Providence Resources Completes First Phase Of AMEC Study For Project
January 10 2011 - 3:38AM
Dow Jones News
Providence Resources Plc (PVR.LN), an international upstream oil
and gas company announced Monday through its wholly owned
subsidiary EIRGAS Limited, that it has completed the first phase of
the AMEC Plc (AMEC.LN) conceptual development study for the ULYSSES
salt cavern gas storage project in the Kish Bank Basin, offshore
eastern Ireland.
MAIN FACTS:
-The ULYSSES Project, which commenced in 2008, assessed the
natural gas storage and carbon sequestration potential of the Kish
Bank Basin, offshore Dublin.
-The initial phase of this new study, carried out by AMEC, which
included planning, capacity modeling, infrastructural integration
and gas sourcing has confirmed that the construction of an offshore
natural gas salt cavern storage facility at the ULYSSES location is
both economically and technically feasible.
-A number of scenarios have been developed which have an
associated range in capacity, off-take export rates and capital
expenditure.
-Detailed technical data relating to the subsurface geology,
which will be acquired through the drilling of the Dalkey Island
exploration prospect, will also assist with the advancement of this
project.
-Shares at 0804 GMT up 0.5 pence, or 0.2%, at 269.5 pence.
-By Zechariah Hemans, Dow Jones Newswires; 44-20-7842-9411;
zechariah.hemans@dowjones.com