Armadale Capital Plc ('Armadale' or 'the Company')
1.2km Mineralised Strike Identified at Mahenge Liandu Graphite
Project
Armadale, the AIM quoted investment company focused on natural
resource projects in Africa, is pleased to announce the completion
of the first phase of Reverse Circulation ('RC') drilling at its
Mahenge Liandu Graphite Project in Tanzania, with wide zones of
near surface mineralisation intersected over a strike length of
1,200m. Test work on the bulk sample is now well underway with
initial metallurgical test work results showing good recoveries and
the production of final graphite concentrates is expected in the
coming weeks.
Overview
-- First phase of RC drilling completed targeting zones of high grade
near surface mineralisation with potential for priority mining
in the
Mahenge Liandu mine plan
-- 24 of the 25 holes returned intersected at or near surface
mineralisation confirming a consistent area of near surface
mineralisation over a strike length of 1,200m
-- Preliminary on-site review of the drilling gives management confidence
that an increase in the Resource size and category will be
achieved
over the maiden JORC resource estimate of 40.9MT @ 9.41%
Total
Graphite Carbon ('TGC')
-- A second drill programme aimed at increasing the Resource category
over a strike length of 2,400m is planned to commence once
results of
the first phase are returned
-- Geological mapping to identify potential extensions has discovered
additional areas of graphite mineralisation previously
untested
-- Bulk sample underway, with initial results showing a 21.3% TGC head
grade and confirming high levels of recovery of above 98%
are
achievable at the rougher stage
-- Multi element analysis on the bulk sample show low levels of
potentially deleterious elements
-- Concentrates from the bulk sample are expected in the coming weeks and
will be reported in due course
Nick Johansen, Director of Armadale said, "The potential for
Mahenge Liandu to host a significant, commercially attractive
graphite mining operation continues to be fuelled by these
consistently encouraging drill results. Following the completion of
our first phase of exploration drilling in the 2017 season, we are
delighted to report a consistent area of near surface
mineralisation over a strike length of 1,200m, underpinning the
scale of this emerging graphite project. With a second phase of
drilling being planned, plus geological mapping evaluating possible
extensions to the deposit on the wider licence area, I am confident
that our maiden JORC Resource estimate of 40.9Mt at 9.41% TGC,
which is already one of the largest in Tanzania, has significant
room for expansion."
Drilling Programme Update
The first phase of drilling on a 200m by 80m pattern is now
complete over a strike length of 1,200m with a total of 25 holes
now completed. The results continue to indicate wide zones of near
surface mineralisation over the full strike length, which is
expected to cover the area of the initial pit. Several holes had
mineralisation much wider than expected up to 105 from surface.
Within this areas of high-grade have been logged. Assay from the
drilling programme will be released when the results come to
hand.
Hole ID Easting Northing Total Depth From To Width
LDRC0022 251,673 9,035,201 65 0 58 58
LDRC0023 251,855 9,035,275 51 0 46 46
LDRC0024 251,821 9,035,352 33 0 29 29
LDRC0025 251,896 9,035,210 34 0 28 28
LDRC0026 251,785 9,035,419 63 0 55 55
LDRC0027 251,758 9,035,495 63 0 58 58
LDRC0028 251,938 9,035,596 41 0 20 20
LDRC0029 251,976 9,035,515 50 0 37 37
LDRC0030 251,909 9,035,660 19 0 3 3
LDRC0031 252,010 9,035,443 63 6 56 50
LDRC0032 252,043 9,035,371 57 13 46 33
LDRC0033 251,728 9,035,571 61 11 54 43
LDRC0034 251,694 9,035,642 48 0 3 3
23 27 4
LDRC0035 251,653 9,035,504 74 37 68 31
LDRC0036 251,620 9,035,351 33 0 10 10
LDRC0037 251,642 9,035,283 69 0 58 58
LDRC0038 251,588 9,035,433 63 0 55 55
LDRC0039 251,461 9,035,183 66 0 58 58
LDRC0040 251,432 9,035,265 56 0 48 48
LDRC0041 251,395 9,035,330 79 0 75 75
LDRC0042 251,494 9,035,112 60 10 54 44
LDRC0043 251,527 9,035,039 33 2 4 2
LDRC0044 251,566 9,034,969 93 17 21 4
45 87 42
LDRC0045 251599.9 9034896.8 50 No mineralisation intercepted n/a
LDRC0046 251267.87 9035127.1 105 0 105 105
Table 1 Graphite intercepts from 2017 drilling programme -
results in italics were previously reported August 2017 (see RNS
dated 1 August 2017 for further information)
The information in this announcement that relates to exploration
results is based on information compiled by Mr Matt Bull, a
competent person, who is a Member of the Australian Institute of
Geoscientists. Mr Bull has sufficient experience which is relevant
to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to
qualify as a competent person as defined in the 2012 Edition of the
"Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves". Mr Bull consents to the inclusion in
the report of the matters based on his information in the form and
context in which it appears.
The information communicated in this announcement contains
inside information for the purposes of Article 7 of the Market
Abuse Regulation (EU) No. 596/2014.
**ENDS**
Enquiries:
Armadale Capital Plc +44 20 7236 1177
Tim Jones, Company Secretary
Nomad and broker: finnCap Ltd +44 20 7220 0500
Christopher Raggett / Simon Hicks
Joint Broker: Beaufort Securities Limited +44 20 7382 8300
Jon Belliss
Press Relations: St Brides Partners Ltd +44 20 7236 1177
Susie Geliher / Charlotte Page
Notes
Armadale Capital Plc is focused on investing in and developing a
portfolio of investments, targeting the natural resources and/or
infrastructure sectors in Africa. The Company, led by a team with
operational experience and a strong track record in Africa, has a
strategy of identifying high growth businesses where it can take an
active role in their advancement.
The Company owns the Mahenge Liandu graphite project in
south-east Tanzania, which is now its main focus. The Project is
located in a highly prospective region with a high-grade JORC
compliant inferred mineral resource estimate of 40.9Mt @ 9.41% TGC.
At least 32Mt of this resource has an average grade of 10.47% TGC,
one of the largest high-grade resources in Tanzania, and work to
date has demonstrated Mahenge Liandu's potential as a commercially
viable deposit with significant tonnage, high-grade coarse flake
and near surface mineralisation (implying a low strip ratio)
contained within one contiguous ore body.
Other assets Armadale has an interest in include the Mpokoto
Gold project in the Democratic Republic of Congo and a portfolio of
quoted investments.
More information can be found on the website
www.armadalecapitalplc.com.
View source version on businesswire.com:
http://www.businesswire.com/news/home/20170816005702/en/
This information is provided by Business Wire
(END) Dow Jones Newswires
August 17, 2017 02:00 ET (06:00 GMT)
Armadale Capital (LSE:ACP)
Historical Stock Chart
From Apr 2024 to May 2024
Armadale Capital (LSE:ACP)
Historical Stock Chart
From May 2023 to May 2024