TIDMCGH

RNS Number : 5200M

Chaarat Gold Holdings Ltd

24 May 2022

24 May 2022

Chaarat Gold Holdings Limited

("Chaarat" or "the Company")

Tulkubash Reserve and Resource Update

Chaarat (AIM:CGH), the AIM-quoted gold mining Company with an operating mine in Armenia, and assets at various stages of development in the Kyrgyz Republic is pleased to announce the results of the revised JORC compliant Tulkubash Mineral Resource Estimate ("MRE") and Ore Reserves ("OR") estimate following the 2021 drilling programme.

Highlights

-- Contained gold ounces in the Ore Reserves increased by 13% to 647 thousand ounces ("koz") compared to 571 koz in the 2021 bankable feasibility study (BFS).

-- Proven & Probable Reserves increased from 20.9Mt to 23.1Mt (+11%) with a slightly increased grade of 0.87 g/t compared to 0.85 g/t (+2%) in the BFS;

-- The pit shell optimisation for the Ore Reserve was based on a USD$ 1,600/oz gold price vs USD 1,450/oz gold price in the 2021 BFS as per latest long term gold price forecasts.

The targeted 2021 drilling programme has resulted in an improved Mineral Resource model which has contributed to an increase in Ore Reserves. Contained gold in the Measured and Indicated Resources remains unchanged at 789 koz, while Measured and Indicated Resources decreased from 28.5 to 25.1 Mt (-12%) and gold grade increased from 0.86 g/t to 0.98 g/t (+14%). The Inferred Resources have decreased as a result of more conservative constraining factors applied to the MRE. Drilling within the existing Mineral Resource footprint demonstrated increased continuity in and between the ore zones and was successful in improving the pit designs.

Further exploration conducted at Tulkubash during 2021 identified several additional new target areas, confirming the Company's belief that Tulkubash has the potential for further mine life extensions. To date, only about 5 kms of a prospective 24 km trend has been systematically drilled. An additional 4 kms of the prospective trend has been trenched and drill tested in 2021, confirming further perspectivity to the northeast.

Mike Fraser, Chief Executive Officer, commented:

"I'm pleased to report the results of the 2021 drilling programme at our Tulkubash gold project in the Kyrgyz Republic. The drilling has delivered a 13% increase in gold in the Ore Reserve to 647koz at a grade of 0.87g/t, adding about a year of production to what was already an economically robust project, while also improving our understanding of this exciting asset."

UpdateD MINERAL Resource Statement

The objective of the 2021 drilling programme was to upgrade Inferred and unclassified Mineral Resources in the mid zone and east area for potential conversion to Ore Reserves. For further information on the drilling campaign please refer to the 2021 release here .

The results of the 2021 drilling have been incorporated into an updated JORC-compliant Mineral Resource Estimate. The new block model and MRE addresses the recommendations of the external consultants that reviewed the 2021 BFS MRE.

The table below summarizes the updated Tulkubash end of year 2021 Mineral Resource at 0.21 g/t Au cut-off grade constrained by a USD$1,800/oz pit shell. Operating cost parameters used were as per the 2021 BFS.

Table 1. End of Year 2021 Mineral Resource Estimate ("EOY 2021")

 
   Classi     Tonnes (Mt)   Au (g/t)   Metal (Oz) 
  fication 
  Measured         -           -           - 
             ------------  ---------  ----------- 
 Indicated       25.1         0.98        789 
             ------------  ---------  ----------- 
    M&I          25.1         0.98        789 
             ------------  ---------  ----------- 
  Inferred       11.2         0.62        222 
             ------------  ---------  ----------- 
   TOTAL         36.3         0.87       1,011 
             ------------  ---------  ----------- 
 
   --     Figures are rounded in accordance with disclosure guidelines. 

-- The Mineral Resource was estimated using 5 m x 5 m x 5 m (x, y, z) blocks, with minimum sub-block dimensions of 1 m x 1 m x 1 m (x, y, z).

   --     The estimate was constrained to the mineralised zone using wireframe solid models. 
   --     Grade estimates were based on 1.5 m composited assay data. 
   --     The interpolation of the metal grades was undertaken using Ordinary Kriging. 
   --     The Mineral Resource was bounded by a pit shell based on a gold price of $1,800/oz Au. 
   --     A cut-off grade of 0.21 g/t Au was applied to report the Mineral Resources. 

A JORC Table appears as an Appendix to this press release.

UPDATED ORE Reserve Statement

The updated Ore Reserve for the Tulkubash project based on a gold price of $1,600/oz is shown below. Total OR are estimated at 23.1 Mt grading 0.87 g/t Au and containing 647 koz of gold. This is an 13% increase in contained gold in Proven & Probable Reserves compared to the 2021 BFS OR.

Table 2. 2022 Tulkubash Ore Reserve Estimate ("2022 OR")

 
 Classification    Ore (Mt)   Grade (g/t   Contained Au 
                               Au)          (koz) 
 Proven               --          --            -- 
                  ---------  -----------  ------------- 
 Probable            23.1        0.87          647 
                  ---------  -----------  ------------- 
 Total               23.1        0.87          647 
                  ---------  -----------  ------------- 
 

Notes to the Ore Reserve Statement:

1) This statement of Ore Reserves has been prepared by Mr. Peter C. Carter, an independent consulting mining engineer, based on a review of work performed by Chaarat Gold and associated technical staff.

2) Mr. Carter is a member of the Association of Professional Engineers and Geoscientists of British Columbia and is qualified as a Competent Person under the JORC Code, 2012.

3) There are no Proven Reserves as drillhole density and historical data quality do not support Measured Resources.

   4)        Tonnages are in metric tonnes. 
   5)        Figures have been rounded to three significant figures. 
   6)        Ore Reserves are reported inclusive of mining dilution (10%) and mining recovery (97.5%). 
   7)        A gold price of US$1,600/oz was used in the preparation of the estimate. 
   8)        Ore Reserves are based on a marginal cut-off grade of 0.22 g/t Au. 

9) Estimated metallurgical recovery for the Ore Reserve is 74.0% based on a geo-metallurgical model.

10) Reserve is contained in a minable pit design generated from an optimised pit shell based on a gold price of $1,350/oz

The Ore Reserve has a strip ratio of 2.9:1 and an average recovery of 74.1% representing 479,000 oz Au recovered. By-product silver is not reported as part of the reserve as its contribution to the project value is immaterial.

Changes from 2021 BFS

While tonnes have decreased in the EOY 2021 MRE gold grade has increased from the BFS as has waste and strip ratio. Wire frames have been revised, a variable rather than fixed gold recovery has been developed. These changes are summarised in table 3. Details can be found in the MRE Report that is available on our homepage.

Table 3. Comparison of EOY 2021 MRE and 2021 BFS MRE

 
             M&I        Au       Inferred       Au       Recovery 
              Mt    g/t    Koz      Mt      g/t    Koz      % 
            -----  -----  ----  ---------  -----  ----  --------- 
 EOY 2021    25.1   0.98   789     11.2     0.62   222     74.1 
            -----  -----  ----  ---------  -----  ----  --------- 
 2021 BFS    28.5   0.86   789     21.4     0.56   388     73.6 
            -----  -----  ----  ---------  -----  ----  --------- 
 Variance    -3.4   0.12    -      -9.8     0.06   166     0.5 
            -----  -----  ----  ---------  -----  ----  --------- 
 

The additional 2021 infill drilling targeted areas led to an increase in Ore Reserves and an improved recovery model. The updated pit design also resulted in a slightly increased strip ratio.

Table 4. Comparison of 2022 and 2021 BFS Ore Reserves

 
             Ore    Au           Recovery     Waste   Total   Strip 
                                                               Ratio 
            =====  ===========  ===========  ======  ======  ======= 
             Mt     g/t    Koz   % Au   Koz   Mt      Mt      w:o 
 2022 
  OR         23.1   0.87   647   74.1   479   66.4    89.5    2.9 
 2021 
  BFS        20.9   0.85   571   73.6   420   54.0    74.9    2.6 
 Variance    2.1    0.02   76    0.5    57    12.4    4.6     0.3 
 

The largest portion of the Ore Reserve is contained in the Main Zone (MZ) Pit (19.8 Mt). To the northeast of MZ lies the Mid Zone, composed of six small satellite pits, accounting for a further 3.1 Mt of ore. Further northeast lies the East Zone, which contains another 0.2 Mt in a single separate pit. The East Zone is not fully drilled off and offers the opportunity to continue growing the Ore Reserve in the coming drill seasons.

Table 5. Breakdown of the updated Ore Reserves by Zone

 
 Zone     Ore    Grade    Metal    Waste   Total   Strip Ratio 
         =====  =======  =======  ======  ======  ============ 
          Mt     g/t Au   Koz Au   Mt      Mt      w:o 
 Main     19.8   0.90     570      55.6    74.8    2.8 
 Mid      3.1    0.66     65       9.4     12.5    3.1 
 East     0.2    1.46     12       1.4     1.6     5.7 
 Total    23.1   0.87     647      66.4    89.5    2.9 
 
 
 Enquiries 
 
                                         +44 (0)20 7499 
 Chaarat Gold Holdings Limited            2612 
 Mike Fraser, Chief Executive Officer    IR@chaarat.com 
 
 Canaccord Genuity Limited (NOMAD and    + 44 (0)20 7523 
  Joint Broker)                           8000 
 Henry Fitzgerald-O'Connor 
 James Asensio 
 
                                         +44 (0)20 7220 
 finnCap Limited (Joint Broker)           0500 
 Christopher Raggett 
 
 Panmure Gordon (UK) Limited (Joint      +44 (0)20 7886 
  Broker)                                 2500 
 John Prior 
  Hugh Rich 
 

About Chaarat

Chaarat is a gold mining company which owns the Kapan operating mine in Armenia as well as Tulkubash and Kyzyltash Gold Projects in the Kyrgyz Republic. The Company has a clear strategy to build a leading emerging markets gold company through organic growth and selective M&A.

Chaarat aims to create value for its shareholders, employees and communities from its high-quality gold and mineral deposits by building relationships based on trust and operating to the best environmental, social and employment standards. Further information is available at www.chaarat.com/ .

Competent Person- Mineral Resource Estimate

The information in this announcement that relates to exploration results is based on and fairly represents information and supporting documentation prepared by Dimitar Dimitrov, P. Geo, AIG member and a Competent Person as defined in the 2012 edition of the JORC Code 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' and is a Qualified Person under the AIM Rules . Mr. Dimitar Dimitrov is a full-time employee of the company. Mr. Dimitrov consents to the publication of this new release dated May 24(th) , 2022 by Chaarat. Mr. Dimitrov certified that this news release fairly and accurately represents the information for which he is responsible.

Competent Person -Ore Reserve Estimate

The updated Ore Reserve estimate was prepared by Chaarat engineering staff at their Bishkek offices in the Kyrgyz Republic. The work was reviewed by Peter C. Carter, BSc, MBA, P.Eng, a consulting engineer registered in the province of British Columbia, Canada. Mr. Carter is qualified as a Competent Person as defined by the JORC code (2012) and a Qualified Person under the AIM Rules. He has reviewed the technical information related to the Ore Reserves in this press release and approves their use herein.

Quality Assurance/Quality Control Procedures: Sampling Methodology and Quality Control

All results used in the mineral resource estimate are from mostly diamond core drill holes, only 2020 drilling is reverse circulation. All core samples are cut along its long axis, half core packed, weighted and shipped to the ALS Global Laboratory in Kara-Balta, Kyrgyz Republic for sample preparation and assay. Gold is analysed using a 30-gramme fire assay with an atomic absorption spectroscopy (AAS) finish. A quality control/quality assurance protocol is employed in the programme which includes standards and blanks in every batch of assays. External check assays are conducted on every 20(th) sample by a second independent laboratory, SGS Vostok Limited Lab in Chita, Russia.

Geological Modelling Procedures

Only drilling data was engaged in the Resource estimation, although channels, trenches, and road cuts assays were used for ore zones interpretation as well. The Tulkubash deposit is interpreted as a brittle shear zone, formed in a shallow epithermal environment, consisting of a SW-NE corridor of low-grade mineralization, hosting a series of discrete, higher grade, steeply dipping lodes. Only the oxidized portion of the mineralisation is targeted for the planned conventional open pit mining and further heap leaching. The ore wireframes, including low- and high-grade types has been generated manually from section to section. Gold grades estimation was done by using Ordinary Kriging (OK), and Inverse Distance Weighting (IDW2) approach was used for the Silver and density interpolation. Micromine(TM) was used in the process of ore modelling, variography and resource estimation.

Pit Optimisation

Ore Reserves were defined as a subset of Measured and Indicated Resources. Whittle 4X pit optimization software was applied to the resource block model to develop a series of nested pit shells, corresponding to a range of gold prices from $1,000/oz to $1,800/oz.

Technical and economic parameters applied to drive the optimization are based on those from the 2021 FS. Cost parameters used to define the Ore Reserve are shown in the table below. A gold price of $1,600/oz, based on consensus forecasts for the operating period, was used to value the resulting pit shells.

The pit slopes used during the optimization varied between 49 degrees and 55 degrees based on feasibility design recommendations for the MZ Pit area.

Table 6. Cost Parameters applied for Pit Optimization

 
 Operating Cost    Units            Value 
 Mining (ore)      $/t mined        2.5 5 
                  ---------------  -------- 
 Mining (waste)    $/t mined        1.83 
                  ---------------  -------- 
 Mining (owner)    $/t processed    0.34 
                  ---------------  -------- 
 Process           $/t processed    4.79 
                  ---------------  -------- 
 G&A               $/t processed    1.27 
                  ---------------  -------- 
 Refining          $/oz             9.78 
                  ---------------  -------- 
 Royalty           %                1 4 .0* 
                  ---------------  -------- 
 

* Sliding scale royalty appropriate at Au prices of $1,501-$1,600/oz

Gold recovery for the updated Reserve averaged 73%. Recovery was estimated on a block-by-block basis using oxidation state and extractions derived from metallurgical test work. The improvement in recovery from the 2021 FS was due to the inclusion of more, highly oxidized material from the Mid and East Zones in the reserve.

Optimisation Results

The results of the pit optimization indicated that a gold price of $1,350/oz produced the highest value shell with the lowest risk. The shell was composed of seven separate entities, collectively containing 21.8 Mt ore at a grade of 0.97 g/t Au and a strip ratio of 2.9:1. This pit shell was selected as the basis for developing minable pit designs.

Mine Design

The shell for each separate pit was used to guide a computer-aided, manual design process. Constructible features such as ramps and safety benches were designed within the optimised pit limits to turn the three-dimensional surface into a minable pit design. The result of the pit design process was an ore reserve within 5% of the optimised minable resource.

The tonnage and grade in the minable pits, was adjusted for mining dilution and ore losses expected from the mining process. Mining dilution was calculated directly from the block model along the ore/waste contacts. Average dilution was estimated at 10% and varied from zone to zone. Ore losses from mining were applied at 2.5%.

Glossary of Technical Terms

 
 "Ag"                   chemical symbol for silver 
 "Au"                   chemical symbol for gold 
 "AuEq"                 the value of a tonne of mineralised material 
                         calculated by summing the value of each contained 
                         payable metal and expressing it as an equivalent 
                         gold content at a given set of metals prices 
 "Cu"                   the chemical symbol for copper 
 "cut-off"              the lowest grade value that is included in a 
                         Resource statement. It must comply with JORC 
                         requirement 19: "reasonable prospects for eventual 
                         economic extraction" the lowest grade, or quality, 
                         of mineralised material that qualifies as economically 
                         mineable and available in a given deposit. It 
                         may be defined on the basis of economic evaluation, 
                         or on physical or chemical attributes that define 
                         an acceptable product specification 
 "g/t"                  grammes per tonne, equivalent to parts per million 
 "Inferred Resource"    that part of a Mineral Resource for which tonnage, 
                         grade and mineral content can be estimated with 
                         a low level of confidence. It is inferred from 
                         geological evidence and assumed but not verified 
                         geological and/or grade continuity. It is based 
                         on information gathered through appropriate techniques 
                         from locations such as outcrops, trenches, pits, 
                         workings and drill holes which may be limited 
                         or of uncertain quality and reliability 
 "Indicated Resource"   that part of a Mineral Resource for which tonnage, 
                         densities, shape, physical characteristics, grade 
                         and mineral content can be estimated with a reasonable 
                         level of confidence. It is based on exploration, 
                         sampling and testing information gathered through 
                         appropriate techniques from locations such as 
                         outcrops, trenches, pits, workings and drill 
                         holes. The locations are too widely or inappropriately 
                         spaced to confirm geological and/or grade continuity 
                         but are spaced closely enough for continuity 
                         to be assumed 
 "JORC"                 The Australasian Joint Ore Reserves Committee 
                         Code for Reporting of Exploration Results, Mineral 
                         Resources and Ore Reserves 2012 (the "JORC Code" 
                         or "the Code"). The Code sets out minimum standards, 
                         recommendations and guidelines for Public Reporting 
                         in Australasia of Exploration Results, Mineral 
                         Resources and Ore Reserves 
 "koz"                  thousand troy ounces of gold 
 "Measured Resource"    that part of a Mineral Resource for which tonnage, 
                         densities, shape, physical characteristics, grade 
                         and mineral content can be estimated with a high 
                         level of confidence. It is based on detailed 
                         and reliable exploration, sampling and testing 
                         information gathered through appropriate techniques 
                         from locations such as outcrops, trenches, pits, 
                         workings and drill holes. The locations are spaced 
                         closely enough to confirm geological and grade 
                         continuity 
 "Mineral Resource"     a concentration or occurrence of material of 
                         intrinsic economic interest in or on the Earth's 
                         crust in such form, quality and quantity that 
                         there are reasonable prospects for eventual economic 
                         extraction. The location, quantity, grade, geological 
                         characteristics and continuity of a Mineral Resource 
                         are known, estimated or interpreted from specific 
                         geological evidence and knowledge. Mineral Resources 
                         are sub-divided, in order of increasing geological 
                         confidence, into Inferred, Indicated and Measured 
                         categories when reporting under JORC 
 "Mt"                   million tonnes 
 "oz"                   troy ounce (= 31.103477 grammes) 
 "Pb"                   the chemical symbol for lead 
 "Probable Reserve"     the part of Indicated and in some cases Measured 
                         Resource that can be mined at a profit. It includes 
                         diluting materials and allowances for losses 
                         that may occur during mining. 
 "Proven Reserve"       the part of Indicated Measured Resource that 
                         can be mined at a profit. It includes diluting 
                         materials and allowances for losses that may 
                         occur during mining. 
 "Ore Reserves"         the part of a Measured and/or Indicated Mineral 
                         Resource that can be mined at a profit. Ore Reserves 
                         are subdivided in order of increasing confidence 
                         into Probable and Proven categories when reporting 
                         under JORC. 
 "t"                    tonne (= 1 million grammes) 
 "Zn"                   the chemical symbol for zinc 
 

Appendix 1: JORC_Table

JORC Code, 2012 Edition - Table 1 report template

Section 1 Sampling Techniques and Data

 
 Criteria       JORC Code explanation                                         Commentary 
               ============================================================ 
 Sampling 
 techniques      *    Nature and quality of sampling (eg cut channels,          *    Sampling comprises predominantly wireline diamond 
                      random chips, or specific specialized industry                 drilling core, along with channel sampling from 
                      standard measurement tools appropriate to the                  trenches, road cuts and underground adit. Limited RC 
                      minerals under investigation, such as down hole gamma          drilling program was completed in 2020 as well 
                      sondes, or handheld XRF instruments, etc). These 
                      examples should not be taken as limiting the broad 
                      meaning of sampling.                                      *    Data from the surface trenches, road cuts and 
                                                                                     underground adit has been used during the 
                                                                                     interpretation of the mineralization, but was 
                 *    Include reference to measures taken to ensure sample           excluded from interpolation process 
                      representivity and the appropriate calibration of any 
                      measurement tools or systems used. 
                                                                                *    Core was drilled through the full expected 
                                                                                     mineralization intersection, as normal to the strike 
                 *    Aspects of the determination of mineralization that            and dip as possible 
                      are Material to the Public Report. 
 
                                                                                *    All drilling is diamond core, standard or triple-tube, 
                 *    In cases where 'industry standard' work has been done          predominantly at HQ diameter. Half core, cut along 
                      this would be relatively simple (eg 'reverse                   the core axis, has been used for sampling 
                      circulation drilling was used to obtain 1 m samples 
                      from which 3 kg was pulverised to produce a 30 g 
                      charge for fire assay'). In other cases more              *    All the trench and road cut sampling were done with 
                      explanation may be required, such as where there is            ordinary hammer, following marked sample boundaries 
                      coarse gold that has inherent sampling problems. 
                      Unusual commodities or mineralisation types (eg 
                      submarine nodules) may warrant disclosure of detailed     *    The average down-hole sample length is 1.5m, the 
                      information.                                                   average trench and road cut sample length is 2.0m 
 
 
                                                                                *    The average sample weight is approx. between 4-6 kg 
 
 
                                                                                *    1.0 m samples were collected from a cyclone, using a 
                                                                                     riffle splitter, during the RC drilling process 
 
 
                                                                                *    Samples were split along the major lithological 
                                                                                     breaks 
 
 
                                                                                *    All the sampling practices are meeting the industry 
                                                                                     standards 
 
 
                                                                                *    Handled XRF instrument was also available, and 
                                                                                     certain data from core and road cut measurements made 
                                                                                     through the exploration activities is available as 
                                                                                     well, although this data is not used directly for the 
                                                                                     current mineral assessment 
=============  ============================================================  =============================================================== 
 Drilling 
 techniques      *    Drill type (e.g. core, reverse circulation, open-hole       *    Almost, only diamond core drilling was conducted in 
                      hammer, rotary air blast, auger, Bangka, sonic, etc.)            Tulkubash project, except 2020 campaign, when limited 
                      and details (e.g. core diameter, triple or standard              RC drilling was completed 
                      tube, depth of diamond tails, face-sampling bit or 
                      other type, whether core is oriented and if so, by 
                      what method, etc.).                                         *    All the available drilling is included in 
                                                                                       MRE_update_21, 729 holes with total length of 
                                                                                       102,406.2m (incl. 24 holes / 2,760.3m at 2021 and 21 
                                                                                       RC holes - 2,434.3m at 2020) 
 
 
                                                                                  *    Additional 13 orientated, geotechnical holes 
                                                                                       (completed at 2021), with a total length of 1,549.9m 
                                                                                       are providing structural and lithological data, but 
                                                                                       were not included in the current Resource modelling 
 
 
                                                                                  *    HQ was used as a major drilling diameter, PQ (at the 
                                                                                       hole upper levels and NQ at the hole deeper zones) 
                                                                                       were also sporadically used, aiming to guarantee best 
                                                                                       drilling performance in fractured host rock 
 
 
                                                                                  *    124mm drilling diameter was used in the RC drilling 
 
 
                                                                                  *    For better core recovery triple - tube was used in 
                                                                                       the critical areas 
 
 
                                                                                  *    The majority of the drilling is inclined, SE or NW 
                                                                                       orientated, aiming to intercept the expected 
                                                                                       mineralization strike as normal as possible 
 
 
                                                                                  *    Overall, no orientation was applied in the drilling 
                                                                                       campaigns, although more than 3,300 orientated 
                                                                                       structural measurements are available after the 
                                                                                       geotechnical drilling, in Main Pit area 
 
 
                                                                                  *    The used drilling equipment was in good condition, 
                                                                                       provided and operated by local subcontractor with 
                                                                                       wide experience in central Asia region 
 
 
                                                                                  *    All drilling procedures are meeting the industry 
                                                                                       standards 
=============  ============================================================  =============================================================== 
 Drill sample 
 recovery        *    Method of recording and assessing core and chip              *    Core recovery is logged as percent of the core 
                      sample recoveries and results assessed.                           recovery length VS drill run length, and it is 
                                                                                        measured by company's geologists and technicians, 
                                                                                        directly in the core boxes, immediately after the 
                 *    Measures taken to maximize sample recovery and ensure             core is transported to the field core shed 
                      representative nature of the samples. 
 
                                                                                   *    Through the drilling process, in an attempt to 
                 *    Whether a relationship exists between sample recovery             maximize the core recovery were used triple - core 
                      and grade and whether sample bias may have occurred               tube and additive drilling muds 
                      due to preferential loss/gain of fine/coarse 
                      material. 
                                                                                   *    Overall diamond core recovery is above 90% 
 
 
                                                                                   *    RC drilling recovery is approx. 80% (based on the 
                                                                                        recovery weights) 
 
 
                                                                                   *    The average down-hole sample length is 1.5m (1m for 
                                                                                        RC) 
 
 
                                                                                   *    The average trench / road cut sample length is 2.0m 
 
 
                                                                                   *    All samples were split along the observed major 
                                                                                        lithological breaks 
 
 
                                                                                   *    There doesn't appear to be a relationship bias 
                                                                                        between grade and length, or sample weight and 
                                                                                        recovery 
 
 
                                                                                   *    All sampling practices are meeting the industry 
                                                                                        standards 
=============  ============================================================  =============================================================== 
 Logging 
                  *    Whether core and chip samples have been geologically       *    The implemented core logging protocol is documented: 
                       and geotechnically logged to a level of detail to               lithology, hydrothermal alteration, oxidation stage, 
                       support appropriate Mineral Resource estimation,                degree of fracturing, mineralization, structures, RQD 
                       mining studies and metallurgical studies.                 , 
                                                                                       core recovery, and RMR based logging for the 
                                                                                       geotechnical holes. Entire core is regularly 
                  *    Whether logging is qualitative or quantitative in               photographed. 
                       nature. Core (or costean, channel, etc) photography. 
 
                                                                                  *    Total length of the logged drill holes is 103, 956.2m 
                  *    The total length and percentage of the relevant                 (including geotechnical) 
                       intersections logged. 
 
                                                                                  *    Total length of the logged surface workings (trenches 
                                                                                 , 
                                                                                       road cuts and profiles) is approx. 38km 
 
 
                                                                                  *    Each day, the core was transported to the field core 
                                                                                       storage area for logging. The core trays are wooden, 
                                                                                       including wooden cover as well, to prevent losses or 
                                                                                       extra moving 
 
 
                                                                                  *    Core logging is done by company's geologists in 
                                                                                       laptops, using AGR 4.0 software as a base platform. 
                                                                                       Before using AGR platform, the logging was done on 
                                                                                       the hard copy and further transcribed into Microsoft 
                                                                                       Excel 
 
 
                                                                                  *    Surface workings logging was done by company's 
                                                                                       geologists and / or sub-contractors, under the 
                                                                                       supervision of company's geologists 
 
 
                                                                                  *    Photo documentation is done on wet trays, and data is 
                                                                                       also incorporated in the database. 
 
 
                                                                                  *    At the end of the field season all core is 
                                                                                       transported at the main core storage facility, in 
                                                                                       Malovodnoye village, located close to Bishkek 
 
 
                                                                                  *    Logging procedures are meeting the industry standards 
                                                                                 , 
                                                                                       and are reasonable for Mineral Resource estimation 
 Sub-sampling 
 techniques       *    If core, whether cut or sawn and whether quarter,          *    All of the drilled core is sampled, except the 
 and sample            half or all core taken.                                         initial diluvium / alluvium zones 
 preparation 
 
                  *    If non-core, whether riffled, tube sampled, rotary         *    All intact core samples are cut along its long axis, 
                       split, etc and whether sampled wet or dry.                      using core saw, half core is packed in a labelled 
                                                                                       polyethylene bag, weighted, and further transported 
                                                                                       to laboratory for sample preparation and assaying. In 
                  *    For all sample types, the nature, quality and                   case of intensively fractured zones, samples are 
                       appropriateness of the sample preparation technique.            taken with trowel 
 
 
                  *    Quality control procedures adopted for all                 *    All in situ bedrock, outcropped in trenches and new 
                       sub-sampling stages to maximize representivity of               road cuts were sampled as well 
                       samples. 
 
                                                                                  *    Rock density measurements are using field Archimedes' 
                  *    Measures taken to ensure that the sampling is                   principle, approach with wax. Density sampling was 
                       representative of the in situ material collected,               designed as per 1 sample (approx. 10 cm) for each 5 
                       including for instance results for field                        meters (at 2021) and 1 sample per each 20m in the 
                       duplicate/second-half sampling.                                 historical campaigns. In areas of intensively 
                                                                                       fractured material the interval is wider due lack of 
                                                                                       proper material. No density was measured at 2020 
                  *    Whether sample sizes are appropriate to the grain               campaign as, RC drilling is not providing intact 
                       size of the material being sampled.                             material 
 
 
                                                                                  *    The collection of geological data meets the 
                                                                                       industrial standards 
               ============================================================ 
 Quality of 
 assay data      *    The nature, quality and appropriateness of the              *    Samples collected from 2007 to 2014 were prepared and 
 and                  assaying and laboratory procedures used and whether              assayed at IRC Laboratory in Karla Balta, Kyrgyzstan. 
 laboratory           the technique is considered partial or total. 
 tests 
                                                                                  *    Sample collected from 2017 to 2019 were prepared and 
                 *    For geophysical tools, spectrometers, handheld XRF               analysed at ALS Global (Karla Balta), and referee 
                      instruments, etc, the parameters used in determining             check samples were sent to SGS Vostok Limited (Chita, 
                      the analysis including instrument make and model,                Russa) 
                      reading times, calibrations factors applied and their 
                      derivation, etc. 
                                                                                  *    2020 (RC drilling) and 2021 campaigns were used 
                                                                                       Steward Assay and Environmental Laboratories LLC 
                 *    Nature of quality control procedures adopted (eg                 (Karla Balta, Kyrgyzstan). SGS (Chita, Russia) was 
                      standards, blanks, duplicates, external laboratory               used for an external control laboratory at 2021 
                      checks) and whether acceptable levels of accuracy (ie            campaign 
                      lack of bias) and precision have been established. 
 
                                                                                  *    Through the sample preparation process, the entire 
                                                                                       sample is crushed to passing 90% at 2mm. Two pulps 
                                                                                       are made by pulverizing to 85% passing 0.075 mm. One 
                                                                                       pulp is return to the company as duplicate, the 
                                                                                       second one is analysed, including: 
 
 
                                                                                 - Fire assay - lead collection with AA 
                                                                                 - Aqua Regia digestion with following ICP-OES reading 
                                                                                 - Analyses of Stotal, Ssulphide, Ssulphate, by chemical 
                                                                                 treatment and LECO, for certain selected 
                                                                                 samples (above 0.25 ppm Au) 
                                                                                 - LeachWELL analysis for certain selected samples ( above 
                                                                                 0.25 ppm Au) 
                                                                                  *    Lower detection limit for Au is 0.05ppm and for Ag is 
                                                                                       1ppm 
 
 
                                                                                  *    Assay quality control was achieved using, reference 
                                                                                       material (standards, provided by RockLab), blank 
                                                                                       material (barren sediments), coarse and pulp 
                                                                                       duplicates, along with field duplicates (applied in 
                                                                                       for first time at 2021 campaign), and external 
                                                                                       laboratory control sampling 
 
 
                                                                                  *    The QA/QC design and results are adequate to support 
                                                                                       estimation of Mineral Resource 
 Verification 
 of sampling     *    The verification of significant intersections by          *    No twin holes have been conducted at Tulkubash area 
 and assaying         either independent or alternative company personnel. 
 
                                                                                *    All the assay results are received electronically as 
                 *    The use of twinned holes.                                      an Excel spreadsheet, and further incorporated in the 
                                                                                     database by company's database manager 
 
                 *    Documentation of primary data, data entry procedures, 
                      data verification, data storage (physical and             *    The access to the database is limited, and only 
                      electronic) protocols.                                         authorized employees can make corrections in it 
 
 
                 *    Discuss any adjustment to assay data.                     *    Prior to data interpretation, the lower detection 
                                                                                     limits of Au (0.05 ppm) are changed to half of the 
                                                                                     detection limit (0.025 ppm). In regard to Ag same 
                                                                                     formula (half of the lower detection limit) was 
                                                                                     applied. For the elements with results restricted by 
                                                                                     upper detection limit, a conservative formula y = 
                                                                                     x*1.01 was applied 
 
 
                                                                                *    Data entry procedures and QA/QC verification meet the 
                                                                                     industrial standards and adequate to support MRE 
               ============================================================ 
 Location of 
 data points     *    Accuracy and quality of surveys used to locate drill      *    All collar locations are reported at Gauss Kruger 
                      holes (collar and down-hole surveys), trenches, mine           Pulkovo 1942 Zone 12 
                      workings and other locations used in Mineral Resource 
                      estimation. 
                                                                                *    The survey is conducted, using Lecia Total Station 
                                                                                     (centimetre accuracy) 
                 *    Specification of the grid system used. 
 
                                                                                *    All the holes have been downhole surveyed, 
                 *    Quality and adequacy of topographic control.                   measurements taken between 25 - 50m interval, using 
                                                                                     REFLEX EZ SHOT tool 
 
 
                                                                                *    The topographic model is based on satellite data 
 
 
                                                                                *    Roads, drill sites and other topographic details have 
                                                                                     been added after on-the-ground survey made by field 
                                                                                     survey team 
 
 
                                                                                *    The quality of the topographic control is adequate 
                                                                                     for MRE and meet the industrial standards 
 Data spacing 
 and             *    Data spacing for reporting of Exploration Results.        *    The hole collars are in accordance with existing 
 distribution                                                                        profiles, designed perpendicular to the mineralised 
                                                                                     zones 
                 *    Whether the data spacing and distribution is 
                      sufficient to establish the degree of geological and 
                      grade continuity appropriate for the Mineral Resource     *    Main Pit area achieves average distance between the 
                      and Ore Reserve estimation procedure(s) and                    drilling profiles of 40m 
                      classifications applied. 
 
                                                                                *    At 2021 campaign, additional infill holes were 
                 *    Whether sample compositing has been applied.                   located in several most promising clusters at 
                                                                                     Tulkubash Middle Zone and East Zone, aiming to 
                                                                                     upgrade the existing data, and to decrees the average 
                                                                                     drilling space of these clusters up to 40m 
                                                                                     (sufficient to upgrade the Inferred Resource to 
                                                                                     Indicated) 
 
 
                                                                                *    Database from trenches, road cuts and adits were used 
                                                                                     only for the interpretation process, but excluded 
                                                                                     from the grade interpolation 
 
 
                                                                                *    The drilling grid allows to establish grade 
                                                                                     continuity and estimation parameters such as average 
                                                                                     grade and mineralization volume 
 
 
                                                                                *    Sample compositing of 1.5m was applied prior to 
                                                                                     interpolation process (1.0m for the RC drilling) 
               ============================================================ 
 Orientation 
 of data in      *    Whether the orientation of sampling achieves unbiased     *    All the exploration holes were designed in attempt to 
 relation to          sampling of possible structures and the extent to              intercept the expected NE strike of the 
 geological           which this is known, considering the deposit type.             mineralization as normal as possible, and to avoid 
 structure                                                                           any sampling biases. The average bearing is SE or NW, 
                                                                                     with drilling angle approx. 50 degrees 
                 *    If the relationship between the drilling orientation 
                      and the orientation of key mineralised structures is 
                      considered to have introduced a sampling bias, this 
                      should be assessed and reported if material. 
 Sample 
 security         *    The measures taken to ensure sample security.            *    The samples are sufficiently secure, with security 
                                                                                     guards in the entry, on both - field camp and 
                                                                                     Malovodnoye core shed 
               ============================================================ 
 Audits or 
 reviews          *    The results of any audits or reviews of sampling         *    The following independent audit was completed out 
                       techniques and data.                                          during the entire period of exploration works at 
                                                                                     Tulkubsh project: 
 
 
                                                                                *    SRK consulting (Update of Mineral Resource Estimates, 
                                                                                     for Chaarat Gold Project, Kyrgyzstan, Feb. 2010) 
 
 
                                                                                *    Wardell Armstrong (Tulkubash Resource Modelling, 
                                                                                     Apr.2011) 
 
 
                                                                                *    Gustavson Associates (Chaarat Gold Project Resource 
                                                                                     Estimation, June 2014) 
 
 
                                                                                *    GeoSystems International (Mineral Resource Update, 
                                                                                     Jan.2018) 
 
 
                                                                                *    Tetra Tech (Competent Person Report for Chaarat Gold 
                                                                                     Project, Kyzrgyz Republic, Dec.2018) 
 
 
                                                                                *    Sound Mining (Competent Person's Report on Tulkubash 
                                                                                     Gold Project, for Chaarat Gold Holdings Limited, Jan 
                                                                                     2019) 
 
 
                                                                                *    LogiProc (Tulkubash Gold Project Bankable Feasibility 
                                                                                     Study Update Report, Aug.2019) 
 
 
                                                                                *    Wardell Armstrong (Review of Modelling Estimation and 
                                                                                     Classification, based on Resource Model, provided by 
                                                                                     IGT up to June 2020) 
 
 
                                                                                *    Roscoe Postle Associates Inc. (RPA), part of SLR 
                                                                                     Consulting (RPA Due Diligence of Tulkubash Resource 
                                                                                     Model, based on Resource Model provided by IGT up to 
                                                                                     June 2020) 
 
 
                                                                                *    Institute of Geotechnologies (IGT) (The Tulkubash 
                                                                                     Gold Project Mineral Resource Estimate, for Chaarat 
                                                                                     ZAAV SJSC, Dec. 2020) 
=============  ============================================================  =============================================================== 
 

Section 2 Reporting of Exploration Results

 
 Criteria         JORC Code explanation                                            Commentary 
 Mineral 
 tenement and       *    Type, reference name/number, location and ownership         *    Chaarat ZAAV CJSC (CZ) is established in Kyrgyz 
 land tenure             including agreements or material issues with third               Republic, and is wholly - owned subsidiary of Chaarat 
 status                  parties such as joint ventures, partnerships,                    Gold Holding Ltd (Chaarat). 
                         overriding royalties, native title interests, 
                         historical sites, wilderness or national park and 
                         environmental settings.                                     *    CZ is developing Tulkubash Gold Project (Project) 
                                                                                          located in the Sandalash Range of the Alatau 
                                                                                          Mountains in the Chatkal district of the Jalal Abad 
                    *    The security of the tenure held at the time of                   region (province) of north-western Kyrgyzstan 
                         reporting along with any known impediments to 
                         obtaining a licence to operate in the area. 
                                                                                     *    The Property is located at latitude 42deg1'6.91" N 
                                                                                          and longitude 71deg9'39.04" E and is close to the 
                                                                                          border with Uzbekistan. The Project site is located 
                                                                                          approximately 300 km southwest of the capital Bishkek, 
                                                                                          60 km northeast of the regional administrative center 
                                                                                          of Kanysh-Kiya in the Chatkal Valley, and 300 km by 
                                                                                          road from the nearest railway station in Shamaldy-Say 
 
 
                                                                                     *    CZ sole holds two licenses, controlling the Property. 
 
 
                                                                                     *    Mining (production) license: #3117AE of 700.03ha, 
                                                                                          valid to 2032 is covering defined Mineral Resources 
                                                                                          of SW part of the Property, which comprising Main Pit 
                                                                                          / Middle Zone and East Zone areas. 
 
 
                                                                                     *    Exploration license # 3319AP, valid till October 2023 
                                                                                          (including retain option), with area of 6776 ha is 
                                                                                          covering prospective ground in NE direction. 
 
 
                                                                                     *    CZ is obtaining consent of the local state 
                                                                                          administration and the local governments of Chatkal 
                                                                                          Region, required to conduct exploration work 
 
 
                                                                                     *    As per Kyrgyz Republic legislation, land allocation 
                                                                                          is granted for subsoil use (e.g. road construction, 
                                                                                          industrial sites, or other infrastructure facilities) 
                                                                                          for the term of license validity 
 
 
                                                                                     *    CZ bear a full legal responsibility for compliance 
                                                                                          with environmental requirements under Kyrgyz Republic 
                                                                                          legislation. CZ is required to obtain relevant 
                                                                                          environmental permits, make quarterly payments for 
                                                                                          environmental pollution as per Kyrgyz Laws and submit 
                                                                                          reports on compliance with environmental requirements 
 Exploration 
 done by other      *    Acknowledgment and appraisal of exploration by other        *    Initial reconnaissance commences in Soviet era, in 
 parties                 parties.                                                         regard with identified antimony mineralization. 
                                                                                          Following the breakup of Soviet Union, Apex Asia in 
                                                                                          joint venture of Newmont Overseas Ltd complete 
                                                                                          approx. 1800m drilling and conduct geophysical 
                                                                                          survey. After 2002 CZ was formed and have acquired 
                                                                                          what is now known as Chaarat Mining License. Till 
                                                                                          2021 CZ manage to confirm the presence of economic 
                                                                                          gold mineralization in the SW area of the Property 
                                                                                          and to opened room for further exploration in NE 
                                                                                          direction 
 Geology 
                    *    Deposit type, geological setting and style of                 *    Chaarat Gold Project (Project) is located within Tien 
                         mineralisation.                                                    Shan Metallogenic Belt, a Hercynian fold and thrust 
                                                                                            belt, with length more than 2,500 km. Tien Shan belt 
                                                                                            consists of three tectono-stratigraphic units, each 
                                                                                            divided by major structural zones, and is thought to 
                                                                                            represent accretionary prisms, on the margin of 
                                                                                            proto-Eurasian continent. The Project is located in 
                                                                                            the middle Tien Shan province, made of Ordovician - 
                                                                                            Carboniferous fragments. Structurally, the t errain 
                                                                                            is intensively deformed by pre and post 
                                                                                            mineralization structural activities, dominated by SE 
                                                                                            and NW verging fore / back thrusts and steep N-NE 
                                                                                            strike-slip faults. Genetically, the mineralization 
                                                                                            system could be reference to "Orogenic" and 
                                                                                            "Intrusion Related" types. It has NE strike and is 
                                                                                            thought to be closely related with structurally 
                                                                                            controlled Permian aged magmatism. 
 
 
                                                                                       *    Two main host rock / mineralization types can be 
                                                                                            outlined in the deposit. Oxidized type of gold 
                                                                                            mineralization, hosted in Devonian silicified 
                                                                                            sandstones of Tulkubash formation, represented by 
                                                                                            relatively steep, NE striking lenses, controlled by 
                                                                                            series of dilatational jogs. 
 
 
                                                                                      The second type of mineralization is unoxidized Au zone, 
                                                                                      containing refractory gold, hosted 
                                                                                      in Ordovician flysch complex, dominated by fine-grained 
                                                                                      black shales, locally appeared in 
                                                                                      green-schist facies, and with features of comprehensive 
                                                                                      structural deformations and contact 
                                                                                      metasomatism. Both ore types are thought to relate to one 
                                                                                      hydrothermal system, developed in 
                                                                                      different facies due to difference in the host rock and the 
                                                                                      stratigraphic position 
                                                                                       *    2021 infill drilling (and Mineral Resource update) 
                                                                                            was conducted in Middle Zone and East Zone, which 
                                                                                            along with Main Pit area are part of the oxidized 
                                                                                            Tulkubash mineralization type 
 Drill hole 
 Information           *    A summary of all information material to the                *    Appproximately 105 km drilling have been carried out 
                            understanding of the exploration results including a             in the Tulkubash area after 2000, including RC and 
                            tabulation of the following information for all                  Geotechnical drilling. 
                            Material drill holes: 
 
                                                                                        *    The 2021 drilling campaign is including approx. 
                      o easting and northing of the drill hole collar                        2,760m (shown in the table below), aiming to update 
                      o elevation or RL (Reduced Level - elevation above sea                 the available Resource Model, particularly in its 
                      level in metres) of the drill hole                                     Middle Zone and East Zone: 
                      collar 
                      o dip and azimuth of the hole                                       BHID      Az    DIP     East      North     RL    Depth 
                      o down hole length and interception depth                         DH21T587    140   -55   12680050   4657226   2853   134.6 
                      o hole length.                                                               ----  ----  ---------  --------  -----  ------ 
                       *    If the exclusion of this information is justified on        DH21T588    140   -55   12680084   4657241   2855   163.1 
                            the basis that the information is not Material and                     ----  ----  ---------  --------  -----  ------ 
                            this exclusion does not detract from the                    DH21T589    140   -47   12679982   4657121   2781   80.1 
                            understanding of the report, the Competent Person                      ----  ----  ---------  --------  -----  ------ 
                            should clearly explain why this is the case.                DH21T590    140   -50   12680458   4657549   2722   80.7 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T591    140   -55   12680481   4657579   2725    80 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T592    135   -55   12680602   4657748   2821    140 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T593    135   -60   12680894   4658292   3084   175.2 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T594    136   -70   12681103   4658543   3117   149.8 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T595    135   -50   12680948   4658294   3063   110.2 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T597    136   -50   12681105   4658543   3117   71.5 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T599    135   -60   12680739   4658062   2997   90.5 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T600    135   -65   12680706   4658090   3021   150.4 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T602    135   -50   12680771   4658146   3034    150 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T606    95    -55   12681281   4658537   3037   100.2 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T609    135   -55   12681179   4658588   3132   80.5 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T610    135   -50   12681182   4658740   3129    85 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T611    135   -58   12681146   4658608   3146   150.4 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T612    135   -60   12681226   4658634   3120    85 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T613    135   -50   12680097   4657281   2857   130.2 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T614    135   -65   12680042   4657176   2819   120.4 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T616    135   -50   12681190   4658682   3139    160 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T617    135   -60   12681151   4658663   3156   85.1 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T618    136   -50   12681231   4658755   3140   60.2 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
                                                                                        DH21T619    135   -58   12679996   4657168   2817   127.2 
                                                                                                   ----  ----  ---------  --------  -----  ------ 
 Data 
 aggregation        *    In reporting Exploration Results, weighting averaging       *    Middle Zone and East Zone holes done in 2021 were 
 methods                 techniques, maximum and/or minimum grade truncations             incorporated into existing block model from 2020, 
                         (eg cutting of high grades) and cut-off grades are               aiming to upgrade the Inferred Resources in these 
                         usually Material and should be stated.                           areas. 
 
 
                    *    Where aggregate intercepts incorporate short lengths        *    Overall, the results from 2021 exploration campaign, 
                         of high grade results and longer lengths of low grade            have available grade intercepts, with COG of 0.21g/t, 
                         results, the procedure used for such aggregation                 accepted for Tulkubash style mineralization, certain 
                         should be stated and some typical examples of such               rules are applied. For a maximum length of interval 
                         aggregations should be shown in detail.                          below the COG, but included in the calculations, is 
                                                                                          considered 6.0m. Each interval should start and end 
                                                                                          with sample >= COG. For top cap grade is considered 
                    *    The assumptions used for any reporting of metal                  20 ppm, weighted averaging (length X grades) 
                         equivalent values should be clearly stated.                      techniques are used for mean grades calculations 
 
 
                                                                                     *    No Au equivalent was used 
 Relationship 
 between            *    These relationships are particularly important in the       *    Middle Zone / East Zone collars are supported by 
 mineralization          reporting of Exploration Results.                                sufficient amount of historical data, aiming to avoid 
 widths and                                                                               any significant fluctuation between the intercepts 
 intercept                                                                                and the true width 
 lengths            *    If the geometry of the mineralization with respect to 
                         the drill hole angle is known, its nature should be 
                         reported. 
 
 
                    *    If it is not known and only the down hole lengths are 
                         reported, there should be a clear statement to this 
                         effect (e.g. 'down hole length, true width not 
                         known'). 
 Diagrams 
                    *    Appropriate maps and sections (with scales) and             *    Wide variety of 2D and 3D graphics, maps, plots and 
                         tabulations of intercepts should be included for any             wireframes are available, the combination of which is 
                         significant discovery being reported These should                fully sufficient to visual description of the 
                         include, but not be limited to a plan view of drill              reported data 
                         hole collar locations and appropriate sectional 
                         views. 
 Balanced 
 reporting          *    Where comprehensive reporting of all Exploration            *    Middle Zone and East Zone results from 2021 will be 
                         Results is not practicable, representative reporting             used for updating the last available Mineral Resource 
                         of both low and high grades and/or widths should be              model for Tulkubash area, prepared by Institute of 
                         practiced to avoid misleading reporting of                       Geotechnologies (IGT) in Dec. 2020 
                         Exploration Results. 
 Other 
 substantive        *    Other exploration data, if meaningful and material,         *    Along with the Resource update made 2021, several 
 exploration             should be reported including (but not limited to):               other technical assessments for Tulkubash area were 
 data                    geological observations; geophysical survey results;             also done, including geotechnical / hydrogeological 
                         geochemical survey results; bulk samples - size and              drilling in Main Pit area based on 13 holes (approx. 
                         method of treatment; metallurgical test results; bulk            1,550m) 
                         density, groundwater, geotechnical and rock 
                         characteristics; potential deleterious or 
                         contaminating substances.                                   *    Acid Rock Drainage (ARD) survey for Tulkubash's Main 
                                                                                          Pit area is in progress 
 Further work 
                    *    The nature and scale of planned further work (eg            *    Magnetic drone-based geophysics in the whole Property 
                         tests for lateral extensions or depth extensions or              area, including Tulkubash area, is planned to define 
                         large-scale step-out drilling).                                  additional exploration targets. 
 
 
                    *    Diagrams clearly highlighting the areas of possible         *    The Karator and Ishakuldy exploration targets of 
                         extensions, including the main geological                        Tulkubash stile, outlined on 2 and 5 km to northeast 
                         interpretations and future drilling areas, provided              are planned for further resource definition drilling. 
                         this information is not commercially sensitive. 
===============  ===============================================================  =============================================================== 
 

Section 3 Estimation and Reporting of Mineral Resources

 
 Criteria         JORC Code explanation                                         Commentary 
                 ============================================================ 
 Database 
 integrity          *    Measures taken to ensure that data has not been          *    The field data is compiled on the site and further 
                         corrupted by, for example, transcription or keying            combined, verified and stored in AGR 4.0 database 
                         errors, between its initial collection and its use            platform, and in Excel spread sheets as well. 
                         for Mineral Resource estimation purposes. 
 
                                                                                  *    Prior the process of the Resource Modelling, the 
                    *    Data validation procedures used.                              historic data and the new available one, were 
                                                                                       verified one more time, using Micromine software 
 
 
                                                                                  *    The database used for the Mineral Resource update 
                                                                                       report has been previously audited by Gustavson and 
                                                                                       Associates (2014), by GeoSystems International (2018), 
                                                                                       by Sound Mining (2019), by IGT (2020) 
===============  ============================================================  ====================================================================================================================================================== 
 Site visits 
                    *    Comment on any site visits undertaken by the             *    Last field visit by Competent Person was made between 
                         Competent Person and the outcome of those visits.             25.08.2021 to 02.09.2021 by Dimitar Dimitrov 
 
 
                    *    If no site visits have been undertaken indicate why      *    Mr.Dimitar Dimitrov P. Geo, AIG member and a 
                         this is the case.                                             Competent Person as defined in the 2012 edition of 
                                                                                       the JORC Code 'Australasian Code for Reporting of 
                                                                                       Exploration Results, Mineral Resources and Ore 
                                                                                       Reserves', is a full-time employee of the company. 
===============  ============================================================  ====================================================================================================================================================== 
 Geological 
 interpretation    *    Confidence in (or conversely, the uncertainty of )           *    Mineralization and associated hydrothermal alteration, 
                        the geological interpretation of the mineral deposit.             developed along a system of regional structural 
                                                                                          deformations, is genetically associated with Permian 
                                                                                          magmatism 
                   *    Nature of the data used and of any assumptions made. 
 
                                                                                     *    Tulkubash mineralization zones are presented by 
                   *    The effect, if any, of alternative interpretations on             series of dilatational jogs, hosted in silicified 
                        Mineral Resource estimation.                                      sandstones 
 
 
                   *    The use of geology in guiding and controlling Mineral        *    No hard borders can be outlined, as all Tulkubash 
                        Resource estimation.                                              mineralization is host rock has similar facies 
 
 
                   *    The factors affecting continuity both of grade and           *    The interpretation is based on gold distribution, 
                        geology.                                                          using actual drilling, trenches and underground adits 
 
 
                                                                                     *    Overall, there is a good level of confidence in the 
                                                                                          geological continuity, although detailed drilling is 
                                                                                          required to advance the interpretation of the 
                                                                                          different mineralization lenses 
 
 
                                                                                     *    The wireframing process is using 0.2 ppm and 0.7 ppm 
                                                                                          Au to contour high and low grade domains. 
 
 
                                                                                     *    The low grade domains are considered as Resource 
                                                                                          outer shell, while the high grades are incorporated 
                                                                                          within it 
===============  ============================================================  ====================================================================================================================================================== 
 Dimensions 
                   *    The extent and variability of the Mineral Resource        *    The Mineral Resource extends approx. 4, 900m along 
                        expressed as length (along strike or otherwise), plan          strike, with maximum plan width of 500m, maximum 
                        width, and depth below surface to the upper and lower          depth below surface of approx. 300m 
                        limits of the Mineral Resource. 
===============  ============================================================  ====================================================================================================================================================== 
 Estimation and 
 modelling         *    The nature and appropriateness of the estimation             *    The 2021 Mineral Resource update, was made internally, 
 techniques             technique(s) applied and key assumptions, including               by Chaarat geological department, and it was 
                        treatment of extreme grade values, domaining,                     completed at March. 2022 
                        interpolation parameters and maximum distance of 
                        extrapolation from data points. If a computer 
                        assisted estimation method was chosen include a              *    The 2021 Mineral resource update is using only drill 
                        description of computer software and parameters used.             hole data for the Resource interpolation, although 
                                                                                          assays from surface workings are used only in the 
                                                                                          interpretation process. 
                   *    The availability of check estimates, previous 
                        estimates and/or mine production records and whether 
                        the Mineral Resource estimate takes appropriate              *    Micromine Software (under the license of Chaarat) was 
                        account of such data.                                             used for the block modelling 
 
 
                   *    The assumptions made regarding recovery of                   *    The Mineral Resource was estimated into block model, 
                        by-products.                                                      using ordinary kriging for Au, Ag is also estimated 
                                                                                          via IDW2 although it was not reported. IDW2 was used 
                                                                                          for density and recovery interpolation as well 
                   *    Estimation of deleterious elements or other non-grade 
                        variables of economic significance (e.g. sulphur for 
                        acid mine drainage characterisation).                        *    Block model with parent block size of 5*5*5 m was 
                                                                                          generated within the wireframe domains, with 1m 
                                                                                          minimum sub-selling applied 
                   *    In the case of block model interpolation, the block 
                        size in relation to the average sample spacing and 
                        the search employed.                                         *    Grade estimates was done by 1.5m composite sampling 
 
 
                   *    Any assumptions behind modelling of selective mining         *    Log probability plots and coefficient of variation 
                        units.                                                            were analysed for each domain for top cuts 
                                                                                          determination, including Au, Ag and Density 
 
                   *    Any assumptions about correlation between variables. 
                                                                                     *    Two different variogram models were applied for low 
                                                                                          and high-grade domains 
                   *    Description of how the geological interpretation was 
                        used to control the resource estimates. 
                                                                                     *    Block model was checked visually by sections, and 
                                                                                          geostatistical, using Q-Q and swath plots 
                   *    Discussion of basis for using or not using grade 
                        cutting or capping. 
                                                                                     *    The grade distribution in the block model is 
                                                                                          sufficiently matching the assay results 
                   *    The process of validation, the checking process used, 
                        the comparison of model data to drill hole data, and 
                        use of reconciliation dta if available.                      *    No estimation of deleterious elements was made 
 
 
                                                                                     *    The Reported results are giving reasonable prospects 
                                                                                          for eventual economic extraction, taking in to 
                                                                                          account the estimated gold recovery 
 
 
                                                                                     *    The updated at 2021 constrained Mineral Resource is: 
 
                                                                                     Density (g/cm     Mt     Au (g/t)   Au (koz)     Class 
                                                                                         (3) ) 
                                                                                                    -------  ---------  --------- 
                                                                                         2.66        25.11      0.98       789      Indicated 
                                                                                         2.56        11.226     0.62       222      Inferred 
                                                                                    --------------  -------  ---------  ---------  ---------- 
===============  ============================================================  ====================================================================================================================================================== 
 Moisture                                                                       *    All Mineral Resource is estimated and reported on a      dry basis 
                    *    Whether the tonnages are estimated on a dry basis or 
                         with natural moisture, and the method of 
                         determination of the moisture content. 
===============  ============================================================  ====================================================================================================================================================== 
 Cut-off 
 parameters         *    The basis of the adopted cut-off grade(s) or quality     *    Mineral Resources have been reported at cut-off grade 
                         parameters applied.                                           of 0.21 ppm Au 
 
 
                                                                                  *    Cut-off grade determined using appropriate economic 
                                                                                       and technical parameters for open pit mining 
                                                                                       operations and heap leach gold extraction 
===============  ============================================================  ====================================================================================================================================================== 
 Mining factors                                                                    The applied open pit optimisation parameters are including:      c                    Item                 Unit      Resource_update_2021 Open pit 
 or assumptions    *    Assumptions made regarding possible mining methods,                                                                            optimization 
                        minimum mining dimensions and internal (or, if                  Econ.          Initial Capital Cost        $'000                 99016.42 
                        applicable, external) mining dilution. It is always         -------------  ---------------------------  -----------  ------------------------------- 
                        necessary as part of the process of determining                      Selling Cost                    $/oz                          9.89 
                        reasonable prospects for eventual economic extraction        ---------------------------  -------------------------  ------------------------------- 
                        to consider potential mining methods, but the                          Royalty                        %                             18 
                        assumptions made regarding mining methods and                ---------------------------  -------------------------  ------------------------------- 
                        parameters when estimating Mineral Resources may not                Discount Rate                     %                             5 
                        always be rigorous. Where this is the case, this             ---------------------------  -------------------------  ------------------------------- 
                        should be reported with an explanation of the basis          Metal Price                Au                  $/oz                   1800 
                        of the mining assumptions made.                             -------------  ---------------------------  -----------  ------------------------------- 
                                                                                                  Ag                         $/oz                          21.7 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                      OP. Costs               Mining             $/t mined                 1.89 
                                                                                    -------------  ---------------------------  -----------  ------------------------------- 
                                                                                      Extra Ore Mining /Haulage            $/t ore                         0.84 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                              Processing                   $/t ore                         4.25 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                               Stacking                    $/t ore                         0.54 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                         Owner's Mining Cost               $/t ore                         0.34 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                                 G/A                       $/t ore                         1.27 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                      Other Par.           Recovery Au               %              Variable by block 
                                                                                    -------------  ---------------------------  -----------  ------------------------------- 
                                                                                         Refining Recovery-Au                 %                            99.8 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                         Refining Recovery-Ag                 %                             60 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                           Internal Cut-off                  g/t                           0.21 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
                                                                                      Pit Slopes                                                   Variable by location 
                                                                                                   ---------------------------  -----------  ------------------------------- 
                                                                                      Op. Limits              Mining               t/year                27000000 
                                                                                    -------------  ---------------------------  -----------  ------------------------------- 
                                                                                              Processing                    t/year                       5000000 
                                                                                     ---------------------------  -------------------------  ------------------------------- 
===============  ============================================================  ====================================================================================================================================================== 
 Metallurgical 
 factors or        *    The basis for assumptions or predictions regarding           *    Recovery model, based on the stage of oxidation, was 
 assumptions            metallurgical amenability. It is always necessary as              prepared in attempt to adjust the designing of the 
                        part of the process of determining reasonable                     reported Resource shell. An unoxidized cluster, 
                        prospects for eventual economic extraction to                     containing refractory gold mineralization, with low 
                        consider potential metallurgical methods, but the                 recovery was outlined beneath the Main Pit area, and 
                        assumptions regarding metallurgical treatment                     accordingly excluded in the process of pit 
                        processes and parameters made when reporting Mineral              optimization. The average recovery in the constrained 
                        Resources may not always be rigorous. Where this is               Resource, estimated per zones is 72-76 % 
                        the case, this should be reported with an explanation 
                        of the basis of the metallurgical assumptions made.          Recovery_Au (%)     Class       Zone 
                                                                                                      ---------- 
                                                                                          71.91        Indicated   Main_Pit 
                                                                                          75.97        Indicated   East_zone 
                                                                                          75.01        Indicated   Mid_zone 
                                                                                          74.47        Inferred    Main_Pit 
                                                                                          75.49        Inferred    East_one 
                                                                                          76.14        Inferred    Mid_zone 
                                                                                    ----------------  ----------  ---------- 
===============  ============================================================  ====================================================================================================================================================== 
 Environmental 
 factors or        *    Assumptions made regarding possible waste and process        *    There are not considered to be any environmental 
 assumptions            residue disposal options. It is always necessary as               factors likely to affect the assumption that the 
                        part of the process of determining reasonable                     deposit has reasonable prospects for eventual 
                        prospects for eventual economic extraction to                     economic extraction 
                        consider the potential environmental impacts of the 
                        mining and processing operation. While at this stage 
                        the determination of potential environmental impacts, 
                        particularly for a greenfields project, may not 
                        always be well advanced, the status of early 
                        consideration of these potential environmental 
                        impacts should be reported. Where these aspects have 
                        not been considered this should be reported with an 
                        explanation of the environmental assumptions made. 
===============  ============================================================  ====================================================================================================================================================== 
 Bulk density 
                   *    Whether assumed or determined. If assumed, the basis      *    Dry bulk density is measured using paraffin -coated 
                        for the assumptions. If determined, the method used,           immersion (Archimedes) method to evaluate the 
                        whether wet or dry, the frequency of the measurements          specific gravity (SG) 
                  , 
                        the nature, size and representativeness of the 
                        samples.                                                  *    Density (SG) values have been interpolated into the 
                                                                                       block model, using Inverse Distance Weighting (IDW) 
                                                                                       method 
                   *    The bulk density for bulk material must have been 
                        measured by methods that adequately account for void 
                        spaces (vugs, porosity, etc), moisture and                *    The density data are comprising total of 1,623 dry 
                        differences between rock and alteration zones within           specimens, measured by Chaarat 
                        the deposit. 
 
                                                                                  *    In 2020 no density measurements were done, as RC 
                   *    Discuss assumptions for bulk density estimates used            drilling is not providing proper material 
                        in the evaluation process of the different materials. 
===============  ============================================================  ====================================================================================================================================================== 
 Classification 
                   *    The basis for the classification of the Mineral              *    Classification of Mineral Resources is based upon a 
                        Resources into varying confidence categories.                     review of geological continuity, quality of 
                                                                                          supporting data, spatial grade continuity and quality 
                                                                                          of a block model 
                   *    Whether appropriate account has been taken of all 
                        relevant factors (ie relative confidence in 
                        tonnage/grade estimations, reliability of input data,        *    Mineral Resource Classification was made manually, 
                        confidence in continuity of geology and metal values,             from section to section 
                        quality, quantity and distribution of the data). 
 
                                                                                     *    Following criteria has been t aken in account during 
                   *    Whether the result appropriately reflects the                     the Resource Classification: 
                        Competent Person's view of the deposit. 
 
                                                                                    -The model has been classified only into two categories of Indicated and Inferred, as it is 
                                                                                    considered that the available data is not sufficient for Measured category 
                                                                                    -Drill hole spacing in plan: for Indicated was used average 30-40m drilling grid, for Inferred 
                                                                                    40-80m 
                                                                                    -Total depth of mineral Resource classification: Inferred was restricted up to 80m from the 
                                                                                    last hole, for Indicated the restriction is 40-60m 
                                                                                     *    The results of the validation of the block model 
                                                                                          shows acceptable correlation in the input data to the 
                                                                                          estimated grades 
 
 
                                                                                     *    The Competent Person is confident that all relevant 
                                                                                          factors have been considered and the results reflects 
                                                                                          these views. 
===============  ============================================================  ====================================================================================================================================================== 
 Audits or                                                                      *    No external reviews have been made for 2021 Mineral      Resource Update 
 reviews            *    The results of any audits or reviews of Mineral 
                         Resource estimates. 
===============  ============================================================  ====================================================================================================================================================== 
 Discussion of 
 relative          *    Where appropriate a statement of the relative             *    The Mineral Resource is appropriate for the Tulkubash 
 accuracy/              accuracy and confidence level in the Mineral Resource          style of mineralization, and it is adequate to the 
 confidence             estimate using an approach or procedure deemed                 available data. It is considered that the current 
                        appropriate by the Competent Person. For example, the          drill hole spacing is sufficient to demonstrate 
                        application of statistical or geostatistical                   geological continuity of the mineralization 
                        procedures to quantify the relative accuracy of the 
                        resource within stated confidence limits, or, if such 
                        an approach is not deemed appropriate, a qualitative      *    Accuracy of the Mineral Resource is sufficient to 
                        discussion of the factors that could affect the                permit economic development of the deposit 
                        relative accuracy and confidence of the estimate. 
 
                                                                                  *    The Mineral Resource relates to global estimate 
                   *    The statement should specify whether it relates to 
                        global or local estimates, and, if local, state the 
                        relevant tonnages, which should be relevant to            *    The application of top cuts and compositing in the 
                        technical and economic evaluation. Documentation               Mineral Resource are considering as appropriate 
                        should include assumptions made and the procedures 
                        used. 
                                                                                  *    The Mineral Resource estimation methodology is deemed 
                                                                                       appropriate, based upon validation of the model, 
                   *    These statements of relative accuracy and confidence           using visual, statistical and graphical checks. Any 
                        of the estimate should be compared with production             alternative methods are likely to yield only minor 
                        data, where available.                                         changes to global Mineral Resource 
 
 
                                                                                  *    The mineralization domains have been adhered to 
                                                                                       geostatistical and grade estimation works, and the 
                                                                                       spatial distribution of grade in the Mineral Resource 
                                                                                       model is representative of the sample data 
===============  ============================================================  ====================================================================================================================================================== 
 

Section 4 - Estimation and Reporting of Ore Reserves

 
 Mineral 
 Resource                     *    Description of the Mineral Resource estimate used as     *    Tulkubash April 2022, resource based on all DDH data 
 estimate for                      a basis for the conversion to Ore Reserves                    inclusive of the 2021 exploration program. 
 conversion to 
 Ore Reserves 
                              *    Clear statement as to whether the Mineral Resources      *    Grades estimated with Ordinary Kriging into ore zones 
                                   are reported additional to, or inclusive of, the Ore          defined by wireframe modelling 
                                   Reserves 
 
                                                                                            *    Total M&I; 25.2 Mt @ 0.98 g/t Au containing 798 Koz 
 
 
                                                                                            *    Inferred 11.2 Mt @ 0.62 g/t Au containing 222 Koz 
 
 
                                                                                            *    Resource defined by 0.21 g/t Au cutoff within an 
                                                                                                 $1,800/oz pit shell 
 
 
                                                                                            *    Mineral Resource is inclusive of the Ore Reserve 
 Site Visits 
                    *    Comment on any site visit undertaken by the Competent              *    Peter C. Carter is qualified as a CP under JORC code 
                         Person and the outcome of those visits                                  (2012) 
 
 
                                                                                            *    As a previous member of Chaarat staff, Mr. Carter has 
                                                                                                 visited the site on numerous occasions in 2018 and 
                                                                                                 2019 
 
 
                                                                                            *    There have been no material changes to the project 
                                                                                                 site with respect to Ore Reserves since Mr. Carter's 
                                                                                                 last site visit 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Study Status 
                    *    The type and level of study undertaken to enable the               *    The basis for the conversion of the Mineral Resource 
                         Mineral Resource to be converted to Ore Reserves                        to an Ore Reserve is the 2021 Updated Feasibility 
                                                                                                 Study completed by LogiProc PLC and Sound Mining Inc 
                                                                                                 of Johannesburg, RSA. 
                    *    The code requires that a study, at least to 
                         Pre-feasibility Study level has been undertaken to 
                         convert Mineral Resources to Ore Reserves. Such                    *    The study represents a Class 3 estimate of the 
                         studies will have been carried out and will have                        project value with an accuracy of -10% to +15%. 
                         determined a mine plan that is technically achievable 
                         and economically viable, and that material Modifying 
                         Factors have been considered.                                      *    The study determined the project to be both 
                                                                                                 technically and economically viable. 
 
 
                                                                                            *    Modifying Factors have been considered in the 
                                                                                                 conversion of the Mineral Resource to an Ore Reserve 
 
 
                                                                                            *    Some technical parameters have changed since 
                                                                                                 completion of the FS and have been updated 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Cutoff Grade 
                    *    Nature of cutoff grade                                             *    A cutoff grade for recovered Au was employed due to 
                                                                                                 the variable recovery in the geo-metallurgical model 
 
 
                                                                                            *    The cutoff grade parameters are based on those from 
                                                                                                 the 2021 FS updated 
 
 
                                                                                            *    Recovered Au cutoff = 0.16 g/t Au 
 
 
                                                                                            *    True marginal cutoff = 0.22 g/t Au at 74% recovery 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Parameters used to calculate cutoff grade                          *    Owner's Mining = 0.34 $/t ore 
 
 
                                                                                            *    Ore Haul = 0.72 $/t ore 
 
 
                                                                                            *    Process = 4.79 $/t ore 
 
 
                                                                                            *    G&A = 1.25 $/t ore 
 
 
                                                                                            *    Refining = 9.78 $/oz 
 
 
                                                                                            *    Gold Price = 1,600 $/oz Au 
 
 
                                                                                            *    Royalty = 14% 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Mining Factors 
 or Assumptions     *    The methods and assumptions used as reported in the                *    Mineral Resource model used a parent block size of 5 
                         PFS or FS to convert the Mineral Resource to an Ore                     m x 5 m x 5 m which respects the selective mining 
                         Reserve.                                                                unit 
 
 
                                                                                            *    Pit optimization conducted with Whittle 4X 
 
 
                                                                                            *    Mining costs were $2.55/t ore and $1.83/t waste 
 
 
                                                                                            *    Other parameters as per cutoff grade calculation and 
                                                                                                 recommended pit slopes 
 
 
                                                                                            *    Shells optimised for $1,000-$1800/oz Au 
 
 
                                                                                            *    $1,350/oz shell selected as basis for pit design 
 
 
                                                                                            *    Manual design process using GEMS software used to 
                                                                                                 generate minable pit design 
 
 
                                                                                            *    Ore Reserve inside manual design within 5% of the 
                                                                                                 minable resource within optimised shell 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Use of Inferred Mineral Resources                                  *    Inferred Mineral Resources were not permitted to 
                                                                                                 influence the pit optimization and were treated as 
                                                                                                 waste during mine design and reserve calculation 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Dilution and Mining Recovery                                       *    0.5 m "dilution skin" modeled around ore 
 
 
                                                                                            *    Average dilution 10.1% at 0.14 g/t Au 
 
 
                                                                                            *    Dilution grade high due to presence of Inferred 
                                                                                                 Resources adjacent to ore zones 
 
 
                                                                                            *    Mining losses estimated at 2.5% resulting in 97.5% 
                                                                                                 ore recovery 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Geotechnical                                                       *    Pit slopes based on slope design study by WAI in 2017 
 
 
                                                                                            *    IRAs of 51(o) and 58(o) 
 
 
                                                                                            *    Overall slopes of 40-50(o) 
 
 
                                                                                            *    5 m benches; 8 m berms; 20 m highwalls 
 
 
                                                                                            *    Design criteria extrapolated to Mid and East Zone as 
                                                                                                 those areas host only 12% of the reserve 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Adjusted Reserve                                                   *    23.1 Mt ore grading 0.87 g/t Au containing 647 Koz Au 
 
 
                                                                                            *    66.4 Mt associated waste 
 
 
                                                                                            *    2.9:1 strip ratio 
 
 
                                                                                            *    89.5 Mt total material 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Open Pit Description                                               *    7 pits arranged along 4 km of strike 
 
 
                                                                                            *    Main Zone (MZ) Pit; 1 large pit; contains 88% of the 
                                                                                                 reserve by contained metal 
 
 
                                                                                            *    Mid & East Zone; 6 small pits; 12% of reserve 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Mining Plan 
                    *    Mining Approach                                                    *    Contract mining 
 
 
                                                                                            *    Contracting reduces capital costs and training burden 
 
 
                                                                                            *    Contractor experienced in western-style open pit gold 
                                                                                                 mining 
 
 
                                                                                            *    Contractor has similar culture and language as local 
                                                                                                 workforce 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Mining Method                                                      *    Conventional drill-blast, truck-shovel open pit 
                                                                                                 mining method 
 
 
                                                                                            *    Small equipment able to provide production capacity, 
                                                                                                 selectivity, and flexibility in restricted working 
                                                                                                 areas 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Mine Production Plan                                               *    6 years of mining including 1.1 years of 
                                                                                                 pre-stripping 
 
 
                                                                                            *    350 days of operation per year 
 
 
                                                                                            *    Average mining rate, 43,000 tpd over LOM 
 
 
                                                                                            *    Peak mining rate, 53,000 tpd 2025-2027 
 
 
                                                                                            *    Average strip ratio during operating period, 2.6:1 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Ore Control                                                        *    Blasthole cuttings tested for g/t Au, % Total Sulfur, 
                                                                                                 CN solubility 
 
 
                                                                                            *    Geologists log cuttings for degree of oxidation 
 
 
                                                                                            *    Ore and waste blocks flagged by surveyors for 
                                                                                                 excavation 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                       *    Mine Water Management                                           *    Groundwater inflows of 30 m3/hr anticipated 
 
 
                                                                                            *    Inflows to be collected in sumps and pumped to a 
                                                                                                 holding pond 
 
 
                                                                                            *    Runoff will be diverted around the open pits by 
                                                                                                 ditches 
 
 
                                                                                            *    Collected water used for dust suppression or treated 
                                                                                                 and released 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Slope Stability                                                    *    Pre-shear and buffer blasting to protect pit walls 
 
 
                                                                                            *    Walls to be cleaned with by excavators with hydraulic 
                                                                                                 hammers 
 
 
                                                                                            *    Visual inspections and survey employed to monitor 
                                                                                                 movement 
 
 
                                                                                            *    Mapping of structural features to optimize design 
                                                                                                 safety 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Mining Equipment                                                   *    5 x 5 m3 excavator + 1 x 5 m3 FEL 
 
 
                                                                                            *    6 x crawler-type, 115 mm, blasthole drills 
 
 
                                                                                            *    Max 70 x highway-type, 35t haul trucks 
 
 
                                                                                            *    40-50 t bulldozers and 200 HP graders in support 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Mine 
 Infrastructure     *    Dumps & Stockpiles                                                 *    Main waste dump 
 
 
                                                                                            *    8 Mt of waste used to backfill pits 2027-28 
 
 
                                                                                            *    Ore SP 600 kt capacity located near Sandalash River 
                                                                                                 bridge 
 
 
                                                                                            *    All stockpiled ore processed by end of LOM 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Mine Roads                                                         *    Dual access to MZ Pit 
 
 
                                                                                            *    6.5 Km Ore Haul Road from Sandalash River bridge to 
                                                                                                 ROM Pad 
 
 
                                                                                            *    All haul roads 15 m wide for 2-way traffic; maximum 
                                                                                                 grade 10% 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Mine Facilities                                                    *    Maintenance Workshop 
 
 
                                                                                            *    Magazine 
 
 
                                                                                            *    AN Storage 
 
 
                                                                                            *    Fuel Farm 
 
 
                                                                                            *    Offices & communications 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Metallurgical 
 Factors or         *    Proposed metallurgical process and flowsheet                       *    Heap leach (HL) processing selected 
 assumptions 
 
                                                                                            *    3-stage crushing of ore to P100 12 mm 
 
 
                                                                                            *    Crushed ore stacked by trucks in 7 m lifts on 
                                                                                                 valley-fill leach pad 
 
 
                                                                                            *    Au adsorbed onto activated carbon from PLS in CIC 
                                                                                                 circuit 
 
 
                                                                                            *    Loaded carbon stripped in AARL-type elution circuit 
 
 
                                                                                            *    Electrowinning and smelting on site produce dore for 
                                                                                                 shipment 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Appropriateness of process to the style of                         *    About 70% of the Au is readily CN soluble 
                         mineralization 
 
                                                                                            *    Host rock fractures easily to produce 12 mm crush 
 
 
                                                                                            *    No agglomeration at crush sizes > 6 mm 
 
 
                                                                                            *    Lowest capital and operating costs for treating low 
                                                                                                 grade, oxidized ore 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Is the metallurgical process well-tested or novel in               *    Process is robust and widely used 
                         nature? 
 
                                                                                            *    Practical for cold-weather conditions 
 
 
                                                                                            *    Heap leaching proven globally over last 40 years 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Nature of metallurgical test work                                  *    Process scoping test work conducted by Mintek, SGS, 
                                                                                                 RDI, BGRIMM, and Hazen 
 
 
                                                                                            *    HL test programs by WAI (2017), MLI (2018), SAEL 
                                                                                                 (2019 & 2021) 
 
 
                                                                                            *    HL testing included bottle roll (BR), column leach 
                                                                                                 (CL), load-permeability, and agglomeration test work 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                       *    Amount and representativeness of metallurgical test             *    93 composite samples tested in all three programs 
                            work 
 
                                                                                            *    78 BR and 11 CL tests produced results representing 
                                                                                                 potential leach feed 
 
 
                                                                                            *    75% of samples from Main Zone, 25% from Mid Zone and 
                                                                                                 potential East Zone 
 
 
                                                                                            *    Results indicate BR good proxy HL recovery 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Nature of metallurgical domaining                                  *    Sulphide and oxide domains defined 
 
 
                                                                                            *    Three oxidation states established 
 
 
                                                                                            *    BR results matched to each ox state 
 
 
                                                                                            *    IDW2 used to estimate recovery for individual blocks 
                                                                                                 in oxide domain 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Metallurgical recovery factors applied                             *    Recoveries derived from geo-metallurgical model 
 
 
                                                                                            *    Overall recovery for the Ore Reserve 74% 
 
 
                                                                                            *    Average recovery in Main Zone 73.8%, Mid Zone 75.9%, 
                                                                                                 and 76.4% East Zone 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Assumptions or allowances for deleterious elements                 *    Ore is associated with arsenic and antimony 
 
 
                                                                                            *    Neither element is present in amounts which affect 
                                                                                                 the selected process or create environmental issues 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Existence of bulk sample or pilot scale test work and              *    No bulk samples or pilot scale test work has been 
                         the degree to which such samples are considered                         conducted 
                         representative 
 
                                                                                            *    The samples tested are representative of the 
                                                                                                 variability of leach feed across the entire known 
                                                                                                 deposit 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                          *    The Ore Reserve is not defined by a specification 
                    *    For minerals that are defined by specification, has 
                         the ore reserve estimate been based on the 
                         appropriate mineralogy to meet the specification? 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Environmental 
                    *    The status of studies of potential environmental                   *    ESIA completed by WAI in 2018, updated in 2020 
                         impacts of the mining and processing operations. 
 
                                                                                            *    Kyrgyz EIA (OVOS) completed in 2015 
 
 
                                                                                            *    OVOS being updated in support of project permitting 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Details of waste rock characterization                             *    NAG testing in 2020 on 110 samples distributed 
                                                                                                 throughout deposit 
 
 
                                                                                            *    Average NAG pH 5-6 indicating little or no acid 
                                                                                                 generating potential 
 
 
                                                                                            *    ABA testing indicates 6% of samples PAG 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Consideration of potential sites and status of design              *    Project site terrain is extremely rugged and 
                         options considered                                                      constrained 
 
 
                                                                                            *    Only location able to accommodate the heap leach pad 
                                                                                                 and process facility was the selected Dry Valley site 
 
 
                                                                                            *    Dry Valley enables a valley-fill leach pad design 
                                                                                                 suited for cold weather operation 
 
 
                                                                                            *    Detailed engineering is in progress 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Status of approvals for process residue storage and                *    Dry Valley location for the heap leach pad is 
                         waste dumps                                                             approved 
 
 
                                                                                            *    MZ waste dump in the Irisai Valley is approved 
 
 
                                                                                            *    Permitting process for various aspects of the process 
                                                                                                 facility is ongoing 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Infrastructure 
                    *    Existence of appropriate infrastructure                            *    New site access road completed 
 
 
                                                                                            *    Exploration/Pioneer camps established 
 
 
                                                                                            *    Permanent camp under construction 
 
 
                                                                                            *    All other infrastructure to be provided during 
                                                                                                 construction 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Availability of land for development                              *    Chaarat has been granted surface rights for the land 
                                                                                                required to develop the project 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Power                                                             *    A 4.5 MW diesel-fired power plant will supply the 
                                                                                                site with electricity 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Water                                                              *    Process water and raw water will be sourced from 
                                                                                                 boreholes located near the plant and camp 
                                                                                                 respectively 
 
 
                                                                                            *    Raw water at the camp and ADR plant will be treated 
                                                                                                 to generate potable water 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Transportation                                                     *    All personnel, goods, and materials will be 
                                                                                                 transported to and from site via road 
 
 
                                                                                            *    Bulk materials and equipment will arrive by rail in 
                                                                                                 Bishkek, 750 km from site, finishing the journey by 
                                                                                                 truck 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Labor                                                              *    The project workforce is estimated at 720 
 
 
                                                                                            *    On a 15-15 continuous shift schedule, half the 
                                                                                                 workforce will be on site at any given time 
 
 
                                                                                            *    80% of the workforce is expected to be national with 
                                                                                                 a target of 30% coming from local villages 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Accommodation                                                     *    The workforce will be housed on site in a 360-man 
                                                                                                permanent camp 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Ease with which infrastructure can be provided                        *    All infrastructure will be installed during the 
                                                                                                    28-month construction period 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Costs 
                    *    Derivation and assumptions regarding capital costs                 *    Capital costs from 2021 FS 
 
 
                                                                                            *    LOM CAPEX estimated at $131 M 
 
 
                                                                                            *    Initial capital approximately $116 M 
 
 
                                                                                            *    Deferred and Closure costs = $15 M 
 
 
                                                                                            *    Contingency was applied at 10% 
 
 
                                                                                            *    AACE Class 3 estimate, -10% to +15% 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Methodology used to estimate operating costs                       *    Mining cost from quote by the Contractor based on the 
                                                                                                 detailed mine plan 
 
 
                                                                                            *    Process, Owner Mining, and G&A were developed from 
                                                                                                 first principles based on detailed operating plans 
 
 
                                                                                            *    All other are based on the 2021 FS Update 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Allowances made for deleterious elements                          *    Project does not incur any added cost due to 
                                                                                                deleterious elements 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Source of exchange rates used in the study                        *    Exchange rates for Rubles, Som, and Euros to USD were 
                                                                                                as per prevailing rates in H1 2021 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Derivation of transportation charges                               *    Transportation costs were included in the price of 
                                                                                                 all goods and materials 
 
 
                                                                                            *    Cost of shipping was based on estimates a specialist 
                                                                                                 logistics service provider in the region 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Basis for forecasting refining charges                            *    Refining charges were based on advice from the Kyrgyz 
                                                                                                gold refinery at Kara-Balta 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Allowances for royalties, both government and private              *    Kyrgyzstan has a sliding scale royalty system pegged 
                                                                                                 to gold price 
 
 
                                                                                            *    At a gold price of $1,600/oz Au the royalty payable 
                                                                                                 is 14% 
 
 
                                                                                            *    No private royalty payable on the project 
 
 
                                                                                            *    Royalties are applied in lieu of corporate tax in 
                                                                                                 Kyrgyzstan 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Revenue 
 Factors            *    Head grade and recovery                                            *    Average head grade 0.87 g/t Au from the block model, 
                                                                                                 adjusted for dilution 
 
 
                                                                                            *    Average Au recovery 74% from geo-metallurgical model 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Metal price                                                        *    Commodity broker consensus forecast Feb 2022, 
                                                                                                 $1,618/oz over production period 
 
 
                                                                                            *    Gold price used $1,600/oz Au 
 
 
                                                                                            *    By-product silver priced at $20.00/oz Ag 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Exchange rates                                                    *    Payment made in USD, foreign exchange not applicable 
                                                                                                to revenue 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Transportation and treatment charges                               *    Refining and transport costs from Kyrgyz national 
                                                                                                 gold refinery at Kara-Balta and a bonded carrier 
                                                                                                 respectively 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                          *    No penalties payable on Tulkubash dore 
                    *    Refining penalties 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Net Smelter Returns                                               *    Dore, 45% Au and 55% Ag, payable 99.5% and 85% 
                                                                                                respectively 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Market 
 Assessment         *    The demand, supply, and stock situation for the                    *    All producers of precious metals in Kyrgyzstan are 
                         commodity, consumption trends and factors likely to                     obliged to offer their output for sale to the 
                         affect supply and demand in the future                                  National Bank of the Kyrgyz Republic at world spot 
                                                                                                 prices 
 
 
                                                                                            *    If NBKR declines to purchase metals offered, the 
                                                                                                 producer is free to directly sell on world markets 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                          *    Not applicable 
                    *    A customer/competitor analysis along with 
                         identification of likely market windows for the 
                         product 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Price and volume forecasts and the basis of these                  *    The forecast gold price averages $1,600/oz over LOM 
                         forecasts 
 
                                                                                            *    Average annual production forecast to be 106 Koz Au 
                                                                                                 during 3 years of full operation 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                          *    Not applicable 
                    *    For industrial minerals, the customer specification, 
                         testing, and acceptance requirements prior to a 
                         supply contract 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Economic 
                    *    Production Plan                                                    *    Operations will mine 23.1 Mt ore grading 0.87 g/t Au 
                                                                                                 and 66.4 Mt associated waste over 6-year period 
 
 
                                                                                            *    Project will recover 479 Koz primary Au and 386 Koz 
                                                                                                 by-product Ag over a 5-year LOM 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                          *    2021 FS LOM capital of $131 M 
                    *    Capital Costs 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Operating Costs                                                    *    Mining, Contract = $2.15/t mined 
 
 
                                                                                            *    Mining, Owner = $0.34/t ore 
 
 
                                                                                            *    Process = $4.80/t ore 
 
 
                                                                                            *    G&A = $1.27/t ore 
 
 
                                                                                            *    Unit costs for production period only 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Financial Considerations                                           *    Royalty applied at 14% in lieu of tax 
 
 
                                                                                            *    Base Case discount rate = 5% 
 
 
                                                                                            *    Project value calculated from July 1, 2022 
 
 
                                                                                            *    Model is unleveraged, assumes 100% equity 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Cost Exclusions                                                    *    Inflation 
 
 
                                                                                            *    Engineering 
 
 
                                                                                            *    Permitting 
 
 
                                                                                            *    Exploration 
 
 
                                                                                            *    Interest and financing charges 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Economic Performance                                               *    After-tax NPV discounted at 5% = $138 M 
 
 
                                                                                            *    After-tax IRR = 33% 
 
 
                                                                                            *    Simple Payback = 2.3 years 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Comparison to 2019 FS                                              *    19% increase in NPV at $1,450/oz Au 
 
 
                                                                                            *    62% increase in NPV at $1,600/oz Au 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Sensitivity Analysis                                                 *    Project NPV declines to $92 M 10% 
 
 
                                                                                              *    Each 1% change in CAPEX = $1.1 M change in NPV 
 
 
                                                                                              *    Each 1% change in OPEX = $2.5 M change in NPV 
 
 
                                                                                              *    Each 1% change in gold price result in $3-$4 M change 
                                                                                                   in NPV 
 
 
                                                                                              *    Project is breakeven is at a gold price of about 
                                                                                                   $1,090/oz Au 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Social 
                    *    Status of agreements with key stakeholders and                     *    Chaarat has a standing agreement to fund annual 
                         matters leading to social license to operate                            "social package" for Chatkal as per Kyrgyz 
                                                                                                 legislation 
 
 
                                                                                            *    Chaarat has committed to hiring quotas from local 
                                                                                                 villages 
 
 
                                                                                            *    Chaarat has promoted the development of local 
                                                                                                 business, education, and social events 
 
 
                                                                                            *    Chaarat maintains a program of engagement with the 
                                                                                                 local government and population 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Other 
                    *    Naturally Occurring Risks                                          *    The project is subject to risks from geohazards, 
                                                                                                 seismicity, and extreme weather 
 
 
                                                                                            *    The project design has been developed to mitigate, 
                                                                                                 control, or manage these risks 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Legal Agreements                                                   *    Chaarat has partnered with its Mining Contractor, 
                                                                                                 Ciftay Insaat 
 
 
                                                                                            *    Ciftay has taken a 12% stake in the project worth $31 
                                                                                                 M 
 
 
                                                                                            *    Ciftay will perform construction earthworks, mining, 
                                                                                                 ore stacking, and operate the Permanent Camp under a 
                                                                                                 variety of separate contracts 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Permitting                                                         *    Chaarat holds a mining license for the operating area, 
                                                                                                 700 ha, and an exploration license for the 
                                                                                                 surrounding 6,770 ha 
 
 
                                                                                            *    Surface rights have been secured for all land 
                                                                                                 required to develop the project 
 
 
                                                                                            *    A permitting process is in place to acquire all 
                                                                                                 permits and approvals required for construction and 
                                                                                                 operation 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Ore Reserve 
 Classification     *    Basis for classifying the ore reserve into various                 *    Drillhole data density 
                         confidence categories 
 
                                                                                            *    Search for Probable reserves 40 m 
 
 
                                                                                            *    Grade/thickness variability 
 
 
                                                                                            *    Continuity along strike 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Do the results reflect the CP's view of the deposit?               *    Yes. The absence of Measured Resources precludes 
                                                                                                 declaring Proven Reserves 
 
 
                                                                                            *    The Probable Reserves are based on accepted standards 
                                                                                                 for similar deposits and appropriately reflect the 
                                                                                                 quality of the geologic, technical, and economic 
                                                                                                 factors used to define them 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                          *    None, there are no Measured Resources 
                    *    What proportion of Probable Ore Reserves have been 
                         derived from Measured Mineral Resources? 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Audits or 
 Reviews            *    Results of any audits or reviews of the Ore Reserve               *    No third-party audits or reviews have been completed 
                         estimate                                                               on the updated Ore Reserve 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 Discussion of 
 relative           *    Qualitative discussion of the factors that would                   *    Mineral Resource Estimate based on an additional 
 accuracy                affect the accuracy and confidence of the estimate                      2,760 m of drilling 
 /confidence 
 
                    *    State whether the accuracy/confidence refers to the                *    Variography and sample selection criteria reviewed 
                         global or a local Ore Reserve estimate 
 
                                                                                            *    Wireframe and sulfide contact interpretation reviewed 
                                                                                                 and updated 
 
 
                                                                                            *    Previous MRE reviewed by external parties with no 
                                                                                                 fatal flaws found 
 
 
                                                                                            *    Accuracy and confidence refer to the global Ore 
                                                                                                 Reserve estimate 
 
 
                                                                                            *    Project design is flexible enough to accommodate 
                                                                                                 local variations in presentation of tonnage and grade 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Modifying Factors which may affect the                             *    The mining plan employs a conventional approach with 
                         accuracy/confidence of the Ore Reserve estimate                         achievable mining rates 
 
 
                                                                                            *    Some geotechnical and hydrogeological factors need 
                                                                                                 further definition, however, this will not affect the 
                                                                                                 accuracy of the Ore Reserve estimate 
 
 
                                                                                            *    Process technology is proven 
 
 
                                                                                            *    Recovery estimate reflects test work 
 
 
                                                                                            *    CAPEX and OPEX estimates are FS-level; review 
                                                                                                 required to confirm current validity 
 
 
                                                                                            *    The project can manage variations in metal and 
                                                                                                 commodity prices of 10-20% 
 
 
                                                                                            *    The project is subject to political and regulatory 
                                                                                                 risks typical for a developing country 
 
 
                                                                                            *    Natural risks such as geohazards and seismicity have 
                                                                                                 been considered in the project design 
                 ----------------------------------------------------------------------  --------------------------------------------------------------- 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDKZGZKGFGGZZZ

(END) Dow Jones Newswires

May 24, 2022 02:01 ET (06:01 GMT)

Chaarat Gold (LSE:CGH)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Chaarat Gold Charts.
Chaarat Gold (LSE:CGH)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Chaarat Gold Charts.