DOW JONES NEWSWIRES 
 

The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Sunoco, Inc. (SUN) on Sep. 6 said it will exit the refining industry and will idle main processing units at its east coast refineries by July 2012 if a buyer isn't found by then. Converting the properties into a terminal/storage facility is under consideration.

Valero Energy Corp. (VLO) on Sep. 6 said upsets over the weekend at its St. Charles oil refinery in Norco, La., had no material impact on production.

ConocoPhillips (COP) on Sep. 5 experienced an equipment malfunction at its Alliance refinery in Belle Chasse, La. The refinery was operating at very low rates at that time due to Tropical Storm Lee. No further details were provided.

Sinclair Oil Corp.'s Wyoming refinery is operating at reduced rates following two separate fires at the plant's crude processing unit on Sep. 2 and Sep. 3. Repairs and damage assessments underway, the co. said on Sep. 6.

ExxonMobil (XOM) said an electrical power supply failure at its Joliet refinery in Channahon, Ill., on Sep. 3 caused emissions and flaring.

Flint Hills Resources on Sep. 3 reported a second emissions and flaring event, due to the second power disruption in as many days at its oil refinery in Corpus Christi, Texas. Equipment failure at Substation No. 3 on Sep. 3 resulted in a loss of power that caused an unscheduled shutdown of the West Refinery. On Sept 2 a transformer outage and loss of power affected operations at the Mid-Plant Complex and SRU No. 3.

ConocoPhillips' Bayway refinery in Linden, N.J. resumed production on Sep. 2 after shutting down ahead of Hurricane/Tropical Storm Irene on August 27.

   For more detailed information, search Dow Jones Newswires using 
the code N/REF. 
 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
Conoco   Linden, NJ    238.0  Refinery resumes production, a   Week of 
Phillips                      source said on Sep. 2. The re-   Aug. 30 
                              start process began on Aug. 30. 
                              Refinery shut on Aug 28 as pre- 
                              caution ahead of Hurricane Irene. 
 
 
GULF COAST 
 
Conoco  Belle Chasse   247.0  Equipment malfunction occurred on 
Phillips La.                  Sep. 4 while refinery was opera- 
                              ting at very low rates due to 
                              Tropical Storm Lee. No details 
                              were provided. 
 
Flint    Corpus        300.0  Second power disruption in as 
Hills    Christi, TX          many days shut West Refinery on 
                              Sep. 4. On Sep. 3 the Mid-Plant 
                              Complex and an SRU resumed nor- 
                              mal operations after a brief 
                              power snag. 
 
Valero   Norco, LA     250.0  Rate reduction due to upsets at 
                              tail gas treating and an SRU on 
                              Sep. 4 had no material impact 
                              on production, the co. said on 
                              Sep. 6. 
 
 
MIDWEST 
 
Exxon    Channahon     268.0  Power failure on Sep. 3 causes 
Mobil    IL                   emissions and flaring; impact 
                              on production unclear. 
 
ROCKIES 
 
Sinclair  Sinclair      74.0  Refinery at reduced rates fol- 
          WY                  lowing fires at CDU on Sep. 3 
                              and Sep. 4. Repairs and damage 
                              assessments underway, the co. 
                              said on Sep.6. 
 
 
Exxon    Billings,     60.0   Production at minimum rates due 
         MT                   to ruptured Silvertip Pipeline. 
                              Company looking for alternative 
                              crude sources, the co. said on 
                              July 5. 
 
WEST COAST 
 
 
 
PLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
Sunoco   Philadelphia  335.0  Refineries up for sale on 
         Marcus Hook   190.0  Sep. 6; process units will 
                              be shuttered in July 2012 
                              if no buyer is found. 
 
 
GULF COAST 
 
Alon     Big Spring     67.0  FCCU turnaround maintenance under- 
         TX                   way, a filing to environmental reg- 
                              ulators made public on July 24 said. 
 
Exxon   Baytown, TX    560.0  The planned shutdown of hydro-     N/A 
Mobil                         finer unit 3 caused emissions on; 
                              July 30 reason for unit shutdown 
                              not clear; restart information not 
                              available. 
 
Motiva   Port Arthur   285.0  Expansion project to increase      1Q 
         TX                   throughput capacity by 325,000     2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Valero   Corpus        315.0  Crude & coker unit turnaround      Oct. 
         Christi, TX          to start in Oct. for three         2011 
                              weeks. 
 
Valero   McKee    TX    170.0 Crude Unit and FCCU to undergo     3Q 2011 
                              turnaround maintenance for six 
                              weeks starting in Oct. 2011, the 
                              co. said on July 26. 
 
                              Vacuum unit turnaround planned for 
                              first half of 2012, co. said. 
 
                              Expansion project announced 
                              March 2011 to increase crude oil 
                              throughput by 25,000 b/d to 
                              195,000 b/d. 
 
Valero   Norco, LA     185.0  Hydrocracker project will pro-     2013 
                              ceed and be completed in late 
                              2013, the co. said on 7/27/10. 
 
                              Upgrade project to build           2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Hydrocracker project will pro-     2012 
         TX                   ceed and be completed in late 
                              2012. 
 
MIDWEST 
 
BP       Whiting, IN   405.0  Turnaround at Pipestill 12 de- 
                              layed by 3 months; it was sup- 
                              posed to begin in November, a 
                              source said on Mar 25. 
 
Cenovus  Roxana, IL    306.0  Coker and refinery expansion       Q4 2011 
(Conoco/WRB)                  project on track for comple- 
                              tion 4th Q 2011, the co. said 
                              on July 26, 2011. 
 
CVR      Coffeyville   115.7  Periodic turnaround will take      2012 
         KS                   place in two phases beginning in 
                              Fall 2011 and completed in Spring 
                              2012. 
 
Husky    Lima, OH      160.0  15-day isocracker maintenance to 
Energy                        replace reactor catalyst will be- 
                              gin in 3rd Q 2011. Refinery will 
                              operate at 90% of capacity during 
                              that time. 
 
                              15-days of maintenance planned     Autumn 
                              at aromatics unit in the fall      2012 
                              of 2012. 
 
Husky    Toledo, OH    140.0  Isocracker maintenance and gen- 
Energy                        eral maintenance for 38 days will 
                              commence in Q3 2011, the Co. said 
                              on July 28. 
 
                              Minor maintenance planned in 4Q 
                              2011, the co. said on July 28; 
                              no details provided. 
 
Tesoro   Mandan, ND     58.0  Total crude-oil processing capa-   2nd Q 
                              city to increase by 17% to 68,000   2012 
                              b/d by 2nd quarter 2012. 
 
WEST COAST 
 
 
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Imperial Oil Charts.
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Imperial Oil Charts.