The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Planned maintenance activity at a crude unit, reformer unit and coker unit in October at Hovensa's oil refinery on the U.S. Virgin Island of St. Croix is not expected to affect the company's ability to meet customer commitments, the company said on Oct. 3.

Crude unit maintenance at Chevron's (CVX) Bay-area refinery in Richmond, Ca., is scheduled to begin on October 8, traders said on Oct. 3. This information has not been confirmed.

In the Pacific Northwest, an unspecified process unit, rumored to be a key gasoline-making fluid catalytic cracking unit, at Tesoro Corp.'s (TSO) Anacortes, Washington, refinery was shut on Oct. 1 for maintenance. The work wasn't expected to affect Tesoro's ability to meet regional supply commitments, traders said on Oct. 3.

ExxonMobil Corp. (XOM) on Oct. 3 said operations at its oil refinery in Billings, Montana, were nearing normal operations and should be at planned rates very soon, company spokeswoman Rachael Moore said. Rates had been reduced on July 1 when the Silvertip crude oil pipeline leaked about 1,000 barrels of crude oil into the Yellowstone River.

A power failure on Sept. 28 at Alon USA Energy Inc's (ALJ) 67,000 barrel-a-day refinery in Big Spring, Texas, was responsible for taking down a substantial number of units at the refinery, according to a filing to the Texas Commission On Environmental Quality. A flaring event lasted for 24 hours and it wasn't known whether the units were back on line.

Total SA (TOT) is performing maintenance work for six weeks at its 232,000 barrel-a-day refinery in Port Arthur, La., that includes work on the crude distillation unit and fluid catalyst cracker, a source familiar with the refinery said Sept. 21.

   For more detailed information, search Dow Jones Newswires using 
the code N/REF. 
 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
GULF COAST 
 
Alon     Big Spring     67.0  Power failure on Sept 28 shuts 
         TX                   several process units, a TCEQ 
                              filing said. Status of opera- 
                              tions unclear. 
 
Total    Port Arthur   232.0  Crude unit shut, traders said      Sep. 19 
         TX                   on Sep. 12; coker 'blow out' 
                              reported to NRC. Restart seen 
                              by about Sep. 19. 
 
 
MIDWEST 
 
ROCKIES 
 
Sinclair  Sinclair      74.0  Refinery at reduced rates fol- 
          WY                  lowing fires at CDU on Sep. 3 
                              and Sep. 4. Repairs and damage 
                              assessments underway, the co. 
                              said on Sep.6. 
 
Exxon    Billings,      60.0  Operations nearing normal rates 
         MT                   after being reduced due to rup- 
                              tured Silvertip pipeline on July 
                              1, the company said on Oct. 3. 
 
WEST COAST 
 
Tesoro   Anacortes,    120.0  FCCU shut Oct. 1 for maintenance 
         WA                   traders said on Oct. 3; no further 
                              details provided. 
 
PLANNED 
 
CANADA 
 
CARIBBEAN 
 
Hovensa  St. Croix     350.0  Planned maintenance at a 
                              crude unit, reformer and 
                              coker unit in Oct. will 
                              last 2-4 weeks, co. said 
                              on Oct. 3. 
 
EAST COAST 
 
Sunoco   Philadelphia  335.0  Refineries up for sale on 
         Marcus Hook   190.0  Sep. 6; process units will 
                              be shuttered in July 2012 
                              if no buyer is found. 
 
 
GULF COAST 
 
Motiva   Port Arthur   285.0  Expansion project to increase      1Q 
         TX                   throughput capacity by 325,000     2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Total    Port Arthur   232.0  Several units, including crude 
USA      TX                   unit and FCCU shut six weeks 
                              turnaround maintenance, a source 
                              familiar with the plant said on 
                              Sept. 21. 
 
Valero   Corpus        315.0  Crude & coker unit turnaround      Oct. 
         Christi, TX          to start in Oct. for three         2011 
                              weeks. 
 
Valero   McKee    TX    170.0 Crude Unit and FCCU to undergo     3Q 2011 
                              turnaround maintenance for six 
                              weeks starting in Oct. 2011, the 
                              co. said on July 26. 
 
                              Vacuum unit turnaround planned for 
                              first half of 2012, co. said. 
 
                              Expansion project announced 
                              March 2011 to increase crude oil 
                              throughput by 25,000 b/d to 
                              195,000 b/d. 
 
Valero   Norco, LA     185.0  Hydrocracker project will pro-     2013 
                              ceed and be completed in late 
                              2013, the co. said on 7/27/10. 
 
                              Upgrade project to build           2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Hydrocracker project will pro-     2012 
         TX                   ceed and be completed in late 
                              2012. 
 
MIDWEST 
 
BP       Whiting, IN   405.0  Turnaround at Pipestill 12 de- 
                              layed by 3 months; it was sup- 
                              posed to begin in November, a 
                              source said on Mar 25. 
 
Cenovus  Roxana, IL    306.0  Coker and refinery expansion       Q4 2011 
(Conoco/WRB)                  project on track for comple- 
                              tion 4th Q 2011, the co. said 
                              on July 26, 2011. 
 
CVR      Coffeyville   115.7  Periodic turnaround will take      2012 
         KS                   place in two phases beginning in 
                              Fall 2011 and completed in Spring 
                              2012. 
 
Husky    Lima, OH      160.0  15-days of maintenance planned at 
Energy                        at aromatics unit in the fall 
                              of 2012. 
 
Husky    Toledo, OH    140.0  Minor maintenance planned in 4Q 
Energy                        2011, the co. said on July 28; 
                              no details provided. 
 
Tesoro   Mandan, ND     58.0  Total crude-oil processing capa-   2nd Q 
                              city to increase by 17% to 68,000   2012 
                              b/d by 2nd quarter 2012. 
 
WEST COAST 
 
Chevron  Richmond,     240.0  Crude unit maintenance scheduled 
         CA                   to begin on Oct. 8, traders said 
                              on Oct. 3. No further details pro- 
                              vided. 
 
 
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Imperial Oil Charts.
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Imperial Oil Charts.