with a 2,500 tonnes per day ("tpd") capacity milling operation which produces silver/gold doré bars. The mine is accessible via a 40-minute flight from the Durango International Airport to a private airstrip in the town of Tayoltita, or by improved roadway. The Company owns 100% of the San Dimas mine.
San Dimas2023-Q32023-Q22023-Q12023-YTD2022-YTD Change
Q3 vs Q2
 Change
'23 vs '22
Total ore processed/tonnes milled213,681227,065219,367660,113577,528(6 %)14 %
Average silver grade (g/t)237245241241276(3 %)(13 %)
Average gold grade (g/t)2.712.922.982.873.39(7 %)(15 %)
Silver recovery (%)95 %95 %94 %95 %94 %%%
Gold recovery (%)96 %96 %96 %96 %96 %%%
Production
Silver ounces produced1,548,2031,690,8311,602,4834,841,5174,808,584(8 %)%
Gold ounces produced17,86320,50920,12458,49660,557(13 %)(3 %)
Silver equivalent ounces produced3,010,4583,372,4183,296,3679,679,2449,903,728(11 %)(2 %)
Cost
Cash cost per AgEq Ounce$14.07$12.07$10.86$12.28$9.2717 %32 %
All-In sustaining costs per AgEq Ounce$17.76$15.89$14.67$16.06$12.8312 %25 %
Total production cost per tonne$193.41$173.62$157.39$174.63$153.2511 %14 %
Underground development (m)4,3694,8954,66413,92816,070(11 %)(13 %)
Exploration drilling (m)22,37416,58814,14553,10755,99235 %(5 %)

During the third quarter, San Dimas produced 3,010,458 AgEq ounces consisting of 1,548,203 ounces of silver and 17,863 ounces of gold. Silver and gold production decreased 8% and 13%, respectively, compared to the prior quarter primarily due to a 6% lower throughput combined with lower silver and gold grades.

The mill processed a total of 213,681 tonnes of ore with average silver and gold grades of 237 g/t and 2.71 g/t, respectively, compared to 227,065 tonnes milled with average silver and gold grades of 245 g/t and 2.92 g/t, respectively, in the previous quarter.

Silver and gold recoveries averaged 95% and 96%, respectively, during the quarter, which were comparable to the prior quarter.

The Central Block and Sinaloa Graben areas contributed approximately 80% and 20%, respectively, of the total production during the quarter.

In the third quarter, cash cost per AgEq ounce was $14.07 per ounce compared to $12.07 per ounce in the prior quarter. The increase in cash costs during the quarter was primarily due to the 11% decrease in AgEq ounces produced and higher energy costs as the Company utilized less power from the hydroelectric plant due to lower than expected rainfall.

AISC per AgEq ounce for the quarter was $17.76 per ounce compared to $15.89 per ounce in the prior quarter. The increase was primarily due to higher cash costs along with higher overall sustaining capital expenditures incurred during the quarter.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 10
              


During the quarter, the Company incurred restructuring costs associated with San Dimas of $5.4 million as the Company continues to focus on workforce optimization.
The San Dimas mine is subject to a gold and silver streaming agreement with Wheaton Precious Metals Corp. ("Wheaton" or "WPM") which entitles Wheaton to receive 25% of the gold equivalent production (based on a fixed exchange ratio of 70 silver ounces to 1 gold ounce) at San Dimas in exchange for ongoing payments equal to the lesser of $600 (subject to a 1% annual inflation adjustment commencing in May 2019) and the prevailing market price, for each gold ounce delivered. Should the average gold to silver ratio over a six-month period exceed 90:1 or fall below 50:1, the fixed exchange ratio would be increased to 90:1 or decreased to 50:1, respectively. The fixed gold to silver exchange ratio as of September 30, 2023, was 70:1. During the three and nine months ended September 30, 2023, the Company delivered 9,695 and 31,700 ounces (2022 - 10,196 and 30,898 ounces) of gold to WPM at $631 and $628 per ounce (2022 - $624 and $622 per ounce).

A total of 4,369 metres of underground development was completed in the third quarter, compared to 4,895 metres in the prior quarter. During the third quarter, up to twelve drill rigs were active, eleven underground and one on surface completing a total of 22,374 metres of exploration drilling compared to 16,588 metres in the prior quarter. Total exploration costs were $2.8 million compared to $2.0 million in the prior quarter. This increase was a result of increased drilling meters during the quarter.






































First Majestic Silver Corp. 2023 Third Quarter Report
Page 11
              


Santa Elena Silver/Gold Mine, Sonora, Mexico

The Santa Elena Silver/Gold Mine is located approximately 150 kilometres northeast of the city of Hermosillo, Sonora, Mexico. The operating plan for Santa Elena involves the processing of ore in a 3,000 tpd cyanidation circuit from a combination of underground reserves. Santa Elena consists of a central processing plant that can receive ore from two separate underground mining operations, Santa Elena and Ermitaño. The Company owns 100% of the Santa Elena Silver/Gold Mine including mining concessions totaling over 102,244 hectares.
SANTA ELENA2023-Q32023-Q22023-Q12023-YTD2022-YTDChange
Q3 vs Q2
 Change
'23 vs '22
Total ore processed/tonnes milled226,292213,878208,821648,991644,785%%
Average silver grade (g/t)753931496692 %(26 %)
Average gold grade (g/t)4.093.124.003.743.5631 %%
Silver recovery (%)64 %52 %50 %58 %75 %23 %(23 %)
Gold recovery (%)95 %94 %90 %93 %93 %%%
Production
Silver ounces produced347,941142,037104,129594,1071,030,224145 %(42 %)
Gold ounces produced28,36720,07324,03972,47968,85441 %%
Silver equivalent ounces produced2,669,4111,788,5962,105,3366,563,3436,844,31149 %(4 %)
Cost
Cash cost per AgEq Ounce$11.72$14.45$11.93$12.53$11.72(19 %)%
All-In sustaining costs per AgEq Ounce$14.68$18.00$15.18$15.75$14.39(18 %)%
Total production cost per tonne$125.05$109.88$108.74$114.80$115.2214 %%
Underground development (m)2,6093,0422,6238,27410,625(14 %)(22 %)
Exploration drilling (m)9,23716,37314,49940,10940,758(44 %)(2 %)

During the third quarter, Santa Elena produced 2,669,411 AgEq ounces consisting of 347,941 ounces of silver and 28,367 ounces of gold. Total production increased 49% compared to the prior quarter primarily due to higher silver and gold grades in the quarter.

The mill processed 226,292 tonnes of ore during the quarter from Ermitaño containing average silver and gold head grades of 75 g/t and 4.09 g/t, respectively.

Silver and gold recoveries from Ermitaño reached another record during the quarter averaging 64% and 95%, respectively, compared to 52% and 94%, respectively, in the prior quarter. The higher recovery rates are facilitated by the operation of the new dual-circuit plant, which allows for finer grinding and full utilization of the High Intensity Grinding ("HIG") mill.

During the third quarter, the Company completed the move of the ISO 9001:2015 certified Central Lab from Durango to Santa Elena. Major construction activities were completed in Q3 with the Lab expected to be fully operational in Q4 as planned.
Cash cost per AgEq ounce in the third quarter was $11.72 per ounce compared to $14.45 per ounce in the previous quarter. The decrease in cash cost was primarily attributed to higher silver and gold grades resulting in a 49% increase in AgEq ounces produced compared to the previous quarter.

AISC per AgEq ounce for the quarter was $14.68 per ounce compared to $18.00 per ounce in the prior quarter. The decrease in AISC was primarily driven by the decrease in cash costs per AgEq ounce along with the impact of higher production on a per ounce basis.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 12
              


The Santa Elena mine is subject to a gold streaming agreement with Sandstorm Gold Ltd. (“Sandstorm”), which requires the Company to sell to Sandstorm 20% of its gold production over the life of mine from its leach pad and a designated area of its underground operations at the Santa Elena mine. The selling price to Sandstorm is the lesser of the prevailing market price or $450 per ounce, subject to 1% annual inflation. During the three and nine months ended September 30, 2023, the Company settled nil and 1,071 ounces (2022 - 484 and 1,968 ounces) of gold to Sandstorm at an average price of $nil and $473 per ounce (2022 - $473 and $471 per ounce). During the quarter, no ore was processed from the Santa Elena mine.

Orogen Royalties Inc., formerly Evrim Resource Corp., retains a 2% net smelter return ("NSR") royalty from the sale of mineral products extracted from the Ermitaño mining concessions. In addition, Osisko Gold Royalties Ltd. has a 2% NSR royalty from the sale of mineral products extracted from the Ermitaño mining concessions. For the three and nine months ended September 30, 2023, the Company has incurred $2.3 million and $5.9 million (September 30, 2022 - $1.6 million and $4.1 million) in NSR payments from the production of Ermitaño ores.

During the quarter, a total of 2,609 metres of underground development was completed at the Ermitaño mine at Santa Elena, compared to 3,042 metres in the previous quarter. Up to four drill rigs consisting of two surface rigs and two underground rigs completed 9,237 metres of exploration drilling in the region compared to 16,373 metres in the prior quarter. Total exploration costs in the third quarter were $2.0 million compared to $2.9 million in the previous quarter due to lower exploration meters.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 13
              


La Encantada Silver Mine, Coahuila, Mexico

The La Encantada Silver Mine is an underground mine located in the northern México State of Coahuila, 708 kilometres northeast of Torreon. La Encantada has 4,076 hectares of mineral concessions and surface land ownership of 1,343 hectares. La Encantada also has a 4,000 tpd cyanidation plant, a camp with 120 houses as well as administrative offices, laboratory, general store, hospital, airstrip and all the necessary infrastructure required for such an operation. The mine is accessible via a two-hour flight from the Durango International Airport to the mine’s private airstrip, or via an improved road from the closest city, Muzquiz, Coahuila State, which is 225 kilometres away. The Company owns 100% of the La Encantada Silver Mine.
LA ENCANTADA2023-Q32023-Q22023-Q12023-YTD2022-YTDChange
Q3 vs Q2
 Change
'23 vs '22
Ore processed/tonnes milled230,230260,986271,278762,494770,406(12 %)(1 %)
Average silver grade (g/t)109127132123124(15 %)(1 %)
Silver recovery (%)70 %75 %72 %73 %75 %(6 %)(3 %)
Production
Silver ounces produced565,724800,543836,4482,202,7152,286,547(29 %)(4 %)
Gold ounces produced 94768925930524 %(15 %)
Silver equivalent ounces produced573,458806,789843,9512,224,1982,312,112(29 %)(4 %)
Cost
Cash cost per AgEq Ounce$25.63$16.90$15.48$18.61$15.2452 %22 %
All-In sustaining costs per AgEq Ounce$29.86$19.83$18.64$21.97$18.1651 %21 %
Total production cost per tonne$61.35$49.91$46.27$52.07$44.1323 %18 %
Underground development (m)7447508342,3281,652(1 %)41 %
Exploration drilling (m)1,9501,8633,8129,152(100%)(58%)

During the quarter, La Encantada produced 565,724 silver ounces compared to 800,543 silver ounces in the previous quarter, representing a 29% decrease in production. The lower silver production is primarily related to reduced water availability due to the collapse of one well which occurred at the end of the second quarter, and lower average silver grades. After geophysical survey and analysis, construction of the new replacement well commenced in September and is expected to be operational towards the end of the fourth quarter. Production is anticipated to return back to expected levels once this new well is commissioned.
The mill processed a total of 230,230 tonnes of ore with an average silver grade and recovery during the quarter of 109 g/t and 70%, respectively, compared to 260,986 tonnes, 127 g/t and 75%, respectively, in the previous quarter. Stope production from the new Beca Zone has contributed 74,695 tonnes with an average silver grade of 146 g/t.
Cash cost per AgEq ounce for the quarter was $25.63 per ounce compared to $16.90 per ounce in the prior quarter. The increase is primarily due to the 29% decrease in AgEq ounces produced compared to the prior quarter, due to the lack of available water and lower ore grades.
AISC per AgEq ounce for the quarter was $29.86 per ounce compared to $19.83 per ounce in the previous quarter. The 51% increase in AISC per AgEq ounce was primarily due to the increase in cash costs.

In 2022, the Company sold a portfolio of its existing royalty interests to Metalla Royalty and Streaming Limited. Under the terms of the agreement, the Company is required to pay a 100% gross value royalty on the first 1,000 ounces of gold produced annually from the La Encantada property. For the three months ended September 30, 2023, the Company has incurred $0.2 and $0.4 million (September 30, 2022 - $nil) in royalty payments from gold production at La Encantada.
A total of 744 metres of underground development was completed in the third quarter compared to 750 metres in the prior quarter. Exploration drilling at La Encantada was temporarily suspended in the quarter as a water conservation measure.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 14
              


Jerritt Canyon Gold Mine, Nevada, United States
The Jerritt Canyon Gold Mine is an underground mining complex located in northern Nevada, United States. Jerritt Canyon was discovered in 1972 and has been in production since 1981 having produced over 9.5 million ounces of gold over its 40-year production history. The operation, which was purchased by the Company on April 30, 2021, has one of only three permitted gold processing plants in Nevada that uses roasting in its treatment of ore. This processing plant has a capacity of 4,000 tpd. On March 20, 2023, the Company temporarily suspended all mining activities at Jerritt Canyon to reduce overall costs and refocus mining and exploration plans at the mine. The property consists of a large, underexplored land package consisting of 30,821 hectares (119 square miles). Jerritt Canyon is 100% owned by the Company.
Jerritt Canyon2023-Q32023-Q22023-Q12023-YTD2022-YTDChange
Q3 vs Q2
 Change
'23 vs '22
Ore processed/tonnes milled31,240146,403177,643624,704(100 %)(72 %)
Average gold grade (g/t)4.904.034.193.40(100 %)23 %
Gold recovery (%)89 %86 %87 %82 %(100 %)%
Production
Gold ounces produced3964,36416,34121,10155,638(91 %)(62 %)
Silver equivalent ounces produced32,463353,1681,381,4521,767,0834,633,978(91 %)(62 %)
Cost
Cash cost per Au Ounce$1,478$4,181$2,540$2,860$2,265(65 %)26 %
All-In sustaining costs per Au Ounce$1,730$4,205$3,055$3,268$2,710(59 %)21 %
Total production cost per tonne$—$577.83$278.57$334.39$197.96(100 %)69 %
Underground development (m)— — 2,8412,8417,452%(62 %)
Exploration drilling (m)— 7,3756,18113,556126,137(100 %)(89 %)

During its partial quarter, Jerritt Canyon produced 396 ounces of gold by pouring ounces from its process inventory. As of April 24, 2023, all activities at the Jerritt Canyon processing plant were suspended following the Company's previously announced temporary suspension of mining activities on March 20, 2023.

One-time standby costs of $13.4 million were incurred year-to-date, primarily related to one-time severance and demobilization costs due to the temporary suspension of mining and processing activities. All mining contractors are now off site with processing activities suspended. The Company continues to advance certain environmental management projects and exploration efforts at Jerritt Canyon following positive drill results highlighting the exploration potential of Jerritt Canyon.

During the quarter, all underground rigs were demobilized. No drilling occurred in the third quarter compared to 7,375 metres in the prior quarter. Exploration activities at Jerritt Canyon consisted of surface mapping and sampling, seismic survey and permitting in support of the planned exploration program for 2024. Surface drilling programs have been deferred to mid 2024 to prioritize drilling targets.






First Majestic Silver Corp. 2023 Third Quarter Report
Page 15
              


La Parrilla Silver Mine, Durango, México

The La Parrilla Silver Mine, located approximately 65 kilometres southeast of the city of Durango in Durango State, México, is a complex of underground operations consisting of the Rosarios, La Blanca and San Marcos mines which are inter-connected through underground workings, and the Vacas and Quebradillas mines which are connected via above-ground gravel roads. The total mining concessions consist of 69,478 hectares. The property includes 167 hectares of surface rights, of which 60 hectares are owned, and an additional 107 hectares are leased. La Parrilla includes a 2,000 tpd sequential processing plant consisting of a 1,000 tpd cyanidation circuit and a 1,000 tpd flotation circuit, metallurgical pilot plant, buildings, offices and associated infrastructure.

Operations at the La Parrilla mine were placed on care and maintenance in September 2019.

On December 7, 2022, the Company announced that it had entered into an asset purchase agreement with Golden Tag Resources Ltd. ("Golden Tag") to sell the La Parrilla Silver Mine for total consideration of up to $33.5 million, consisting of 143,673,684 common shares of Golden Tag at a deemed price of $0.16 per share, having an aggregate value as of the date of the sale agreement of $20 million, and up to $13.5 million in contingent consideration, in the form of three milestone payments payable in either cash or Golden Tag shares, out of which $2.7 million is payable no later than 18 months following the closing date.

As of December 31, 2022, the sale was considered highly probable; therefore, the assets of La Parrilla were classified as assets held for sale and presented separately under current assets. Immediately prior to the classification to assets held for sale, the carrying amount of La Parrilla was remeasured to its recoverable amount, being its FVLCD, based on the $20 million initial payment, and the first milestone payment of $2.7 million.

During the six months ended June 30, 2023, the Company recorded an additional write down on asset held-for-sale related to La Parrilla of $7.2 million, based on the change in value of Golden Tag's common shares at the end of the reporting period. The recoverable amount of La Parrilla, being its FVLCD, was $14.9 million, net of estimated transaction costs, based on the expected proceeds from the sale.

On August 14, 2023, the Company completed the sale of La Parrilla to Golden Tag and received total consideration of $13.3 million net of transaction costs. Based on the price of Golden Tag's common shares at the time of closing the transaction, the Company has recorded a loss on disposition of $1.6 million. In addition, First Majestic participated in Golden Tag's offering of subscription receipts (the "Subscription Receipts") and purchased 18,009,000 Subscription Receipts at a price of CAD$0.20 per Subscription Receipt which, in accordance with their terms, have now converted into 18,009,000 Golden Tag common shares and 9,004,500 common share purchase warrants (the "Warrants"). Each Warrant is exercisable for one additional Golden Tag common share until August 14, 2026, at a price of CDN$0.34. The Company began accounting for the shares and warrants received from Golden Tag as an equity security at FVTOCI .

Del Toro Silver Mine, Zacatecas, Mexico

The Del Toro Silver Mine is located 60 kilometres to the southeast of the La Parrilla mine and consists of 3,815 hectares of mining concessions and 219 hectares of surface rights. The Del Toro operation represents the consolidation of three historical silver mines, the Perseverancia, San Juan and Dolores mines, which are approximately one and three kilometres apart, respectively. Del Toro includes a 2,000 tpd flotation circuit and a 2,000 tpd cyanidation circuit. First Majestic owns 100% of the Del Toro Silver Mine.

Operations at the Del Toro mine have been on care and maintenance since January 2020.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 16
              


San Martin Silver Mine, Jalisco, Mexico

The San Martin Silver Mine is an underground mine located near the town of San Martin de Bolaños in the Bolaños river valley, in the northern portion of the State of Jalisco, México. San Martin has 33 contiguous mining concessions in the San Martin de Bolaños mining district covering mineral rights for 12,795 hectares, plus an application of a new mining concession covering 24,723 hectares to be granted. In addition, the mine includes 160 hectares of surface land where the processing plant, camp, office facilities, maintenance shops, and tailings dams are located, and an additional 640 hectares of surface rights. The 1,300 tpd mill and processing plant consists of crushing, grinding and conventional cyanidation by agitation in tanks and a Merrill-Crowe doré production system. The mine can be accessed via small plane, 150 kilometres from Durango, or 250 kilometres by paved road north of Guadalajara, Jalisco. The San Martin Silver Mine is 100% owned by the Company.

In July 2019, the Company suspended all mining and processing activities at the San Martin operation due to growing insecurity in the area. Increasing violence and safety concerns resulted in the Company removing all of its remaining employees from the area in 2021 and the mine and plant have been occupied and are currently under the de facto control of an organized criminal group. Due to this situation, the Company has been unable to carry out proper care and maintenance of the mine and plant and tailings storage facilities and the Company has limited information as to the current state of repair at the mine, including the tailings storage facility. The Company has repeatedly requested all applicable governmental authorities to take action to secure the area but, to date, the Mexican government has failed to take any such action and the Company's own efforts have been unsuccessful. The Company is continuing its efforts to work with governmental authorities to take action to secure the area, although it is not known when that might, if ever, occur.

La Guitarra Silver Mine, Mexico State, Mexico

The La Guitarra Silver Mine is located in the Temascaltepec Mining District in the State of México, México, approximately 130 kilometres southwest from México City. The La Guitarra mine covers 39,714 hectares of mining claims and has a 500 tpd flotation processing plant, buildings and related infrastructure.

The La Guitarra milling and mining operations were placed under care and maintenance in August, 2018.

On May 24, 2022, the Company announced that it had entered into a share purchase agreement with Sierra Madre Gold and Silver Ltd. ("Sierra Madre"), to sell the Company's subsidiary La Guitarra Compañia Minera S.A. de C.V. ("La Guitarra"), which owns the La Guitarra Silver Mine, to Sierra Madre for total consideration of approximately $35 million, consisting of 69,063,076 Sierra Madre common shares at a deemed price of $0.51 per share. The closing of the transaction was subject to customary closing conditions including approval of the Sierra Madre shareholders (which was obtained in December 2022), regulatory approval and that Sierra Madre raise a minimum of $7.7 million (CAD $10 million) in a private placement concurrent or prior to the sale.

On June 30, 2022, the sale was considered highly probable; therefore, the assets and liabilities of La Guitarra were classified as assets and liabilities held for sale and presented separately under current assets and current liabilities, respectively. Immediately prior to the classification to assets and liabilities held for sale, the carrying amount of La Guitarra was remeasured to its recoverable amount, being its FVLCD, based on the expected proceeds from the sale. At December 31, 2022, the sale continued to be considered highly probable; therefore the assets and liabilities were presented as assets and liabilities held for sale and presented separately under current assets and current liabilities. During 2022, the Company recorded a reversal of impairment loss related to the La Guitarra assets of $12.3 million based on the recoverable amount implied by the share purchase agreement.

On March 29, 2023, the Company completed the sale of La Guitarra to Sierra Madre and received total consideration of $33.2 million net of transaction costs (paid in common shares of Sierra Madre), before working capital adjustments. Based on the carrying value of the asset at the time of disposal of $34.3 million, and the working capital adjustment of $0.2 million, the Company has recorded a loss on disposition of $1.4 million. The Company began accounting for the common shares received from Sierra Madre as an equity security at FVTOCI.






First Majestic Silver Corp. 2023 Third Quarter Report
Page 17
              


Springpole Silver Stream, Ontario, Canada

In July 2020, the Company completed an agreement with First Mining Gold Corp. (“First Mining”) to purchase 50% of the life of mine payable silver produced from the Springpole Gold Project ("Springpole Silver Stream"), a development stage mining project located in Ontario, Canada. First Majestic agreed to pay First Mining consideration of $22.5 million in cash and shares, in three milestone payments, for the right to purchase silver at a price of 33% of the silver spot price per ounce, to a maximum of $7.50 per ounce (subject to annual inflation escalation of 2%, commencing at the start of the third anniversary of production). Commencing with its production of silver, First Mining must deliver 50% of the payable silver which it receives from the offtaker within five business days of the end of each quarter.

The transaction consideration paid and payable by First Majestic is summarized as follows:

The first payment of $10.0 million, consisting of $2.5 million in cash and $7.5 million in First Majestic common shares (805,698 common shares), was paid to First Mining on July 2, 2020;
The second payment of $7.5 million, consisting of $3.75 million in cash and $3.75 million in First Majestic common shares (287,300 common shares), was paid on January 21, 2021 upon the completion and public announcement by First Mining of the results of a Pre-Feasibility Study for Springpole; and
The third payment, consisting of $2.5 million in cash and $2.5 million in First Majestic common shares (based on a 20 day volume weighted average price), will be paid upon receipt by First Mining of a Federal or Provincial Environmental Assessment approval for Springpole, which has not yet been received.

In connection with the streaming agreement, First Mining also granted First Majestic 30.0 million common share purchase warrants of First Mining (the "First Mining Warrants"), each of which will entitle the Company to purchase one common share of First Mining at CAD$0.40 over a period of five years. As a result of the distribution by First Mining of shares and warrants of Treasury Metals Inc. that was completed by First Mining on July 15, 2021, pursuant to the adjustment provisions of the First Mining Warrants, the exercise price of these warrants was reduced from $0.40 to $0.37, and the number of these warrants was increased from 30.0 million to 32.1 million. The fair value of the warrants was measured at $5.7 million using the Black-Scholes option pricing model.

First Mining shall have the right to repurchase 50% of the silver stream for $22.5 million at any time prior to the commencement of production at Springpole, and if such a repurchase takes place, the Company will be left with a reduced silver stream of 25% of life of mine payable silver production from Springpole.

Springpole is one of Canada’s largest, undeveloped gold projects with permitting underway. In January 2021, First Mining announced positive results of its Pre-Feasibility Study (“PFS”) which supports a 30,000 tpd open pit mining operation over an 11-year mine life. First Mining announced resources of 24.3 million ounces of silver in the Indicated category and 1.4 million ounces of silver in the Inferred category, plus 4.6 million ounces of gold in the Indicated category and 0.3 million ounces of gold in the Inferred category. A draft Environmental Impact Statement for Springpole was published in June 2022, and the Federal and Provincial Environment Assessment processes for the project are in progress.

The Springpole Project also includes large land holdings of 41,913 hectares which are fully encompassed under the silver streaming agreement.

First Mining is a related party with two independent board members who are also directors and/or officers of First Majestic.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 18
              


OVERVIEW OF FINANCIAL PERFORMANCE
For the quarters ended September 30, 2023 and 2022 (in thousands of dollars, except for per share amounts):
Third QuarterThird Quarter
20232022Variance %
Revenues$133,211 $159,751 (17 %)(1)
Mine operating costs
Cost of sales92,187 120,707 (24 %)(2)
Depletion, depreciation and amortization27,998 35,707 (22 %)(3)
120,185 156,414 (23 %)
Mine operating earnings13,026 3,337 NM
General and administrative expenses10,439 8,545 22 %(4)
Share-based payments2,762 3,305 (16 %)
Mine holding costs7,243 3,690 96 %(5)
Restructuring costs6,428 — 100 %(6)
Loss on sale of mining interest1,646 — 100 %(7)
Foreign exchange loss2,642 3,076 (14 %)
Operating loss(18,134)(15,279)19 %
Investment and other income1,275 360 NM(8)
Finance costs(6,739)(5,236)29 %(9)
Loss before income taxes(23,598)(20,155)17 %
Current income tax (recovery) expense(178)14,270 (101 %)(10)
Deferred income tax expense (recovery)3,729 (13,733)127 %
Income tax (recovery) expense3,551 537 NM(10)
Net loss for the period($27,149)($20,692)31 %(11)
Loss per share (basic and diluted)($0.09)($0.08)(13 %)(11)

NM - Not meaningful

1.Revenues in the quarter decreased $26.5 million compared to the same quarter of the prior year primarily attributed to:
a 27% decrease in the payable AgEq ounces sold compared to the same quarter of the prior year, which resulted in a decrease in revenues of $41.4 million. This was primarily due to the temporary suspension of mining activities at Jerritt Canyon in the first quarter of 2023. Additionally, there was a decrease in revenues from San Dimas and La Encantada as a result of the reduction in payable AgEq ounces sold due to lower production in the third quarter.
Partially offset by:
a 14% increase in the average realized silver price, which averaged $22.41 per ounce, compared to $19.74 per ounce during the same quarter of the prior year. This resulted in a $14.8 million increase in revenue compared to the third quarter of 2022.
2.Cost of sales in the quarter decreased $28.5 million compared to the same quarter of the prior year primarily due to:
a $29.0 million decrease in labour, consumables, energy and maintenance costs during the quarter along with other costs including insurance, lab work, and service costs, primarily due to the temporary suspension of mining activities at Jerritt Canyon during the first quarter of 2023; and
a $1.5 million decrease in change in inventory expense compared to the same quarter of 2022.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 19
              


Partially offset by:
a $1.6 million increase in worker participation costs in Mexico
An inventory write-down of $1.0 million at La Encantada related to heightened costs due to lower grades, recoveries and throughput which lowered performance at the end of the second quarter; and
a stronger Mexican Peso against the U.S. dollar, which averaged 16% higher compared to the same period of 2022.
3. Depletion, depreciation and amortization in the quarter decreased $7.7 million compared to the same quarter of the previous year, primarily as a result of:
a decrease of $11.0 million related to lower depletion at Jerritt Canyon due to lack of ore processed through the mill following the temporary suspension in the first quarter of 2023.
Partially offset by:
an increase of $3.3 million during the current quarter related to depletion at the Santa Elena and La Encantada mines primarily due to an increase in production from Santa Elena and an increase in depletable assets following the reclassification from non-depletable to depletable mineral interest in the first quarter of 2023.
4. General and administrative expenses increased by $1.9 million compared to the same quarter of 2022, primarily due to higher severance costs during the quarter relating to restructuring efforts to optimize the workforce along with additional legal and professional fees relating to the Company's two ongoing NAFTA cases.
5. Mine holding costs increased by $3.6 million compared to the same quarter of 2022, primarily related to the temporary suspension of Jerritt Canyon. This was partially offset by lower holding costs due to the sale of La Guitarra in the first quarter and La Parrilla in the third quarter of 2023.
6. Restructuring Costs for the quarter totalled $6.4 million as the Company continues to focus on optimizing its workforce primarily at San Dimas, as well as the Durango regional office and Santa Elena.
7. Loss on sale of mining interest for the quarter increased compared to the third quarter of the prior year, following the sale of La Parrilla to Golden Tag. The sale of La Parrilla was completed on August 14, 2023, and the Company received $13.3 million net of transaction costs. Based on the carrying value of the asset of $14.9 million, and the price of Golden Tag's shares at the time of disposal, the Company has recorded a loss on disposition of $1.6 million.
8. Investment and other income for the quarter increased by $0.9 million compared to the third quarter of the prior year, primarily due to interest income of $1.5 million, compared to income of $0.5 million in the same quarter of the prior year. Additionally, there was an unrealized loss on marketable securities of $0.7 million, compared to a loss of $0.4 million in the same quarter of the prior year.
9. Finance costs in the quarter increased by $1.5 million compared to the third quarter of the prior year due to an increase in interest expense as a result of higher interest rates on the Company's revolving credit facility and additional interest from the issuance of surety bonds during the quarter. Additionally, there was an increase in the accretion expense for decommissioning liabilities resulting from changes in the asset retirement obligations at the end of the prior year.
10. During the quarter, the Company recorded an income tax expense of $3.6 million compared to an expense of $0.5 million in the third quarter of 2022. The increase in income tax expense was primarily due to an increase in deferred income tax of $17.5 million partially offset by lower current income tax of $14.4 million due to lower earnings at its Mexican operations.
11. As a result of the foregoing, net loss for the quarter was $27.1 million (EPS of ($0.09)) compared to a net loss of $20.7 million (EPS of ($0.08)) in the same quarter of the prior year.



First Majestic Silver Corp. 2023 Third Quarter Report
Page 20
              


For the years to date ended September 30, 2023 and 2022 (in thousands of dollars, except for per share amounts):
Year to DateYear to DateVariance %
2023202223 vs '22
Revenues$436,855 $476,032 (8 %)(1)
Mine operating costs
Cost of sales320,662 345,539 (7 %)(2)
Cost of sales - standby costs13,438 — 100 %(2)
Depletion, depreciation and amortization95,014 100,475 (5 %)(3)
429,114 446,014 (4 %)
Mine operating earnings7,741 30,018 (74 %)
General and administrative30,560 28,207 %(4)
Share-based payments10,711 11,113 (4 %)
Mine holding costs14,750 9,285 59 %(5)
Write down on asset held-for-sale7,229 — 100 %(6)
Restructuring costs6,428 — 100 %(7)
Impairment (reversal) of non-current asset125,200 (7,585)NM(8)
Loss on sale of mining interest3,024 — 100 %(9)
Foreign exchange (gain) loss(8,953)3,353 NM
Operating loss(181,208)(14,355)NM
Investment and other income (loss)8,144 (926)NM
Finance costs(19,688)(14,661)34 %(10)
Loss before income taxes(192,752)(29,942)NM
Current income tax expense5,235 51,212 (90 %)
Deferred income tax (recovery) expense (52,644)16,303 NM(11)
Income tax (recovery) expense(47,409)67,515 (170 %)(11)
Net loss for the period($145,343)($97,457)(49 %)(12)
Loss per common share
     Basic and diluted($0.52)($0.37)(39 %)(12)

NM - Not meaningful
1.Revenues in the nine months ended September 30, 2023 decreased $39.2 million or 8% compared to the previous year, primarily attributed to:
$53.3 million decrease due to a 10% decrease in payable AgEq ounces sold compared to the prior year. This was mainly attributed to the temporary suspension of Jerritt Canyon during the first quarter. Jerritt Canyon only contributed 79 full days of production during the first quarter of 2023.
Partially offset by:
$13.9 million increase due to a 3% increase in realized silver price per ounce sold, which averaged $23.03 compared to $22.27 in the prior year.
2.Cost of sales in the year decreased $11.4 million or 7% compared to the previous year as a result of the following factors:
a $31.6 million decrease in consumables and materials, energy, labour, changes in inventory expense, and other costs including insurance, lab work, and service costs, primarily due to the temporary suspension of operations at the Jerritt Canyon Mine during the first quarter of 2023; and
First Majestic Silver Corp. 2023 Third Quarter Report
Page 21
              


a decrease of $3.1 million due to the higher one-time abnormal costs incurred in the third quarter of 2022. These costs were incurred as a result of marginal ore material processed to keep the mill running at minimum feed requirements to perform mandated air compliance test work at Jerritt Canyon.
Partially offset by:
one-time standby costs of $13.4 million due to the temporary suspension of mining and processing activities at Jerritt Canyon;
a $4.6 million increase due to changes in inventory expense compared to the prior year;
a $4.3 million increase in worker participation costs in Mexico; and
a stronger Mexican Peso against the U.S. dollar, which averaged 10% higher compared to the same period of 2022.
3.Depletion, depreciation and amortization in the year decreased $5.5 million or 5% compared to the prior year primarily as a result a $20.1 million decrease related to lower depletion at Jerritt Canyon as a result of the temporary suspension of mining activities at Jerritt Canyon.
Partially offset by:
a $14.7 million increase from the Mexican operations due to an increase in throughput as well as higher depreciation due to the addition of the dual circuit plant at Santa Elena.
4. General and administrative expense in the year increased $2.4 million or 8% compared to the prior year, primarily attributed to higher severance costs related to restructuring efforts to optimize the workforce during the year along with additional legal and professional fees relating to the Company's two ongoing NAFTA cases.
5. Mine holding costs increased by $5.5 compared to the prior year, primarily related to the temporary suspension of Jerritt Canyon and care and maintenance activities at Santa Elena. This was partially offset by lower holding costs due to the sale of La Guitarra in the first quarter and La Parrilla in the third quarter of 2023.
6. Write down on asset held-for-sale increased by $7.2 million compared to the prior year as the Company recorded an additional impairment loss related to La Parrilla based on the change in value of Golden Tag's shares at the end of the second quarter.
7. Restructuring costs for the year totalled $6.4 million as the Company continued to focus on optimizing its workforce during the third quarter primarily at San Dimas, as well as the Durango regional office and Santa Elena.
8. Impairment of $125.2 million on the Jerritt Canyon mine due to the temporary suspension of mining operations was recorded during the year. This was compared to 2022 where the Company recorded a reversal of impairment of $7.6 million for La Guitarra based on its recoverable amount, being its fair value less cost of disposal.
9. Loss on sale of mining interest for the year increased by $3.0 million compared to the prior year, following the sale of La Guitarra to Sierra Madre and the sale of La Parrilla to Golden Tag. The sale of La Guitarra was completed on March 29, 2023, and the Company received $33.2 million in consideration net of transaction costs, before working capital adjustments, representing the value of the Sierra Madre shares received. Based on the carrying value of the asset at the time of disposal of $34.3 million, and the working capital adjustment of $0.2 million, along with changes in the foreign exchange rate between the time the asset was classified as held-for-sale and the closing date, the Company recorded a loss on disposition of $1.4 million. The sale of La Parrilla was completed on August 14, 2023, and the Company received $13.3 million in consideration net of transaction costs. Based on the carrying value of the asset of $14.9 million, and the price of Golden Tag's shares at the time of disposal, the Company has recorded a loss on disposition of $1.6 million.
10. Finance costs for the year increased by $5.0 million compared to the prior year due to an increase in interest expense as a result of higher interest rates on the Company's revolving credit facility and additional interest from the issuance of surety bonds during the year. Additionally, there was an increase in the accretion expense for decommissioning liabilities resulting from changes in the asset retirement obligations at the end of the prior year.
11. During the nine months ended September 30, 2023, the Company recorded an income tax recovery of $47.4 million, compared to an income tax expense of $67.5 million in 2022. The decrease in income tax expense was primarily driven by the one-time payment Corporación First Majestic S.A. de C.V. ("CFM") made of approximately $21.3 million and surrendering of certain tax loss carry forwards resulting in a non-cash deferred tax expense of $54 million in the second quarter of 2022. The income tax recovery was also driven by an impairment on non-current assets during the first quarter of 2023.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 22
              


12. As a result of the foregoing, net loss for the nine months ended September 30, 2023 was $145.3 million (EPS of ($0.52)), compared to the net loss of $97.5 million (EPS of ($0.37)) in the prior year.

SUMMARY OF QUARTERLY RESULTS

The following table presents selected financial information for each of the most recent eight quarters:
202320222021
Selected Financial InformationQ3Q2Q1Q4Q3Q2Q1Q4
Revenue$133,211 $146,692 $156,952 $148,189 $159,751 $159,443 $156,838 $204,876 
Cost of sales$92,187 $104,607 $123,868 $126,148 $120,707 $113,619 $111,213 $121,236 
Depletion, depreciation and amortization$27,998 $32,587 $34,429 $35,307 $35,707 $34,212 $30,556 $43,278 
Mine operating earnings (loss)$13,026 $1,138 ($6,423)($13,266)$3,337 $11,612 $15,069 $40,362 
Net (loss) earnings after tax($27,149)($17,534)($100,660)($16,819)($20,692)($84,050)$7,285 ($3,971)
(Loss) earnings per share - basic($0.09)($0.06)($0.37)($0.06)($0.08)($0.32)$0.03 ($0.02)
(Loss) earnings per share - diluted($0.09)($0.06)($0.37)($0.06)($0.08)($0.32)$0.03 ($0.02)

During the third quarter of 2023, mine operating earnings were $13.0 million compared to earnings of $1.1 million in the previous quarter primarily due to lower cost of sales and depletion, depreciation and amortization primarily due to the temporary suspension of operations at Jerritt Canyon. The net loss for the quarter was $27.1 million compared to the net loss of $17.5 million in the prior quarter primarily attributed to restructuring costs at San Dimas, the Durango regional office and Santa Elena of $6.4 million, along with an increase in income tax expense of $8.5 million compared to the prior quarter.

LIQUIDITY, CAPITAL RESOURCES AND CONTRACTUAL OBLIGATIONS

Liquidity

As at September 30, 2023, the Company had cash and cash equivalents of $138.3 million, comprised primarily of cash held with reputable financial institutions and is invested in cash accounts and in highly liquid short-term investments with maturities of three months or less. With the exception of $1.5 million held in-trust for tax audits in Mexico, the Company's cash and cash equivalents are not exposed to liquidity risk and there are no restrictions on the ability of the Company to use these funds to meet its obligations. On August 3, 2023, the Company filed a final short form base shelf prospectus in each province of Canada (other than Quebec), and a registration statement on Form F-10 in the United States, which will allow the Company to undertake offerings (including by way of "at-the-market distributions") under one or more prospectus supplements of various securities listed in the shelf prospectus, up to an aggregate total of $500.0 million, over a 25-month period commencing as of the filing date of the shelf prospectus.
Working capital as at September 30, 2023 was $197.8 million compared to $202.9 million at December 31, 2022. Total available liquidity at September 30, 2023 was $322.4 million, including working capital and $124.6 million of undrawn revolving credit facility.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 23
              


The following table summarizes the Company's cash flow activity during the year:
 Three Months Ended September 30,Nine Months Ended September 30,
 2023202220232022
Cash flow    
Cash generated by operating activities$19,980 $65,983 $35,689 $33,746 
Cash used in investing activities(32,643)(54,043)(122,485)(160,871)
Cash (used in) provided by financing activities(8,265)23,281 71,465 46,834 
(Decrease) increase in cash and cash equivalents($20,928)$35,221 ($15,331)($80,291)
Effect of exchange rate on cash and cash equivalents held in foreign currencies (976)(3,524)2,228 (3,547)
Cash and cash equivalent reclassified as held for sale— (599)— (5,269)
Cash and cash equivalents, beginning of the period160,239 117,721 151,438 237,926 
Cash and cash equivalents, end of period$138,335 $148,819 $138,335 $148,819 

The Company’s cash flows from operating, investing and financing activities during the nine months ended September 30, 2023 are summarized as follows:
Cash generated by operating activities of $35.7 million, primarily due to:
$62.9 million in cash flows from operating activities before movements in working capital and taxes;
net of:
$22.2 million in income taxes paid during the period; and
$5.0 million net change in non-cash working capital items during the period, including a $15.7 million decrease in trade payable, a $4.0 million increase in prepaid expenses, a $0.6 million decrease in income taxes payable, and a $0.5 million increase in trade and other receivables, partially offset by a $6.2 million decrease in restricted cash, a $5.9 million decrease in value added tax ("VAT") receivables, and a $2.5 million decrease in inventories.

Cash used in investing activities of $122.5 million, primarily related to:
$95.6 million spent on mine development and exploration activities;
$24.8 million spent on purchase of property, plant and equipment; and
$2.3 million spent on deposits on non-current assets.
Cash provided by financing activities of $71.5 million, primarily consists of the following:
$92.1 million of net proceeds from the issuance of shares through the ATM program;
$1.5 million of net proceeds from the exercise of stock options;
net of:
$11.1 million for repayment of lease obligations;
$6.6 million payment of financing costs; and
$4.6 million for the payment of dividends during the period

During the quarter ended September 30, 2023, the Company received $12.5 million (220.7 million Pesos) related to value added tax filings. In connection with the Primero Empresa Minera, S.A. de C.V. ("PEM") tax ruling, the tax authority has frozen a PEM bank account with cumulative funds of $100.8 million as a guarantee against certain disputed tax assessments which are currently held within the Company's restricted cash accounts. This balance consists of VAT refunds that the Company has received which were previously withheld by the tax authority. The Company does not agree with Servicio de Administracion Tributaria's ("SAT") position and is challenging the freezing of the bank account through the relevant legal channels.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 24
              


During the quarter, the Company received total funds of $28.7 million which was previously classified as restricted cash. These funds related to an interest-bearing account previously held with AIG (the "Commutation Account"). The Commutation Account principal plus interest earned on the principal was used to fund ongoing reclamation and mine closure. The Company elected to extinguish all rights under the policy releasing AIG from reclamation cost and financial assurance liabilities by replacing the policy with surety bonds on June 28, 2023.

Capital Resources

The Company’s objective when managing capital is to maintain financial flexibility to continue as a going concern while optimizing growth and maximizing returns of investments from shareholders.

The Company continually monitors its capital structure and, based on changes in operations and economic conditions, may from time to time adjust the structure by repurchasing shares, issuing new shares, issuing new debt or retiring existing debt. The Company prepares an annual budget and quarterly forecasts to facilitate the management of its capital requirements. The annual budget is approved by the Company’s Board of Directors.

The Company is not subject to any externally imposed capital requirements with the exception of complying with banking covenants defined in its debt facilities. As at September 30, 2023 and December 31, 2022, the Company was fully in compliance with these covenants.

Contractual Obligations and Commitments

As at September 30, 2023, the Company’s contractual obligations and commitments are summarized as follows:
Contractual
Cash Flows
Less than
1 year
2 to 3
years
4 to 5
years
After 5 years
Trade and other payables$79,411 $79,411 $— $— $— 
Debt facilities258,409 2,901 25,292 230,216 — 
Lease liabilities42,050 16,956 20,230 4,061 803 
Other liabilities5,898 — — 5,898 — 
Purchase obligations and commitments4,269 4,269 — — — 
$390,037 $103,537 $45,522 $240,175 $803 

At September 30, 2023, the Company had working capital of $197.8 million (December 2022 – $202.9 million) and total available liquidity of $322.4 million (December 2022 – $277.9 million), including $124.6 million (December 2022 - $75.0 million) of undrawn revolving credit facility.

The Company believes it has sufficient cash on hand, combined with cash flows from operations, to meet operating requirements as they arise for at least the next 12 months.

MANAGEMENT OF RISKS AND UNCERTAINTIES

The Company thoroughly examines the various financial instruments and risks to which it is exposed and assesses the impact and likelihood of those risks. These risks may include credit risk, liquidity risk, currency risk, commodity price risk, and interest rate risk. Where material, these risks are reviewed and monitored by the Board of Directors. For a discussion of additional risks related to the Company's business please see "Risk Factors" in the Company's most recent Annual Information Form.
Credit Risk

Credit risk is the risk of financial loss if a customer or counterparty fails to meet its contractual obligations. The Company’s credit risk relates primarily to chartered banks, trade receivables in the ordinary course of business, value added taxes receivable and other receivables.

As at September 30, 2023, net VAT receivable was $39.0 million (December 31, 2022 - $44.9 million), of which $25.0 million (December 31, 2022 - $21.6 million) relates to Minera La Encantada S.A. de C.V. ("MLE") and $22.3 million (December 31, 2022 - $17.7 million) relates to PEM, offset by VAT payable balances.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 25
              




The Company sells and receives payment upon delivery of its silver doré and by-products primarily through three international customers. All of the Company's customers have good ratings and payments of receivables are scheduled, routine and fully received within 60 days of submission; therefore, the balance of trade receivables owed to the Company
in the ordinary course of business is not significant.

The carrying amount of financial assets recorded in the condensed consolidated financial statements represents the Company’s maximum exposure to credit risk. With the exception to the above, the Company believes it is not exposed to significant credit risk.
Liquidity Risk

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they arise. The Company manages liquidity risk by monitoring actual and projected cash flows and matching the maturity profile of financial assets and liabilities. Cash flow forecasting is performed regularly to ensure that there is sufficient capital in order to meet short-term business requirements, after taking into account cash flows from operations and our holdings of cash and cash equivalents.

Currency Risk

The Company is exposed to foreign exchange risk primarily relating to financial instruments that are denominated in Canadian dollars or Mexican pesos, which would impact the Company’s net earnings or loss. To manage foreign exchange risk, the Company may occasionally enter into short-term foreign currency derivatives, such as forwards and options, to hedge its cash flows.

The sensitivity of the Company’s net earnings or loss and comprehensive income or loss due to changes in the exchange rates of the Canadian Dollar and the Mexican Peso against the U.S. Dollar is included in the table below:
 September 30, 2023
 Cash and cash equivalentsRestricted cashValue added taxes receivableOther financial assetsTrade and other payables Foreign exchange derivativeNet assets (liabilities) exposureEffect of +/- 10% change in currency
Canadian dollar$15,433 $— $— $1,587 ($4,850)$— $12,170 $1,217 
Mexican peso22,191 100,821 39,032 — (51,201)430 111,273 11,127 
 $37,624 $100,821 $39,032 $1,587 ($56,051)$430 $123,443 $12,344 


Commodity Price Risk

The Company is exposed to commodity price risk on silver and gold, which have a direct and immediate impact on the value of its related financial instruments, non-financial items and net earnings. The Company’s revenues are directly dependent on commodity prices that have shown volatility and are beyond the Company’s control. The Company does not use long-term derivative instruments to hedge its commodity price risk to silver or gold.

The following table summarizes the Company’s exposure to commodity price risk and their impact on net earnings:
  September 30, 2023
 
 Effect of +/- 10% change in metal prices
 SilverGoldTotal
Metals in doré inventory$999 $644 $1,643 
 $999 $644 $1,643 

Political and Country Risk
First Majestic currently conducts foreign operations in México and the United States, and as such the Company’s operations are exposed to various levels of political and economic risks by factors outside of the Company’s control. These potential factors include, but are not limited to: royalty and tax increases or claims by governmental bodies, the conflict between Russia and Ukraine, expropriation or nationalization, foreign exchange controls, high rates of inflation, fluctuations in foreign currency exchange rates, import and export tariffs and regulations, lawlessness, cancellation or renegotiation of
First Majestic Silver Corp. 2023 Third Quarter Report
Page 26
              


contracts and environmental and permitting regulations, illegal mining operations by third parties on the Company's properties, labour unrest and surface access issues. The Company currently has no political risk insurance coverage against these risks.

The Company is unable to determine the impact of these risks on its future financial position or results of operations. Changes, if any, in mining or investment policies or shifts in political attitude in foreign countries may substantively affect the Company’s exploration, development and production activities.

Uncertainty in the Estimation of Mineral Resources and Mineral Reserves, and Metal Recoveries
There is a degree of uncertainty attributable to the estimation of Mineral Resources and Mineral Reserves (as defined in the Canadian Institute of Mining's Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines. Until Mineral Reserves or Mineral Resources are actually mined, extracted and processed, the quantity of minerals and their grades must be considered estimates only. In addition, the quantity of Mineral Reserves and Mineral Resources may vary depending on, among other things, applicable metal prices, exchange rates assumptions used, underground stability conditions, the ability to maintain constant underground access to all working areas, geological variability, mining methods assumptions used and operating cost escalation. Any material change in the quantity of Mineral Reserves, Mineral Resources, grade or dimensions of the geological structures may affect the economic viability of some or all of the Company’s mineral properties and may have a material adverse effect on the Company's operational results and financial condition. Mineral Reserves on the Company’s properties have been estimated on the basis of economic factors at the time of calculation, including commodity prices and operating costs; variations in such factors may have an impact on the amount of the Company’s Mineral Reserves. In addition, there can be no assurance that metal recoveries in small scale laboratory tests will be replicated in larger scale tests under on-site conditions or during production, or that the existing known and experienced recoveries will continue.

Public Health Crises
Global financial conditions and the global economy in general have, at various times in the past and may in the future, experience extreme volatility in response to economic shocks or other events. Many industries, including the mining industry, are impacted by volatile market conditions in response to the widespread outbreak of epidemics, pandemics, or other health crises. Such public health crises and the responses of governments and private actors can result in disruptions and volatility in economies, financial markets, and global supply chains as well as declining trade and market sentiment and reduced mobility of people, all of which could impact commodity prices, interest rates, credit ratings, credit risk and inflation.

Any public health crises could materially and adversely impact the Company's business, including without limitation, employee health, workforce availability and productivity, limitations on travel, supply chain disruptions, increased insurance premiums, increased costs and reduced efficiencies, the availability of industry experts and personnel, restrictions on the Company's exploration and drilling programs and/or the timing to process drill and other metallurgical testing and the slowdown or temporary suspension of operations at some or all of the Company's properties, resulting in reduced production volumes. Any such disruptions could have an adverse effect on the Company’s production, revenue, net income and business.

Environmental and Health and Safety Risks

The Company’s activities are subject to extensive laws and regulations governing environmental protection and employee health and safety. Environmental laws and regulations are complex and have tended to become more stringent over time. The Company is required to obtain governmental permits and in some instances air, water quality, waste disposal, hazardous substances and mine reclamation rules and permits. Although the Company makes provisions for environmental compliance and reclamation costs, it cannot be assured that these provisions will be adequate to discharge its future obligations for these costs. Failure to comply with applicable environmental and health and safety laws may result in injunctions, damages, suspension or revocation of permits and imposition of penalties. There can be no assurance that First Majestic has been or will be at all times in complete compliance with such laws, regulations and permits, or that the costs of complying with current and future environmental and health and safety laws and permits will not materially and adversely affect the Company’s business, results of operations or financial condition.

On August 26, 2021, the NDEP issued 10 Notices of Alleged Violation (collectively the “NOAV”) that alleged the Company doing business as Jerritt Canyon Gold, LLC had violated various air permit conditions and regulations applicable to operations at the Jerritt Canyon in Elko County, Nevada. The NOAV are related to compliance with emission monitoring, testing, recordkeeping requirements, and emission and throughput limits.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 27
              



The Company filed a Notice of Appeal on September 3, 2021, challenging the NOAV before the Nevada State Environmental Commission (“NSEC”). The Company raised various defenses to the NOAV, including that the Company is not liable for the violations because it was never the owner/operator of Jerritt Canyon during the period the alleged violations began (on April 30, 2021, the Company acquired Jerritt Canyon Canada Ltd, which, through subsidiaries, owns and operates Jerritt Canyon). There is currently no hearing scheduled or any scheduling order in the matter, and the parties have yet to engage in discovery.

On March 8, 2022, NDEP issued an additional four Notices of Alleged Violations to Jerritt Canyon Gold, LLC for alleged exceedances and violations of an Air Quality Operating permit and Mercury Operating Permit to Construct. The new NOAVs relate to alleged exceedances of mercury emission limitations, exceedances of operating parameters, installation of equipment, and recordkeeping requirements. The Company filed a Request for Hearing with the Nevada State Environmental Commission on March 18, 2022, that challenged the bases for the alleged NOAVs and any potential penalties associated with the NOAVs. JCG and NDEP agreed to waive the 20-day hearing requirement for the NOAVs and the parties request that the NSEC withhold schedule a hearing for the NOAVs at this time. At this time the estimated amount cannot be reliably determined.

Climate Related Risks

A number of governments have introduced or are moving to introduce climate change legislation and treaties at the international, national, state/provincial and local levels. Regulation relating to emission levels (such as carbon taxes) and energy efficiency is becoming more stringent. If the current regulatory trend continues, this may result in increased costs at some or all of the Company’s operations. In addition, the physical risks of climate change may also have an adverse effect on the Company’s operations. These risks include the following:
Changes in sea levels could affect ocean transportation and shipping facilities that are used to transport supplies, equipment and workforce and products from the Company's operations to world markets.
Extreme weather events (such as prolonged drought, flooding or freezing conditions) have the potential to disrupt operations at the Company’s mines and may require the Company to make additional expenditures to mitigate the impact of such events. Extended disruptions to supply lines could result in interruption to production.
The Company’s facilities depend on regular supplies of consumables (diesel, tires, sodium cyanide, etc.) and reagents to operate efficiently. In the event that the effects of climate change or extreme weather events cause prolonged disruption to the delivery of essential commodities, production levels at the Company’s operations may be reduced.
There can be no assurance that efforts to mitigate the risks of climate changes will be effective and that the physical risks of climate change will not have an adverse effect on the Company’s operations and profitability.

Claims and Legal Proceedings Risks

The Company is subject to various claims and legal proceedings covering a wide range of matters that arise in the ordinary course of business activities. Each of these matters is subject to various uncertainties and it is possible that some of these other matters may be resolved in a manner that is unfavourable to the Company which may result in a material adverse impact on the Company's financial performance, cash flow or results of operations. First Majestic carries liability insurance coverage and establishes provisions for matters that are probable and can be reasonably estimated, however there can be no guarantee that the amount of such coverage is sufficient to protect against all potential liabilities. In addition, the Company may in the future be subjected to regulatory investigations or other proceedings and may be involved in disputes with other parties in the future which may result in a significant impact on our financial condition, cash flow and results of operations.

Title to Properties

The validity of mining or exploration titles or claims or rights, which constitute most of the Company’s property holdings, can be uncertain and may be contested. The Company has used reasonable commercial efforts to investigate the Company’s title or claim to its various properties, however, no assurance can be given that applicable governments will not revoke or significantly alter the conditions of the applicable exploration and mining titles or claims and that such exploration and mining titles or claims will not be challenged or impugned by third parties. Mining laws are continually developing and changes in such laws could materially impact the Company’s rights to its various properties or interests therein. The Company has obtained title insurance for its Jerritt Canyon Mine but there is a risk that such insurance could
First Majestic Silver Corp. 2023 Third Quarter Report
Page 28
              


be insufficient, or the Company could not be successful in any claim against its insurer. Accordingly, the Company may have little or no recourse as a result of any successful challenge to title to any of its properties. The Company’s properties may be subject to prior unregistered liens, agreements or transfers, land claims or undetected title defects which may have a material adverse effect on the Company’s ability to develop or exploit the properties.

Primero Tax Rulings
When Primero, the previous owner of San Dimas acquired the San Dimas Mine in August 2010, it assumed the obligations under a Silver Purchase Agreement (“Old Stream Agreement”) that required its subsidiary PEM to sell exclusively to Wheaton Precious Metals ("WPMI") up to 6 million ounces silver produced from the San Dimas Mine, and 50% of silver produced thereafter, at the lower of: (i) the spot market price and (ii) $4.014 per ounce plus an annual increase of 1% (“PEM Realized Price”). In May 2018, the Old Stream Agreement was terminated between WPMI and STB in connection with the Company entering into a new stream agreement with WPMI concurrent with the acquisition of Primero by the Company.

In order to reflect the commercial terms and the effects of the Old Stream Agreement, for Mexican income tax purposes, PEM recognized the revenue on these silver sales based on the PEM Realized Price instead of at spot market prices.

To obtain tax and legal assurance that the Mexican tax authority, Servicio de Administración Tributaria ("SAT") would accept the PEM Realized Price as the transfer price to calculate Mexican income taxes payable by PEM, a mutually binding Advance Pricing Agreement (“APA”) was entered into with the SAT for taxation years 2010 to 2014. On October 4, 2012, the SAT confirmed that based on the terms of the APA, the PEM Realized Price could be used as PEM’s basis for calculating taxes owed for the silver sold under the Old Stream Agreement.

In February 2015, the SAT commenced a legal process seeking to retroactively nullify the APA.

In 2019, the SAT issued reassessments for the 2010 to 2012 tax years in the total amount of $339.3 million (5,978 million MXN) inclusive of interest, inflation, and penalties. In 2021, the SAT also issued a reassessment against PEM for the 2013 tax year in the total amount of $179.3 million (3,158 million MXN) (collectively, the "Reassessments"). In 2023, the SAT issued reassessments for the 2014 and 2015 tax years in the total amount of $363.8 million (6,409 million MXN) inclusive of interest, inflation, and penalties. The Company believes that the Reassessments fail to recognize the applicability of a valid transfer pricing methodology. The major items in the Reassessments include determination of revenue based on silver spot market prices, denial of the deductibility of interest expense and service fees, SAT technical error related to double counting of taxes, and interest and penalties.

The Company continues to defend the APA in domestic legal proceedings in Mexico, and the Company has also requested resolution of the transfer pricing dispute pursuant to the Mutual Agreement Procedure (“MAP”), under the relevant avoidance of double taxation treaties, between the competent tax authorities of Mexico, Canada, Luxembourg and Barbados. The SAT has refused to take the necessary steps under the MAP process contained in the three tax treaties. The Company believes that by its refusal, Mexico is in breach of its international obligations regarding double taxation treaties. Furthermore, the Company continues to believe that the APA remains valid and legally binding on the SAT.

The Company continues to pursue all available domestic and international remedies under the laws of Mexico and under the relevant tax treaties. Furthermore, as discussed further below, it has also made claims against Mexico under Chapter 11 of the North American Free Trade Agreement (“NAFTA”) for violation of its international law obligations.

Domestic Remedies

In September 2020, the Company was served with a decision of the Federal Court seeking to nullify the APA granted to PEM. The Federal Court’s decision directs SAT to re-examine the evidence and basis for the issuance of the APA with retroactive effect, for the following key reasons:
(i) SAT’s errors in analyzing PEM’s request for the APA and the evidence provided in support of the request; and
(ii) SAT’s failure to request from PEM certain additional information before issuing the APA.

The Company filed an appeal of the decision to the Mexican Circuit Courts on November 30, 2020. As two writs of certiorari were filed by the Company before the Mexican Supreme Court of Justice, on April 15, 2021, the Plenary of the Supreme Court i) admitted one of those writs, ii) requested the Circuit Court to send the appeal file to them, and iii) assigned such
First Majestic Silver Corp. 2023 Third Quarter Report
Page 29
              


writ to the Second Chamber of the Supreme Court for issuing the corresponding decision. Both writs of certiorari were withdrawn in December 2022. The challenge filed by the Company has been returned to the Mexican Circuit Courts and a decision may be issued by the end of 2023.

International Remedies

i. NAFTA APA Claim
On March 2, 2021, the Company submitted a Request for Arbitration to the International Centre for Settlement of Investment Disputes ("ICSID"), on its own behalf and on behalf of PEM, based on Chapter 11 of NAFTA. On March 31, 2021, the Notice of Registration of the Request for Arbitration was issued by the ICSID Secretariat. Once the NAFTA Arbitration Panel (the “Tribunal”) was fully constituted on August 20, 2021 by the appointment of all three panel members, the NAFTA Arbitration Proceedings (the “NAFTA Proceedings”) were deemed to have been fully commenced. The first session of the Tribunal was held by videoconference on September 24, 2021 to decide upon the procedural rules which will govern the NAFTA Proceedings. The Tribunal issued Procedural Order No. 1 on October 21, 2021. Thereafter, on April 26, 2022, the Company submitted its Claimant’s Memorial including expert reports and witness statements to the Tribunal, and on November 25, 2022, Mexico submitted its Counter-Memorial. On January 4, 2023, the Company submitted a Request for Provisional Measures (the “PM Request”) to the Tribunal. Following a reply that was filed by Mexico on February 16, 2023, a hearing regarding the request took place on March 13, 2023. On May 26, 2023, the Tribunal made its decision on the PM Request, partially granting the provisional measures set out in the request (the "PM Decision"). On June 15, 2023, the Company requested Mexico to comply with the Tribunal’s decision, and in response, on June 19, 2023, Mexico filed a Revocation Request against the PM Decision.

On July 21, 2023, the Company filed its response to Mexico’s Revocation Request. On September 1, 2023, after receiving the Company's submissions opposing the Revocation Request, the Tribunal issued its decision dismissing the Revocation Request, and confirming that the PM Decision stands and that the Government of Mexico is obligated to comply with the PM Decision.

On July 28, 2023, the Government of Mexico filed a Preliminary Objection to Jurisdiction and Request for Bifurcation in which it has requested that the Tribunal should stay the merits phase of the international arbitration commenced in 2021, and instead proceed to examine on a preliminary basis, under what is commonly called a bifurcated procedure, whether the Company’s commencement of the new NAFTA Chapter 11 proceeding limited to the recovery of PEM’s VAT refunds impinges on the Tribunal’s jurisdiction. The Company filed its initial response on September 1, 2023, objecting to the Request for Bifurcation, and will be making an additional submission by November 6, 2023. The Company expects a decision on the Request for Bifurcation to be rendered by the Tribunal before the end of this year.

Subsequent to the end of the quarter, on October 10, 2023, the Government of Mexico filed its reply to the Company's response on Mexico's bifurcation request. The Company will file its rejoinder on the jurisdictional objection that has been made by Mexico on November 6, 2023, and the Company anticipates the Tribunal will render its decision on the bifurcation request by the end of 2023.

If the SAT’s attempts to retroactively nullify the APA are successful, the SAT can be expected to enforce any Reassessments for 2010 through 2014 against PEM in respect of its sales of silver pursuant to the Old Stream Agreement. Such an outcome would likely have a material adverse effect on the Company’s results of operations, financial condition and cash flows. Should the Company ultimately be required to pay tax on its silver revenues based on spot market prices without any mitigating adjustments, the incremental income tax for the years 2010-2019 would be approximately $296.1 million (5,217 million MXN), before taking into consideration interest or penalties.

Based on the Company’s consultation with third party advisors, the Company believes PEM filed its tax returns in compliance with applicable Mexican law and that the APA is valid, therefore, at this time, no liability has been recognized in the financial statements with respect to this matter.

To the extent it is ultimately determined that the pricing for silver sales under the Old Stream Agreement is significantly different from the PEM Realized Price, and while PEM would have rights of appeal in connection with any reassessments, it is likely to have a materially adverse effect on the Company’s business, financial position and results of operations.



First Majestic Silver Corp. 2023 Third Quarter Report
Page 30
              


ii. NAFTA VAT Claim
On March 31, 2023, the Company filed a new Notice of Intent on its own behalf and on behalf of PEM under Chapter 11 of NAFTA to invite the Government of Mexico to engage in discussions to resolve the dispute regarding the ongoing denial of access to PEM’s VAT refunds ("NAFTA VAT Claim") within the stipulated 90-day consultation period. On June 29, 2023, the Company submitted its Request for Arbitration for the NAFTA VAT Claim to ICSID in order to preserve its legacy claim within NAFTA's applicable limitation period. The Request for Arbitration was registered by ICSID on July 21, 2023, and the Tribunal was to be constituted by October 19, 2023. The Company named its nominee to the Tribunal by this date, but Mexico has yet to appoint its nominee. In the event Mexico fails to put forward its nominee, procedures exist under the rules for a Tribunal consisting of a Chair and two members to be constituted, at the request of the Company.
While the Company remains confident in its position with regards to its two NAFTA filings, it continues to engage the Government of Mexico in consultation discussions so as to amicably resolve these disputes.
La Encantada Tax Re-assessments

In December 2019, as part of the ongoing annual audits of the tax returns of Minera La Encantada S.A. de C.V. and Corporacion First Majestic S.A. de C.V., the SAT issued tax assessments for fiscal 2012 and 2013 for corporate income tax in the amount of $40.01 million (705 million MXN) and $29.0 million (512 million MXN) including interest, inflation and penalties, respectively. In December 2022, the SAT issued tax assessments to Minera La Encantada, S.A. de C.V. for fiscal years 2014 and 2015 for corporate income tax in the amount of $18.40 million (317 million MXN) and $226.7 million (3,995 million MXN). The major items relate to forward silver purchase agreement and denial of the deductibility of mine development costs and service fees. The Company continues to defend the validity of the forward silver purchase agreement and will vigorously dispute the assessments that have been issued. The Company, based on advice from legal and financial advisors, believes MLE’s tax filings were appropriate and its tax filing position is correct, therefore no liability has been recognized in the financial statements.

San Martin Tax Re-assessments

In 2023, as part of the ongoing annual audits of the tax returns of Minera El Pilon S.A. de C.V. ("MEP"), the SAT issued tax assessments for fiscal 2014 and 2015 for corporate income tax in the total amount of $23.8 million (420 million MXN) including interest, inflation and penalties. The major items relate to forward silver purchase agreement and denial of the deductibility of mine development costs. The Company continues to defend the validity of the forward silver purchase agreement and will vigorously dispute the assessments that have been issued. The Company, based on advice from legal and financial advisors, believes MEP’s tax filings were appropriate and its tax filing position is correct, therefore no liability has been recognized in the financial statements.

La Parrilla Tax Re-assessments

In 2023, as part of the ongoing annual audits of the tax returns of First Majestic Plata S.A. de C.V. ("FMP"), the SAT issued tax assessment for fiscal 2014 for corporate income tax in the total amount of $25.2 million (443 million MXN) including interest, inflation and penalties. The major items relate to forward silver purchase agreement and denial of the deductibility of mine development costs. The Company continues to defend the validity of the forward silver purchase agreement and will vigorously dispute the assessments that have been issued. The Company, based on advice from legal and financial advisors, believes FMP’s tax filings were appropriate and its tax filing position is correct, therefore no liability has been recognized in the financial statements.

First Silver litigation

In April 2013, the Company received a positive judgment on the First Silver litigation from the Supreme Court of British Columbia (the “Court”), which awarded the sum of $93.8 million in favour of First Majestic against Hector Davila Santos (the “Defendant”) in connection with a dispute between the Company and the Defendant and his private company involving a mine in México (the “Bolaños Mine”) as set out further below. The Company received a sum of $14.1 million in June 2013 as partial payment of the judgment, leaving an unpaid amount of approximately $64.3 million (CAD$81.5 million). As part of the ruling, the Court granted orders restricting any transfer or encumbrance of the Bolaños Mine by the Defendant and limiting mining at the Bolaños Mine. The orders also require the Defendant to preserve net cash flow from the Bolaños Mine in a holding account and periodically provide to the Company certain information regarding the Bolaños Mine. After many years of domestic Mexican litigation, the enforceability of the British Columbia judgment was finally recognized by the Mexican Supreme Court in a written judgment on November 11, 2022. The Company has commenced collection actions in
First Majestic Silver Corp. 2023 Third Quarter Report
Page 31
              


Mexico against the Defendant’s assets and continues to seek recovery of the balance against one of the Defendant’s assets located in the United States. Nonetheless, there can be no guarantee that the remainder of the judgment amount will be collected. Therefore, as at September 30, 2023, the Company has not accrued any of the remaining $64.3 million (CAD$81.5 million) unrecovered judgment in favour of the Company.

Amendments to mining and other related laws in Mexico

On May 8, 2023, the Mexican Government enacted a decree amending several provisions of the Mining Law, the Law on National Waters, the Law on Ecological Equilibrium and Environmental Protection and the General Law for the Prevention and Integral Management of Waste (the "Decree"), which became effective on May 9, 2023.

The Decree amends the mining and water laws, including: i) the duration of the mining concession titles, ii) the process to obtain new mining concessions (through a public tender), iii) imposing conditions on water use and availability for the mining concessions, iv) the elimination of “free land and first applicant” scheme; iv) new social and environmental requirements in order to obtain and keep mining concessions, v) the authorization by the Ministry of Economy of any mining concession’s transfer, vi) new penalties and cancellation of mining concessions grounds due to non-compliance with the applicable laws, vii) the automatic dismissal of any application for new concessions, viii) new financial instruments or collaterals that should be provided to guarantee the preventive, mitigation and compensation plans resulting from the social impact assessments, among other amendments.

These amendments are expected to have an impact on our current and future exploration activities and operations in Mexico and the extent of such impact is yet to be determined but could be material for the Company.

On June 7, 2023, the Senators of the opposition parties (PRI, PAN and PRD) filed a constitutional action against the Decree, and such action is pending to be decided by the Plenary of the Supreme Court of Justice. Additionally, during the second quarter of 2023, the Company filed amparo lawsuits, challenging the constitutionality of the Decree. Those amparo lawsuits are pending to be decided by the District Courts in Mexico.

OTHER FINANCIAL INFORMATION

Share Repurchase Program

The Company has an ongoing share repurchase program to repurchase up to 5,000,000 of the Company's issued and outstanding shares up to March 31, 2024. The normal course issuer bid will be carried out through the facilities of the Toronto Stock Exchange and alternative Canadian marketplaces. All common shares, if any, purchased pursuant to the share repurchase program will be cancelled. The Company believes that from time to time, the market price of its common shares may not fully reflect the underlying value of the Company's business and its future business prospects. The Company believes that at such times, the purchase of common shares would be in the best interest of the Company. During the nine months ended September 30, 2023, the Company repurchased an aggregate of nil common shares (December 2022 - 100,000) at an average price of $nil per share as part of the share repurchase program (December 2022 - $8.52) for total proceeds of $nil (December 2022 - $0.7 million), net of transaction costs.

Off-Balance Sheet Arrangements

At September 30, 2023, the Company had no material off-balance sheet arrangements such as contingent interest in assets transferred to an entity, derivative instruments obligations or any obligations that generate financing, liquidity, market or credit risk to the Company, other than contingent liabilities and vendor liability and interest, as disclosed in this MD&A and the consolidated financial statements and the related notes.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 32
              


Related Party Disclosures

Amounts paid to related parties were incurred in the normal course of business and measured at the exchange amount, which is the amount agreed upon by the transacting parties and on terms and conditions similar to non-related parties.

In July 2020, the Company entered into a streaming agreement with First Mining to purchase 50% of the payable silver produced over the life of the Springpole Gold Project for total consideration of $22.5 million in cash and shares, over three payments. First Mining is a related party with two independent board members who are directors and/or officers of First Majestic.

With the exception of the agreement with First Mining, there were no transactions with related parties outside of the ordinary course of business during the nine months ended September 30, 2023.

Outstanding Share Data

As at November 1, 2023, the Company has 286,941,327 common shares issued and outstanding.

Senior Management Changes

In alignment with First Majestic's growth strategy, Mani Alkhafaji was appointed to the role of Vice President of Corporate Development & Investor Relations. Mr. Alkhafaji joined the Company in 2015 and most recently was Vice President of Business Planning & Procurement.


SUBSEQUENT EVENTS

The following significant events have occurred subsequent to September 30, 2023:

Declaration of Quarterly Dividend
On November 1, 2023, the Company's Board of Directors approved the declaration of its quarterly common share dividend of $0.0046 per share, payable on or after November 30, 2023, to common shareholders of record at the close of business on November 15, 2023. This dividend was declared subsequent to the quarter-end and has not been recognized as a distribution to owners during the period ended September 30, 2023.


ACCOUNTING POLICIES, JUDGMENTS AND ESTIMATES

Critical Accounting Judgments and Estimates

The preparation of consolidated financial statements in conformity with IFRS as issued by the International Accounting Standards Board ("IASB") requires management to make judgments, estimates and assumptions about future events that affect the reported amounts of assets and liabilities at the date of the financial statements and the reported amounts of revenue and expenses during the reporting period. Although these estimates are based on management’s best knowledge of the amount, events or actions, actual results may differ from these estimates.

For the Company's condensed interim consolidated financial statements for the three and nine months ended September 30, 2023, there were no changes in critical accounting judgments and estimates that were significantly different from those disclosed in the Company's annual MD&A as at and for the year ended December 31, 2022 and the following accounting policies, critical judgments and estimates in applying accounting policies:

Assets and liabilities held-for-sale
Accounting Policy
A non-current asset or disposal group of assets and liabilities ("disposal group") is classified as held-for-sale, if its carrying amount will be recovered principally through a sale transaction rather than through continuing use, and when the following criteria are met:
(i) The non-current asset or disposal group is available for immediate sale in its present condition subject only to terms that are usual and customary for sales of such assets or disposal groups; and
First Majestic Silver Corp. 2023 Third Quarter Report
Page 33
              


(ii) The sale of the non-current asset or disposal group is highly probable. For the sale to be highly probable:
The appropriate level of management must be committed to a plan to sell the asset or disposal group;
An active program to locate a buyer and complete the plan must have been initiated;
The non-current asset or disposal group must be actively marketed for sale at a price that is reasonable in relation to its current fair value;
The sale should be expected to qualify for recognition as a completed sale within one year from the date of classification as held for sale (with certain exceptions); and
Actions required to complete the plan should indicate that it is unlikely that significant changes to the plan will be made or that the plan will be withdrawn.

Non-current assets and disposal groups are classified as held for sale from the date these criteria are met and are measured at the lower of the carrying amount and fair value less costs to sell ("FVLCTS"). If the FVLCTS is lower than the carrying amount, an impairment loss is recognized in net earnings. Upon classification as held for sale, non-current assets are no longer depreciated.

Significant estimates and judgements
In determining the probability of the sale being completed within a year, management has considered a number of factors including necessary approvals from management, the Board of Directors, regulators and shareholders.

Critical Judgements and Estimates
Investments in Associates and Joint Ventures

As a result of the sale of the La Guitarra Mine and the La Parrilla Mine, the Company is a material shareholder of Sierra Madre and of Golden Tag. Judgement is needed to assess whether the Company’s interest in an investee meets the definition of having significant influence and therefore requires to be accounted for under the equity method.

In making a judgement of whether the Company has significant influence over the entity, management has evaluated the ownership percentage as well as other qualitative factors including but not limited to representation on the Board of Directors, participation in operational or financial policy-making processes, material transactions between the Company and the investee, interchange of managerial personnel, provision of technical information and the nature of potential voting rights.

As part of this assessment, management has considered that until such time that the Company holds less than 19.9% of the outstanding shares, the Company has agreed to vote in the manner recommended by the Board of Directors of each of Sierra Madre and Golden Tag.

Based on the qualitative factors noted above, the restrictions imposed on voting rights, and the lack of rights to have or appoint members to the Board, the Company has determined that significant influence does not exist despite holding a 48% interest in Sierra Madre and a 41% interest in Golden Tag. The Company began accounting for the shares received from Sierra Madre and the shares and warrants received from Golden Tag as an equity security at FVTOCI.

Impairment of non-current asset
Once an indicator of impairment is identified, significant judgement is required to determine the recoverable amounts of the Company's mining interests. Following the temporary suspension of operations at Jerritt Canyon, the Company has determined that there was an indicator of impairment. The Company determined that the value of the cash generating unit ("CGU") can be estimated using the market approach, based on the implied value per in-situ ounce of the property, rather than from the future cash flows from continuing operations.

In estimating the fair value less costs of disposal ("FVLCD"), the Company took into account the consideration paid in recent transactions for comparable Companies and benchmarked the value per in-situ ounce at Jerritt Canyon against these transactions. The Company concluded that the resulting measurement is more representative of the fair value of the CGU in the circumstances existing at the end of the current period.

New and amended IFRS standards that are effective for the current year

In the current year, the Company has applied the below amendments to IFRS Standards and Interpretations issued by the IASB that were effective for annual periods that begin on or after January 1, 2023. Their adoption has not had any material impact on the disclosures or on the amounts reported in these financial statements.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 34
              



Amendments to IAS 1 Presentation of Financial Statements and IFRS Practice Statement 2 Making Materiality Judgments—Disclosure of Accounting Policies

The amendments change the requirements in IAS 1 with regard to disclosure of accounting policies. The amendments replace all instances of the term "significant accounting policies" with "material accounting policy information." Accounting policy information is material if, when considered together with other information included in an entity’s financial statements, it can reasonably be expected to influence decisions that the primary users of general purpose financial statements make on the basis of those financial statements.

The supporting paragraphs in IAS 1 are also amended to clarify that accounting policy information that relates to immaterial transactions, other events or conditions is immaterial and need not be disclosed. Accounting policy information may be material because of the nature of the related transactions, other events or conditions, even if the amounts are immaterial. However, not all accounting policy information relating to material transactions, other events or conditions is itself material. The International Accounting Standards Board ("IASB") has also developed guidance and examples to explain and demonstrate the application of the ‘four-step materiality process’ described in IFRS Practice Statement 2.

The amendments were applied effective January 1, 2023 and did not have a material impact on the Company's interim consolidated financial statements.

Amendments to IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors—Definition of Accounting Estimates

The amendments replace the definition of a change in accounting estimates with a definition of accounting estimates. Under the new definition, accounting estimates are “monetary amounts in financial statements that are subject to measurement uncertainty.”

The definition of a change in accounting estimates was deleted. However, the Board retained the concept of changes in accounting estimates in the Standard with the following clarifications:

• A change in accounting estimate that results from new information or new developments is not the correction of an
error

• The effects of a change in an input or a measurement technique used to develop an accounting estimate are changes
in accounting estimates if they do not result from the correction of prior period errors

The amendments were applied effective January 1, 2023 and did not have a material impact on the Company's interim consolidated financial statements.

Deferred Tax Related to Assets and Liabilities Arising from a Single Transaction (Amendments to IAS 12)
The amendments clarify that companies are required to recognize deferred taxes on transactions where both assets and liabilities are recognized, such as with leases and decommissioning liabilities. The amendments were applied effective January 1, 2023 and did not have a material impact on the Company's interim consolidated financial statements.

Future Changes in Accounting Policies Not Yet Effective in the Current Period:

At the date of authorization of these financial statements, the Company has not applied the following new and revised IFRS Accounting Standards that have been issued but are not yet effective. Management does not expect that the adoption of the Standards listed below will have a material impact on the financial statements of the Company in future periods, except if indicated.

Classification of Liabilities as Current or Non-Current with Covenants (Amendments to IAS 1)

The amendments aim to promote consistency in applying the requirements by helping companies determine whether, in the statement of financial position, debt and other liabilities with an uncertain settlement date should be classified as current (due or potentially due to be settled within one year) or non-current.

In addition, the amendment requires entities to disclose information to enable users of the financial statements to understand the risk that non-current liabilities with covenants could become repayable within twelve months. The
First Majestic Silver Corp. 2023 Third Quarter Report
Page 35
              


amendments are applied on or after the first annual reporting period beginning on or after January 1, 2024, with early application permitted. This amendment is not expected to have a material impact on the Company’s consolidated financial statements.

Lease Liability in a Sale and Leaseback (Amendments to IFRS 16)

The amendments require a seller-lessee to subsequently measure lease liabilities arising from a leaseback in a way that it does not recognize any amount of the gain or loss that relates to the right of use it retains. The new requirements do not prevent a seller-lessee from recognizing in profit or loss any gain or loss relating to the partial or full termination of a lease. A seller-lessee applies the amendments retrospectively in accordance with IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors to sale and leaseback transactions entered into after the date of initial application.

The amendments are effective for annual reporting periods beginning on or after January 1, 2024 although earlier application is permitted. This amendment is not expected to have a material impact on the Company's consolidated financial statements.

NON-GAAP MEASURES

The Company has included certain non-GAAP measures including “Cash costs per silver equivalents ounce”, "All-in sustaining cost per silver equivalent ounce", "All-in sustaining cost per gold ounce", “Production cost per tonne”, “Average realized silver price per silver equivalent ounce”, "Average realized gold price", "Adjusted net earnings", “Adjusted earnings per share”, “Free cash flow” and "Working capital” to supplement its consolidated financial statements, which are presented in accordance with IFRS. The terms IFRS and generally accepted accounting principles (“GAAP”) are used interchangeably throughout this MD&A.

The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. Non-GAAP measures do not have any standardized meaning prescribed under IFRS and the methods used by the Company to calculate such measures may differ from methods used by other companies with similar descriptions, therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Cash Cost per AgEq Ounce, All-In Sustaining Cost per AgEq Ounce, All-In Sustaining Cost per Au Ounce, and Production Cost per Tonne

Cash costs per AgEq ounce and total production cost per tonne are non-GAAP performance measures used by the Company to manage and evaluate operating performance at each of the Company’s operating mining units, in conjunction with the related GAAP amounts. These metrics are widely reported in the mining industry as benchmarks for performance but do not have a standardized meaning and are disclosed in addition to IFRS measures. Management and investors use these metrics for comparing the costs against peers in the industry and for assessing the performance of each mine within the portfolio.

Management calculates the cash costs per ounce and production costs per tonne by:
starting with the production costs (GAAP) from the income statement;
adding back duties and royalties, smelting and refining costs as well as transportation and selling costs, which form a part of the cost of sales on the financial statements and provide a better representation of total costs incurred;
cash costs are divided by the payable silver equivalent ounces produced; and
production costs are divided by the total tonnes milled.

AISC is a non-GAAP performance measure and was calculated based on guidance provided by the World Gold Council (“WGC”). WGC is not a regulatory industry organization and does not have the authority to develop accounting standards for disclosure requirements. Other mining companies may calculate AISC differently as a result of differences in underlying accounting principles and policies applied, as well as differences in definitions of sustaining versus expansionary capital expenditures. AISC is a more comprehensive measure than cash cost per ounce and is useful for investors and management to assess the Company’s operating performance by providing greater visibility, comparability and representation of the total costs associated with producing silver from its current operations, in conjunction with related GAAP amounts. AISC helps investors to assess costs against peers in the industry and help management assess the performance of each mine within the portfolio in a standardized manner.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 36
              



The Company defines sustaining capital expenditures as, “costs incurred to sustain and maintain existing assets at current productive capacity and constant planned levels of productive output without resulting in an increase in the life of assets, future earnings, or improvements in recovery or grade. Sustaining capital includes costs required to improve/enhance assets to minimum standards for reliability, environmental or safety requirements. Sustaining capital expenditures excludes all expenditures at the Company’s new projects and certain expenditures at current operations which are deemed expansionary in nature.”

Expansionary capital expenditure is defined as, "costs incurred to extend existing assets beyond their current productive capacity and beyond their planned levels of productive output, resulting in an increase in the life of the assets, increasing their future earnings potential, or improving their recoveries or grades which would serve to increase the value of the assets over their useful lives". Development and exploration work which moves inferred resources to measured or indicated resources and adds to the Net Present Value of the assets is considered expansionary in nature. Expansionary capital also includes costs required to improve/enhance assets beyond their minimum standard for reliability, environmental or safety requirements.

Consolidated AISC includes total production costs (GAAP measure) incurred at the Company’s mining operations, which forms the basis of the Company’s total cash costs. Additionally, the Company includes sustaining capital expenditures, corporate general and administrative expenses, share-based payments, operating lease payments and reclamation cost accretion. AISC by mine does not include certain corporate and non-cash items such as general and administrative expense and share-based payments. The Company believes this measure represents the total sustainable costs of producing silver from current operations and provides additional information of the Company’s operational performance and ability to generate cash flows. As the measure seeks to reflect the full cost of silver production from current operations, new projects and expansionary capital at current operations are not included. Certain other cash expenditures, including tax payments, dividends and financing costs are also not included.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 37
              


The following tables provide detailed reconciliations of these measures to cost of sales, as reported in notes to our condensed interim consolidated financial statements.
(expressed in thousands of U.S. Dollars,
except ounce and per ounce amounts)
Three Months Ended September 30, 2023
San DimasSanta ElenaLa EncantadaJerritt CanyonConsolidated
Mining cost$17,381 $12,480 $4,055 $459 $34,374 
Milling cost 8,297 9,507 6,017 108 23,929 
Indirect cost 15,651 6,312 4,053 — 26,018 
Total production cost (A)$41,329 $28,299 $14,126 $568 $84,322 
Add: transportation and other selling cost290 238 124 533 
Add: smelting and refining cost352 108 121 587 
Add: environmental duty and royalties cost288 2,595 263 3,153 
Total cash cost (B)$42,259 $31,240 $14,634 $585 $88,595 
Workers’ participation2,747 959 272 — 3,977 
General and administrative expenses— — — — 10,074 
Share-based payments— — — — 2,762 
Accretion of decommissioning liabilities285 201 209 — 695 
Sustaining capital expenditures7,882 4,059 1,049 100 13,544 
Operating lease payments156 2,671 887 — 4,103 
All-In Sustaining Costs (C)$53,329 $39,130 $17,051 $685 $123,831 
Payable silver equivalent ounces produced (D)3,002,851 2,665,332 570,963 32,386 6,271,532 
Payable gold ounces produced (E)N/AN/AN/A396 N/A
Tonnes milled (F)213,681 226,292 230,230  670,203 
Cash cost per AgEq ounce (B/D)$14.07 $11.72 $25.63 $18.08 $14.13 
AISC per AgEq ounce (C/D)$17.76 $14.68 $29.86 $21.16 $19.74 
Cash cost per Au ounce (B/E)N/AN/AN/A$1,478 N/A
AISC per Au ounce (C/E)N/AN/AN/A$1,730 N/A
Production cost per tonne (A/F)$193.41 $125.05 $61.35 N/A$125.81 



First Majestic Silver Corp. 2023 Third Quarter Report
Page 38
              


(expressed in thousands of U.S. Dollars,
except ounce and per ounce amounts)
Three Months Ended September 30, 2022
San DimasSanta ElenaLa EncantadaJerritt CanyonConsolidated
Mining cost $10,821 $11,697 $3,732 $24,503 $50,754 
Milling cost 7,796 10,165 5,027 14,969 37,957 
Indirect cost 11,263 4,924 3,088 5,006 24,280 
Total production cost (A)$29,880 $26,786 $11,847 $44,478 $112,991 
Add: transportation and other selling cost375 196 119 22 761 
Add: smelting and refining cost432 108 166 22 728 
Add: environmental duty and royalties cost372 1,204 80 529 2,185 
Total cash cost (B)$31,059 $28,294 $12,212 $45,051 $116,665 
Workers’ participation1,566 518 256 — 2,340 
General and administrative expenses— — — — 8,125 
Share-based payments— — — — 3,305 
Accretion of decommissioning liabilities294 160 210 513 1,531 
Sustaining capital expenditures8,222 2,563 1,094 8,444 20,660 
Operating lease payments169 2,008 848 — 3,373 
All-In Sustaining Costs (C)$41,310 $33,543 $14,620 $54,008 $155,999 
Payable silver equivalent ounces produced (D)3,766,684 2,729,552 785,461 1,465,968 8,747,665 
Payable gold ounces produced (E)N/AN/AN/A16,283 N/A
Tonnes milled (F)185,126 214,387 255,945 181,056 836,514 
Cash cost per AgEq ounce (B/D)$8.25 $10.37 $15.55 $30.73 $13.34 
AISC per AgEq ounce (C/D)$10.97 $12.29 $18.61 $36.84 $17.83 
Cash cost per Au ounce (B/E)N/AN/AN/A$2,767 N/A
AISC per Au ounce (C/E)N/AN/AN/A$3,317 N/A
Production cost per tonne (A/F)$161.41 $124.94 $46.29 $245.66 $135.07 
























First Majestic Silver Corp. 2023 Third Quarter Report
Page 39
              


(expressed in thousands of U.S. Dollars,
except ounce and per ounce amounts)
Nine Months Ended September 30, 2023
San DimasSanta ElenaLa EncantadaJerritt CanyonConsolidated
Mining cost$48,663 $30,278 $12,104 $27,297 $118,340 
Milling cost 25,120 27,835 16,746 26,853 96,554 
Indirect cost 41,494 16,393 10,854 5,252 73,995 
Total production cost (A)$115,276 $74,506 $39,704 $59,402 $288,888 
Add: transportation and other selling cost1,133 715 455 34 2,337 
Add: smelting and refining cost1,141 212 444 57 1,854 
Add: environmental duty and royalties cost1,030 6,701 624 787 9,142 
Total cash cost (B)$118,580 $82,134 $41,227 $60,280 $302,221 
Workers’ participation11,099 1,862 941 — 13,902 
General and administrative expenses— — — — 29,416 
Share-based payments— — — — 10,711 
Accretion of decommissioning liabilities1,100 774 807 514 3,196 
Sustaining capital expenditures23,741 12,792 3,040 8,094 48,543 
Operating lease payments505 5,626 2,634 — 9,987 
All-In Sustaining Costs (C)$155,025 $103,188 $48,649 $68,889 $417,970 
Payable silver equivalent ounces produced (D)9,655,045 6,553,498 2,214,743 1,765,316 20,188,602 
Payable gold ounces produced (E)N/AN/AN/A21,080 N/A
Tonnes milled (F)660,113 648,991 762,494 177,643 2,249,241 
Cash cost per AgEq ounce (B/D)$12.28 $12.53 $18.61 $34.15 $14.97 
AISC per AgEq ounce (C/D)$16.06 $15.75 $21.97 $39.02 $20.70 
Cash cost per Au ounce (B/E)N/AN/AN/A$2,860 N/A
AISC per Au ounce (C/E)N/AN/AN/A$3,268 N/A
Production cost per tonne (A/F)$174.63 $114.80 $52.07 $334.39 $128.44 



First Majestic Silver Corp. 2023 Third Quarter Report
Page 40
              


(expressed in thousands of U.S. Dollars, except ounce and per ounce amounts)Nine Months Ended September 30, 2022
San DimasSanta ElenaLa EncantadaJerritt CanyonConsolidated
Mining cost$33,503 $33,600 $10,508 $69,967 $147,578 
Milling cost 22,504 25,631 14,543 37,998 100,676 
Indirect cost 32,498 15,060 8,944 15,700 72,201 
Total production cost (A)$88,505 $74,291 $33,995 $123,665 $320,456 
Add: transportation and other selling cost886 573 341 88 2,045 
Add: smelting and refining cost1,153 324 491 61 2,029 
Add: environmental duty and royalties cost1,069 4,892 263 2,199 8,423 
Total cash cost (B)$91,613 $80,080 $35,090 $126,013 $332,953 
Workers’ participation7,584 2,741 (744)— 9,581 
General and administrative expenses— — — — 26,975 
Share-based payments— — — — 11,113 
Accretion of decommissioning liabilities884 482 629 1,540 4,548 
Sustaining capital expenditures26,245 10,917 4,355 23,227 66,332 
Operating lease payments410 4,084 2,473 — 8,097 
All-In Sustaining Costs (C)$126,736 $98,304 $41,803 $150,780 $459,599 
Payable silver equivalent ounces produced (D)9,880,782 6,833,663 2,302,199 4,629,344 23,645,988 
Payable gold ounces produced (E)N/AN/AN/A55,583 N/A
Tonnes milled (F)577,528 644,785 770,406 624,704 2,617,423 
Cash cost per AgEq ounce (B/D)$9.27 $11.72 $15.24 $27.22 $14.08 
AISC per AgEq ounce (C/D)$12.83 $14.39 $18.16 $32.57 $19.44 
Cash cost per Au ounce (B/E)N/AN/AN/A$2,267 N/A
AISC per Au ounce (C/E)N/AN/AN/A$2,713 N/A
Production cost per tonne (A/F)$153.25 $115.22 $44.13 $197.96 $122.43 



















First Majestic Silver Corp. 2023 Third Quarter Report
Page 41
              


Average Realized Silver Price per Silver Equivalent Ounce

Revenues are presented as the net sum of invoiced revenues related to delivered shipments of silver or gold doré bars, including associated metal by-products of lead and zinc after having deducted refining and smelting charges, and after elimination of intercompany shipments of silver, silver being minted into coins, ingots and bullion products.

The average realized silver price is a non-GAAP performance measure that allows management and investors to assess the Company's ability to sell ounces produced, in conjunction with related GAAP amounts. Management calculates this measure by taking total revenue reported under GAAP and adding back smelting and refining charges to arrive at the gross reportable revenue for the period. Gross revenues are divided into payable silver equivalent ounces sold to calculate the average realized price per ounce of silver equivalents sold. The streaming and royalty agreements in place between the Company and Sandstorm as well as Wheaton, impacts the total revenues reported on the financial statements given the reduced prices provided to these vendors in line with the terms of the agreements. Therefore, management adjusts revenue to exclude smelting and refining charges as well as revenues earned through agreements with these vendors. This provides management with a better picture regarding its ability to convert ounces produced to ounces sold and provides the investor with a clear picture of the price that the Company can currently sell the inventory for, excluding pre-arranged agreements.
Three Months Ended September 30,Nine Months Ended September 30,
2023202220232022
Revenues as reported$133,211 $159,752 $436,855 $476,032 
Add back: smelting and refining charges587 728 1,854 2,029 
Gross revenues133,798 160,480 438,709 478,061 
Less: Sandstorm gold revenues(3)(229)(507)(928)
Less: Wheaton gold revenues(6,114)(6,366)(19,895)(19,221)
Gross revenues, excluding Sandstorm, Wheaton (A)$127,681 $153,885 $418,307 $457,912 
Payable silver equivalent ounces sold6,975,493 8,754,114 20,910,221 23,313,263 
Less: Payable silver equivalent ounces sold to Sandstorm— (43,699)(88,543)(165,124)
Less: Payable silver equivalent ounces sold to Wheaton(1,277,748)(912,992)(2,655,553)(2,589,327)
Payable silver equivalent ounces sold, excluding Sandstorm and Wheaton (B)5,697,745 7,797,423 18,166,125 20,558,812 
Average realized silver price per silver equivalent ounce (A/B)$22.41 $19.74 $23.03 $22.27 
Average market price per ounce of silver per COMEX$23.56 $19.24 $23.44 $21.97 












First Majestic Silver Corp. 2023 Third Quarter Report
Page 42
              


Average Realized Gold Price per Ounce

Revenues are presented as the net sum of invoiced revenues related to delivered shipments of silver or gold doré bars, including associated metal by-products of lead and zinc after having deducted refining and smelting charges, and after elimination of intercompany shipments of silver, silver being minted into coins, ingots and bullion products.

The average realized gold price is a non-GAAP performance measure that allows management and investors to assess the Company's ability to sell ounces produced, in conjunction with related GAAP amounts. Management calculates this measure by taking total revenue reported under GAAP and adding back smelting and refining charges to arrive at the gross reportable revenue for the period. Silver revenues are deducted from the reportable revenue for the period in order to arrive at the gold revenue for the period. Gross gold revenues are divided into gold ounces sold to calculate the average realized price per ounce of gold sold. The streaming and royalty agreements in place between the Company and Sandstorm as well as Wheaton, impacts the total revenues reported on the financial statements given the reduced prices provided to these vendors in line with the terms of the agreements. Therefore, management adjusts revenue to exclude smelting and refining charges as well as revenues earned through agreements with these vendors. This provides management with a better picture regarding its ability to convert ounces produced to ounces sold and provides the investor with a clear picture of the price that the Company can currently sell the inventory for, excluding pre-arranged agreements.

Three Months Ended September 30,Nine Months Ended September 30,
2023202220232022
Gross revenue, excluding Sandstorm, Wheaton $127,682 $153,885 $418,307 $457,912 
Less: Silver revenues(59,021)(56,744)(186,998)(180,988)
Gross gold revenues, excluding Sandstorm, Wheaton (A)$68,661 $97,141 $231,309 $276,924 
Gold ounces sold44,866 68,842 154,513 186,754 
Less: Gold ounces sold to Wheaton(9,695)(10,195)(31,700)(30,898)
Less: Gold ounces sold to Sandstorm(5)(484)(1,071)(1,968)
Gold ounces sold, excluding Sandstorm and Wheaton (B)35,166 58,162 121,742 153,888 
Average realized gold price per ounce (A/B)$1,952 $1,670 $1,900 $1,800 
Average market price per ounce of gold$1,927 $1,728 $1,932 $1,824 

Free Cash Flow

Free cash flow is a non-GAAP liquidity measure which is determined based on operating cash flows less sustaining capital expenditures. Management uses free cash flow as a critical measure in the evaluation of liquidity in conjunction with related GAAP amounts. It also uses the measure when considering available cash, including for decision-making purposes related to dividends and discretionary investments. Further, it helps management, the Board of Directors and investors evaluate a Company's ability to generate liquidity from operating activities.

Three Months Ended September 30,Nine Months Ended September 30,
2023202220232022
Operating cash flows $19,980 $65,983 $35,689 $33,746 
Less: Sustaining capital expenditures13,544 20,660 48,543 66,332 
Free cash flow$6,436 $45,323 ($12,854)($32,586)





First Majestic Silver Corp. 2023 Third Quarter Report
Page 43
              


Adjusted Earnings per Share (“Adjusted EPS”)

The Company uses the financial measure “Adjusted EPS” which is a non-GAAP measure, to supplement earnings per share (GAAP) information in its condensed interim consolidated financial statements. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, the Company and certain investors and analysts use this information to evaluate the Company’s performance.

Management uses adjusted earnings per share as a critical measure of operating performance in conjunction with the related GAAP amounts. The only items considered in the adjusted earnings-per-share calculation are those that management believes (1) may affect trends in underlying performance from year to year and (2) are not considered normal recurring cash operating expenses.

Adjusted earnings per share is used for forecasting, operational and strategic decision making, evaluating current Company and management performance, and calculating financial covenants. Management believes that excluding certain non-cash and non-recurring items from the calculation increases comparability of the metric from period to period, which makes it useful for management, the audit committee and investors, to evaluate the underlying core operations. The presentation of Adjusted EPS is not meant to be a substitute for EPS presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measure.

To calculate adjusted earnings per share, management adjusts from net earnings (GAAP), the per-share impact, net of the tax effects of adjustments, of the following:
share based payments;
realized and unrealized gains and losses from investment in derivatives and marketable securities; and
other infrequent or non-recurring losses and gains.

The following table provides a detailed reconciliation of net earnings (losses) as reported in the Company’s condensed interim consolidated financial statements to adjusted net earnings and Adjusted EPS:
Three Months Ended September 30,Nine Months Ended September 30,
2023202220232022
Net loss as reported($27,149)($20,692)($145,343)($97,457)
Adjustments for non-cash or unusual items:
Tax settlement— — — 21,340 
Impairment (reversal) of non-current assets— — 125,200 (7,585)
Deferred income tax (recovery) expense3,729 (13,733)(52,644)16,303 
Loss from investment in marketable securities685 441 1,619 4,290 
Loss on divestiture of mining interest1,646 — 3,024 — 
Share-based payments2,762 3,305 10,711 11,113 
Standby Costs— — 13,438 — 
Abnormal costs (1)
— — — 3,117 
Restructuring costs 6,428 — 6,428 — 
Write-down on assets held-for-sale— — 7,229 — 
Write-down of mineral inventory972 8,100 14,841 14,453 
Adjusted net loss($10,927)($22,579)($15,497)($34,426)
Weighted average number of shares on issue - basic286,921,720 262,865,860 280,758,404 261,925,327 
Adjusted EPS($0.04)($0.09)($0.06)($0.13)
(1) Abnormal costs includes $3.1 million in costs that were incurred during the second quarter of 2022 as a result of marginal ore material that was processed to keep the mill running at minimum feed requirements to perform government mandated air compliance test work at the Jerritt Canyon Gold mine.


First Majestic Silver Corp. 2023 Third Quarter Report
Page 44
              


Working Capital and Available Liquidity

Working capital is determined based on current assets and current liabilities as reported in the Company’s consolidated financial statements. The Company uses working capital as a measure of the Company’s short-term financial health and operating efficiency. Available liquidity includes the Company's working capital and undrawn revolving credit facility.
September 30, 2023December 31, 2022
Current Assets$298,262 $370,289 
Less: Current Liabilities(100,463)(167,399)
Working Capital$197,799 $202,890 
Available Undrawn Revolving Credit Facility124,640 75,000 
Available Liquidity$322,439 $277,890 

MANAGEMENT’S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Disclosure Controls and Procedures

The Company’s management, with the participation of its President and Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), has evaluated the effectiveness of the Company’s disclosure controls and procedures. Based upon the results of that evaluation, the Company’s CEO and CFO have concluded that, as of September 30, 2023, the Company’s disclosure controls and procedures were effective to provide reasonable assurance that the information required to be disclosed by the Company in reports it files is recorded, processed, summarized and reported, within the appropriate time periods and is accumulated and communicated to management, including the CEO and CFO, as appropriate to allow timely decisions regarding required disclosure.

Internal Control over Financial Reporting

The Company’s management, with the participation of its CEO and CFO, is responsible for establishing and maintaining adequate internal control over financial reporting as such term is defined in the rules of the United States Securities and Exchange Commission and the Canadian Securities Administrators. The Company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS as issued by the IASB. The Company’s internal control over financial reporting includes policies and procedures that:

maintain records that accurately and fairly reflect, in reasonable detail, the transactions and dispositions of assets of the Company;
•     provide reasonable assurance that transactions are recorded as necessary for preparation of financial statements in accordance with IFRS as issued by IASB;
provide reasonable assurance that the Company’s receipts and expenditures are made only in accordance with authorizations of management and the Company’s Directors; and
• provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the Company’s assets that could have a material effect on the Company’s condensed interim consolidated financial statements.

The Company’s internal control over financial reporting may not prevent or detect all misstatements because of inherent limitations. Additionally, projections of any evaluation of effectiveness for future periods are subject to the risk that controls may become inadequate because of changes in conditions or deterioration in the degree of compliance with the Company’s policies and procedures.

The Company's management evaluated the effectiveness of our internal controls over financial reporting based upon the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on management's evaluation, our CEO and CFO concluded that our internal controls over financial reporting was effective as of September 30, 2023. There have been no significant changes in our internal controls during the quarter ended September 30, 2023 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.
First Majestic Silver Corp. 2023 Third Quarter Report
Page 45
              


Limitations of Controls and Procedures

The Company’s management, including the President and CEO and CFO, believes that any disclosure controls and procedures or internal control over financial reporting, no matter how well conceived and operated, may not prevent or detect all misstatements because of inherent limitations. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, they cannot provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been prevented or detected. These inherent limitations include the realities that judgments in decision-making can be faulty, and that breakdowns can occur because of simple errors or mistakes. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by unauthorized override of the control. The design of any control system also is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Accordingly, because of the inherent limitations in a cost effective control system, misstatements due to error or fraud may occur and not be detected.

CAUTIONARY STATEMENTS

Cautionary Note regarding Forward-Looking Statements

Certain information contained herein this MD&A constitutes forward-looking statements under applicable securities laws (collectively, “forward-looking statements”). These statements relate to future events or the Company’s future performance, business prospects or opportunities. Forward-looking statements include, but are not limited to: commercial mining operations; anticipated mineral recoveries; projected quantities of future mineral production; statements with respect to the Company’s business strategy; future planning processes; interpretation of drill results and other technical data; anticipated development, expansion, exploration activities and production rates and mine plans and mine life; the security situation at the San Martin mine; the estimated cost and timing of plant improvements at the Company’s operating mines and development of the Company’s development projects; construction and operations of the replacement well at La Encantada; the operations of the Company's central lab; the timing of completion of exploration programs and drilling programs; the restarting of operations or potential interim plans at the Company's temporarily suspended and/or non-operating mines; the temporary suspension of processing activities at Jerritt Canyon; decommissioning activities at Jerritt Canyon; anticipated reclamation and decommissioning activities and associated costs; conversion of mineral resources to proven and probable mineral reserves; statements with respect to the Company’s future financial position including operating efficiencies, cash flow, capital budgets, costs and expenditures; the implementation and effect of cost reduction initiatives; the preparation of technical reports and completion of preliminary economic assessments; the repurchase of the Company’s shares; viability of the Company’s projects; potential metal recovery rates; sales of bullion direct to customers; payment of dividends; the impact of amendments to accounting policies; effectiveness of internal controls and procedures; the validity of the APA; statements with respect to the recovery of value added tax receivables and the tax regime in México; the conduct or outcome of outstanding litigation, regulatory proceedings, negotiations or proceedings under NAFTA or other claims and the compliance by counterparties with judgments or decisions; expectations regarding the continuing effect of the COVID‐19 pandemic on the Company's operations, the global economy and the market for the Company's products. All statements other than statements of historical fact may be forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “seek”, “anticipate”, “plan”, “continue”, “estimate”, “expect”, “may”, “will”, “project”, “predict”, “forecast”, “potential”, “targeting”, “intend”, “could”, “might”, “should”, “believe” and similar expressions) are not statements of historical fact and may be “forward-looking statements”.

Forward-looking statements are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends, current conditions and expected future developments at the dates the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include, without limitation: global economic conditions including public health threats, the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating commodity prices, fluctuating currency exchange rates, the possibility of project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of financing, the availability of and costs of financing needed in the future, uninsured risks, defects in title, availability and costs of materials and equipment, climate change events including, but not limited to, drought conditions, changes in national or local governments, changes in applicable legislation or application thereof,
First Majestic Silver Corp. 2023 Third Quarter Report
Page 46
              


timeliness of government approvals, actual performance of facilities, equipment, and processes relative to specifications and expectations and unanticipated environmental impacts on operations, availability of time on court calendars in Canada and elsewhere; the recognition of Canadian judgments under Mexican law; the possibility of settlement discussions; the risk of appeal of judgment; and the insufficiency of the defendant's assets to satisfy the judgment amount and other factors described in the Company’s Annual Information Form under the heading “Risk Factors”.

The Company believes that the expectations reflected in any such forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included herein this MD&A should not be unduly relied upon. These statements speak only as of the date of this MD&A. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws. Actual results may differ materially from those expressed or implied by such forward-looking statements.

Cautionary Note regarding Reserves and Resources

National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”), issued by the Canadian Securities Administrators, lays out the standards of disclosure for mineral projects. This includes a requirement that a certified Qualified Person (“QP”) (as defined under the NI 43-101) supervises the preparation of the mineral reserves and mineral resources. Gonzalo Mercado, Vice President of Exploration and Technical Services is a certified QP for the Company and has reviewed this MD&A for QP technical disclosures. All NI 43-101 technical reports can be found on the Company’s website at www.firstmajestic.com or under the Company's profile on SEDAR+ at www.sedarplus.ca.

Cautionary Note to United States Investors Concerning Estimates of Mineral Reserves and Resources

This Management’s Discussion and Analysis has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ materially from the requirements of United States securities laws applicable to U.S. companies. Information concerning our mineral properties has been prepared in accordance with the requirements of Canadian securities laws, which differ in material respects from the requirements of the United States Securities and Exchange Commission (the “SEC”) applicable to domestic United States issuers. Accordingly, the disclosure in this Management’s Discussion and Analysis regarding our mineral properties is not comparable to the disclosure of United States issuers subject to the SEC’s mining disclosure requirements.

Additional Information

Additional information on the Company, including the Company’s Annual Information Form and the Company’s audited consolidated financial statements for the year ended December 31, 2022, is available under the Company's profile on SEDAR+ at www.sedarplus.ca and on the Company’s website at www.firstmajestic.com.

First Majestic Silver Corp. 2023 Third Quarter Report
Page 47
              

Exhibit 99.3




Form 52-109F1
Certification of Interim Filings
Full Certificate

I, Keith Neumeyer, President & Chief Executive Officer of First Majestic Silver Corp., certify the following:

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of First Majestic Silver Corp. (the “issuer”) for the interim period ended September 30, 2023.

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim filings, for the issuer.

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the financial year end

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the annual filings are being prepared; and

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is COSO’s 2013 Internal Control – Integrated Framework.

5.2N/A.


5.3    N/A.

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2023 and ended on September 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.




Date: November 1, 2023
/s/ Keith Neumeyer
Keith Neumeyer
President & Chief Executive Officer



Exhibit 99.4




Form 52-109F1
Certification of Interim Filings
Full Certificate


I, David Soares, Chief Financial Officer of First Majestic Silver Corp., certify the following:

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of First Majestic Silver Corp. (the “issuer”) for the interim period ended September 30, 2023.

2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.

3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.

4.Responsibility: The issuer’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim filings, for the issuer.

5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer(s) and I have, as at the financial year end

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the annual filings are being prepared; and

(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

5.1Control framework: The control framework the issuer’s other certifying officer(s) and I used to design the issuer’s ICFR is COSO’s 2013 Internal Control – Integrated Framework.

5.2N/A.

5.3    N/A.

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2023 and ended on September 30, 2023 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.





Date: November 1, 2023
/s/ David Soares
David Soares
Chief Financial Officer



fmlogoa41.jpg
NEWS RELEASE
New York - AGNovember 2, 2023
Toronto – FR
Frankfurt – FMV 

First Majestic Reports Third Quarter Financial Results and Quarterly Dividend Payment

Vancouver, BC, Canada - First Majestic Silver Corp. (NYSE:AG) (TSX:FR) (FSE:FMV) (the "Company" or “First Majestic”) is pleased to announce the unaudited interim consolidated financial results of the Company for the third quarter ended September 30, 2023. The full version of the financial statements and the management discussion and analysis can be viewed on the Company's website at www.firstmajestic.com or on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. All amounts are in U.S. dollars unless stated otherwise.

Q3 2023 HIGHLIGHTS

Production of 6.3 million silver equivalent (“AgEq”) ounces, consisting of 2.5 million silver ounces and 46,720 gold ounces, comparable to the previous quarter.
Quarterly revenues totalled $133.2 million, compared to $146.7 million in the previous quarter.
Mine operating earnings totalled $13.0 million, compared to $1.1 million in the previous quarter.
Operating cash flows before movements in working capital and taxes totalled $14.1 million, compared to $26.9 million in the previous quarter.
Consolidated cash costs improved to $14.13 per AgEq ounce and All-in sustaining costs (“AISC”) (see “Non-GAAP Financial Measures”, below) improved to $19.74 per AgEq ounce representing a reduction of 9% and 8%, respectively, compared to the previous quarter.
Adjusted net earnings of ($10.93) million (adjusted EPS of ($0.04)) (see “Non-GAAP Financial Measures”, below) after excluding non-cash and non-recuring items.
Sold 61,444 ounces of silver bullion, or approximately 2.9% of the Company’s silver production, on First Majestic’s online bullion store at an average silver price of $26.17 per ounce for total proceeds of $1.6 million.
At the end of the quarter, the Company had a cash and restricted cash balance of $257.3 million consisting of $138.3 million cash and cash equivalents and $119.0 million of restricted cash.
Declared a cash dividend payment of $0.0046 per common share for the third quarter of 2023 for shareholders of record as of the close of business on November 15, 2023, and will be distributed on or about, November 30, 2023.
1


OPERATIONAL AND FINANCIAL HIGHLIGHTS
Key Performance Metrics2023-Q32023-Q2Change
Q3 vs Q2
2022-Q3Change Q3 vs Q3
Operational
Ore Processed / Tonnes Milled670,203 733,170 (9 %)836,514 (20 %)
Silver Ounces Produced2,461,868 2,633,411 (7 %)2,736,100 (10 %)
Gold Ounces Produced46,720 45,022 %67,072 (30 %)
Silver Equivalent Ounces Produced6,285,790 6,320,971 (1 %)8,766,192 (28 %)
Cash Costs per Silver Equivalent Ounce (1)
$14.13 $15.58 (9 %)$13.34 %
All-in Sustaining Cost per Silver Equivalent Ounce (1)
$19.74 $21.52 (8 %)$17.83 11 %
Total Production Cost per Tonne (1)
$125.81 $128.21 (2 %)$135.07 (7 %)
Average Realized Silver Price per Silver Equivalent Ounce (1)
$22.41 $24.95 (10 %)$19.74 14 %
Financial (in $millions)
Revenues$133.2 $146.7 (9 %)$159.8 (17 %)
Mine Operating Earnings (Loss)$13.0 $1.1 NM$3.3 NM
Net Loss($27.1)($17.5)55 %($20.7)31 %
Operating Cash Flows before Non-Cash Working Capital and Taxes$14.1 $26.9 (47 %)$27.7 (49 %)
Cash and Cash Equivalents$138.3 $160.2 (14 %)$148.8 (7 %)
Working Capital (1)
$197.8 $237.2 (17 %)$148.2 34 %
Free Cash Flow (1)
$6.4 $7.4 (13 %)$45.3 (86 %)
Shareholders
(Loss) Earnings per Share ("EPS") - Basic($0.09)($0.06)(52 %)($0.08)(13 %)
Adjusted EPS (1)
($0.04)($0.02)100 %($0.09)56 %
NM – Not meaningful
(1) The Company reports non-GAAP measures which include cash costs per silver equivalent ounce produced, cash costs per gold ounce produced, all-in sustaining cost per silver equivalent ounce produced, all-in sustaining cost per gold ounce produced, total production cost per tonne, average realized silver price per silver equivalent ounce sold, average realized gold price per ounce sold, working capital, adjusted EPS and free cash flow. These measures are widely used in the mining industry as a benchmark for performance, but do not have a standardized meaning under the Company's financial reporting framework and the methods used by the Company to calculate such measures may differ from methods used by other companies with similar descriptions. See “Non-GAAP Measures” below for further details of these measures.

Q3 2023 FINANCIAL RESULTS

The Company realized an average price of $22.41 per AgEq ounce during the third quarter of 2023, representing a 14% increase compared to the third quarter of 2022.
Revenues generated during the quarter totalled $133.2 million, compared to $159.8 million in the third quarter of 2022. The decrease in revenues was primarily attributable to the temporary suspension of operations at Jerritt Canyon and slightly lower production at San Dimas and La Encantada.
The Company reported mine operating earnings of $13.0 million compared to $3.3 million in the third quarter of 2022. The increase in mine operating earnings is primarily attributable to an improvement in cost of sales and depreciation and depletion compared to the prior year quarter, following the temporary suspension of mining operations at Jerritt Canyon in the first quarter of 2023.
During the quarter, the Company incurred restructuring costs of $6.4 million as the Company continues to focus on optimizing its workforce primarily at San Dimas, as well as the Durango regional office and Santa Elena.
The Company reported net loss of $27.1 million (EPS of ($0.09)) compared to net loss of $20.7 million (EPS of ($0.08)) in the third quarter of 2022. The net loss for the quarter was driven by the restructuring costs, additional mine holding costs primarily related to the temporary suspension of Jerritt Canyon, and $1.6 million one-time loss on sale of mining interest following the disposition of La Parrilla.
2


Adjusted net earnings for the quarter, normalized for non-cash or non-recurring items such as share-based payments, unrealized losses on marketable securities and non-recurring write-downs on mineral inventory for the quarter was ($10.9) million (adjusted EPS of ($0.04)) compared to ($22.6) million (adjusted EPS of ($0.09)) in the third quarter of 2022.
Operating cash flow before movements in working capital and taxes in the quarter $14.1 million compared to $27.7 million in the third quarter of 2022.
As of September 30, 2023, the Company had a cash and restricted cash balance of $257.3 million consisting of $138.3 million cash and cash equivalents and $119.0 million of restricted cash. The Company also had working capital of $197.8 million.

OPERATIONAL HIGHLIGHTS

The table below represents the quarterly operating and cost parameters at each of the Company’s four producing mines during the quarter.

Third Quarter Production SummarySan DimasSanta ElenaLa Encantada
Jerritt Canyon(1)
Consolidated
Ore Processed / Tonnes Milled213,681226,292230,230— 670,203
Silver Ounces Produced1,548,203347,941565,724— 2,461,868
Gold Ounces Produced17,86328,3679439646,720
Silver Equivalent Ounces Produced3,010,4582,669,411573,45832,4636,285,790
Cash Costs per Silver Equivalent Ounce(2)
$14.07 $11.72 $25.63 $18.08 $14.13 
All-in Sustaining Cost per Silver Equivalent Ounce(2)
$17.76 $14.68 $29.86 $21.16 $19.74 
Cash Cost per Gold Ounce(2)
N/AN/AN/A$1,478 N/A
All-In Sustaining Costs per Gold Ounce(2)
N/AN/AN/A$1,730 N/A
Total Production Cost per Tonne(2)
$193.41 $125.05 $61.35 $— $125.81 
(1) Jerritt Canyon production during the third quarter comprised of pouring residual work-in-process inventory.
(2) See “Non-GAAP Financial Measures”, below for further details of these measures.

Total production in the third quarter was 6.3 million AgEq ounces consisting of 2.5 million ounces of silver and 46,720 ounces of gold, representing a 7% decrease and 4% increase, respectively, compared to the previous quarter. The Company's Mexican operations produced over 2.5 million ounces of silver and 46,324 gold ounces, or approximately 6.3 million AgEq ounces in the quarter. Silver equivalent production for the Mexican operations increased 5% over the prior quarter primarily due to higher tonnes, grades and recoveries at Santa Elena.
Cash cost for the quarter improved to $14.13 per AgEq ounce, compared to $15.58 per AgEq ounce in the previous quarter. The reduction in cash costs per ounce was primarily attributable to an increase in AgEq production at the Santa Elena operations. Production at Santa Elena increased by 49%, compared to the prior quarter, as a direct result of processing higher grade silver and gold ore from the Ermitaño underground mine. Record recoveries were also achieved due to the recent addition of the Dual Circuit plant. Additionally, the Company has implemented numerous costs saving measures to help offset the strengthening of the Mexican Peso and to combat inflationary impacts primarily in energy, reagents, and other major consumables.
AISC in the third quarter was $19.74 per AgEq ounce compared to $21.52 per AgEq ounce in the previous quarter. The 8% improvement in AISC was primarily attributable to lower cash costs along with a reduction in general and administrative costs as the Company has reduced its headcount across various corporate and operational departments.
Total capital expenditures in the third quarter were $32.2 million, primarily consisting of $13.5 million at San Dimas, $12.3 million at Santa Elena, $1.6 million at La Encantada, $2.8 million at Jerritt Canyon and $2.0 million for strategic projects.


3


Q3 2023 DIVIDEND ANNOUNCEMENT

The Company is pleased to announce that its Board of Directors has declared a cash dividend payment in the amount of $0.0046 per common share for the third quarter of 2023. The third quarter cash dividend will be paid to holders of record of First Majestic’s common shares as of the close of business on November 15, 2023, and will be distributed on or about November 30, 2023.
Under the Company’s dividend policy, the quarterly dividend per common share is targeted to equal approximately 1% of the Company’s net quarterly revenues divided by the number of the Company’s common shares outstanding on the record date.
The amount and distribution dates of future dividends remain at the discretion of the Board of Directors. This dividend qualifies as an “eligible dividend” for Canadian income tax purposes. Dividends paid to shareholders outside Canada (non-resident investors) may be subject to Canadian non-resident withholding taxes.
ABOUT THE COMPANY
First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates the San Dimas Silver/Gold Mine, the Santa Elena Silver/Gold Mine, and the La Encantada Silver Mine as well as a portfolio of development and exploration assets, including the Jerritt Canyon Gold project located in northeastern Nevada, U.S.A.
First Majestic is proud to offer a portion of its silver production for sale to the public. Bars, ingots, coins and medallions are available for purchase online at its Bullion Store at some of the lowest premiums available.
FOR FURTHER INFORMATION contact info@firstmajestic.com, visit our website at www.firstmajestic.com or call our toll-free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.
“signed”
Keith Neumeyer, President & CEO

Non-GAAP Financial Measures

This news release includes reference to certain financial measures which are not standardized measures under the Company's financial reporting framework. These measures include cash costs per silver equivalent ounce produced, all-in sustaining cost (or “AISC”) per silver equivalent ounce produced, cash costs per gold ounce produced, AISC per gold ounce produced, total production cost per tonne, average realized silver price per ounce sold, average realized gold price per ounce sold, working capital, adjusted net earnings and EPS and free cash flow. The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. These measures are widely used in the mining industry as a benchmark for performance but do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures disclosed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For a complete description of how the Company calculates such measures and a reconciliation of certain measures to GAAP terms please see “Non-GAAP Measures” in the Company's most recent management discussion and analysis filed on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov.


Cautionary Note Regarding Forward Looking Statements

This news release contains “forward‐looking information” and "forward-looking statements” under applicable Canadian and U.S. securities laws (collectively, “forward‐looking statements”). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends, current conditions and expected future developments. Forward-looking statements include, but are not limited to, statements with respect to: commercial mining operations; cash flow; anticipated costs; and payment of dividends, if any. Assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, guidance cannot be guaranteed. As such, investors are cautioned not to place undue reliance upon guidance and forward-looking statements as there can be no assurance that the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as “seek”, “anticipate”, “plan”, “continue”, “estimate”, “expect”, “may”, “will”, “project”, “predict”, “forecast”, “potential”, “target”, “intend”, “could”, “might”, “should”, “believe” and similar expressions) are not statements of historical fact and may be “forward‐looking statements”.
Actual results may vary from forward-looking statements. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward-looking statements, including but not limited to: the duration and effects of the coronavirus and COVID-19, and any other pandemics on our operations and workforce, and the effects on global economies and society; general economic conditions including inflation risks ; the inherent risks involved in the mining, exploration and development of mineral
4


properties; changes in project parameters as plans continue to be refined; commodity prices; variations in ore reserves, grade or recovery rates; actual performance of plant, equipment or processes relative to specifications and expectations; accidents; labour relations; relations with local communities; uninsured risks; defects in title; climate change events including, but not limited to, drought conditions, changes in national or local governments; changes in applicable legislation or application thereof, including, but not limited to, Mexican mining reforms; delays in obtaining approvals or financing or in the completion of development or construction activities; exchange rate fluctuations; requirements for additional capital; government regulation; environmental risks; reclamation expenses; outcomes of pending litigation; conditions in the market for the Company’s shares and the equity markets in general; as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in the Company's most recent Annual Information Form, available on SEDAR+ at www.sedarplus.ca, and Form 40-F on file with the United States Securities and Exchange Commission, available on EDGAR at www.sec.gov. Although First Majestic has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company notes that changes in climate conditions could adversely affect the business and operations through shifting weather patterns, environmental incidents, and extreme weather events. This can include changes in snow and precipitation levels, extreme temperatures, changing sea levels and other weather events which can result in frozen conditions, flooding, droughts, or fires. Such conditions could directly or indirectly impact our operations by affecting the safety of our staff and the communities in which we operate, disrupting safe access to sites, damaging facilities and equipment, disrupting energy and water supply, creating labor and material shortages and can cause supply chain interruptions. There is no assurance that the Company will be able to successfully anticipate, respond to or manage risks associated with severe climate conditions. Any such disruptions could have an adverse effect on the Company’s operations, production, and financial results.
The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws.
5

First Majestic Silver (NYSE:AG)
Historical Stock Chart
From Mar 2024 to Apr 2024 Click Here for more First Majestic Silver Charts.