TIDMATM
RNS Number : 8423U
Andrada Mining Limited
30 March 2023
30 March 2023
The information contained within this announcement is deemed by
the Company to constitute inside information as stipulated under
the Market Abuse Regulations (EU) No. 596/2014 (MAR) as in force in
the United Kingdom pursuant to the European Union (Withdrawal) Act
2018. Upon the publication of this announcement via Regulatory
Information Service (RIS), this inside information is now
considered to be in the public domain.
Andrada Mining Limited
("Andrada" or the "Company")
V1V2 tin, lithium, and tantalum 2022 infill drill programme
final update
Andrada Mining Limited (AIM: ATM), an African technology metals
mining company with a portfolio of mining and exploration assets in
Namibia, announces the final results from the tin, lithium, and
tantalum infill drilling programme at the Company's flagship
operation, the Uis Mine ("Uis"). The 2022 drill programme was
undertaken with an aim of upgrading the existing JORC compliant
lithium and tantalum 2019 Mineral Resource (see announcement dated
16 September 2019).
The 51-hole drilling programme, comprising 22 diamond ("DD") and
29 reverse circulation ("RC") drill holes, commenced in 2022 over
the V1/V2 pegmatite. This update announces the results of the
remaining two drill holes as illustrated in Figure 1, to complete
the requisite reporting on all holes for this programme.
Highlights:
-- Pegmatite was intersected in all holes at the depths and
apparent widths predicted by the geological model.
-- Significant pegmatite intersections include:
o 113 m at 0.167% Sn, 68 ppm Ta and 1.15% Li(2) O for the drill
hole V1V2053, from 113 m to 226 m:
-- 59 m at 1.62% Li(2) O from 163 m to 222 m
o 114 m at 0.164% Sn, 85 ppm Ta and 1.15% Li(2) O for the drill
hole V1V2063, from 151 m to 265 m:
-- 48 m at 1.51% Li(2) O from 216 m to 264 m
Anthony Viljoen (CEO) commented:
"We are pleased to announce the final set of drill results for
the remaining two holes of the 2022 drill programme. These drilling
results indicate higher lithium grades and widths of the V1/V2
pegmatite at depth. The overall metal content within these
intersections highlights the potential of the Uis pegmatites and
supports ongoing exploration initiatives.
The selected lithium intersections within the pegmatite provide
valuable guidance on what we can expect as mining progresses and
provides an indication of the full potential of the V1/V2
pegmatite. The commissioning of the lithium pilot plant this year
will inform the optimisation of the lithium process flow diagram,
for the addition of a full-scale lithium production stream within
the main processing plant."
Overview of the results
The pegmatite intersections reported in this update align with
the existing geological model and continue to confirm its spatial
accuracy and interpretation. The drill holes intersected the
pegmatite where the separate V1 and V2 pegmatites have combined
into a single larger unit, with some minor offshoots into the
hanging wall. The dip angle of the pegmatites varies from 24
degrees to 48 degrees and the reported drill holes are orientated
vertically such that the reported intersections represent apparent
thickness.
Table 1 : Exploration results of diamond drill holes V1V2053 and
V1V2063 indicating the full pegmatite intersection and grades. The
drill holes were oriented vertically, and intersections are
indicative of apparent thickness and not true thickness. Note that
apparent thickness is greater than true thickness.
Hole ID Pegmatite From / To including Interval (m) Grade
waste (m)
--------- ------------ ----------------------- ---------------------- ------------- -----------------------------
Sn (%) Ta (ppm) Li O (%)
--------- ------------ ----------------------- ---------------------- ------------- ------- --------- ---------
V1V2053 O ff-shoot Hanging wall pegmatite 98.99-102.27 3.28 0.118 329 0.10
--------- ------------ ----------------------- ---------------------- ------------- ------- --------- ---------
O ff-shoot Hanging wall pegmatite 106.88-111.26 4.38 0.126 244 0.69
------------ --------------------------------- ---------------------- ------------- ------- --------- ---------
V1/V2 Whole intersection 113.42-226.19 112.77 0.167 68 1.15
------------ --------------------------------- ---------------------- ------------- ------- --------- ---------
Including 163-222 59 0.157 63 1.62
---------------------------------------------- ---------------------- ------------- ------- --------- ---------
V1V2063 O ff-shoot Hanging wall pegmatite 141.11 - 146.00 4.89 0.152 295 0.28
--------- ------------ ----------------------- ---------------------- ------------- ------- --------- ---------
Whole intersection (includes
1.58 m of internal waste from
155.43 m -156.62 m and 156.92 m
V1/V2 - 157.31m) 151.25 - 265.39 114.14 0.164 85 1.15
------------ --------------------------------- ---------------------- ------------- ------- --------- ---------
Including 216 - 264 48 0.184 69 1.51
---------------------------------------------- ---------------------- ------------- ------- --------- ---------
Each drill hole was geologically and geotechnically logged
before being sampled. The sample analysis was undertaken by UIS
Analytical Services, a certified independent laboratory, using a
peroxide fusion. ICP-OES analysis was utilised for major and minor
elements and ICP-MS utilised for the trace elements.
Figure 1 : Map displaying the localities of the reported holes,
the drill holes of the previous (2019) exploration programme and
the holes from the current programme previously reported. Line A-A'
indicates the area represented by the cross section (Fig.2).
Figure 2 : Section line A-A' displaying a projection of the
holes drilled during the current programme for which the results
are reported in this release and previous communications for this
programme.
Competent Person statement
The technical data in this announcement has been reviewed by
Michael Cronwright (M.Sc., FGSSA, Pr. Sci Nat. (Geological
Sciences)). He is a full-time employee of CSA Global and provides
geological consulting services to Andrada. Mr Cronwright is the
Principal Consultant - Battery Metals co-ordinator for CSA Global
and has 23 years of industry related exploration as well as mineral
project development experience and is a Competent Person for the
reporting of these exploration results. He has reviewed both the
technical disclosures in this release as well as the quality
assurance protocols and results for the assay campaign. Mr
Cronwright consents to the release of the information contained in
the announcement and is satisfied that the results of the QAQC on
the assay results released to date are sufficient to support the
planned estimation of Mineral Resources.
Glossary of abbreviations
DD Diamond Drilling
ICP-MS Inductively Coupled Plasma-Mass Spectrometry
-----------------------------------------------------------------------------------------------
ICP-OES Inductively Coupled Plasma-Optical Emission Spectrometry
-----------------------------------------------------------------------------------------------
Li Symbol for Lithium
-----------------------------------------------------------------------------------------------
Li -> Li(2) O Metal to metal-oxide conversion factor of 2.153
-----------------------------------------------------------------------------------------------
Li(2) O Lithium oxide
-----------------------------------------------------------------------------------------------
JORC The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
-----------------------------------------------------------------------------------------------
MRE Mineral Resource Estimate
-----------------------------------------------------------------------------------------------
PPM Parts Per Million
-----------------------------------------------------------------------------------------------
QA/QC Quality Assurance / Quality Control
-----------------------------------------------------------------------------------------------
RC Reverse Circulation drilling
-----------------------------------------------------------------------------------------------
Sn Symbol for Tin
-----------------------------------------------------------------------------------------------
Ta Symbol for Tantalum
-----------------------------------------------------------------------------------------------
V1/V2 Name of the targeted pegmatite unit, V1/V2 denotes where the V1 and V2 pegmatites have merged
at depth.
-----------------------------------------------------------------------------------------------
Glossary of technical terminology
Apparent thickness The relationship between apparent width and true thickness is based on the formula by Addie
(1968 Economic Geology, vol 63, pp 188-189).
Dip angle The angle of inclination measured downward from horizontal.
-------------------------------------------------------------------------------------------------
Geological model The interpretation of mineralisation and geology that controls mineralisation. This is usually
generated in a three-dimensional computer environment.
-------------------------------------------------------------------------------------------------
Mineral resources Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred,
Indicated and Measured categories. An Inferred Mineral Resource has a lower level of confidence
than that applied to an Indicated Mineral Resource. An Indicated Mineral Resource has a higher
level of confidence than an Inferred Mineral Resource but has a lower level of confidence
than a Measured Mineral Resource.
-------------------------------------------------------------------------------------------------
Pegmatite An igneous rock typically of granitic composition, which is distinguished from other igneous
rocks by the extremely coarse and systematically variable size of its crystals, or by an
abundance
of crystals with skeletal, graphic, or other strongly directional growth habits, or by a
prominent
spatial zonation of mineral assemblages, including monomineralic zones.
-------------------------------------------------------------------------------------------------
Xenolith A foreign rock fragment (e.g., schist) within an intrusive body (e.g., pegmatite) that is
unrelated to the igneous body.
-------------------------------------------------------------------------------------------------
Andrada Mining Limited +27 (11) 268 6555
Anthony Viljoen, CEO
Sakhile Ndlovu, Head of Investor
Relations
Nominated Adviser +44 (0) 207 220 1666
WH Ireland Limited
Katy Mitchell
Corporate Advisor and Joint Broker
H&P Advisory Limited
Andrew Chubb
Jay Ashfield
Nilesh Patel +44 (0) 20 7907 8500
Stifel Nicolaus Europe Limited +44 (0) 20 7710 7600
Ashton Clanfield
Callum Stewart
Varun Talwar
Tavistock Financial PR (United
Kingdom) +44 (0) 207 920 3150
Emily Moss
Catherine Drummond
Adam Baynes
__________________________________________________________________________________________
About Andrada Mining Limited
Notes to editors.
Andrada Mining Limited is a London-listed technology metals
mining company with a vision to create a portfolio of globally
significant, conflict-free, production and exploration assets. The
Company's flagship asset is the Uis Mine in Namibia, formerly the
world's largest hard-rock open cast tin mine.
Lithium laboratory test work completed during the 2022 calendar
year indicated a high-grade, ultra-low iron lithium petalite
concentrate. The test work to convert lithium petalite concentrate
to battery-grade lithium hydroxide was initiated with Nagrom, a
leading Australian processing company, and commercial engagements
with lithium petalite concentrate off - takers are on-going.
An exploration drilling programme is currently underway with the
aim of expanding the tin resource over the fourteen additional,
historically mined pegmatites, all of which occur within a 5 km
radius of the current processing plant. The Company has set a
mineral resource target of 200 Mt to be delineated within the next
5 years. The substantial mineral resource potential allows the
Company to consider economies of scale.
Andrada is managed by a board of directors with extensive
industry knowledge and management team with deep commercial and
technical skills. Furthermore, the Company is committed to the
sustainable development of its operations and the growth of its
business. This is demonstrated by how the leadership team places
significant emphasis on creating value for the wider community,
investors, and other key stakeholders. Andrada has established an
environmental, social and governance system which has been
implemented at all levels of the Company and aligns with
international standards.
-END-
This information is provided by RNS, the news service of the
London Stock Exchange. RNS is approved by the Financial Conduct
Authority to act as a Primary Information Provider in the United
Kingdom. Terms and conditions relating to the use and distribution
of this information may apply. For further information, please
contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms
and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an
anonymised basis with others as part of our commercial services.
For further information about how RNS and the London Stock Exchange
use the personal data you provide us, please see our Privacy
Policy.
END
MSCNKKBBABKDQNN
(END) Dow Jones Newswires
March 30, 2023 12:26 ET (16:26 GMT)
Andrada Mining (LSE:ATM)
Historical Stock Chart
From Jun 2024 to Jul 2024
Andrada Mining (LSE:ATM)
Historical Stock Chart
From Jul 2023 to Jul 2024