Central China Goldfields plc                          

                           ("GGG" or "the Company")                            

                           DONG MAO HUO GOLD PROJECT                           

                           THIRD BATCH DRILL RESULTS                           

LONDON - 8 July 2008 - Central China Goldfields plc (AIM: GGG) is pleased to
announce the third batch of results from 12 additional holes completed in the
May-June 2008 reverse circulation ("RC") drilling programme at the Dong Mao Huo
gold project in the Nei Menggu Autonomous Region of Northern China.

Highlights:

  * Results further confirm the presence of significant gold mineralisation at
    1 gramme per tonne gold ("g/t Au")) in 7 out of 12 holes.
   
  * Hole RC43A intersected 3 metres of 29.31 g/t gold from 57 metres down hole,
    including 84 g/t gold over 1 metre;
   
  * Hole RC43A additionally intersected 11 metres of 1.43 g/t gold from 33
    metres down hole and 4 metres of 2.12 g/t gold from 72 metres down hole;
   
  * Hole RC41 intersected 6 metres of 3.25 g/t gold from 109 metres down hole, 
    including 8.16 g/t gold over 1 metre;
   
  * Hole RC39 intersected 2 metres of 8.95 g/t gold from 112 metres down hole, 
    including 17.1 g/t gold over 1 metre;
   
  * Hole RC37 intersected 5 metres of 3.15 g/ t gold from 44 metres down hole, 
    including 6.03 g/t gold over 2 metres.
   
  * Hole RC34 intersected 5 metres of 1.47 g/t gold from 29 metres down hole, 
    including 4.78 g/t gold over 1 metre.
   
  * Preliminary metallurgical testing is due to commence on both the gold oxide
    and sulphide ores.
   
  * To date, assay results from 24 out of 35 holes have validated the presence
    of significant gold mineralisation (above 1 g/t gold). Assay results are
    still pending for the last 15 holes.
   
Jeff Malaihollo, Managing Director of Central China Goldfields, comments:

"We are delighted with the progress being made at Dong Mao Huo where this
latest set of drill hole results yet again confirms the presence of high grade
pods against a broader backdrop of wide but lower grade gold mineralisation.
Hole RC43A is the third of such high grade pods we have encountered and the
fourth one identified so far.

This round of RC drilling has been very successful in delineating the Dong Mao
Huo ore body. Up to now we have had around a 70% success rate in hitting gold
intersections of above 1 g/t.

Given the progress at Dong Mao Huo to date, Central China is due to commence
initial metallurgical testing on both gold oxide and sulphide ores with the
objective of moving ahead to pilot bulk sampling."

GEOLOGICAL DETAILS:

Drilling Results Details:

A reverse circulation ("RC") drill programme was undertaken by Beijing Kente
Drilling Co. Ltd., a subsidiary of the Drillcorp Group from 4 May to 15 June
2008. The aim is to assist mine planning by infilling the drill grid from 80 x
80 metres to about 40 x 40 metres. The drilling also confirmed that the trend
of gold mineralisation is generally northerly which is transverse to the
east-west trend of the host rhyodacite breccia. The programme consisted of 50
holes totaling 5,328 metres. To date, the total drilling is 7,129 metres of RC
and 3,294.60 metres of core, or a grand total of 10,423.60 metres.

The gold mineralisation at Dong Mao Huo is associated with a 800m long x 120m
wide east-west trending structurally emplaced rhyodacite breccia/dyke in an
orthogneiss and schist complex. The gold-base metal mineralisation is generally
associated with northerly trending structures characterised by hydraulic
emplacement of sulphides along fractures and zones of hydrothermal breccias.
The ore minerals are pyrite and chalcopyrite with minor to trace amounts of
sphalerite, chalcocite, galena and arsenopyrite as disseminations, fracture and
breccia fills. Deep weathering has oxidised the mineralised zone down to about
35 - 50 metres.

A third batch of gold assay results from 14 additional holes (RC23A to RC30A)
has been received from the drill programme. The first batch of results from 9
holes was released last 18 June 2008 and the second batch on 14 holes last 30
June 2008.

At about 0.35 g/t Au cut-off, the assay results of the RC holes are outlined in
Table 1.

Table 1. Summary of significicant drillhole assay results

Hole No. Drill Azimuth Ore Zone From (m) To (m) Width (m) Au g/t
                                                                
RC33           0        Oxide    38.00   40.00      2      0.38 
                                                                
RC33           0        Mixed    66.00   68.00      2      1.38 
                                                                
RC34           0        Oxide    29.00   34.00      5      1.47 
                                                                
incl.                            32.00   33.00      1      4.78 
                                                                
RC34           0        Oxide    54.00   56.00      2      0.77 
                                                                
RC34           0       Sulphide  80.00   81.00      1      1.31 
                                                                
RC35           0        Oxide    29.00   38.00      9      0.51 
                                                                
RC36           0        Oxide     4.00    7.00      3      0.65 
                                                                
RC36           0        Oxide    12.00   21.00      9      0.65 
                                                                
RC36           0       Sulphide  56.00   58.00      2      0.64 
                                                                
RC37          90       Sulphide  44.00   49.00      5      3.15 
                                                                
incl.                            46.00   48.00      2      6.03 
                                                                
RC37          90       Sulphide  104.00  108.00     4      0.60 
                                                                
RC39           0       Sulphide  70.00   71.00      1      1.21 
                                                                
RC39           0       Sulphide  73.00   76.00      3      0.54 
                                                                
RC39           0       Sulphide  104.00  108.00     4      0.64 
                                                                
RC39           0       Sulphide  112.00  114.00     2      8.95 
                                                                
incl.                            112.00  113.00     1     17.10 
                                                                
RC41          90       Sulphide  109.00  115.00     6      3.25 
                                                                
incl.                            111.00  112.00     1      8.16 
                                                                
RC43          90        Oxide    35.00   37.00      2      0.45 
                                                                
RC43A         90        Oxide    33.00   44.00     11      1.43 
                                                                
RC43A         90        Oxide    57.00   60.00      3     29.31 
                                                                
incl.                            57.00   58.00      1     84.00 
                                                                
RC43A         90        Mixed    65.00   70.00      5      0.56 
                                                                
RC43A         90        Oxide    72.00   76.00      4      2.12 
                                                                
RC43A         90        Oxide    80.00   82.00      2      0.46 

*No significant mineralisation in holes RC38, RC40 and RC 42. Silver and Copper
grade are not yet available.

At about 0.35 g/t Au cut-off, the best results are: hole RC43A intersected 11
metres of 1.43 g/t Au from 33 metres, and 3 metres of 29.31 g/t Au from 57
metres, including 84 g/t Au over 1 metre; hole RC41 intersected 6 metres of
3.25 g/t Au from 109 metres, including 8.16 g/t Au over 1 metre; hole RC39
intersected 2 metres of 8.95 g/t Au from 112 metres, including 17.1 g/t Au over
1 metre; hole RC37 intersected 5 metres of 3.15 g/ t Au from 44 metres,
including 6.03 g/t Au over 2 metres; and lastly hole RC34 intersected 5 metres
of 1.47 g/t Au from 29 metres, including 4.78 g/t Au over 1 metre.

North-directed holes RC33 to RC36, located at the southeastern part of West
Hill, probably hit the fringes of northerly trending mineralised structures as
indicated by wide (20 to 36 metres) intervals of anomalous 0.1-0.3 g/t Au and
only a few metres wide zones of >1 g/t Au. East-directed hole RC43 was
terminated at 42 metres as it hit an underground working. Hole RC43A was a step
out to continue hole RC43 at depth and hit significant mineralisation.

Copper ("Cu") and silver ("Ag") grades have also been received for the first 17
of the 50 drill holes programme. The results are shown in Table 2.

Table 2. Summary of significant drill gold, silver and copper results to date

Hole No. Ore Zone From (m) To (m) Width (m) Au g/t Ag g/t Cu %  Ag:Au Ratio
                                                                           
RC16     Sulphide  40.00   42.00      2      0.70   9.05  0.34     12.9    
                                                                           
RC16      Oxide    70.00   72.00      2      1.78  22.75  0.69     12.8    
                                                                           
RC16     Sulphide  78.00   82.00      4      0.56   4.05  0.16      7.2    
                                                                           
RC17     Sulphide  82.00   91.00      9      0.94   4.56  0.17      4.8    
                                                                           
RC17     Sulphide  98.00   101.00     3      0.43   2.63  0.05      6.1    
                                                                           
RC17     Sulphide  110.00  112.00     2      1.44   2.50  0.03      1.7    
                                                                           
RC17     Sulphide  116.00  118.00     2      0.82   6.90  0.06      8.4    
                                                                           
RC17     Sulphide  122.00  125.00     3      0.63   1.67  0.03      2.6    
                                                                           
RC18      Oxide    44.00   49.00      5      1.83   5.18  0.22      2.8    
                                                                           
RC18     Sulphide  59.00   63.00      4      0.71   3.00  0.04      4.2    
                                                                           
RC18     Sulphide  92.00   94.00      2      1.19   1.35  0.01      1.1    
                                                                           
RC18     Sulphide  124.00  128.00     4      0.73   1.05  0.01      1.4    
                                                                           
RC19      Oxide    22.00   31.00      9      1.10  22.22  0.03     20.2    
                                                                           
RC19      Oxide    33.00   37.00      4      3.07  29.08  0.02      9.5    
                                                                           
RC19A     Oxide    23.00   28.00      5      1.52  21.62  0.07     14.2    
                                                                           
RC19A     Oxide    35.00   40.00      5      1.07   3.88  0.03      3.6    
                                                                           
RC19A    Sulphide  50.00   52.00      2      0.75   1.50  0.03      2.0    
                                                                           
RC19A    Sulphide  54.00   66.00     12      1.00   3.06  0.02      3.1    
                                                                           
RC19A    Sulphide  70.00   73.00      3      0.66   7.63  0.13     11.5    
                                                                           
RC19A    Sulphide  86.00   90.00      4      1.94   1.60  0.01      0.8    
                                                                           
RC19A    Sulphide  95.00   99.00      4      1.22   2.15  0.04      1.8    
                                                                           
RC20     Sulphide  80.00   81.00      1      2.33   8.60  0.07      3.7    
                                                                           
RC20     Sulphide  100.00  102.00     2      0.42   1.80  0.04      4.3    
                                                                           
RC21     Sulphide  75.00   77.00      2      0.61   1.95  0.08      3.2    
                                                                           
RC21     Sulphide  97.00   100.00     3      0.48  14.33  0.36     29.8    
                                                                           
RC21     Sulphide  104.00  126.00    22      1.48   5.51  0.13      3.7    
                                                                           
RC21     Sulphide  135.00  140.00     5      0.69   1.86  0.02      2.7    
                                                                           
RC22     Sulphide  85.00   90.00      5      0.64  11.96  0.28     18.7    
                                                                           
RC22      Mixed    95.00   99.00      4      0.62   3.13  0.10      5.0    
                                                                           
RC22     Sulphide  141.00  142.00     1      1.52  27.40  0.89     18.0    
                                                                           
RC23     Sulphide  59.00   63.00      4      0.63  10.20  0.30     16.1    
                                                                           
RC23     Sulphide  78.00   84.00      6      0.82   8.45  0.20     10.3    
                                                                           
RC23     Sulphide  89.00   93.00      4      0.72   4.48  0.12      6.2    
                                                                           
RC23     Sulphide  96.00   99.00      3      1.09  10.17  0.22      9.4    
                                                                           
RC23     Sulphide  102.00  104.00     2      1.50  38.30  0.60     25.6    
                                                                           
RC23     Sulphide  110.00  114.00     4      1.13  10.63  0.21      9.4    
                                                                           
RC23     Sulphide  150.00  156.00     6      1.41   2.08  0.03      1.5    
                                                                           
RC23A     Oxide    61.00   63.00      2      0.38   1.55  0.05      4.1    
                                                                           
RC23A    Sulphide  75.00   76.00      2      0.43   1.00  1.00     3.1    
                                                                           
RC25     Sulphide  74.00   76.00      2      0.47   2.40  0.03      5.1    
                                                                           
RC26A     Oxide    22.00   23.00      1      1.67  34.80  0.47     20.8    
                                                                           
RC26A     Oxide    52.00   53.00      1      1.04   6.70  0.15      6.4    
                                                                           
RC26A     Oxide    55.00   58.00      3      2.35  12.83  0.14      5.5    
                                                                           
RC26A    Sulphide  66.00   75.00      9      1.55   3.50  0.06      2.3    
                                                                           
RC27      Oxide    24.00   26.00      2      0.63   1.20  0.04      1.9    
                                                                           
RC28      Mixed    52.00   53.00      1      1.41   1.60 
GGG Resources (LSE:GGG)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more GGG Resources Charts.
GGG Resources (LSE:GGG)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more GGG Resources Charts.