Stock Symbol: AEM (NYSE and TSX)
TORONTO, Feb. 10, 2022 /PRNewswire/ - Agnico Eagle
Mines Limited (NYSE: AEM) (TSX: AEM) ("Agnico Eagle" or
the "Company") today announced results from 59 holes, including
four wedge holes and one hole extension, totaling 49,073.5 m of drilling along the Detour Mine
Trend ("DMT") at the Detour Lake property. The new holes
being reported are the eighth batch of results from the 2020/2021
exploration program and the second since the October 15, 2021 filing by Kirkland Lake Gold
Ltd. ("Kirkland Lake Gold") of an updated 43-101 Technical Report
which incorporated ongoing drilling at the Detour Lake property up
to July 26, 2021 (the "Mid-Year 2021
Mineral Resource Estimate"). This brings the total holes
released since the Mid-Year 2021 Mineral Resource Estimate to 98
holes and 10 wedge holes totaling 84,646.1
m.
The Company acquired the Detour Lake property on February 8, 2022, following the successful
completion of the previously announced merger of equals transaction
with Kirkland Lake Gold.
Highlights include:
- Drilling at future West Pit and Saddle Zone expands
mineralization north and west of the Mid-Year 2021 Mineral Resource
Estimate pit shell
-
- Key West Pit Zone intercepts1 include: 30.89
g/t2 g/t over 17.4
m2, incl2 58.42 g/t over 9.0 m; 22.22 g/t over 9.5
m; 4.87 g/t over 10.0 m, incl
14.73 g/t over 3.0 m; 4.81 g/t over
13.9 m, incl 15.48 g/t over
3.8 m; 2.86 g/t over 21.0 m, incl 21.80 g/t over 2.0 m; 2.76 g/t over 24.0
m, incl 18.06 g/t over 2.3 m
and 2.28 g/t over 12.0 m; 1.67 g/t
over 67.0 m; 1.63 g/t over
25.5 m; and 0.92 g/t over
79.0 m
- Key Saddle Zone intercepts1 include: 142.66 g/t over
3.0 m; 2.98 g/t over 10.0 m, incl 12.46 g/t over 2.0 m; 2.21 g/t over 20.4
m; 19.52 g/t over 2.0 m; 1.01
g/t over 40.0 m; 0.87 g/t over
47.0 m; and 0.84 g/t over
59.3 m
- Drilling at future West Pit and Saddle Zone continues to
confirm mineralization inside the Mid-Year 2021 Mineral Resource
Estimate pit shell
-
- Key Saddle Zone intercepts1 include: 5.41 g/t over
32.4 m, incl 38.74 g/t over
4.0 m; 22.94 g/t over 2.0 m; 3.23 g/t over 16.0
m, incl 8.84 g/t over 5.0 m;
2.73 g/t over 26.0 m, incl 7.16 g/t
over 8.4 m; 1.63 g/t over
29.1 m; and 1.34 g/t over
32.0 m, incl 6.52 g/t over
3.2 m
- Key West Pit Zone intercepts1 include: 2.71 g/t over
27.4 m, incl 30.14 g/t over
2.1 m; and 0.87 g/t over 30.7 m
- Drilling at the North Pit intersects multiple mineralized
structures and extends mineralization 440 metres to the west along
the North Walter Lake Trend
-
- Key North Pit Zone intercepts1 include: 2.54 g/t
over 21.5 m; 2.45 g/t over
13.0 m; 20.74 g/t over 2.0 m; 8.40 g/t over 3.0
m; 4.73 g/t over 6.0 m; 2.73
g/t over 11.0 m; 2.27 g/t over
12.0 m; 2.02 g/t over 13.0 m; 1.94 g/t over 17.0
m, incl 9.12 g/t over 3.0 m;
1.91 g/t over 13.1; 1.25 g/t over 22.3
m; 1.13 g/t over 23.2 m; 1.02
g/t over 23.0 m; 1.01 g/t over
20.3 m
(1)
|
True widths are
unknown at this time and intervals are reported using core lengths
intersected in the holes. Assays are reported
uncut.
|
(2)
|
Grams per tonne
("g/t"); Metres ("m"); Including ("incl.").
|
The recent drilling was carried out to collect additional
information to support and potentially expand the
10.1-million-ounce increase in measured and indicated ("M&I")
open-pit mineral resources in the Mid-Year 2021 Mineral Resource
Estimate to a total of 572.0 million tonnes at 0.80 g/t for
14,718,000 ounces (including 25.8 million tonnes at 1.53 g/t for
1,271,000 ounces of measured mineral resources and 546.2 million
tonnes at 0.77 g/t for 13,447,000 ounces of indicated mineral
resources (exclusive of mineral reserves)). Of the 14,718,000
ounces of open-pit M&I mineral resources, a total of 386.5
million tonnes at 0.98 g/t for 12,214,000 ounces were established
using a 0.50 g/t cut-off grade (including 22.8 million tonnes at
1.68 g/t for 1,231,000 ounces of measured mineral resources and
363.7 million tonnes at 0.94 g/t for 10,983,000 ounces of indicated
mineral resources) with 185.5 million tonnes at 0.42 g/t for
2,505,000 ounces of low-grade mineral resources established using
cut-off grades between 0.35 – 0.50 g/t. Under previous mine
plans, the low-grade resources represented tonnes expected to be
mined as waste, whereas they will now be stockpiled and processed
in later years. The Company expects to convert a significant
percentage of the increased M&I mineral resources into mineral
reserves as it works to complete a new production plan, expected to
be released in the second quarter of 2022. The new holes
announced today are from drilling in the North Pit area, which is
located North of the Saddle Zone and West Pit, along with a portion
of the holes targeting areas inside and outside the Mid-Year 2021
Mineral Resource Estimate pit shell proximal to the Saddle Zone and
future West Pit.
Tony Makuch, CEO of Agnico Eagle,
commented: "Today's drill results highlight the significant
opportunity that exists to continue to grow mineral resources
beyond the levels included in the Mid-Year 2021 Mineral Resource
Estimate announced in September 2021. The results
include a number of wide, high-grade intersections located both
within and outside of the Mid-Year 2021 Mineral Resource Estimate
pit shell. Also encouraging is that we continue to extend the
mineralization at depth. Based on work to date, we have
confirmed the existence of a broad and continuous corridor of
mineralization extending over 4.0 kilometres from the Main Pit
through the Saddle Zone to beyond the planned West Pit location to
a depth of at least 800 m below
surface with the system remaining open. Given that open-pit
M&I mineral resources have already been tripled since
Kirkland Lake Gold's acquisition of
the Detour Lake property on January 31,
2020, with further increases expected, we are well
positioned to report strong growth in mineral reserves and to
identify additional value creation opportunities for the operation
when we issue the 2022 technical report and life-of-mine plan for
Detour Lake, expected during the second quarter of this year."
Saddle Zone
Drilling in the Saddle Zone included 23 holes and two wedge
holes totaling 21,705.0 m which
targeted areas along the DMT between the future West Pit and the
Main Pit Mineral Reserve shell.
Significant results from the drilling include: 5.41 g/t over
32.4 m, incl 38.74 g/t over
4.0 m, 3.23 g/t over 16.0 m, incl 8.84 g/t over 5.0 m, 22.94 g/t over 2.0
m and 1.07 g/t over 37.0
m from hole DLM-21-327; 2.73 g/t over
26.0 m, incl 7.16 g/t over
8.4 m, 2.35 g/t over 11.0 m and 0.85 g/t over 44.9 m from hole DLM-21-315; 1.80 g/t
over 11.0 m, 8.49 g/t over
2.1 m and 1.70 g/t over 14.0 m from hole DLM-21-208; 1.63 g/t
over 29.1 m and 0.96 g/t over
26.6 m from hole DLM-21-341;
1.34 g/t over 32.0 m, incl 6.52
g/t over 3.2 m from hole
DLM-21-355; 0.84 g/t over 21.8 m
and 0.83 g/t over 31.4
m from hole DLM-21-298A; 0.87 g/t over
52.5 m, 0.85 g/t over 54.0 m, 0.87 g/t over 22.0
m and 0.81 g/t over 16.0
m from hole DLM-21-305A; and 0.81 g/t over
41.0 m from hole
DLM-21-370A.
These holes were drilled to target the DMT between 200 and
550 m below surface and continue to
demonstrate mineral continuity within untested gaps inside the
Mid-Year 2021 Mineral Resource Estimate pit shells.
Additional significant intersections within the Saddle Zone
which identified mineralization outside and below the Mid-Year 2021
Mineral Resource Estimate pit shell include: 142.66 g/t over
3.0 m, 1.85 g/t over 14.2 m and 0.81 g/t over 13.0 m from hole DLM-21-318; 19.52
g/t over 2.0 m and 0.86 g/t over
27.1 m from hole DLM-21-336;
2.98 g/t over 10.0 m, incl 12.46
g/t over 2.0 m from hole
DLM-21-250W; 2.21 g/t over 20.4 m
and 1.10 g/t over 26.0
m from hole DLM-21-304; 1.36 g/t over
45.0 m, incl 2.1 g/t over
21.0 m from hole DLM-21-355;
1.01 g/t over 40.0 m from
hole DLM-21-250; 0.84 g/t over 59.3
m, 0.97 g/t over 21.0 m and
0.80 g/t over 22.1 m from
hole DLM-21-303; 0.87 g/t over 47.0
m and 1.12 g/t over 17.2
m from hole DLM-21-335A; and 0.85 g/t over
30.0 m, 0.93 g/t over 17.0 m and 0.86 g/t over 12.0 m from hole DLM-21-350A.
Results from all new holes in this area are considered
encouraging as they continue to confirm the presence of a broad
corridor of mineralization extending between the Main Pit and the
planned West Pit (a distance of over 800
m) with the overall style of mineralization and gold tenor
being very similar to that found in existing mineral reserves.
Particularly encouraging is the identification of wide,
high-grade mineralization near the lower limits of the current
mineral resource pit shell, which indicates that the potential
exists to expand the pit shell to depth and to add new open-pit
mineral resources as well as to define underground mineral
resources below the pit.
Future West Pit
Drilling west of the Main Pit and Saddle Zone areas in the
future West Pit location included 12 holes, one wedge hole and an
extension of a previously drilled hole, totaling 13,092.0 m. Drilling primarily targeted the
DMT below and north of the Mid-Year 2021 Mineral Resource Estimate
pit shell, intersecting mineralization at depths up to 1,000 m below surface and continue to confirm and
expand mineralization in both directions.
Significant results from the drilling include: 30.89 g/t over
17.4 m, incl 58.42 g/t over
9.0 m and 0.85 g/t over 27.5 m from hole DLM-21-328; 17.17
g/t over 2.0 m, 10.29 g/t over
2.0 m, 1.02 g/t over 16.0 m and 0.87 g/t over 23.9 m from hole DLM-21-332; 4.81 g/t
over 13.9 m, incl 15.48 g/t over
3.8 m from hole DLM-21-326;
2.71 g/t over 27.4 m, incl 30.14
g/t over 2.1 m from hole
DLM-21-323; 2.76 g/t over 24.0 m,
incl 18.06 g/t over 2.3 m, 2.11 g/t
over 10.1 m, 1.18 g/t over
24.5 m and 1.04 g/t over 26.1 m from hole DLM-21-337A; 1.49
g/t over 25.3 m, incl 6.12 g/t over
4.0 m, 1.50 g/t over 14.2 m, 1.49 g/t over 26.0
m and 0.81 g/t over 21.0
m from hole DLM-21-339C; and 0.87 g/t over
30.7 m from hole DLM-21-321.
All of these intercepts were from the upper part of the DMT between
200 and 500 meters below surface.
Additional significant intercepts from the drilling include:
22.22 g/t over 9.50 m, 1.52 g/t
over 21.0 m, 1.29 g/t over
23.5 m and 0.87 g/t over 37.0 m from hole DLM-21-337A; 50.36
g/t over 2.0 m and 3.13 g/t over
6.0 m from hole DLM-21-352;
17.3 g/t over 2.0 m from
hole DLM-302; 13.64 g/t over 2.3
m, 1.63 g/t over 25.5 m and
1.42 g/t over 14.3 m from
hole DLM-21-328; 4.87 g/t over 10.0
m, incl 14.73 g/t over 3.0 m
and 0.93 g/t over 59.2
m from hole DLM-21-332; 2.86 g/t over
21.0 m, incl 21.80 g/t over
2.0 m, 1.67 g/t over 67.0 m, incl 13.13 g/t over 2.0 m, 17.41 g/t over 2.0
m, 1.06 g/t over 37.0 m and
0.92 g/t over 79.0 m from
hole DLM-21-339C; 2.28 g/t over 12.0
m and 1.47 g/t over 18.0
m from hole DLM-21-283AW; 0.95 g/t over
45.1 m, 0.84 g/t over 26.0 m, 5.71 g/t over 2.1
m and 5.09 g/t over 2.0
m from hole DLM-21-390A. All of these intercepts
were from the lower part of the DMT mainly below the 500 meters
level.
Results from the drilling are considered positive and continue
to confirm the continuation of mineralization at depth through the
west portion of the future West Pit and beyond the current west
limit. Particularly encouraging are the results from holes
DLM-21-328, DLM-21-332, DLM-21-337A and DLM-21-339C which
intersected broad zones containing high grade mineralization up to
300 meters west of the current pit shell for the future West
Pit.
North Pit
Drilling at the North Pit targeted extensions of mineralization
from the current mineral reserves and mineral resources along the
North Walter Lake Trend which appears to be a parallel fault
structure to the DMT, located to the immediate north of the Future
West Pit and Saddle Zones, and included 24 holes totaling
13,355 m.
Significant results from the drilling include: 20.74 g/t over
2.0 m, 2.02 g/t over 13.0 m and 1.13 g/t over 23.2 m from hole DLM-21-344; 8.40 g/t over
3.0 m from hole DLM-21-342;
2.54 g/t over 21.5 m from
hole DLM-21-330; 2.73 g/t over 11.0
m, 8.99 g/t over 2.0 m and
0.83 g/t over 18.0 m from
hole DLM-21-340; 2.45 g/t over 13.0
m, incl 4.73 g/t over 6.0 m,
6.09 g/t over 2.0 m and 1.33 g/t over
14.0 m from hole DLM-21-388;
2.27 g/t over 12.0 and 1.25 g/t over 22.3
m from hole DLM-21-362C; 1.91 g/t over
13.1 m, 1.24 g/t over 16.0 and 1.24
g/t over 13.7 m from hole
DLM-21-389; 1.94 g/t over 17.0 m,
incl 9.12 g/t over 3.0 m and 0.89 g/t
over 12.0 m from hole
DLM-21-334B; 1.02 g/t over
23.0 m, 1.47 g/t over 12.0 m and 0.87 g/t over 16.0 m from hole DLM-21-338; and 1.01
g/t over 20.3 m and 0.80 g/t over
19.0 m from hole
DLM-331.
Information from the new holes is considered positive and
indicates multiple mineralized structures extending for a minimum
of 440 m west of the current North
Pit and to a minimum depth of 300 meters from surface. This
extension represents a doubling of the strike length for the
current pit shell for the North pit. Drilling to the west and below
the new results is very limited and considered to offer additional
potential for expansion.
Based on all assay results and other observations obtained from
the program to date, the outlook for the project continues to be
encouraging. The evidence of a broad and continuous corridor
of mineralization extending from the Main Pit through the Saddle
Zone to the planned West Pit is supported by the October 15, 2021 43-101 Technical Report with
continued drilling intersecting mineralization to a depth of at
least 900 m below surface. The
work also suggests that the mineralization within the corridor is
hosted within broad zones containing variable amounts of quartz and
pyrite, is controlled mainly by east-west trending, moderately
north-dipping folds and shear structures plunging at a shallow
angle to the west, is very similar to that found in existing
mineral reserves. Given results to date, the potential to
identify further extensions of known mineralization and
subsequently increasing mineral resources and mineral reserves
through additional drilling is considered positive.
The 2022 exploration program is continuing at Detour Lake with
twelve drills currently operating, building on the 318,116 m of drilling completed along the DMT in
2020/2021 by Kirkland Lake Gold,
with an additional 234,000 m of
proposed drilling which is expected to be completed by the end of
2022.
About Agnico Eagle
The new Agnico Eagle is a senior Canadian gold mining company,
producing precious metals from operations in Canada, Australia, Finland and Mexico. It has a pipeline of high-quality
exploration and development projects in these countries as well as
in the United States and
Colombia. Agnico Eagle is a
partner of choice within the mining industry, recognized globally
for its leading environmental, social and governance practices. The
Company was founded in 1957 and has consistently created value for
its shareholders, declaring a cash dividend every year since
1983.
For further information regarding Agnico Eagle, contact Investor
Relations at investor.relations@agnicoeagle.com or call (416)
947-1212. Agnico Eagle's head office continues to be located at 145
King Street East, Suite 400, Toronto,
Ontario M5C 2Y7.
Qualified Persons
The Company's exploration programs at Detour Lake are conducted
under the supervision of Eric
Kallio, P.Geo., Senior Vice President. Mr. Kallio, as well
as Keith Green, P.Geo., Director,
Exploration, Canada, and
Steve Gray, P.Geo, Exploration
Manager, Detour Lake Mine, are "qualified persons" for the purpose
of National Instrument 43-101, Standards of Disclosure for Mineral
Projects, of the Canadian Securities Administrators, and have
reviewed and approved the scientific and technical information in
this news release.
QA/QC Controls
The Company has implemented a quality assurance and control
("QA/QC") program to ensure sampling and analysis of all
exploration work is conducted in accordance with best practices.
Samples are logged and sampled in a secure facility at the Detour
mine site and under supervision of Qualified Geologists. NQ
sized core is predominantly sawn in half with one half of the core
prepared for shipment and the other half of core retained for
future assay verification. Certified reference material (CRM)
standards and coarse blank material are inserted every 20 samples.
Core samples are shipped directly by courier and tracked via a
chain of custody from site to certified off-site analytical
laboratories for preparation and assaying.
The Company utilizes three accredited external laboratories to
manage the significant volume of sample submissions. Each lab is
certified by the Standards Council of Canada (SCC) which conforms with ASB-RG
Mineral Analysis Laboratory for the Accreditation of Mineral
Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025: General
Requirements for the Competence of Testing and Calibration
Laboratories.
Sample preparation includes crushing drill core up to 80%
passing 2 mm, riffle splitting 500 grams and pulverizing to 95%
passing 105 µm followed by both scheduled and specifically
requested silica sand cleaning. Gold Analysis involves Fire Assay –
Atomic Absorption (AA) technique from a 50-gram pulp sample with
grade ranges between 5 to 10,000 ppb. Samples greater than
10,000 ppb are analyzed with a gravimetric finish. Selected
high grade samples are also analyzed using the screen metallics
procedure.
Contracted laboratories for the Detour mine site include: ALS
Global (sample preparation completed in Timmins, Ontario with pulps sent to
Vancouver, BC for analysis),
Activation Laboratories (sample preparation and analysis completed
in Timmins, Ontario), and AGAT
Laboratories (sample preparation in Timmins and analysis in Mississauga).
Cautionary Note Regarding Forward-Looking Information
The information in this news release has been prepared as at
February 10, 2022. Certain statements
contained in this news release constitute "forward-looking
statements" within the meaning of the United States Private
Securities Litigation Reform Act of 1995 and "forward-looking
information" under the provisions of Canadian provincial securities
laws and are referred to herein as "forward-looking statements".
All statements, other than statements of historical fact, that
address circumstances, events, activities or developments that
could, or may or will occur are forward looking
statements. When used in this news release, the words
"anticipate", "could", "estimate", "expect", "forecast", "future",
"plan", "possible", "potential", "will" and similar expressions are
intended to identify forward-looking statements. Such statements
include without limitation, statements with respect to: the planned
exploration program at the Detour Lake property, including costs
and expenditures; the ability to potentially expand mineral
reserves and mineral resources, changes in mineral resources and
the conversion of mineral resources to proven and probable mineral
reserves; the ability to expand the current pit design of the mine,
the new mine plan and anticipated timing of the updated technical
report with respect to the Detour Lake Mine and the anticipated
benefits thereon; and other information that is based on forecasts
of future operational or financial results, estimates of amounts
not yet determinable and assumptions of management. Such
statements reflect the Company's views as at the date of this news
release and are subject to certain risks, uncertainties and
assumptions, and undue reliance should not be placed on such
statements. Forward-looking statements are necessarily based upon a
number of factors and assumptions that, while considered reasonable
by Agnico Eagle as of the date of such statements, are inherently
subject to significant business, economic and competitive
uncertainties and contingencies. The material factors and
assumptions used in the preparation of the forward looking
statements contained herein, which may prove to be incorrect,
include, but are not limited to, the assumptions set forth herein
as well as: that there are no significant disruptions affecting
operations; and that Agnico Eagle's current estimates of mineral
reserves, mineral resources, mineral grades and metal recovery are
accurate. Many factors, known and unknown, could cause the actual
results to be materially different from those expressed or implied
by such forward looking statements. Such risks include, but
are not limited to: the extent and manner to which COVID-19, and
measures taken by governments, the Company or others to attempt to
reduce the spread of COVID-19, may affect the Company; uncertainty
of mineral reserves, mineral resources, mineral grades and mineral
recovery estimates; cost of exploration and development programs;
risks associated with foreign operations; risks related to
obtaining the permits required to carry out planned exploration or
development work; governmental and environmental regulation;
and the volatility of the Company's stock price. For a more
detailed discussion of such risks and other factors that may affect
the Company's ability to achieve the expectations set forth in the
forward-looking statements contained in this news release, see
management's discussion and analysis and the Company's Annual
Information Form for the year ended December
31, 2020 filed with Canadian securities regulators on SEDAR
at www.sedar.com and that are included in its Annual Report on Form
40-F for the year ended December 31,
2020 filed with the U.S. Securities and Exchange Commission
(the "SEC") filed on EDGAR at www.sec.gov, as well as the Company's
other filings with the Canadian securities regulators and the
SEC. Other than as required by law, the Company does not
intend, and does not assume any obligation, to update these
forward-looking statements.
Cautionary Note to U.S. Investors – Mineral Reserve and
Mineral Resource Estimates
The mineral reserve and mineral resource information contained
in this news release have been prepared in accordance with the
Canadian securities administrators' (the "CSA") National Instrument
43-101 Standards of Disclosure for Mineral Projects ("NI
43-101"). For United States
reporting purposes, the SEC has adopted amendments to its
disclosure rules (the "SEC Modernization Rules") to modernize the
mining property disclosure requirements for issuers whose
securities are registered with the SEC under the United States
Securities Exchange Act of 1934, as amended (the "Exchange Act"),
which became effective February 25,
2019. The SEC Modernization Rules more closely align the
SEC's disclosure requirements and policies for mining properties
with current industry and global regulatory practices and
standards, including NI 43-101, and replace the historical property
disclosure requirements for mining registrants that were included
in SEC Industry Guide 7. Issuers must begin to comply with the
SEC Modernization Rules in their first fiscal year beginning on or
after January 1, 2021, though
Canadian issuers that report in the
United States using the Multijurisdictional Disclosure
System ("MJDS") may still use NI 43-101 rather than the SEC
Modernization Rules when using the SEC's MJDS registration
statement and annual report forms.
As a result of the adoption of the SEC Modernization Rules, the
SEC now recognizes estimates of "measured mineral resources",
"indicated mineral resources" and "inferred mineral
resources." In addition, the SEC has amended definitions of
"proven mineral reserves" and "probable mineral reserves" in the
SEC Modernization Rules, with definitions that are substantially
similar to those used in NI 43-101.
United States investors are
cautioned that while the SEC now recognizes "measured mineral
resources", "indicated mineral resources" and "inferred mineral
resources", investors should not assume that any part or all of the
mineral deposits in these categories will ever be converted into a
higher category of mineral resources or into mineral
reserves. These terms have a great amount of uncertainty as to
their economic and legal feasibility. Under Canadian regulations,
estimates of inferred mineral resources may not form the basis of
feasibility or pre-feasibility studies, except in limited
circumstances. Investors are cautioned not to assume that any
"measured mineral resources", "indicated mineral resources", or
"inferred mineral resources" that the Company reports in this news
release are or will be economically or legally mineable.
Further, "inferred mineral resources" have a great amount of
uncertainty as to their existence and as to their economic and
legal feasibility. It cannot be assumed that any part or all of an
inferred mineral resource will ever be upgraded to a higher
category.
The mineral reserve and mineral resource data set out in this
news release are estimates, and no assurance can be given that the
anticipated tonnages and grades will be achieved or that the
indicated level of recovery will be realized. The Company does
not include equivalent gold ounces for by-product metals contained
in mineral reserves in its calculation of contained ounces and
mineral reserves are not reported as a subset of mineral
resources.
Table 1. Detour Lake Mine – Significant Assay Results
Hole
Number
|
Section
East
|
UTM
NAD83
|
Hole
Length
(m)
|
Azimuth
(°)
|
Dip
(°)
|
From
(m)
|
To
(m)
|
Length
(m)
|
Au
(g/t)
|
Deposit
|
Easting
|
Northing
|
DLM-21-208
|
17340
|
589616
|
5541518
|
660
|
180
|
-49
|
249.0
|
251.0
|
2.0
|
8.36
|
Saddle
|
|
|
|
|
|
|
|
260.0
|
262.1
|
2.1
|
8.49
|
|
|
|
|
|
|
|
391.0
|
408.0
|
17.0
|
0.63
|
|
|
|
|
|
|
|
427.7
|
440.4
|
12.7
|
1.25
|
|
|
|
|
|
|
|
469.0
|
480.0
|
11.0
|
1.80
|
|
|
|
|
|
|
|
502.0
|
516.0
|
14.0
|
1.70
|
|
|
|
|
|
|
|
524.0
|
556.4
|
32.4
|
5.41
|
INCL.
|
|
|
|
|
|
|
547.5
|
551.5
|
4.0
|
38.74
|
|
|
|
|
|
|
|
574.0
|
576.0
|
2.0
|
6.11
|
|
|
|
|
|
|
|
597.0
|
599.0
|
2.0
|
5.59
|
|
|
|
|
|
|
|
611.0
|
622.0
|
11.0
|
1.80
|
DLM-21-215
ext
|
16820
|
589084
|
5541794
|
1302
|
183
|
-63
|
793.8
|
796.0
|
2.2
|
6.13
|
Saddle
|
|
|
|
|
|
|
|
893.2
|
896.0
|
2.8
|
3.96
|
|
|
|
|
|
|
|
1220.3
|
1223.0
|
2.7
|
3.44
|
DLM-21-
242W
|
17900
|
590169
|
5541515
|
921.5
|
182
|
-58
|
645.0
|
657.3
|
12.3
|
0.64
|
Saddle
|
|
|
|
|
|
|
|
671.2
|
683.0
|
11.8
|
1.13
|
|
|
|
|
|
|
|
744.0
|
789.0
|
45.0
|
0.97
|
INCL.
|
|
|
|
|
|
|
744.0
|
756.0
|
12.0
|
2.53
|
|
|
|
|
|
|
|
805.0
|
816.0
|
11.0
|
0.77
|
|
|
|
|
|
|
|
836.0
|
848.0
|
12.0
|
0.75
|
|
|
|
|
|
|
|
1011.0
|
1025.0
|
14.0
|
0.87
|
DLM-21-243
|
17700
|
589969
|
5541535
|
699
|
181
|
-53
|
609.0
|
638.0
|
29.0
|
0.70
|
Saddle
|
DLM-21-246
|
17620
|
589887
|
5541515
|
651
|
181
|
-59
|
583.8
|
618.0
|
34.2
|
0.80
|
Saddle
|
DLM-21-247B
|
17500
|
589767
|
5541603
|
702
|
182
|
-57
|
650.0
|
673.0
|
23.0
|
0.89
|
Saddle
|
DLM-21-249
(ext)
|
15700
|
587965
|
5541725
|
294
|
178
|
-56
|
717.0
|
733.0
|
16.0
|
0.91
|
West Pit
|
DLM-21-250
|
17700
|
589968
|
5541578
|
906
|
181
|
-54
|
614.5
|
654.5
|
40.0
|
1.01
|
Saddle
|
|
|
|
|
|
|
|
718.0
|
730.3
|
12.3
|
1.44
|
DLM-21-
250W
|
17700
|
589968
|
5541578
|
254
|
181
|
-54
|
1039.0
|
1049.0
|
10.0
|
2.98
|
INCL.
|
|
|
|
|
|
|
1047.0
|
1049.0
|
2.0
|
12.46
|
DLM-21-
283AW
|
15900
|
588162
|
5541854
|
468.0
|
178
|
-60
|
600.0
|
610.0
|
10.0
|
1.23
|
West Pit
|
|
|
|
|
|
|
|
837.0
|
849.0
|
12.0
|
2.28
|
|
|
|
|
|
|
|
898.0
|
909.0
|
11.0
|
0.92
|
|
|
|
|
|
|
|
919.0
|
937.0
|
18.0
|
1.47
|
DLM-21-
298A
|
16580
|
588844
|
5541760
|
831
|
179
|
-61
|
640.0
|
671.4
|
31.4
|
0.83
|
Saddle
|
|
|
|
|
|
|
|
686.2
|
708.0
|
21.8
|
0.84
|
|
|
|
|
|
|
|
766.0
|
785.0
|
19.0
|
0.64
|
|
|
|
|
|
|
|
799.0
|
809.0
|
10.0
|
1.07
|
DLM-21-302
|
15940
|
588202
|
5541905
|
1101
|
178
|
-58
|
371.0
|
392.0
|
21.0
|
0.80
|
West Pit
|
|
|
|
|
|
|
|
791.0
|
818.0
|
27.0
|
0.73
|
|
|
|
|
|
|
|
979.0
|
981.0
|
2.0
|
17.30
|
DLM-21-303
|
17420
|
589684
|
5541732
|
1401
|
182
|
-54
|
873.0
|
895.1
|
22.1
|
0.80
|
Saddle
|
|
|
|
|
|
|
|
927.0
|
948.0
|
21.0
|
0.97
|
|
|
|
|
|
|
|
962.7
|
975.5
|
12.8
|
1.44
|
|
|
|
|
|
|
|
988.7
|
1048.0
|
59.3
|
0.84
|
|
|
|
|
|
|
|
1121.0
|
1140.0
|
19.0
|
1.01
|
DLM-21-304
|
16660
|
588928
|
5541581
|
1063.0
|
179
|
-57
|
470.1
|
484.0
|
13.9
|
1.28
|
Saddle
|
|
|
|
|
|
|
|
521.0
|
532.0
|
11.0
|
0.64
|
|
|
|
|
|
|
|
551.0
|
563.0
|
12.0
|
1.18
|
|
|
|
|
|
|
|
629.0
|
641.0
|
12.0
|
1.69
|
|
|
|
|
|
|
|
750.0
|
752.0
|
2.0
|
9.65
|
|
|
|
|
|
|
|
792.0
|
818.0
|
26.0
|
1.10
|
|
|
|
|
|
|
|
856.0
|
876.4
|
20.4
|
2.21
|
DLM-21-
305A
|
16940
|
589206
|
5541646
|
801.0
|
180
|
-60
|
444.6
|
456.0
|
11.4
|
1.24
|
Saddle
|
|
|
|
|
|
|
|
488.0
|
510.0
|
22.0
|
0.87
|
|
|
|
|
|
|
|
547.0
|
563.0
|
16.0
|
0.81
|
|
|
|
|
|
|
|
663.0
|
715.5
|
52.5
|
0.87
|
|
|
|
|
|
|
|
742.0
|
796.0
|
54.0
|
0.85
|
DLM-21-315
|
16740
|
589006
|
5541702
|
822.0
|
180
|
-57
|
521.0
|
565.9
|
44.9
|
0.85
|
Saddle
|
|
|
|
|
|
|
|
593.5
|
609.0
|
15.5
|
0.69
|
|
|
|
|
|
|
|
660.0
|
686.0
|
26.0
|
2.73
|
INCL.
|
|
|
|
|
|
|
666.0
|
674.4
|
8.4
|
7.16
|
|
|
|
|
|
|
|
703.0
|
714.0
|
11.0
|
2.35
|
|
|
|
|
|
|
|
733.0
|
769.4
|
36.4
|
0.72
|
|
|
|
|
|
|
|
777.0
|
798.0
|
21.0
|
0.77
|
DLM-21-317
|
17500
|
589766
|
5541683
|
1401
|
182
|
-62
|
555.4
|
557.4
|
2.0
|
7.43
|
Saddle
|
DLM-21-318
|
16620
|
588883
|
5541769
|
1299
|
181
|
-64
|
97.0
|
110.0
|
13.0
|
0.81
|
Saddle
|
|
|
|
|
|
|
|
657.8
|
672.0
|
14.2
|
1.85
|
|
|
|
|
|
|
|
672.0
|
675.0
|
3.0
|
142.66
|
|
|
|
|
|
|
|
690.0
|
700.4
|
10.4
|
0.76
|
|
|
|
|
|
|
|
1064.0
|
1076.0
|
12.0
|
0.93
|
DLM-21-321
|
15740
|
588011
|
5541433
|
892
|
178
|
-56
|
38.0
|
68.7
|
30.7
|
0.87
|
West Pit
|
|
|
|
|
|
|
|
495.0
|
508.1
|
13.1
|
0.86
|
DLM-21-323
|
15420
|
587693
|
5541393
|
675
|
177
|
-55
|
84.0
|
98.0
|
14.0
|
0.70
|
West Pit
|
|
|
|
|
|
|
|
145.6
|
173.0
|
27.4
|
2.71
|
INCL.
|
|
|
|
|
|
|
169.0
|
171.1
|
2.1
|
30.14
|
DLM-21-
325A
|
16980
|
589243
|
5541843
|
783
|
181
|
-61
|
No significant
assays
|
Saddle
|
DLM-21-
325AW
|
16980
|
589243
|
5541843
|
564
|
181
|
-61
|
1267.0
|
1277.0
|
10.0
|
0.72
|
Saddle
|
DLM-21-326
|
15780
|
588041
|
5541873
|
1203
|
177
|
-64
|
264.0
|
281.0
|
17.0
|
0.77
|
West Pit
|
|
|
|
|
|
|
|
398.0
|
400.0
|
2.0
|
4.38
|
|
|
|
|
|
|
|
506.0
|
508.0
|
2.0
|
6.29
|
|
|
|
|
|
|
|
520.9
|
534.8
|
13.9
|
4.81
|
INCL.
|
|
|
|
|
|
|
530.3
|
534.1
|
3.8
|
15.48
|
|
|
|
|
|
|
|
548.0
|
550.2
|
2.2
|
4.47
|
|
|
|
|
|
|
|
700.7
|
711.0
|
10.3
|
1.91
|
|
|
|
|
|
|
|
867.0
|
887.0
|
20.0
|
0.64
|
|
|
|
|
|
|
|
982.0
|
1000.0
|
18.0
|
0.80
|
DLM-21-327
|
17020
|
589295
|
5541180
|
300
|
180
|
-52
|
23.0
|
39.0
|
16.0
|
3.23
|
Saddle
|
INCL.
|
|
|
|
|
|
|
24.0
|
29.0
|
5.0
|
8.84
|
|
|
|
|
|
|
|
87.0
|
124.0
|
37.0
|
1.07
|
|
|
|
|
|
|
|
246.0
|
248.0
|
2.0
|
22.94
|
|
|
|
|
|
|
|
282.0
|
298.0
|
16.0
|
0.72
|
DLM-21-328
|
15540
|
587804
|
5541784
|
1080
|
178
|
-58
|
246.6
|
259.6
|
13.0
|
0.91
|
West Pit
|
|
|
|
|
|
|
|
297.4
|
307.4
|
10.0
|
1.46
|
|
|
|
|
|
|
|
452.8
|
480.3
|
27.5
|
0.85
|
|
|
|
|
|
|
|
555.5
|
572.9
|
17.4
|
30.89
|
INCL.
|
|
|
|
|
|
|
556.9
|
565.9
|
9.0
|
58.42
|
|
|
|
|
|
|
|
606.0
|
620.3
|
14.3
|
1.42
|
|
|
|
|
|
|
|
662.5
|
688.0
|
25.5
|
1.63
|
INCL.
|
|
|
|
|
|
|
682.5
|
684.8
|
2.3
|
13.64
|
|
|
|
|
|
|
|
733.5
|
747.9
|
14.4
|
0.73
|
DLM-21-329
|
16540
|
588804
|
5541765
|
1263.0
|
181
|
-66
|
127.0
|
141.0
|
14.0
|
1.02
|
Saddle
|
|
|
|
|
|
|
|
677.0
|
690.0
|
13.0
|
1.31
|
|
|
|
|
|
|
|
841.0
|
844.0
|
3.0
|
5.01
|
DLM-21-330
|
16460
|
588719
|
5541996
|
309.0
|
180
|
-55
|
186.1
|
207.6
|
21.5
|
2.54
|
North
Pit
|
DLM-21-331
|
16380
|
588639
|
5541938
|
1401.0
|
183
|
-60
|
178.0
|
198.3
|
20.3
|
1.01
|
North
Pit
|
|
|
|
|
|
|
|
356.0
|
375.0
|
19.0
|
0.80
|
|
|
|
|
|
|
|
810.0
|
835.0
|
25.0
|
0.61
|
DLM-21-332
|
15460
|
587725
|
5541735
|
1050.0
|
177
|
-58
|
287.0
|
303.0
|
16.0
|
1.02
|
West Pit
|
|
|
|
|
|
|
|
307.4
|
331.3
|
23.9
|
0.87
|
|
|
|
|
|
|
|
425.0
|
427.0
|
2.0
|
10.29
|
|
|
|
|
|
|
|
510.0
|
512.0
|
2.0
|
17.17
|
|
|
|
|
|
|
|
528.0
|
530.5
|
2.5
|
8.52
|
|
|
|
|
|
|
|
603.0
|
662.2
|
59.2
|
0.93
|
|
|
|
|
|
|
|
681.0
|
696.0
|
15.0
|
0.60
|
|
|
|
|
|
|
|
718.0
|
728.0
|
10.0
|
4.87
|
INCL.
|
|
|
|
|
|
|
718.0
|
721.0
|
3.0
|
14.73
|
|
|
|
|
|
|
|
840.0
|
844.0
|
4.0
|
6.44
|
DLM-21-333
|
16140E
|
588402
|
5541861
|
1257.0
|
177
|
-61
|
231.0
|
249.0
|
18.0
|
0.80
|
West Pit
|
|
|
|
|
|
|
|
719.2
|
731.0
|
11.8
|
0.77
|
|
|
|
|
|
|
|
796.0
|
809.7
|
13.7
|
0.77
|
|
|
|
|
|
|
|
977.0
|
993.0
|
16.0
|
2.01
|
DLM-21-
334B
|
16300
|
588561
|
5541940
|
450.0
|
181
|
-61
|
146.0
|
158.0
|
12.0
|
0.89
|
North
Pit
|
|
|
|
|
|
|
|
194.0
|
211.0
|
17.0
|
1.94
|
INCL.
|
|
|
|
|
|
|
205.0
|
208.0
|
3.0
|
9.12
|
DLM-21-
335A
|
16580
|
588842
|
5541832
|
975.0
|
182
|
-61
|
268.9
|
271.0
|
2.1
|
6.17
|
Saddle
|
|
|
|
|
|
|
|
669.0
|
679.0
|
10.0
|
0.76
|
|
|
|
|
|
|
|
704.8
|
722.0
|
17.2
|
1.12
|
|
|
|
|
|
|
|
868.0
|
915.0
|
47.0
|
0.87
|
DLM-21-336
|
16540
|
588806
|
5541697
|
801.0
|
181
|
-66
|
199.0
|
201.0
|
2.0
|
19.52
|
Saddle
|
|
|
|
|
|
|
|
565.0
|
569.0
|
4.0
|
3.74
|
|
|
|
|
|
|
|
621.9
|
649.0
|
27.1
|
0.86
|
|
|
|
|
|
|
|
660.4
|
699.0
|
38.6
|
0.65
|
DLM-21-
337A
|
15540
|
587800
|
5541859
|
1218.0
|
178
|
-58
|
235.0
|
261.1
|
26.1
|
1.04
|
West Pit
|
INCL.
|
|
|
|
|
|
|
251.0
|
261.1
|
10.1
|
2.11
|
|
|
|
|
|
|
|
370.0
|
381.0
|
11.0
|
1.73
|
|
|
|
|
|
|
|
412.6
|
428.0
|
15.4
|
0.83
|
|
|
|
|
|
|
|
438.6
|
462.6
|
24.0
|
2.76
|
INCL.
|
|
|
|
|
|
|
443.0
|
445.3
|
2.3
|
18.06
|
|
|
|
|
|
|
|
494.5
|
519.0
|
24.5
|
1.18
|
|
|
|
|
|
|
|
559.0
|
582.5
|
23.5
|
1.29
|
|
|
|
|
|
|
|
593.2
|
609.9
|
16.7
|
1.12
|
|
|
|
|
|
|
|
637.0
|
646.5
|
9.5
|
22.22
|
|
|
|
|
|
|
|
712.0
|
714.0
|
2.0
|
7.81
|
|
|
|
|
|
|
|
752.0
|
776.0
|
24.0
|
0.66
|
INCL.
|
|
|
|
|
|
|
752.0
|
768.0
|
16.0
|
0.82
|
|
|
|
|
|
|
|
831.5
|
851.0
|
19.5
|
0.83
|
|
|
|
|
|
|
|
878.0
|
899.0
|
21.0
|
1.52
|
|
|
|
|
|
|
|
914.0
|
951.0
|
37.0
|
0.87
|
DLM-21-338
|
16300
|
588559
|
5542004
|
606.0
|
181
|
-62
|
180.0
|
192.0
|
12.0
|
1.47
|
North
Pit
|
|
|
|
|
|
|
|
233.0
|
249.0
|
16.0
|
0.87
|
|
|
|
|
|
|
|
257.0
|
280.0
|
23.0
|
1.02
|
DLM-21-
339C
|
15460
|
587723
|
5541813
|
1131.0
|
177
|
-60
|
189.0
|
210.0
|
21.0
|
0.81
|
West Pit
|
|
|
|
|
|
|
|
246.0
|
258.0
|
12.0
|
0.79
|
|
|
|
|
|
|
|
279.0
|
297.0
|
18.0
|
0.66
|
|
|
|
|
|
|
|
327.0
|
352.3
|
25.3
|
1.49
|
INCL.
|
|
|
|
|
|
|
346.0
|
350.0
|
4.0
|
6.12
|
|
|
|
|
|
|
|
363.0
|
377.2
|
14.2
|
1.50
|
|
|
|
|
|
|
|
412.0
|
425.0
|
13.0
|
1.24
|
|
|
|
|
|
|
|
519.0
|
545.0
|
26.0
|
1.49
|
|
|
|
|
|
|
|
577.0
|
644.0
|
67.0
|
1.67
|
INCL.
|
|
|
|
|
|
|
577.0
|
579.0
|
2.0
|
13.13
|
|
|
|
|
|
|
|
704.0
|
741.0
|
37.0
|
1.06
|
|
|
|
|
|
|
|
793.0
|
814.0
|
21.0
|
2.86
|
INCL.
|
|
|
|
|
|
|
811.0
|
813.0
|
2.0
|
21.80
|
|
|
|
|
|
|
|
832.0
|
834.0
|
2.0
|
17.41
|
|
|
|
|
|
|
|
851.0
|
930.0
|
79.0
|
0.92
|
DLM-21-340
|
16460
|
588717
|
5542123
|
400.0
|
180
|
-57
|
8.0
|
10.0
|
2.0
|
8.99
|
North
Pit
|
|
|
|
|
|
|
|
62.0
|
73.0
|
11.0
|
2.73
|
|
|
|
|
|
|
|
245.0
|
263.0
|
18.0
|
0.83
|
|
|
|
|
|
|
|
345.0
|
355.0
|
10.0
|
1.25
|
DLM-21-341
|
16540
|
588807
|
5541627
|
750.0
|
181
|
-65
|
165.5
|
168.0
|
2.5
|
4.15
|
Saddle
|
|
|
|
|
|
|
|
557.9
|
587.0
|
29.1
|
1.63
|
|
|
|
|
|
|
|
681.4
|
708.0
|
26.6
|
0.96
|
DLM-21-342
|
16380
|
588642
|
5541876
|
920.0
|
182
|
-59
|
117.0
|
120.0
|
3.0
|
8.40
|
North
Pit
|
|
|
|
|
|
|
|
232.0
|
258.0
|
26.0
|
0.61
|
DLM-21-344
|
16500
|
588757
|
5542136
|
654.0
|
183
|
-61
|
5.0
|
7.0
|
2.0
|
20.74
|
North
Pit
|
|
|
|
|
|
|
|
23.0
|
36.0
|
13.0
|
2.02
|
|
|
|
|
|
|
|
360.0
|
383.2
|
23.2
|
1.13
|
DLM-21-346
|
16260
|
588512
|
5542122
|
666.0
|
183
|
-64
|
322.0
|
332.0
|
10.0
|
0.95
|
North
Pit
|
|
|
|
|
|
|
|
383.0
|
397.2
|
14.2
|
0.92
|
DLM-21-
347A
|
16140
|
588399
|
5542051
|
575.0
|
183
|
-63
|
268.0
|
270.0
|
2.0
|
5.31
|
North
Pit
|
|
|
|
|
|
|
|
312.0
|
325.0
|
13.0
|
1.10
|
|
|
|
|
|
|
|
558.0
|
560.0
|
2.0
|
3.61
|
DLM-21-350A
|
16460
|
588724
|
5541772
|
900.0
|
181
|
-57
|
204.0
|
216.0
|
12.0
|
0.86
|
Saddle
|
|
|
|
|
|
|
|
649.0
|
666.0
|
17.0
|
0.93
|
|
|
|
|
|
|
|
767.0
|
797.0
|
30.0
|
0.85
|
DLM-21-351
|
16380
|
588637
|
5542139
|
605.0
|
183
|
-62
|
311.0
|
313.0
|
2.0
|
3.75
|
North
Pit
|
|
|
|
|
|
|
|
378.8
|
387.8
|
9.0
|
1.51
|
DLM-21-352
|
15980
|
588240
|
5541960
|
1050.0
|
180
|
-59
|
169.0
|
171.0
|
2.0
|
10.68
|
West Pit
|
|
|
|
|
|
|
|
346.0
|
364.0
|
18.0
|
0.73
|
|
|
|
|
|
|
|
658.0
|
660.0
|
2.0
|
50.36
|
|
|
|
|
|
|
|
765.0
|
767.0
|
2.0
|
5.57
|
|
|
|
|
|
|
|
796.1
|
836.5
|
40.4
|
0.65
|
|
|
|
|
|
|
|
843.0
|
856.0
|
13.0
|
0.60
|
|
|
|
|
|
|
|
905.0
|
911.0
|
6.0
|
3.13
|
DLM-21-353
|
16540
|
588797
|
5542126
|
375.0
|
182
|
-53
|
207.0
|
220.0
|
13.0
|
0.65
|
North
Pit
|
|
|
|
|
|
|
|
310.0
|
325.5
|
15.5
|
0.72
|
DLM-21-354
|
16300
|
588558
|
5542052
|
486.0
|
182
|
-67
|
No significant
assays
|
North
Pit
|
DLM-21-355
|
16420
|
588684
|
5541769
|
852.0
|
179
|
-58
|
139.0
|
151.0
|
12.0
|
1.63
|
Saddle
|
|
|
|
|
|
|
|
230.0
|
232.0
|
2.0
|
5.24
|
|
|
|
|
|
|
|
666.0
|
682.0
|
16.0
|
0.55
|
|
|
|
|
|
|
|
749.0
|
781.0
|
32.0
|
1.34
|
INCL.
|
|
|
|
|
|
|
772.8
|
776.0
|
3.2
|
6.52
|
|
|
|
|
|
|
|
804.0
|
849.0
|
45.0
|
1.36
|
INCL.
|
|
|
|
|
|
|
820.0
|
841.0
|
21.0
|
2.12
|
DLM-21-356
|
16220
|
588477
|
5542138
|
639.0
|
183
|
-59
|
169.0
|
180.0
|
11.0
|
1.88
|
North
Pit
|
DLM-21-
359A
|
16940
|
589197
|
5542136
|
361.0
|
182
|
-56
|
No significant
assays
|
North
Pit
|
DLM-21-361
|
16860
|
589116
|
5542131
|
519.0
|
182
|
-64
|
No significant
assays
|
North
Pit
|
DLM-21-
362C
|
16380
|
588638
|
5542063
|
450.0
|
183
|
-60
|
275.0
|
287.0
|
12.0
|
2.27
|
North
Pit
|
|
|
|
|
|
|
|
308.0
|
330.3
|
22.3
|
1.25
|
|
|
|
|
|
|
|
349.0
|
365.0
|
16.0
|
0.85
|
DLM-21-365
|
17020
|
589277
|
5542170
|
402.0
|
181
|
-52
|
No significant
assays
|
North
Pit
|
DLM-21-366
|
16820
|
589072
|
5542190
|
450.0
|
182
|
-52
|
259.0
|
271.8
|
12.8
|
0.65
|
North
Pit
|
|
|
|
|
|
|
|
337.0
|
339.0
|
2.0
|
5.07
|
DLM-21-
370A
|
16660
|
588924
|
5541733
|
825.0
|
178
|
-62
|
615.0
|
655.1
|
40.1
|
0.81
|
Saddle
|
|
|
|
|
|
|
|
769.0
|
782.0
|
13.0
|
0.69
|
|
|
|
|
|
|
|
805.0
|
823.0
|
18.0
|
0.85
|
DLM-21-371
|
16740
|
588995
|
5542209
|
477.0
|
182
|
-64
|
No significant
assays
|
North
Pit
|
DLM-21-
372A
|
16420
|
588678
|
5542064
|
402.0
|
182
|
-59
|
294.0
|
316.2
|
22.2
|
0.99
|
North
Pit
|
DLM-21-386
|
17340
|
589606
|
5542180
|
501.0
|
180
|
-61
|
No significant
assays
|
North
Pit
|
DLM-21-387
|
17260
|
589515
|
5542153
|
450.0
|
181
|
-58
|
No significant
assays
|
North
Pit
|
DLM-21-388
|
16220
|
588483
|
5542062
|
657.0
|
182
|
-59
|
248.0
|
250.0
|
2.0
|
6.09
|
North
Pit
|
|
|
|
|
|
|
|
264.0
|
278.0
|
14.0
|
1.33
|
|
|
|
|
|
|
|
309.0
|
322.0
|
13.0
|
2.45
|
INCL.
|
|
|
|
|
|
|
315.0
|
321.0
|
6.0
|
4.7
|
DLM-21-389
|
16340
|
588599
|
5542049
|
600.0
|
182
|
-57
|
215.0
|
231.0
|
16.0
|
1.24
|
North
Pit
|
|
|
|
|
|
|
|
239.5
|
252.6
|
13.1
|
1.91
|
|
|
|
|
|
|
|
285.3
|
299.0
|
13.7
|
1.24
|
DLM-21-
390A
|
15980
|
588242
|
5541900
|
1316.0
|
177
|
-58
|
768.0
|
777.0
|
9.0
|
0.78
|
West Pit
|
|
|
|
|
|
|
|
795.0
|
821.0
|
26.0
|
0.84
|
|
|
|
|
|
|
|
843.9
|
889.0
|
45.1
|
0.95
|
|
|
|
|
|
|
|
912.0
|
914.0
|
2.0
|
4.23
|
|
|
|
|
|
|
|
985.0
|
987.0
|
2.0
|
5.09
|
|
|
|
|
|
|
|
1030.8
|
1047.0
|
16.2
|
1.39
|
|
|
|
|
|
|
|
1103.9
|
1106.0
|
2.1
|
5.71
|
DLM-21-393
|
16180
|
588442
|
5541896
|
357.0
|
179
|
-61
|
286.0
|
302.0
|
16.0
|
1.05
|
West Pit
|
DLM-21-395
|
16420
|
588683
|
5541843
|
900.0
|
181
|
-60
|
303.0
|
313.0
|
10.0
|
0.75
|
Saddle
|
|
|
|
|
|
|
|
723.0
|
735.2
|
12.2
|
0.89
|
Notes:
|
1. Assays
are reported uncut.
|
2. Assay Intervals
are reported as drill thickness.
|
3. An additional
1,534.5 m drilled from 22 abandoned/restarted holes not reported in
table.
|
Figure 1. Detour Lake Mine – Property Plan View
Figure 2. Detour Lake Mine – Longitudinal View
Figure 3. Detour Lake Mine – Saddle Zone – Plan View
View original
content:https://www.prnewswire.com/news-releases/agnico-eagle-reports-new-wide-high-grade-intersections-at-detour-lake-results-confirm-and-expand-mineralization-beyond-mid-year-2021-mineral-resource-301479696.html
SOURCE Agnico Eagle Mines Limited