Central China Goldfields plc                          

                           ("GGG" or "the Company")                            

                       ENCOURAGING INITIAL RESULTS FROM                        

                SECOND ROUND OF REVERSE CIRCULATION DRILLING AT                

                           DONG MAO HUO GOLD PROJECT                           

LONDON - 18 June 2008 - Central China Goldfields plc (AIM: GGG) is pleased to
announce the completion of the second round of reverse circulation ("RC")
drilling program at the Dong Mao Huo gold project in the Nei Menggu Autonomous
Region. Gold assays are available for the first nine holes.

Highlights:

  * Results from the first nine, of fifty, drill holes confirm the presence of
    1 gramme per tonne gold ("g/t")) in all nine holes.
   
  * Hole RC21 intersected 22 metres at an average grade of 1.48 g/t gold from
    104 metres, including 6.31 g/t gold over 2 metres;
   
  * Hole RC18 intersected 1.83 g/t gold over 5 metres from 44 metres;
   
  * Hole RC19 intersected 9 metres at 1.1 g/t gold from 22 metres;
   
  * Hole RC19A intersected 1 g/t gold over 12 metres from 54 metres;
   
  * Hole RC23 intersected 1.41 g/t gold over 6 metres from 150 metres;
   
  * The second round of infill RC drilling programme, totaling 50 holes for a
    total of 5,328 metres, was completed on 15 June 2008. The aim of the
    drilling program is to provide additional data to assist mine planning by
    infilling the drill grid from 80 x 80 metres to approximately 40 x 40
    metres.
   
  * The results from the first nine holes have validated the presence of
    significant mineralisation. Assay results are still pending for the
    remaining 41 holes.
   
  * The in-fill drilling has confirmed that the trend of gold mineralisation is
    generally northerly rather than east-west, as was previously presumed.
   
Jeff Malaihollo, Managing Director of Central China Goldfields, comments:

"Central China Goldfields is on track to produce early cash flow from small
scale mining and gold production at Dong Mao Huo, with a targeted startup in
the first quarter of next year. These initial drill results are encouraging in
that they show that we are starting to define a mineable block in the West
Hill. Furthermore, these results also confirm our assessment that the
mineralised structure is generally northerly orientated. The grades are in line
with our expectation that there are high grade areas surrounded by a lower
grade envelope."

GEOLOGICAL DETAILS:

Drilling Results Details:

A RC drill program was undertaken by Beijing Kente Drilling Co. Ltd., a
subsidiary of the Drillcorp Group, from 4 May to 15 June 2008. The aim is to
assist mine planning by infilling the drill grid from 80 x 80 metres to
approximately 40 x 40 metres. The drilling also confirmed that the trend of
gold mineralisation is generally northerly which is transverse to the east-west
trend of the host rhyodacite breccia. The program consisted of 50 holes
totaling 5,328 metres. The total drilling from the first and second round is
10,423.60 metres, comprising 7,129 metres of RC and 3,294.60 metres.

The second round of 50 RC holes is summarised below:

Table 1. Dong Mao Huo drilling summary

Hole No. Elevation  Azimuth   Dip   Depth (m)
            (m)                              
                                             
  RC16      1663       90     -60      180   
                                             
  RC17      1669       90     -60      165   
                                             
  RC18      1673       90     -60      160   
                                             
  RC19      1671       90     -60      37    
                                             
 RC19A      1671       90     -60      105   
                                             
  RC20      1666       90     -60      132   
                                             
  RC21      1666       90     -60      168   
                                             
  RC22      1660       90     -60      180   
                                             
  RC23      1678      180     -70      168   
                                             
 RC23A      1678       90     -60      144   
                                             
  RC24      1672       90     -60      132   
                                             
  RC25      1674       0      -60      108   
                                             
 RC25A      1672       90     -60      122   
                                             
  RC26      1677       0      -60      110   
                                             
 RC26A      1676       90     -60      120   
                                             
  RC27      1679       90     -60      44    
                                             
  RC28      1680       90     -60      102   
                                             
  RC29      1677      180     -60      26    
                                             
  RC30      1674       0      -60      66    
                                             
 RC30A      1674      270     -60      108   
                                             
  RC31      1670       0      -60      110   
                                             
  RC32      1675       0      -60      102   
                                             
 RC32A      1674       90     -60      108   
                                             
  RC33      1667       0      -60      108   
                                             
  RC34      1666       0      -60      102   
                                             
  RC35      1666       0      -55      90    
                                             
  RC36      1659       0      -60      62    
                                             
  RC37      1667       90     -60      122   
                                             
  RC38      1666       0      -60      156   
                                             
  RC39      1664       0      -55      140   
                                             
  RC40      1658       90     -60      150   
                                             
  RC41      1656       90     -60      150   
                                             
  RC42      1665       90     -60      80    
                                             
  RC43      1678       90     -60      42    
                                             
 RC43A      1678       90     -60      106   
                                             
  RC44      1677       90     -60      31    
                                             
 RC44A      1677       90     -60      102   
                                             
  RC45      1653       90     -60      137   
                                             
  RC46      1681       90     -60      131   
                                             
  RC47      1678       90     -60      96    
                                             
  RC48      1673       90     -60      52    
                                             
  RC49      1673       90     -60      68    
                                             
  RC50      1668      270     -55      90    
                                             
  RC51      1668       90     -60      72    
                                             
  RC52      1675       90     -60      57    
                                             
  RC53      1654       90     -60      19    
                                             
 RC53A      1654       90     -60      42    
                                             
  RC54      1649       90     -60      142   
                                             
  RC55      1652       90     -60      144   
                                             
  RC56     1647        90     -60      140   
                                             
          TOTAL DEPTH (m)             5,328  

The gold mineralisation at Dong Mao Huo is associated with an 800 metre long x
120 metre wide east-west trending structurally emplaced rhyodacite breccia/dyke
in an orthogneiss and schist complex. The gold and base metal mineralisation is
generally associated with northerly trending structures characterized by
hydraulic emplacement of sulphides along fractures and zones of hydrothermal
breccias. The ore minerals are pyrite and chalcopyrite with minor to trace
amounts of sphalerite, chalcocite, galena and arsenopyrite as disseminations,
fracture and breccia fills. Deep weathering has oxidised the mineralised zone
down to about 35 to 50 metres.

Gold assay results and some partial results of silver ("Ag") and copper ("Cu")
for the first 9 holes have been received. Significant gold mineralisation at >1
g/t Au has been confirmed in all holes.

At about 0.35 g/t Au cut-off, the assay results of the RC holes are outlined in
Table 2.

Table 2. Summary of significicant drillhole assay results

Hole No.   Zone   From (m) To (m) Width (m) Au g/t Ag g/t Cu %
                                                              
  RC16    Mixed    40.00   42.00    2.00     0.70   9.05  0.34
                                                              
  RC16    Mixed    70.00   72.00    2.00     1.78  22.75  0.69
                                                              
  RC16   Sulphide  78.00   82.00    4.00     0.56   4.05  0.16
                                                              
  RC17   Sulphide  82.00   91.00    9.00     0.94   4.56  0.17
                                                              
   incl.           86.00   87.00    1.00     3.76  16.90  0.58
                                                              
  RC17   Sulphide  98.00   101.00   3.00     0.43   2.63  0.05
                                                              
  RC17   Sulphide  110.00  112.00   2.00     1.44   2.50  0.03
                                                              
  RC17   Sulphide  116.00  118.00   2.00     0.82   6.90  0.06
                                                              
  RC17   Sulphide  122.00  125.00   3.00     0.63   1.67  0.03
                                                              
  RC18    Mixed    44.00   49.00    5.00     1.83   N.A.  N.A.
                                                              
  RC18   Sulphide  59.00   63.00    4.00     0.71   N.A.  N.A.
                                                              
  RC18   Sulphide  92.00   94.00    2.00     1.19   N.A.  N.A.
                                                              
  RC18   Sulphide  124.00  128.00   4.00     0.73   N.A.  N.A.
                                                              
  RC19    Oxide    22.00   31.00    9.00     1.10   N.A.  N.A.
                                                              
   incl.           25.00   27.00    2.00     3.06   N.A.  N.A.
                                                              
  RC19    Oxide    33.00   37.00    4.00     3.07   N.A.  N.A.
                                                              
   incl.           34.00   36.00    2.00     5.43   N.A.  N.A.
                                                              
 RC19A    Mixed    23.00   28.00    5.00     1.52   N.A.  N.A.
                                                              
   incl.           24.00   27.00    3.00     2.16   N.A.  N.A.
                                                              
 RC19A    Mixed    35.00   40.00    5.00     1.07   N.A.  N.A.
                                                              
 RC19A   Sulphide  50.00   52.00    2.00     0.75   N.A.  N.A.
                                                              
 RC19A   Sulphide  54.00   66.00    12.00    1.00   N.A.  N.A.
                                                              
   incl.           54.00   58.00    4.00     1.77   N.A.  N.A.
                                                              
 RC19A   Sulphide  70.00   73.00    3.00     0.66   N.A.  N.A.
                                                              
 RC19A   Sulphide  86.00   90.00    4.00     1.94   N.A.  N.A.
                                                              
   incl.           86.00   88.00    2.00     3.57   N.A.  N.A.
                                                              
 RC19A   Sulphide  95.00   99.00    4.00     1.22   N.A.  N.A.
                                                              
  RC20   Sulphide  80.00   81.00    1.00     2.33   N.A.  N.A.
                                                              
  RC20   Sulphide  100.00  102.00   2.00     0.42   N.A.  N.A.
                                                              
  RC21   Sulphide  75.00   77.00    2.00     0.61   N.A.  N.A.
                                                              
  RC21   Sulphide  97.00   100.00   3.00     0.48   N.A.  N.A.
                                                              
  RC21   Sulphide  104.00  126.00   22.00    1.48   N.A.  N.A.
                                                              
   incl.           109.00  111.00   2.00     6.31   N.A.  N.A.
                                                              
   incl.           121.00  124.00   3.00     3.33   N.A.  N.A.
                                                              
  RC21   Sulphide  135.00  140.00   5.00     0.69   N.A.  N.A.
                                                              
  RC22   Sulphide  85.00   90.00    5.00     0.64   N.A.  N.A.
                                                              
   incl.           86.00   87.00    1.00     1.71   N.A.  N.A.
                                                              
  RC22   Sulphide  95.00   99.00    4.00     0.62   N.A.  N.A.
                                                              
   incl.           97.00   98.00    1.00     1.37   N.A.  N.A.
                                                              
  RC22   Sulphide  141.00  142.00   1.00     1.52   N.A.  N.A.
                                                              
  RC23   Sulphide  59.00   63.00    4.00     0.63   N.A.  N.A.
                                                              
  RC23   Sulphide  78.00   84.00    6.00     0.82   N.A.  N.A.
                                                              
  RC23   Sulphide  89.00   93.00    4.00     0.72   N.A.  N.A.
                                                              
  RC23   Sulphide  96.00   99.00    3.00     1.09   N.A.  N.A.
                                                              
  RC23   Sulphide  102.00  104.00   2.00     1.50   N.A.  N.A.
                                                              
  RC23   Sulphide  110.00  114.00   4.00     1.13   N.A.  N.A.
                                                              
  RC23   Sulphide  150.00  156.00   6.00     1.41   N.A.  N.A.

N.A. - Not Available Yet

At about 0.35 g/t Au cut-off, the best results are hole RC21 which intersected
1.48 g/t Au over 22 metres from 104 metres downhole, including 6.31 g/t Au over
2 metres and 3.33 g/t Au over 3 metres; hole RC18 which intersected 1.83 g/t Au
over 5 metres from 44 metres downhole; hole RC19 which intersected 1.1 g/t Au
over 9 metres from 22 metres downhole and 3.07 g/t Au over 4 metres from 33
metres downhole; hole RC19A which intersected 1 g/t Au over 12 metres from 54
metres downhole and 1.94 g/t Au over 4 metres from 86 metres downhole; and hole
RC23 which interesected 1.41 g/t Au over 6 metres from 150 metres downhole.
Hole RC19A is a redrill of hole RC19 which had to be terminated due to broken
ground.

Sampling and Analytical Details

RC drilling uses 139.7mm sized drill rods producing about 25 to 30 kilograms of
crushed rock every one metre of drilling with largest fragment size at about 1
centimetre. Samples were taken every one metre and split down to about 1.5 to 2
kilograms using a Jones sample splitter at the drillsite. Sample preparation
and chemical analysis were done by Intertek Testing Service Ltd. Shanghai in
Beijing. Sample preparation involves crushing and pulverisation of the
subsamples to minus 75 microns. Gold was analysed by 50 grammes fire assay with
AAS finish and 34 other elements by inductively coupled plasma-optical emission
spectroscopy (ICP-OES). Three of the 35 elements are reported here: gold (Au),
silver (Ag) and copper (Cu). The detection limits for Au, Ag and Cu are 0.005,
0.1 and 1 part per million (ppm) respectively. Routine international-standard
quality assurance/quality control (QA/QC) procedures were adopted. Duplicate
sampling was done every tenth sample at the drillsite and Intertek utilised
internal standard procedures for standard, blank and replicate sample testing.

Corrections

The news release dated 5 June 2008 on Dong Mao Huo surface sampling contains
the following error under the paragraph describing East Hill and Table 1:

"The trench intersected three high-grade mineralised zones. These are 8 metres
@ 2.26 g/t Au (including 5 metres @ 5.77 g/t Au and a high of 8.19 g/t Au), *"

This should read:

"The trench intersected three high-grade mineralised zones. These are 8 metres
@ 2.26 g/t Au (including 5 metres @ 3.4 g/t Au and a high of 8.19 g/t Au), *"

Technical information in the Company news releases has been reviewed and
approved by Ciceron "Jun" Angeles (MSc. FAusIMM, CPGeo) the Company's
Exploration Vice President. He is qualified as a Competent Person under the
Code for the Reporting Mineral Exploration Results, Mineral Resources and
Mineral Reserves, 2004 ("The Reporting Code") prepared by the Australasian
Institute of Mining and Metallurgy and the Australian Institute of
Geoscientists.

For Further Information:

Central China Goldfields plc     Hanson Westhouse Limited         
                                                                  
Dr. Jeffrey Malaihollo           Anita Ghanekar / Martin Davison  
                                                                  
Tel: 020 7621 0200               Tel: 020 7601 6100               
                                                                  
Email: info@ccgoldfields.com                                      
                                                                  
www.ccgoldfields.com                                              
                                                                  
Neil Boom                                                         
                                                                  
Bishopgate Communications Ltd                                     
                                                                  
Tel: 020 7562 3367                                                



END



GGG Resources (LSE:GGG)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more GGG Resources Charts.
GGG Resources (LSE:GGG)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more GGG Resources Charts.