Preliminary exploration results for the Mahefadok, Mahela and
Ambatofafana prospects, Madagascar
StratMin (AIM: STGR), the graphite exploration and production
company with assets in Madagascar, today announces better than
expected preliminary exploration results for its previously
unexplored Mahefadok, Mahela and Ambatofafana prospects.
These prospects occur in the central to southern part of the
Company's Loharano property, south of the producing Loharano
graphite deposit.
HIGHLIGHTS
Mahefadok prospect
-- Outcrop sample results returned up to 7.18 per cent.
Graphitic Carbon ("GC"), and occur over a strike length of
approximately 2 km and East of the Mahefadok prospect, pit sample
results returned weighted averages up to 7.74 per cent. GC over
2.00 metres (incl. 9.26 per cent. GC over 1.00 metre).
-- At Zone 1, trench sample results returned weighted averages
up to 4.50 per cent. GC over 3.20 metres (incl. 8.19 per cent. GC
over 1.60 metres) and pit samples returned weighted averages up to
5.30 per cent. GC over 4.30 metres (incl. 7.22 per cent. GC over
1.00 metre).
-- At Zone 2, pit sample results returned weighted averages up
to 4.48 per cent. GC over 1.50 metres (incl. 5.35 per cent. GC over
0.80 metres) and additional sample results at the bottom of pits
(the maximum depth of excavations) returned up to 9.09 per cent.
GC.
Mahela prospect
-- Outcrop sample results returned up to 6.90 per cent. GC.
Ambatofafana prospect
-- Outcrop samples results returned up to 11.00 per cent. GC.
Based on the encouraging preliminary results for the Mahefadok,
Mahela and Ambatofafana prospects, further exploration activities
are being planned to include drilling work to test the depth of the
regolith mineralisation at Mahefadok, and pitting and trenching
work to test the extent of the regolith mineralisation at Mahela
and Ambatofafana.
Manoli Yannaghas, Managing Director, said;
"These results demonstrate that StratMin is well on its way to
joining the ranks of other publicly listed graphite companies who
have world class deposits. However, where StratMin stands apart
from the rest of this community is that it is also in production
and selling product to its offtake partner.
"Of particular interest is that exploration activities at
Mahefadok were only to a depth of 6 metres, the Zones 1 and 2
regolith-hosted graphite mineralisation is open at depth and the
saprolite hosts graphitic carbon grades of up to 9.09 per cent.
GC.
"I look forward to updating the market with a resource
estimation and drilling results following these encouraging
results."
The Prospects
The Mahefadok, Mahela and Ambatofafana prospects occur within
the Company's exploitation permit (number 26670), which includes
several historical mapped graphitic gneiss units and graphite
deposits (Figure 1). The prospects were not subjected to any
systematic exploration activities in the past.
Figure 1 - Map showing the Mahefadok, Mahela and Ambatofafana
prospects.
http://www.rns-pdf.londonstockexchange.com/rns/8221F_3-2015-2-25.pdf
Mahefadok Prospect
Exploration activities at Mahefadok have included geological
mapping, outcrop sampling, ground magnetic surveying, the
excavation of 6 trenches (SGRT005 to SGRT010) and 75 pits (SGRP030
to SGRP104). A total of 280 samples were collected and were sent to
ALS Chemex for quantitative analysis. The results for Graphitic
Carbon (GC) in per cent (%) as shown in Table 1.
Please see the appendix for Table 1: the Results Table for the
Mahefadok Prospect.
Initial geological mapping and outcrop sampling confirmed
graphite mineralisation over a strike length of approximately 2km,
which coincides with two north-south historical mapped graphitic
gneiss units. A total of ten outcrop samples (E003829 to E003831,
E003845 to E003850 and Q0090) returned values between 3.16 and 7.18
per cent. GC, corresponding to an average of 5.01 per cent. GC.
Initial ground magnetic traverses at the Mahefadok prospect and
over known graphite mineralisation showed low magnetic responses
associated with graphite mineralisation. Based on the initial
results, a systematic magnetic survey program, was completed which
included 14 lines and 6.5 line kms (Figure 2).
Figure 2 - Map showing the ground magnetic results for
theMahefadok prospect.
http://www.rns-pdf.londonstockexchange.com/rns/8221F_2-2015-2-25.pdf
The survey results showed 4 north-southmagnetic anomalies (A, B,
C and D) present at the Mahefadok prospect and further south.
Anomalies A and B occur over known graphite mineralisation.
Furthermore, the magnetic results also confirm north-south
structural and lithological trends.
Based on the encouraging geological mapping, outcrop sampling
and ground magnetic results, a trench and pit program were
completed at the Mahefadok prospect and further south (Figure 3).
Trenches and pits were lithologically logged and, where graphite
mineralisation was observed, vertical sampling was completed within
the regolith.
Figure 3 - Map showing graphite mineralisation zones for the
Mahefadok prospect.
http://www.rns-pdf.londonstockexchange.com/rns/8221F_1-2015-2-25.pdf
Based on the trench and pit results, two substantial
regolith-hosted graphite mineralisation zones were identified
(Zones 1 and 2). At the Mahefadok prospect, Zone 1 occurs as a
north-south zone 480 metres in length, between 45 and 120 metres in
width and up to 6 metres in depth (the maximum depth of
excavations), and open ended to the north. South of the Mahefadok
prospect, Zone 2 occurs as a north-south mineralisation zone 880
metres in length, between 60 and 120 metres in width and up to 3.20
metres in depth (the maximum depth of excavations), and open ended
to the south.
At Zone 1, samples within trenches (SGRT005 to SGRT010) and pits
(SGRP030, SGRP031, SGRP036, SGRP037, SGRP083, and SGRP088 to
SGRP091) returned weighted average values between 0.80 per cent. to
5.30 per cent. GC. In general, the graphitic carbon values increase
with depth and up to 8.35 per cent. GC values were obtained within
the saprolite (at the maximum depth of the excavations). Some
weighted average results from trenches and pits include:
-- SGRT005_02 - 3.64% GC over 3.00 metres (incl. 4.63% GC over 2.00 metres);
-- SGRT006_01 - 4.04% GC over 3.60 metres (incl. 4.90% GC over 1.00 metre);
-- SGRT007_02 - 3.81% GC over 4.50 metres (incl. 5.86% GC over 0.75 metres);
-- SGRT007_03 - 3.65% GC over 3.00 metres (incl. 5.07% GC over 1.00 metre);
-- SGRT008_02 - 4.50% GC over 3.20 metres (incl. 8.19% GC over 1.60 metres);
-- SGRT009_03 - 2.92% GC over 3.60 metres (incl. 5.54% GC over 1.60 metres);
-- SGRP037 - 4.77% GC over 1.50 metres (incl. 5.38% GC over 0.90 metres);
-- SGRP088 - 5.30% GC over 4.30 metres (incl. 7.22% GC over 1.00 metre);
-- SGRP089 - 4.08% GC over 1.70 metres (incl. 4.36% GC over 0.70 metres).
At Zone 2, samples within pits (SGRP040 to SGRP046, SGRP049 to
SGRP053, SGRP055, SGRP058 to SGRP060, SGRP062 to SGRP064, SGRP066
to SGRP067, SGRP069 to SGRP074, SGRP077 to SGRP081, SGRP096 to
SGRP102 and SGRP104) returned weighted average values that varied
between 0.42 per cent. to 4.48 per cent. GC. In general, the
graphitic carbon values increase with depthand up to 4.72 per cent.
GC values were obtained within the saprolite (at the maximum depth
of the excavations). Some weighted average results from pits
include:
-- SGRP046 - 4.47% GC over 1.20 metres (incl. 5.55% GC over 0.60 metres);
-- SGRP059 - 3.94% GC over 2.00 metres (incl. 6.42% GC over 1.00 metre);
-- SGRP064 - 3.83% GC over 1.90 metres (incl. 4.37% GC over 1.00 metre);
-- SGRP078 - 3.47% GC over 2.50 metres (incl. 4.54% GC over 1.00 metre);
-- SGRP100 - 4.48% GC over 1.50 metres (incl. 5.35% GC over 0.80 metres).
Additional saprolite and saprock samples (Q0082, Q0086, Q0112,
Q0132, Q0138, Q0164, and Q0173) from pits (SGRP080, SGRP077,
SGRP066, SGRP096, SGRP098, SGRP102, and SGRP055) respectively,
returned values between 1.61 per cent. to 9.09 per cent. GC,
corresponding to an average of 5.18 per cent. GC.
East of the Mahefadok prospect, 4 pits were excavated within
ground magnetic Anomaly C. Samples within pits (SGRP032, SGRP033,
and SGRP035) returned weighted average values between 0.71 per
cent. to 7.74 per cent. GC. Pit SGRP033 returned 7.74 per cent. GC
over 2.00 metres (incl. 9.26 per cent. GC over 1.00 metres).
Mahela
Exploration activities at Mahela have included geological
mapping and outcrop sampling. A total of ten samples were collected
and sent to ALS Chemex for quantitative analysis. The results for
Graphitic Carbon (GC) in percent (%) are shown below in Table
2.
Table 2 - Results table for the Mahela prospect.
Collar Collar Utm39sX Utm39sY Sample Intersection Interval Lithology Sub GC
Type ID ID (m) Lithology (%)
--------- -------- -------- ---------- ------- --------------- --------- ---------- ----------- -----
From To
(m) (m)
--------- -------- -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Outcrop Q0149 287,920 7,902,785 Q0149 - - - GQZT NA 4.47
--------- -------- -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0150 287,935 7,902,803 Q0150 - - - GQZT NA 5.21
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0152 287,962 7,902,972 Q0152 - - - GQZT NA 3.08
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0153 287,969 7,903,007 Q0153 - - - GQZT NA 6.51
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0154 287,819 7,902,834 Q0154 - - - GQZT NA 5.90
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0155 287,908 7,903,022 Q0155 - - - GQZT NA 3.32
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0156 287,793 7,903,139 Q0156 - - - GQZT NA 4.98
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0157 287,778 7,903,199 Q0157 - - - GQZT NA 4.71
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0158 287,641 7,902,967 Q0158 - - - GQZT NA 3.51
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
Q0159 287,559 7,903,029 Q0159 - - - GGNE NA 6.90
------------------ -------- ---------- ------- ------- ------ --------- ---------- ----------- -----
LITHOLOGY / SUB LITHOLOGY
--------------------------
Graphitic gneiss
--------------------------
Graphitic quartzite
--------------------------
Not applicable
--------------------------
Initial geological mapping and outcrop sampling confirmed
graphite mineralisation coinciding with at least two
northeast-southwest historical mapped graphitic gneiss units. The
mineralised zones strike at least 270 metres and 330 metres
respectively. A total of ten outcrop samples (Q0049 to Q0050, and
Q0152 to Q0159) returned values between 3.08 per cent. and 6.90 per
cent. GC, corresponding to an average of 4.86 per cent. GC.
Ambatofafana
Exploration activities at Ambatofafana have included geological
mapping and outcrop sampling. A total of 17 samples were collected
and sent to ALS Chemex for quantitative analysis. The results for
Graphitic Carbon (GC) in percent (%) are shown below in Table
3.
Table 3 - Results table for the Ambatofafana prospect.
Collar Collar Utm39sX Utm39sY Sample Intersection Interval Lithology Sub GC Weighted
Type ID ID (m) Lithology (%) Averages
--------- -------------- -------- ---------- ------- --------------- --------- ---------- ---------- ------ ---------
From To
(m) (m)
--------- -------------- -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Outcrop Q0091 288,293 7,900,917 Q0091 - - - GGNE NA 6.42
--------- -------------- -------- ---------- ------- ------ ------- ---------
3.00
m @ 5.36
Ambatofafana 288,282 7,900,933 Q0092 0.00 1.00 1.00 SAP SP 5.32 % GC
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Ambatofafana 288,282 7,900,933 Q0093 1.00 2.00 1.00 SAP SP 5.73
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Ambatofafana 288,282 7,900,933 Q0094 2.00 3.00 1.00 SAP SP 5.02
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0095 288,287 7,900,943 Q0095 - - - GGNE NA 7.00
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0096 288,287 7,900,943 Q0096 - - - GGNE NA 9.13
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0097 288,287 7,901,010 Q0097 - - - GGNE NA 5.37
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0098 288,189 7,900,951 Q0098 - - - GGNE NA 7.93
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0099 288,197 7,900,930 Q0099 - - - GGNE NA 3.37
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0101 288,176 7,900,930 Q0101 - - - GGNE NA 11.00
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0102 288,157 7,900,919 Q0102 - - - GGNE NA 4.68
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0103 288,174 7,900,872 Q0103 - - - GGNE NA 8.08
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0104 288,167 7,900,844 Q0104 - - - GGNE NA 5.50
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0105 289,187 7,901,244 Q0105 - - - GQZT NA 8.85
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0106 289,143 7,901,089 Q0106 - - - GQZT NA 6.45
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0107 289,154 7,901,126 Q0107 - - - GQZT NA 6.25
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
Q0108 289,194 7,901,142 Q0108 - - - GQZT NA 8.27
------------------------ -------- ---------- ------- ------ ------- --------- ---------- ---------- ------ ---------
LITHOLOGY / SUB LITHOLOGY
----------------------------
Graphitic gneiss
----------------------------
Graphitic quartzite
----------------------------
Not applicable
----------------------------
Saprolith
--------------------------
Saprolite
--------------------------
Initial geological mapping and outcrop sampling confirmed
graphite mineralisation coinciding with at least two north-south
historical mapped graphitic gneiss units and a historical graphite
working. A total of 14 outcrop samples (Q0091, Q0095 to Q0099, and
Q0101 to Q0108) returned values between 3.37 per cent. and 11.0 per
cent. GC, corresponding to an average of 7.02 per cent. GC. At the
Ambatofafana graphite working, three continuous channel samples
(Q0092 to Q0094) returned a weighted average of 5.36 per cent. GC
over 3 metres.
The information in this announcement that relates to Exploration
Results has been reviewed by Mr. Jannie Leeuwner, BSc (Hons), who
is a full-time employee of Vato Consulting LLC. Mr. Leeuwner is a
registered Professional Natural Scientist (Pr.Sci.Nat) with the
South African Council for Natural Scientific Professional (SACNASP)
and a "Qualified Person" as defined in the AIM Note for Mining Oil
& Gas Companies - June 2009, of the London Stock Exchange. Mr.
Leeuwner consents to the inclusion of the information in this
release in the form and context in which it appears.
Enquiries
For further information please visit www.stratminglobal.com or
contact:
+44 (0) 20 3691
StratMin Global Resources Plc 6160
Manoli Yannaghas (Managing Director)
Strand Hanson (Nomad & Financial Adviser) +44 (0) 20 7409
James Spinney / Ritchie Balmer 3494
+44 (0) 20 3693
Hume Capital Securities Plc (Sole Broker) 1470
Jon Belliss / Abigail Wayne
Blytheweigh (Financial PR) +44 (0) 20 7138
Tim Blythe / Halimah Hussain / Camilla Horsfall 3204
Appendix
Table 1 - Results Table for the
Mahefadok Prospect.
Collar Collar Utm39sX Utm39sY Sample Intersection Interval Lithology Sub GC Weighted Notes
Type ID ID (m) Lithology (%) Averages
--------- ------------ -------- ---------- -------- --------------- --------- ---------- ---------- ----- ----------- ---------------
From To
(m) (m)
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Outcrop E003829 289,058 7,905,752 E003829 - - - PED MZ 6.12
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003830 289,069 7,905,709 E003830 - - - PED MZ 5.45
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003831 289,054 7,905,808 E003831 - - - PED MZ 7.18
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003845 289,178 7,904,721 E003845 - - - GGNE NA 4.63
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003846 289,186 7,904,638 E003846 - - - GGNE NA 6.25
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003847 289,181 7,904,464 E003847 - - - GGNE NA 3.16
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003848 289,248 7,903,634 E003848 - - - GGNE NA 3.19
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003849 289,294 7,903,963 E003849 - - - GGNE NA 3.99
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
E003850 289,253 7,904,342 E003850 - - - GGNE NA 5.75
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Q0090 289,112 7,905,151 Q0090 - - - GGNE NA 4.37
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
3.10 m @
Trench 2.89
SGRT005 SGRT005_01 289,045 7,905,806 E003870 0.40 1.00 0.60 PED MZ 1.72 % GC
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.50
m @ 5.71 %
SGRT005_01 289,045 7,905,806 E003872 1.00 2.00 1.00 PED MZ 2.50 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT005_01 289,045 7,905,806 E003873 2.00 3.00 1.00 SAP SP 2.58
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT005_01 289,045 7,905,806 E003874 3.00 3.50 0.50 SAP SP 5.71
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT005_02 289,055 7,905,806 E003875 0.30 1.00 0.70 PED FZ 0.37
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.00 m @
3.64
SGRT005_02 289,055 7,905,806 E003876 1.00 2.00 1.00 PED MZ 1.65 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
2.00
m @ 4.63 %
SGRT005_02 289,055 7,905,806 E003877 2.00 3.00 1.00 PED MZ 4.62 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT005_02 289,055 7,905,806 E003878 3.00 4.00 1.00 SAP SP 4.64
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT005_03 289,063 7,905,806 E003879 0.40 1.00 0.60 PED FZ 0.09
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT005_03 289,063 7,905,806 E003881 1.00 2.00 1.00 PED MZ 0.21
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.00 m @
2.17
SGRT005_03 289,063 7,905,806 E003882 2.00 3.00 1.00 PED MZ 3.02 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 3.02 %
SGRT005_03 289,063 7,905,806 E003883 3.00 4.00 1.00 PED MZ 1.10 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Footwall
mineralisation
SGRT005_03 289,063 7,905,806 E003884 4.00 4.60 0.60 SAP SP 0.05 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRT005_04 289,070 7,905,806 NA 0.00 5.00 5.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
3.60 m @
Trench 4.04
SGRT006 SGRT006_01 289,051 7,905,752 E003926 0.00 1.00 1.00 PED MZ 2.44 % GC
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 4.90 %
SGRT006_01 289,051 7,905,752 E003927 1.00 2.00 1.00 PED MZ 4.43 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT006_01 289,051 7,905,752 E003928 2.00 3.00 1.00 SAP SP 4.90
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT006_01 289,051 7,905,752 E003929 3.00 3.60 0.60 SAP SP 4.65
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
4.20 m @
2.37
SGRT006_02 289,060 7,905,752 E003930 0.00 1.00 1.00 PED MZ 1.68 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 2.87 %
SGRT006_02 289,060 7,905,752 E003931 1.00 2.00 1.00 PED MZ 2.63 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT006_02 289,060 7,905,752 E003932 2.00 3.00 1.00 PED MZ 2.87
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT006_02 289,060 7,905,752 E003933 3.00 4.20 1.20 PED MZ 2.32
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.20 m @
1.33
SGRT006_03 289,068 7,905,752 E003934 0.00 1.00 1.00 PED MZ 1.07 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl 0.30
m @ 2.29 %
SGRT006_03 289,068 7,905,752 E003935 1.00 1.90 0.90 PED MZ 1.30 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT006_03 289,068 7,905,752 E003936 1.90 2.20 0.30 PED MZ 2.29
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Footwall
mineralisation
SGRT006_03 289,068 7,905,752 E003937 2.20 3.00 0.80 PED MZ 0.05 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT006_03 289,068 7,905,752 E003938 3.00 3.80 0.80 PED MZ 0.07
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRT006_04 289,072 7,905,752 NA 0.00 4.00 4.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Trench
SGRT007 SGRT007_01 289,050 7,905,705 E003939 0.00 1.00 1.00 PED FZ 0.27
--------- ------------ -------- ---------- -------- ------- ------ ---------
3.70 m @
0.87
SGRT007_01 289,050 7,905,705 E003941 1.00 2.00 1.00 PED MZ 0.71 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.20
m @ 1.05 %
SGRT007_01 289,050 7,905,705 E003942 2.00 2.80 0.80 PED MZ 0.76 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_01 289,050 7,905,705 E003943 2.80 3.50 0.70 PED MZ 0.91
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_01 289,050 7,905,705 E003944 3.50 4.70 1.20 SAP SP 1.05
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
4.50 m @
3.81
SGRT007_02 289,060 7,905,705 E003945 0.00 1.00 1.00 PED MZ 2.69 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.75
m @ 5.86 %
SGRT007_02 289,060 7,905,705 E003946 1.00 2.00 1.00 SAP SP 4.48 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_02 289,060 7,905,705 E003947 2.00 3.00 1.00 SAP SP 2.44
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_02 289,060 7,905,705 E003948 3.00 3.75 0.75 SAP SP 4.19
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_02 289,060 7,905,705 E003949 3.75 4.50 0.75 SAP SP 5.86
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
3.00 m @
3.65
SGRT007_03 289,070 7,905,705 E003950 0.00 1.00 1.00 PED MZ 5.07 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 5.07 %
SGRT007_03 289,070 7,905,705 E003952 1.00 2.00 1.00 PED MZ 4.40 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_03 289,070 7,905,705 E003953 2.00 3.00 1.00 SAP SP 1.49
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Footwall
mineralisation
SGRT007_03 289,070 7,905,705 E003954 3.00 3.70 0.70 SAP SP 0.06 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT007_03 289,070 7,905,705 E003955 3.70 4.40 0.70 SAP SP 0.07
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.50 m @
1.29
SGRT007_04 289,080 7,905,705 E003962 0.00 0.70 0.70 PED MZ 1.02 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT007_04 289,080 7,905,705 E003963 0.70 1.50 0.80 PED MZ 1.53
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Footwall
mineralisation
SGRT007_04 289,080 7,905,705 E003964 1.50 2.20 0.70 SAP SP 0.07 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT007_04 289,080 7,905,705 E003965 2.20 3.00 0.80 SAP SP 0.18
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT007_04 289,080 7,905,705 E003966 3.00 4.00 1.00 SAP SP 0.09
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT007_04 289,080 7,905,705 E003967 4.00 5.10 1.10 SAP SP 0.62
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------------
No graphite
mineralisation
SGRT007_05 289,083 7,905,705 NA 0.00 5.00 5.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Trench
SGRT008 SGRT008_01 289,006 7,905,632 E003968 0.00 1.00 1.00 PED FZ 0.12
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_01 289,006 7,905,632 E003969 1.00 2.00 1.00 PED FZ 0.57
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.50 m @
2.12
SGRT008_01 289,006 7,905,632 E003970 2.00 2.60 0.60 PED MZ 0.76 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.10
m @ 3.37 %
SGRT008_01 289,006 7,905,632 E003972 2.60 3.40 0.80 PED MZ 1.43 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_01 289,006 7,905,632 E003973 3.40 4.50 1.10 SAP SP 3.37
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_02 289,016 7,905,632 E003974 0.00 1.10 1.10 PED FZ 0.06
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.20 m @
4.50
SGRT008_02 289,016 7,905,632 E003975 1.10 2.10 1.00 PED MZ 0.51 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.60
m @ 8.19 %
SGRT008_02 289,016 7,905,632 E003976 2.10 3.00 0.90 SAP SP 8.35 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_02 289,016 7,905,632 E003977 3.00 3.70 0.70 SAP SP 7.99
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_02 289,016 7,905,632 E003978 3.70 4.30 0.60 SAP SP 1.31
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_03 289,026 7,905,632 E003979 0.60 1.50 0.90 PED FZ 0.01
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_03 289,026 7,905,632 E003981 1.50 2.20 0.70 PED MZ 0.05
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.60 m @
0.89
SGRT008_03 289,026 7,905,632 E003982 2.20 3.00 0.80 PED MZ 0.55 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.80
m @ 1.07 %
SGRT008_03 289,026 7,905,632 E003983 3.00 4.00 1.00 SAP SP 1.03 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_03 289,026 7,905,632 E003984 4.00 4.80 0.80 SAP SP 1.07
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_04 289,036 7,905,632 E003985 0.50 1.20 0.70 PED FZ 0.02
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_04 289,036 7,905,632 E003986 1.20 2.00 0.80 PED FZ 0.07
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.70 m @
0.80
SGRT008_04 289,036 7,905,632 E003987 2.00 3.00 1.00 PED MZ 1.07 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 1.07 %
SGRT008_04 289,036 7,905,632 E003988 3.00 3.70 0.70 PED MZ 0.59 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_04 289,036 7,905,632 E003989 3.70 4.70 1.00 SAP SP 0.67
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_05 289,046 7,905,632 E003990 0.50 1.40 0.90 PED FZ 0.08
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.90 m @
1.94
SGRT008_05 289,046 7,905,632 E003991 1.40 2.10 0.70 PED MZ 1.06 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 4.06 %
SGRT008_05 289,046 7,905,632 E003992 2.10 3.00 0.90 PED MZ 0.85 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_05 289,046 7,905,632 E003993 3.00 4.00 1.00 SAP SP 4.06
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_05 289,046 7,905,632 E003994 4.00 4.70 0.70 SAP SP 1.04
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_05 289,046 7,905,632 E003995 4.70 5.30 0.60 SAP SP 2.12
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_06 289,056 7,905,632 E003996 0.00 0.70 0.70 PED FZ 0.03
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_06 289,056 7,905,632 E003997 0.70 1.40 0.70 PED FZ 0.12
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
4.00 m @
0.92
SGRT008_06 289,056 7,905,632 E003998 1.40 2.00 0.60 PED MZ 0.80 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.70
m @ 1.96 %
SGRT008_06 289,056 7,905,632 E003999 2.00 3.00 1.00 PED MZ 0.50 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_06 289,056 7,905,632 Q0001 3.00 4.00 1.00 PED MZ 0.60
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_06 289,056 7,905,632 Q0002 4.00 4.70 0.70 PED MZ 1.06
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_06 289,056 7,905,632 Q0003 4.70 5.40 0.70 PED MZ 1.96
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_07 289,066 7,905,632 Q0004 0.00 0.70 0.70 PED FZ 0.02
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT008_07 289,066 7,905,632 Q0005 0.70 1.50 0.80 PED FZ 0.13
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.90 m @
1.03
SGRT008_07 289,066 7,905,632 Q0006 1.50 2.50 1.00 PED MZ 1.26 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.70
m @ 1.75 %
SGRT008_07 289,066 7,905,632 Q0007 2.50 3.20 0.70 PED MZ 0.81 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_07 289,066 7,905,632 Q0008 3.20 4.00 0.80 PED MZ 1.34
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_07 289,066 7,905,632 Q0009 4.00 4.70 0.70 SAP SP 1.30
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT008_07 289,066 7,905,632 Q0010 4.70 5.40 0.70 SAP SP 1.75
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRT008_08 289,076 7,905,632 NA 0.00 4.00 4.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
Trench mineralisation
SGRT009 SGRT009_01 289,033 7,905,520 NA 0.00 4.70 4.70 NA NA NA observed
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_02 289,043 7,905,520 Q0033 0.30 1.50 1.20 PED FZ 0.05
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_02 289,043 7,905,520 Q0034 1.50 2.50 1.00 PED MZ 0.08
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_02 289,043 7,905,520 Q0035 2.50 3.40 0.90 PED MZ 0.08
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Hangwall
mineralisation
SGRT009_02 289,043 7,905,520 Q0036 3.40 4.00 0.60 SAP SP 0.06 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.80 m @
1.35
SGRT009_02 289,043 7,905,520 Q0037 4.00 4.80 0.80 SAP SP 1.35 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_03 289,053 7,905,520 Q0038 0.40 1.00 0.60 PED FZ 0.03
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.60 m @
2.92
SGRT009_03 289,053 7,905,520 Q0039 1.00 2.00 1.00 PED MZ 0.90 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.60
m @ 5.54 %
SGRT009_03 289,053 7,905,520 Q0041 2.00 3.00 1.00 PED MZ 0.74 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_03 289,053 7,905,520 Q0042 3.00 3.80 0.80 SAP SP 4.43
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_03 289,053 7,905,520 Q0043 3.80 4.60 0.80 SAP SP 6.65
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_04 289,063 7,905,520 Q0044 0.50 1.60 1.10 PED FZ 0.02
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.90 m @
0.81
SGRT009_04 289,063 7,905,520 Q0045 1.60 2.50 0.90 PED MZ 1.08 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.90
m @ 1.07 %
SGRT009_04 289,063 7,905,520 Q0046 2.50 3.50 1.00 PED MZ 1.07 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_04 289,063 7,905,520 Q0047 3.50 4.50 1.00 PED MZ 0.31
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_05 289,073 7,905,520 Q0048 0.50 1.40 0.90 PED FZ 0.01
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_05 289,073 7,905,520 Q0049 1.40 2.00 0.60 PED FZ 0.01
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.60 m @
2.54
SGRT009_05 289,073 7,905,520 Q0050 2.00 3.00 1.00 PED MZ 0.90 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.60
m @ 6.57 %
SGRT009_05 289,073 7,905,520 Q0052 3.00 4.00 1.00 PED MZ 1.76 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_05 289,073 7,905,520 Q0053 4.00 4.60 0.60 SAP SP 6.57
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_06 289,083 7,905,520 Q0054 0.50 1.10 0.60 PED FZ 0.04
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_06 289,083 7,905,520 Q0055 1.10 1.70 0.60 PED FZ 0.04
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
4.20 m @
1.16
SGRT009_06 289,083 7,905,520 Q0056 1.70 2.50 0.80 PED MZ 0.69 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_06 289,083 7,905,520 Q0057 2.50 3.20 0.70 PED MZ 1.35
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_06 289,083 7,905,520 Q0058 3.20 4.00 0.80 PED MZ 1.33
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_06 289,083 7,905,520 Q0059 4.00 5.00 1.00 SAP SP 1.14
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_06 289,083 7,905,520 Q0061 5.00 5.90 0.90 SAP SP 1.32
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRT009_07 289,089 7,905,520 Q0062 0.50 1.50 1.00 PED FZ 0.12
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
3.50 m @
2.30
SGRT009_07 289,089 7,905,520 Q0063 1.50 2.20 0.70 PED MZ 3.12 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 3.62 %
SGRT009_07 289,089 7,905,520 Q0064 2.20 3.00 0.80 PED MZ 1.65 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_07 289,089 7,905,520 Q0065 3.00 4.00 1.00 SAP SP 3.62
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRT009_07 289,089 7,905,520 Q0066 4.00 5.00 1.00 SAP SP 0.93
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Footwall
mineralisation
SGRT009_07 289,089 7,905,520 Q0067 5.00 5.70 0.70 SAP SP 0.04 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRT009_08 289,096 7,905,520 NA 0.00 6.00 6.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
Trench mineralisation
SGRT010 SGRT010_01 289,028 7,905,433 NA 0.00 5.00 5.00 NA NA NA observed
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Hangwall
mineralisation
SGRT010_02 289,043 7,905,433 NA 0.00 4.50 4.50 NA NA NA contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.50 m @
2.71
SGRT010_02 289,043 7,905,433 Q0068 4.50 5.50 1.00 PED MZ 2.48 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.50
m @ 3.18 %
SGRT010_02 289,043 7,905,433 Q0069 5.50 6.00 0.50 SAP SP 3.18 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
trench
SGRT010_03 289,063 7,905,433 NA 0.00 3.50 3.50 NA NA NA collapsed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
trench
SGRT010_04 289,073 7,905,433 NA 0.00 3.00 3.00 NA NA NA collapsed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
trench
SGRT010_05 289,083 7,905,433 NA 0.00 4.00 4.00 NA NA NA collapsed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
trench
SGRT010_06 289,093 7,905,433 NA 0.00 3.80 3.80 NA NA NA collapsed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
trench
SGRT010_07 289,103 7,905,433 NA 0.00 3.80 3.80 NA NA NA collapsed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Pit SGRP030 288,952 7,905,831 E003857 0.00 1.00 1.00 PED FZ 0.02
--------- ------------ -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP030 288,952 7,905,831 E003858 1.00 2.00 1.00 PED FZ 0.03
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP030 288,952 7,905,831 E003859 2.00 3.00 1.00 PED MZ 0.01
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Hangwall
mineralisation
SGRP030 288,952 7,905,831 E003861 3.00 3.70 0.70 PED MZ 0.03 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.10 m @
3.57
SGRP030 288,952 7,905,831 E003862 3.70 4.80 1.10 PED MZ 3.57 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP031 288,980 7,905,829 E003852 0.40 1.00 0.60 PED FZ 0.35
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP031 288,980 7,905,829 E003853 1.00 2.00 1.00 PED FZ 0.04
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.85 m @
2.35
SGRP031 288,980 7,905,829 E003854 2.00 3.00 1.00 PED MZ 1.80 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.0.85
m @ 2.99 %
SGRP031 288,980 7,905,829 E003856 3.00 3.85 0.85 PED MZ 2.99 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
SGRP032 289,254 7,905,830 NA 0.00 3.00 3.00 NA NA NA pit unstable
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.90 m @
1.29
SGRP032 289,254 7,905,830 Q0011 3.00 4.00 1.00 PED MZ 0.74 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.90
m @ 2.28 %
SGRP032 289,254 7,905,830 Q0012 4.00 5.00 1.00 SAP SP 0.95 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP032 289,254 7,905,830 Q0013 5.00 5.90 0.90 SAP SP 2.28
---------------------- -------- ---------- ---------- ---------- ----- -----------
Not sampled,
SGRP033 289,286 7,905,832 NA 0.00 3.00 3.00 NA NA NA pit unstable
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.00 m @
7.74
SGRP033 289,286 7,905,832 Q0014 3.00 4.00 1.00 PED MZ 6.22 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 9.26 %
SGRP033 289,286 7,905,832 Q0015 4.00 5.00 1.00 SAP SP 9.26 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
SGRP034 289,304 7,905,755 NA 0.00 3.00 3.00 NA NA NA pit collapsed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
SGRP035 289,261 7,905,757 NA 0.00 3.10 3.10 NA NA NA pit unstable
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
0.90 m @
0.71
SGRP035 289,261 7,905,757 Q0016 3.10 4.00 0.90 PED MZ 0.71 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP036 288,972 7,905,748 E003863 0.50 1.70 1.20 PED FZ 0.03
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ----------- ---------------
SGRP036 288,972 7,905,748 E003864 1.70 3.00 1.30 PED MZ 0.03
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP036 288,972 7,905,748 E003865 3.00 4.00 1.00 PED MZ 0.04
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.20 m @
2.55
SGRP036 288,972 7,905,748 E003866 4.00 4.20 0.20 PED MZ 2.55 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP037 288,936 7,905,749 E003867 0.40 1.40 1.00 PED FZ 0.24
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.50 m @
4.77
SGRP037 288,936 7,905,749 E003868 1.40 2.00 0.60 PED MZ 3.87 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.90
m @ 5.38 %
SGRP037 288,936 7,905,749 E003869 2.00 2.90 0.90 PED MZ 5.38 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- -----------
No graphite
mineralisation
SGRP038 289,130 7,905,153 NA 0.00 2.20 2.20 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP039 288,981 7,905,630 NA 0.00 4.70 4.70 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP040 289,067 7,905,053 NA 0.00 2.00 2.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Hangwall
mineralisation
SGRP040 289,067 7,905,053 Q0024 2.00 2.60 0.60 PED MZ 0.04 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.40 m @
0.42
SGRP040 289,067 7,905,053 Q0025 2.60 3.00 0.40 PED MZ 0.42 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.50 m @
1.41
SGRP041 289,091 7,905,155 Q0019 0.50 1.00 0.50 PED FZ 1.32 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP041 289,091 7,905,155 Q0021 1.00 1.70 0.70 PED MZ 1.52
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP041 289,091 7,905,155 Q0022 1.70 2.50 0.80 PED MZ 1.59
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP041 289,091 7,905,155 Q0023 2.50 3.00 0.50 SAP SP 1.08
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.30 m @
2.20
SGRP042 289,061 7,904,952 E003885 0.50 1.00 0.50 PED MZ 1.95 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP042 289,061 7,904,952 E003886 1.00 1.80 0.80 PED MZ 2.36
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP043 289,039 7,904,951 E003893 0.40 1.00 0.60 PED FZ 0.05
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Hangwall
mineralisation
SGRP043 289,039 7,904,951 E003894 1.00 1.70 0.70 PED FZ 0.08 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.50 m @
1.66
SGRP043 289,039 7,904,951 E003895 1.70 2.20 0.50 PED MZ 1.66 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.50 m @
3.04
SGRP044 289,070 7,904,953 E003889 0.50 1.00 0.50 PED MZ 1.73 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 3.69 %
SGRP044 289,070 7,904,953 E003890 1.00 2.00 1.00 PED MZ 3.69 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP045 289,149 7,904,721 E003891 0.70 1.00 0.30 PED FZ 0.51
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.00 m @
0.95
SGRP045 289,149 7,904,721 E003892 1.00 2.00 1.00 PED MZ 0.95 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.20 m @
4.47
SGRP046 289,168 7,904,720 E003887 0.40 1.00 0.60 PED FZ 3.39 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.60
m @ 5.55 %
SGRP046 289,168 7,904,720 E003888 1.00 1.60 0.60 PED MZ 5.55 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP047 289,187 7,904,719 NA 0.00 1.50 1.50 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP048 289,209 7,904,720 NA 0.00 1.50 1.50 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.60 m @
2.44
SGRP049 289,157 7,904,637 E003902 0.40 1.40 1.00 PED MZ 1.94 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.60
m @ 3.28 %
SGRP049 289,157 7,904,637 E003903 1.40 2.00 0.60 PED MZ 3.28 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP050 289,175 7,904,637 E003899 0.60 1.40 0.80 PED FZ 0.26
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.60 m @
1.50
SGRP050 289,175 7,904,637 E003901 1.40 2.00 0.60 PED MZ 1.50 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP051 289,195 7,904,639 E003906 0.50 1.30 0.80 PED MZ 0.02 observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.80 m @
1.90
SGRP052 289,215 7,904,637 E003904 0.50 1.30 0.80 PED MZ 1.90 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Footwall
mineralisation
SGRP052 289,215 7,904,637 E003905 1.30 2.00 0.70 PED MZ 0.01 contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.60 m @
3.04
SGRP053 289,163 7,904,552 E003909 0.30 0.60 0.30 PED FZ 1.15 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.30
m @ 3.47 %
SGRP053 289,163 7,904,552 E003910 0.60 1.20 0.60 PED MZ 2.91 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP053 289,163 7,904,552 E003911 1.20 1.90 0.70 PED MZ 3.95
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP054 289,185 7,904,553 NA 0.00 2.00 2.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP055 289,177 7,904,600 Q0168 0.50 1.00 0.50 PED FZ 0.18
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.00 m @
2.08
SGRP055 289,177 7,904,600 Q0169 1.00 1.50 0.50 PED MZ 1.36 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.80
m @ 3.00 %
SGRP055 289,177 7,904,600 Q0170 1.50 2.20 0.70 SAP SP 1.55 GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP055 289,177 7,904,600 Q0172 2.20 3.00 0.80 SAP SP 3.00
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SP sampled
Q0173 289,177 7,904,600 Q0173 2.00 2.00 0.00 SAP SP 3.75 in SGRP055
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------------
No graphite
mineralisation
SGRP056 289,203 7,904,555 NA 0.00 1.80 1.80 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP057 289,224 7,904,553 NA 0.00 1.70 1.70 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP058 289,155 7,904,464 E003917 0.20 1.00 0.80 PED FZ 0.41
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.00 m @
1.64
SGRP058 289,155 7,904,464 E003918 1.00 2.00 1.00 PED MZ 1.64 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.00 m @
3.94
SGRP059 289,172 7,904,462 E003912 0.00 1.00 1.00 PED FZ 1.46 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 6.42 %
SGRP059 289,172 7,904,462 E003913 1.00 2.00 1.00 PED MZ 6.42 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.80 m @
1.35
SGRP060 289,189 7,904,461 E003914 0.20 0.40 0.20 PED FZ 1.43 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP060 289,189 7,904,461 E003915 0.40 1.20 0.80 PED MZ 1.09
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP060 289,189 7,904,461 E003916 1.20 2.00 0.80 PED MZ 1.58
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP061 289,215 7,904,463 NA 0.00 2.00 2.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.50 m @
1.32
SGRP062 289,089 7,904,951 E003907 0.50 1.30 0.80 PED MZ 1.22 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP062 289,089 7,904,951 E003908 1.30 2.00 0.70 PED MZ 1.44
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP063 289,109 7,904,953 E003896 0.30 0.70 0.40 PED FZ 0.62
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.15 m @
2.14
SGRP063 289,109 7,904,953 E003897 0.70 1.40 0.70 PED MZ 2.01 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP063 289,109 7,904,953 E003898 1.40 1.85 0.45 PED MZ 2.34
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.90 m @
3.83
SGRP064 289,128 7,904,954 Q0017 0.20 1.10 0.90 PED FZ 3.24 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 4.37 %
SGRP064 289,128 7,904,954 Q0018 1.10 2.10 1.00 PED MZ 4.37 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP065 289,150 7,904,955 NA 0.00 2.00 2.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP066 289,083 7,905,052 Q0109 0.50 1.40 0.90 PED FZ 0.33
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.10 m @
1.33
SGRP066 289,083 7,905,052 Q0110 1.40 2.00 0.60 PED MZ 1.18 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP066 289,083 7,905,052 Q0111 2.00 2.50 0.50 PED MZ 1.50
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SP sampled
Q0112 289,083 7,905,052 Q0112 2.50 2.50 0.00 SAP SP 1.61 in SGRP066
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.80 m @
2.51
SGRP067 289,126 7,904,720 E003919 0.20 1.00 0.80 PED FZ 2.11 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP067 289,126 7,904,720 E003921 1.00 2.00 1.00 PED MZ 2.83
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP068 289,110 7,904,721 NA 0.00 2.00 2.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.70 m @
1.09
SGRP069 289,091 7,904,720 E003956 0.40 0.80 0.40 PED MZ 4.19 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.40
m @ 4.19 %
SGRP069 289,091 7,904,720 E003957 0.80 1.50 0.70 PED MZ 0.20 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP069 289,091 7,904,720 E003958 1.50 2.10 0.60 PED MZ 0.06
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.20 m @
1.64
SGRP070 289,068 7,904,718 Q0030 0.80 1.80 1.00 PED FZ 1.54 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.60
m @ 2.78 %
SGRP070 289,068 7,904,718 Q0031 1.80 2.40 0.60 PED MZ 0.65 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP070 289,068 7,904,718 Q0032 2.40 3.00 0.60 PED MZ 2.78
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP071 289,136 7,904,636 E003922 0.40 1.50 1.10 PED FZ 0.04
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.50 m @
1.82
SGRP071 289,136 7,904,636 E003923 1.50 2.00 0.50 PED MZ 1.82 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP072 289,118 7,904,637 E003924 0.30 1.00 0.70 PED FZ 0.43
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.00 m @
0.89
SGRP072 289,118 7,904,637 E003925 1.00 2.00 1.00 PED MZ 0.89 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP073 289,098 7,904,636 E003959 0.40 1.30 0.90 PED FZ 0.50
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.70 m @
3.86
SGRP073 289,098 7,904,636 E003961 1.30 2.00 0.70 PED MZ 3.86 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.50 m @
1.87
SGRP074 289,079 7,904,637 Q0026 0.50 1.00 0.50 PED FZ 1.74 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.30
m @ 2.72 %
SGRP074 289,079 7,904,637 Q0027 1.00 1.70 0.70 PED FZ 0.39 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP074 289,079 7,904,637 Q0028 1.70 2.30 0.60 PED MZ 2.58
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP074 289,079 7,904,637 Q0029 2.30 3.00 0.70 PED MZ 2.84
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP075 289,132 7,905,243 NA 0.00 2.20 2.20 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP076 289,112 7,905,243 NA 0.00 0.60 0.60 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP077 289,102 7,905,241 Q0083 0.40 1.00 0.60 PED FZ 0.33
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.30 m @
2.80
SGRP077 289,102 7,905,241 Q0084 1.00 2.00 1.00 PED MZ 2.23 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl. 0.3
m @ 4.72 %
SGRP077 289,102 7,905,241 Q0085 2.00 2.30 0.30 SAP SP 4.72 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SR sampled
Q0086 289,102 7,905,241 Q0086 2.30 2.30 0.00 SAP SR 8.62 in SGRP077
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.50 m @
3.47
SGRP078 289,093 7,905,243 Q0070 0.50 1.00 0.50 PED FZ 1.67 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.00
m @ 4.54 %
SGRP078 289,093 7,905,243 Q0072 1.00 2.00 1.00 PED MZ 3.29 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP078 289,093 7,905,243 Q0073 2.00 3.00 1.00 SAP SP 4.54
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.70 m @
0.85
SGRP079 289,051 7,905,243 Q0074 0.60 1.20 0.60 PED MZ 0.76 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.60
m @ 1.20 %
SGRP079 289,051 7,905,243 Q0075 1.20 2.00 0.80 PED MZ 0.98 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP079 289,051 7,905,243 Q0076 2.00 2.60 0.60 SAP SP 1.20
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP079 289,051 7,905,243 Q0077 2.60 3.30 0.70 SAP SP 0.47
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
1.60 m @
1.88
SGRP080 289,032 7,905,242 Q0078 0.40 0.70 0.30 PED FZ 1.28 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
1.30
m @ 2.02 %
SGRP080 289,032 7,905,242 Q0079 0.70 1.40 0.70 PED MZ 1.85 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP080 289,032 7,905,242 Q0081 1.40 2.00 0.60 PED MZ 2.21
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SR sampled
Q0082 289,032 7,905,242 Q0082 2.00 2.00 0.00 SAP SR 9.09 in SGRP080
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP081 289,010 7,905,240 Q0087 0.40 0.65 0.25 PED FZ 0.42
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.25 m @
1.52
SGRP081 289,010 7,905,240 Q0088 0.65 1.20 0.55 PED MZ 1.20 % C
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP081 289,010 7,905,240 Q0089 1.20 2.00 0.80 SAP SP 1.55
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP082 289,000 7,905,431 NA 0.00 5.30 5.30 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Hangwall
mineralisation
SGRP083 289,017 7,905,522 NA 0.00 3.70 3.70 NA NA NA contact
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.80 m @
0.23
SGRP083 289,017 7,905,522 Q0113 3.70 4.50 0.80 SAP SP 0.23 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP084 289,037 7,905,329 NA 0.00 5.60 5.60 NA NN NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP085 289,058 7,905,332 NA 0.00 5.40 5.40 NA NN NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP086 289,080 7,905,332 NA 0.00 5.20 5.20 NA NN NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP087 289,020 7,905,332 NA 0.00 4.60 4.60 NA NN NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP088 289,026 7,905,390 Q0114 0.40 1.00 0.60 PED FZ 0.22
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
4.30 m @
5.30
SGRP088 289,026 7,905,390 Q0115 1.00 2.00 1.00 PED MZ 3.49 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.1.00
m @ 7.22 %
SGRP088 289,026 7,905,390 Q0116 2.00 3.00 1.00 PED MZ 7.22 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP088 289,026 7,905,390 Q0117 3.00 4.00 1.00 PED MZ 3.90
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP088 289,026 7,905,390 Q0118 4.00 4.60 0.60 PED MZ 7.08
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP088 289,026 7,905,390 Q0119 4.60 5.30 0.70 SAP SP 5.61
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
SGRP089 289,049 7,905,387 NA 0.00 4.00 4.00 NA NA NA pit unstable
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.70 m @
4.08
SGRP089 289,049 7,905,387 Q0121 4.00 5.00 1.00 SAP SP 3.88 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.70
m @ 4.36 %
SGRP089 289,049 7,905,387 Q0122 5.00 5.70 0.70 SAP SP 4.36 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
SGRP090 289,065 7,905,387 NA 0.00 3.70 3.70 NA NA NA pit unstable
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.40 m @
1.64
SGRP090 289,065 7,905,387 Q0123 3.70 4.50 0.80 PED MZ 1.52 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.10
m @ 2.37 %
SGRP090 289,065 7,905,387 Q0124 4.50 5.00 0.50 PED MZ 1.69 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP090 289,065 7,905,387 Q0125 5.00 5.10 0.10 SAP SP 2.37
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
Not sampled,
SGRP091 289,012 7,905,389 NA 0.00 3.50 3.50 NA NA NA pit unstable
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
2.10 m
2.68
SGRP091 289,012 7,905,389 Q0126 3.50 4.20 0.70 PED MZ 3.93 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.70
m 3.93 %
SGRP091 289,012 7,905,389 Q0127 4.20 5.00 0.80 PED MZ 2.03 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP091 289,012 7,905,389 Q0128 5.00 5.60 0.60 SAP SP 2.09
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP092 288,872 7,905,573 NA 0.00 4.50 4.50 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP093 288,876 7,905,634 NA 1.00 5.00 5.00 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP094 288,869 7,905,700 NA 2.00 4.60 4.60 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
No graphite
mineralisation
SGRP095 289,168 7,904,831 NA 0.00 1.80 1.80 NA N NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP096 289,149 7,904,832 Q0129 0.30 1.40 1.10 PED FZ 0.93
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.40 m @
2.28
SGRP096 289,149 7,904,832 Q0130 1.40 2.40 1.00 PED MZ 1.73 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.40
m @ 3.66 %
SGRP096 289,149 7,904,832 Q0131 2.40 2.80 0.40 SAP SP 3.66 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SR sampled
Q0132 289,149 7,904,832 Q0132 2.80 2.80 0.00 SAP SR 3.12 in SGRP096
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP097 289,130 7,904,832 Q0133 0.50 1.60 1.10 PED FZ 0.55
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.00 m @
3.21
SGRP097 289,130 7,904,832 Q0134 1.60 2.60 1.00 PED MZ 3.21 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP098 289,110 7,904,831 Q0135 0.60 1.40 0.80 PED FZ 0.14
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------------
SGRP098 289,110 7,904,831 Q0136 1.40 2.00 0.60 PED MZ 0.39
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
0.30 m @
3.39
SGRP098 289,110 7,904,831 Q0137 2.00 2.30 0.30 SAP SP 3.39 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SR sampled
Q0138 289,110 7,904,831 Q0138 2.30 2.30 0.00 SAP SR 5.15 in SGRP098
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.60 m @
2.20
SGRP099 289,090 7,904,831 Q0139 0.50 1.20 0.70 PED FZ 1.46 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.30
m @ 3.69 %
SGRP099 289,090 7,904,831 Q0141 1.20 1.80 0.60 PED MZ 2.33 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP099 289,090 7,904,831 Q0142 1.80 2.10 0.30 SAP SR 3.69
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP100 289,071 7,904,830 Q0143 0.50 1.00 0.50 PED FZ 0.91
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.50 m @
4.48
SGRP100 289,071 7,904,830 Q0144 1.00 1.70 0.70 PED MZ 3.49 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl. 080
m @ 5.35 %
SGRP100 289,071 7,904,830 Q0145 1.70 2.50 0.80 PED MZ 5.35 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP101 289,051 7,904,830 Q0146 0.50 1.00 0.50 PED FZ 0.42
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.60 m @
0.81
SGRP101 289,051 7,904,830 Q0147 1.00 1.80 0.80 PED MZ 1.08 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.80
m @ 1.08 %
SGRP101 289,051 7,904,830 Q0148 1.80 2.60 0.80 PED MZ 0.54 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
2.20 m @
3.34
SGRP102 289,142 7,904,556 Q0161 0.80 1.60 0.80 PED FZ 3.16 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP102 289,142 7,904,556 Q0162 1.60 2.30 0.70 PED MZ 3.65
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
SGRP102 289,142 7,904,556 Q0163 2.30 3.00 0.70 PED MZ 3.24
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SR sampled
Q0164 289,142 7,904,556 Q0164 0.80 0.80 0.00 SAP SR 4.95 in SGRP102
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
No graphite
mineralisation
SGRP103 289,122 7,904,552 NA 0.00 2.40 2.40 NA NA NA observed
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
SGRP104 289,102 7,904,553 Q0165 0.50 1.00 0.50 PED FZ 0.28
---------------------- -------- ---------- -------- ------- ------ --------- ---------------
1.20 m @
1.38
SGRP104 289,102 7,904,553 Q0166 1.00 1.70 0.70 PED MZ 0.55 % GC
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ---------------
(incl.
0.50
m @ 2.54 %
SGRP104 289,102 7,904,553 Q0167 1.70 2.20 0.50 SAP SP 2.54 GC)
---------------------- -------- ---------- -------- ------- ------ --------- ---------- ---------- ----- ----------- ---------------
LITHOLOGY / SUB LITHOLOGY
----------------------------
Ferruginous zone
----------------------------
Graphitic gneiss
----------------------------
Mottled zone
--------------------------
Not applicable
----------------------------
Pedolith
--------------------------
Saprolith
--------------------------
Saprolite
--------------------------
Saprock
--------------------------
This information is provided by RNS
The company news service from the London Stock Exchange
END
DRLTAMLTMBITMMA
Stratmin Global (LSE:STGR)
Historical Stock Chart
From Oct 2024 to Nov 2024
Stratmin Global (LSE:STGR)
Historical Stock Chart
From Nov 2023 to Nov 2024