Access Rights
The grant of access to DRDGOLD of the:
· Kloof 10 shaft located in the Kloof mining area that is subject to
the Kloof Mining Right, for the purpose of pumping and
supplying, at the cost of WRTRP, the required quantities of
water, as licenced, for the WRTRP Assets;
· rights, servitudes and agreements for installation, supply and
distribution and maintenance of power supply; existing and
proposed pipeline routes; servitudes; wayleaves and surface
right permits; and
· Driefontein 1 Gold Plant for the purpose of accessing the Pilot
Plant.
*Capitalised terms herein should be read as definitions according to the content of this announcement.
5.
DRDGOLD and its strategy for the WRTRP Assets
DRDGOLD has a network of surface assets that is unrivalled in South Africa and is focused on
optimising these assets in order to increase gold production and extend its operational life.
DRDGOLD intends on developing the WRTRP Assets through a phased approach. The first phase
(“Phase 1”) will include upgrading the existing DP2 Plant and DP3 Plant to process tailings from
the Driefontein 5 dump. Phase 1 is estimated to be commissioned within 12 months after
implementation of the Proposed Transaction and will provide for:
· the construction of a reclamation pump station and slurry pipeline at the Driefontein 5 dump
and associated process water pump station and pipeline;
· the upgrading of the DP2 Plant and DP3 Plant from their nameplate capacity of 315 000
tonnes per month (“tpm”) to between 400 000 tpm and 600 000 tpm to treat additional slime;
· the potential upgrading of the Driefontein 4 for additional tailings storage capacity; and
· the refurbishment of conventional Carbon-in-leach (“CIL”) treatment plants (DP2 Plant and
DP3 Plant).
Further evaluation of all dumps through the pilot plant will occur within 24 months. The evaluation
of each resource will include:
· Bulk samples to be trucked to DP3 Plant for evaluation
· CIL, milling, flotation and concentrate leaching
· Blending of various resources to determine the optimal combination and ratio.
Phase 1 is expected to be cash-generative with minimal upfront capital investment required. These
cash flows will be prioritised for the development of subsequent phases. Outputs from Phase 1 will
enable DRDGOLD to refine the original WRTRP process and engineering design as well as
financial and capital models for Phase 2.
Phase 2 will deliver a central, high-volume, CPP capable of processing at least 1 million tpm of
tailings and development of a new RTSF including associated pipeline infrastructure, within an
additional 24-month period.
6.
Salient terms of the Proposed Transaction
6.1.
Salient terms of the Proposed Acquisition
The Proposed Acquisition consists of, inter alia, two separate, but indivisible, simultaneous
transactions as set out below: