DOW JONES NEWSWIRES 
 

The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

BP Plc (BP) shut one of three crude units at its 405,000 barrel-a-day refinery in Whiting, Ind., for unplanned repairs, a person familiar with operations said Aug. 3.

Tesoro Corp.'s (TSO) 93,500 barrel-a-day refinery in Kapolei, Hawaii, shut down after a power outage on August 2, a company spokesman said. The refinery was expected to restart the following day. Supply was not impacted, the spokesman said.

Valero Energy Corp. (VLO) on Aug. 1 said it restarted the third crude distillation unit at its Texas City, Texas, refinery. The CDU was expected to be at planned rates within a few days, a Valero spokesman said.

ExxonMobil Corp. (XOM) on July 30 reported emissions at its huge Baytown, Texas, oil refinery during the planned shutdown of Hydrofining Unit 3. was in the process of shutting down as planned Saturday when an associated tower over pressured, releasing emissions to the flare system, the company said in a report to Texas state environmental regulators. The report did not state the reason for the unit's shutdown or how long it will be out of service.

A key gasoline-making FCCU at BP PLC's Texas City, Texas, oil refinery lost circulation on July 29, causing an upset that resulted in excess opacity and emissions at the refinery for about nine hours, the company said in a report to Texas state environmental regulators. FCCU was stabilized and resumed normal operations, the report said.

Valero Energy (VLO) on July 29 said the restart of the third crude unit at its Texas City, Texas, refinery was on track for late this week. The unit was taken out of service on July 18 to repair a leak while the two other crude distillation units remained in operation.

North Atlantic Refining on July 29 said its 115,000-barrel-a-day refinery in St. John's, Newfoundland, Canada, is in the process of restarting after a longer-than-expected period of planned maintenance. The plant-wide turnaround began in early May and was planned to end in mid July. However, on July 5, the company delayed the start-up until the end of the month.

BP PLC (BP, BP.LN) on July 29 began the process of restarting a residual hydrotreating unit, or RHU, train at its refinery in Texas City, Texas. The train was depressurized on July 18 to facilitate repairs to fix a leak at the unit's heat exchanger. Two other trains at the RHU continued to operate during the repairs.

Husky Energy (HSE.T, HUSKF) on July 28 said turnaround maintenance on isocracking units at its Toledo and Lima, Ohio, oil refineries will take place in the third quarter of 2011. General maintenance will go on simultaneously at the Toledo refinery.

Western Refining Inc. (WNR) on July 27 said its El Paso, Texas, refinery is in the process of restarting following a widespread power outage and plant-wide shutdown the night before.

Total Petrochemicals USA on July 26 began the process of restarting several processing units at its Port Arthur, Texas, oil refinery after a lightning strike earlier on July 26 forced shutdowns, the company said in a report to Texas state environmental regulators.

Valero Energy (VLO) on July 26 announced third-quarter turnaround maintenance plans for a crude unit and a coker unit in the east plant at its Corpus Christi, Texas, refinery for three weeks starting in October. Six weeks of planned maintenance will begin in October at a crude unit and FCCU at its Three Rivers, Texas, refinery.

Alon USA Energy Inc. (ALJ) recently began turnaround maintenance at a key gasoline-making unit at its oil refinery in Big Spring, Texas, a report to Texas state environmental regulators made public on July 25 said. The date of the unit's return to normal service wasn't provided.

Exxon Mobil Corp. (XOM) on July 25 confirmed an equipment malfunction and the emissions associated with the event at its Joliet refinery in Channahon, Ill., but would not provide further details.

Valero Energy on July 25 said a coker unit at its refinery in Texas City, Texas, continues to operate following a power "blip" at an associated compressor. The event had no material impact on production.

 
   For more detailed information, search Dow Jones Newswires using 
the code N/REF. 
 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
GULF COAST 
 
BP       Texas City    437.0  FCCU#1 lost circulation on July    July 29 
         TX                   29 causing an upset that re- 
                              sulted in increased opacity and 
                              emissions for about nine hours. 
                              The unit was stabilized and re- 
                              sumed normal service. 
 
                              Residual hydrotreating unit        July 29 
                              train in restart on July 29; it 
                              was depressurized 7/18 to repair 
                              heat exchanger leak. Two other trains 
                              trains functioned throughout the repair. 
 
                              Refinery should return to full 
                              capacity in August after April 
                              power outage reduced rates. 
 
Exxon    Baytown, TX   560.6  Upsets at two FCCUs results in 
Mobil                         flaring on July 16. Status 
                              of units unclear. 
 
Total   Port Arthur   232.0   Several unspecified process units 
USA     TX                    restarted on July 26 after light- 
                              ning strike earlier on 7/16 shut 
                              them down. 
 
Valero  Texas City    245.0   The plant's third crude unit 
                              restarted on July 30 after 
                              being shut down on July 18 to 
                              repair a leak. 
 
Western El Paso, TX   125.0   Refinery restarting following      July 27 
Refining                      plant-wide shutdown on storm- 
                              related power outages on July 
                              26. 
 
MIDWEST 
 
Exxon   Channanhon,   238.6   July 24 equipment malfunction 
Mobil   IL (Joliet)           and emissions confirmed by Co. 
                              on 7/25. No further details 
                              provided. 
 
ROCKIES 
 
Exxon    Billings,      60.0  Production at minimum rates due 
         MT                   to ruptured Silvertip Pipeline. 
                              Company looking for alternative 
                              crude sources, to co. said on 
                              July 5. 
 
WEST COAST 
 
 
 
PLANNED 
 
CANADA 
 
North    St. John's    115.0  Refinery in restart on July 29.    End of 
Atlantic                      Plant-wide maintenance began in    July 
                              early May and was extended on 
                              July 5. 
 
CARIBBEAN 
 
EAST COAST 
 
GULF COAST 
 
Alon     Big Spring     67.0  FCCU turnaround maintenance under- 
         TX                   way, a filing to environmental reg- 
                              ulators made public on July 24 said 
 
Conoco  Borger, TX     146.0  Planned maintenance of Unit 29     July 16 
                              electrostatic precipitators start- 
                              ing July 6. 
 
Exxon   Baytown, TX    560.0  The planned shutdown of hydro-     N/A 
Mobil                         finer unit 3 caused emissions on; 
                              July 30 reason for unit shutdown 
                              not clear; restart information not 
                              available. 
 
 
 
Motiva   Port Arthur   285.0  Expansion project to increase      1Q 
         TX                   throughput capacity by 325,000     2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Valero   Corpus        315.0  Crude & coker unit turnaround      Oct. 
                              to start in Oct. for three         2011 
                              weeks. 
 
Valero   McKee    TX    170.0 Crude Unit and FCCU to undergo     3Q 2011 
                              turnaround maintenance for six 
                              weeks starting in Oct. 2011, the 
                              co. said on July 26. 
 
                              Vacuum unit turnaround planned for 
                              first half of 2012, co. said. 
 
                              Expansion project announced 
                              March 2011 to increase crude oil 
                              throughput by 25,000 b/d to 
                              195,000 b/d. 
 
Valero   Norco, LA     185.0  Hydrocracker project will pro-     2013 
                              ceed and be completed in late 
                              2013, the co. said on 7/27/10. 
 
                              Upgrade project to build           2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Hydrocracker project will pro-     2012 
         TX                   ceed and be completed in late 
                              2012. 
 
MIDWEST 
 
BP       Whiting, IN   405.0  Turnaround at Pipestill 12 de- 
                              layed by 3 months; it was sup- 
                              posed to begin in November, a 
                              source said on Mar 25. 
 
Cenovus  Roxana, IL    306.0  Coker and refinery expansion       Q4 2011 
(Conoco/WRB)                  project on track for comple- 
                              tion 4thQ 2011, the co. said 
                              on July 26, 2011. 
 
CVR      Coffeyville   115.7  Periodic turnaround will take      2012 
         KS                   place in two phases beginning in 
                              Fall 2011 and completed in Spring 
                              2012. 
 
Husky    Lima, OH      160.0  15-day isocracker maintenance to 
Energy                        replace reactor catalyst will be- 
                              gin in 3rd Q 2011. Refinery will 
                              operate at 90% of capacity during 
                              that time. 
 
                              15-days of maintenance planned     Autumn 
                              at aromatics unit in the fall      2012 
                              of 2012. 
 
Husky    Toledo, OH    140.0  Isocracker maintenance and gen- 
Energy                        eral maintenance for 38 days will 
                              commence in Q3 2011, the Co. said 
                              on July 28. 
 
                              Minor maintenance planned in 4Q 
                              2011, the co. said on July 28; 
                              no details provided. 
 
Tesoro   Mandan, ND     58.0  Total crude-oil processing capa-   2nd Q 
                              city to increase by 17% to 68,000   2012 
                              b/d by 2nd quarter 2012. 
 
WEST COAST 
 
 
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Imperial Oil Charts.
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Imperial Oil Charts.