The following table lists unplanned and planned production
outages at U.S. refineries as reported by Dow Jones Newswires. The
information is compiled from both official and unofficial refining
sources and doesn't purport to be a comprehensive list.
Alon USA (ALJ) said Tuesday that it's Big Spring, Texas,
refinery is expected to resume maximum processing rates by the end
of the day following cut backs last week when sulfur recovery units
tripped off-line.
Valero Energy Corp. (VLO) Monday was forced to shut an FCCU at
it's Port Arthur, Texas, refinery, due to a loss of steam. Restart
is expected as soon as steam is restored, the company said on
Tuesday.
Western Refining Inc. (WRN) is halting operations at its
refinery at El Paso, Texas, for up to five days because of cold
weather-related damage and regional electrical outages, the company
said on Monday.
Exxon Mobil Corp. (XOM) Monday said planned turnaround
maintenance began Saturday at its oil refinery in Baton Rouge,
Louisiana. The work at an unspecified unit, or units, is expected
to last for several weeks.
Valero Energy Corp.'s McKee oil refinery in Sunray, Texas,
returned to normal operating rates over the weekend, company
spokesman Bill Day said Monday. Cold weather-related issues and
problems with the supply of electricity to the 171,000 barrel-a-day
refinery forced the company to reduce rates on Feb. 3.
Valero Energy Corp.'s oil refinery on Aruba was shut Friday when
the collapse of a 20,300-barrel freshwater storage tank resulted in
damage to several pipes carrying petroleum products, company
spokesman Bill Day said on Monday. The refinery remains shut while
repairs are being completed; restart timing not yet known, but the
outage isn't expected to be lengthy.
Holly Corporation (HOC) Friday said inclement weather has
delayed its Navajo Refinery in Artesia, New Mexico from returning
to planned operating levels by about a week. The Navajo Refinery
experienced a plant-wide power failure late in the day on January
26 due to an interruption in power supply from its local utility.
The plant as been operating at approximately 40,000 barrels a day,
down from its boiler plate capacity of 100,000 barrels a day, while
plant personnel continue to work to restart certain downstream
processing units.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart
(in 000s
bbl/day)
UNPLANNED
CANADA
CARIBBEAN
Valero Aruba 235.0 Water tank collapse on Feb 2
caused pipe damage which resulted
in a plant wide shutdown. Repairs
underway; no restart estimate yet,
the Co. said on Feb 7.
EAST COAST
Sunoco Marcus Hook 178.0 Reformer, Crude Unit, gas plant 1st Q
PA shut Jan. 7 for maintenance, a 2011
source said on Jan. 6. Co. said
on Feb. 3 work will conclude 1st
quarter 2011.
Sunoco Philadelphia 335.0 Crude unit, FCCU to shut Feb. 1st Q
PA 1 for 2 weeks, a source said 2011
on Jan. 6. Co. said on Feb. 3
work will conclude in 1st
quarter 2011.
GULF COAST
Alon Big Spring 70.0 Refinery seen back at maximum Feb 8
USA TX levels following cuts due to
sulfur recovery unit shutdowns
on Feb. 2, the co. said on Feb.
8.
Citgo Corpus 163.0 East Plant unit rates adjusted
Christi, TX following due to unplanned up-
sets at Unibon and SRU on Feb 3.
Impact on production unclear.
Exxon Beaumont 344.5 Production to be impacted by un-
TX specified equipment failure the
co. said on Feb. 3.
Flint Corpus 300.0 Fire at East Plant on Jan. 31
Hills Christi, TX results in excess opacity at
FCCU II. Fire extinguished with-
in 15 minutes. Company would
not comment on status of FCCU
operations.
Holly Artesia 100.0 Refinery operating at 40,000 b/d
Corp. NM since Jan. 26 following plant-wide
power failure; return to normal
may take an additional week, the
co. said on Feb. 4.
Western El Paso 125.0 Operations halted on Feb 7 due Feb 12
Refining TX to cold weather-related damage
and rolling power outages by 3rd
party power providers. Repairs
underway; restart expected in 5
days.
Valero Sunray, 171.0 Operations returned to normal on
TX Feb 5/6 following cold weather-re-
lated power supply issues, the Co.
said on Feb 7.
Valero Port Arthur 287.0 FCCU shut Feb. 7 due to loss of
TX steam to associated compressor.
Unit will restart as soon as steam
is restored, the Co. said on Feb. 8.
MIDWEST
Tesoro Mandan, ND 58.0 Refinery continues to operate at
90% of capacity following fire
at alkylation unit furnace on
Jan. 19. All customer requirements
are being met. Estimate to return to normal not yet available, the co.
to normal by mid-March, the co.
said on Feb. 3.
ROCKIES
WEST COAST
Conoco Rodeo, CA 120.2 Leak and fire occurred Jan. 30
Phillips at coker unit, the Co. said on
Jan. 31, but would not comment
on impact on operations.
PLANNED
CANADA
Shell Montreal 130.0 The refinery will be converted
Quebec into a terminal.
CARIBBEAN
Hovensa St. Croix 500.0 Operations will soon return to
USVI newly established rates as turn-
around maintenance at SRU nears
completion, the Co. said on Feb.1.
The SRU turnaround began in Jan.
Shutting smaller, older process
units on west side of plant, which
will reduce crude distillation to
350,000-b/d, Co. said Jan. 26.
Coker, FCCU will not be affected.
Valero Aruba 235.0 Plant nearing planned rates,
the company said on Jan. 28.
The plant, shut in July
2009 on poor economics, will
use LNG to reduce utility costs.
EAST COAST
Sunoco Westville 145.0 Idling all Eagle Point refin- n/a
NJ ing operations indefinitely due
to poor economics, co. said
Oct. 6, 2009.
Valero Delaware 210.0 PBF Energy has closed Apr
deal to buy plant. Petroplus 2011
said May 5 the plant would be
restarted in 2Q of 2011.
Valero Paulsboro, 185.0 Sale of refinery to PBF Energy Dec.17
NJ completed on Dec. 17.
Western Yorktown 64.5 The refinery will close in Sept
VA September 2010 for economic
reasons. Terminal operations
will continue.
GULF COAST
BP Texas City 437.0 A crude unit is going into
TX turnaround maintenance
as similar work is being done
on FCCU No. 1, which was taken
out of service on Jan. 12, a
person familiar with ops said
Jan. 25.
Chevron Pascagoula 330.0 Pre-commercial heavy oil 2010
Miss. conversion project delayed
from 2008 to 2010 due to
economic factors.
Expansion project including
the replacement of two 30-year-
old reformers and construction
of a 55,000 b/d continuous
catalytic reformer platformer
unit to be completed by late
summer, Industrial Info
Resources said July 6. A
premium base-oil facility
was also being planned, co.
said in late Feb.
Exxon Baton 504.5 Several weeks of work got under
Mobil Rouge, LA way on Feb 5, the company said
on Feb 7. It would not comment on
what unit, or units, are involved.
Exxon Baytown, TX 560.6 New ULSD Units commissioned,
Mobil Co. said Oct 21. ULSD supply
will increase by over 3 million
gallons from Baytown & Baton
Rouge.
Shell Deer Park 327.0 Maintenance activities are
TX underway, Co. said Jan. 18,
but the duration and type
of work were not disclosed.
Exxon Chalmette 120.0 Crude throughput will be re- N/A
LA duced to 90,000-b/d as redun-
dant units and about 70 jobs
are taken out of service and
cut for economic reason. These
have begun to take place, the
co. said Aug 26.
FCCU was taken out of service on
Jan. 22, but the rest of refinery
is operational.
Motiva Port Arthur 285.0 Expansion project to increase 1Q
throughput capacity by 325,000 2012
b/d, to 610,000-b/d, slowed.
Completion now seen 1Q
2012, from 2010.
Valero Houston, TX 145.0 Shut down of 90,000-b/d CDU Feb. 24
got underway on Jan. 31/Feb.
1 for 24 days turnaround main-
tenance, the Co. said on Feb. 1.
Valero Corpus 340.0 West Plant 50,000-b/d FCCU at
Christi, TX reduced rates since mid-Dec for
economic reasons.
Valero Norco, LA 250.0 Hydrocracker project will pro- 2013
ceed and be completed in late
2013, the co. said on July 27.
FCCU, 100,000 b/d, will be 2Q
revamped and work will take 2011
place at a alky unit, lasting
55 days starting in March, Co.
said Oct. 26.
Work planned at 90,000-b/d
alky unit in March for 56 days.
Upgrade project to build 2012
a new diesel hydrotreater
unit moved from 2010 to
4Q 2012.
Valero Port Arthur 325.0 Hydrocracker project will pro- 2012
TX ceed and be completed in late
2012, the co. said on July 27.
Crude and coker work lasting 1H 2011
51 days to begin in February.
Six coke drums will be re- 2011
placed in 2011.
77,000-b/d FCCU at reduced n/a
rates since mid-Dec for
economic reasons.
Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
rates since mid-Dec for
economic reasons.
Planned hydrocracker turnaround,
delayed from March, to take place
in April and will last 24 days,
Co. said Jan. 26.
Flint Corpus 300.0 Final dust clearning for sulfur
Hills Christi, TX recovery unit No. 3 on Jan. 19-20,
so the new unit can be commissioned.
Citgo Corpus 163.0 Turnaround activities in process
Christi, TX and will continue to Feb. 28, Co.
said Jan. 20. Sources said work is
being performed at FCCU.
New 42,500 B/D ULSD new unit has been
started, now allowing the company to
produce all of this fuel entirely in-
house, Co. said Jan. 27.
Pasadena Pasadena, TX 56.0 FCCU, 56,000-b/d, will be taken out
of service Feb. 28 for 44 days for
planned work, Co. reported Jan.25.
MIDWEST
Valero Ardmore, OK 90.0 Plantwide turnaround expected to take
place in March 2011.
CVR Coffeyville 115.7 Periodic turnaround will take place
KS in two phases beginning in Fall 2011
and completed in Spring 2012.
WEST COAST
BP Carson, CA 264.0 Flaring, not related to equip-
ment breakdown, planned between
Feb. 4 and Feb. 12.
Conoco Rodeo, CA 120.0 Planned maintenance underway, Co.
said Jan. 20, but declined to say
what units are involved and how
long the work will last.
Exxon Torrance 149.5 Hyrocracker, Sat. Gas Plant and
Mobil CA hydrogen unit shut Feb 1 for several
weeks of planned turnaround mainte-
nance, the co. said on Feb. 1.
Valero Benicia, CA 170.0 Process unit and FCCU down.
FCCU unit to remain down amid
maintenance planned for 1Q 2011.
Plantwide turnaround is taking
place and will last about 42 days,
Co. reported Jan. 26.
BP Carson, CA 264.0 Planned flaring activity to take
place on Jan. 22-27, Co. reported
Jan. 20.