U.S. SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE
SECURITIES EXCHANGE
ACT OF 1934
For the Month of October 2024
Nexa Resources S.A.
(Exact Name as Specified in its Charter)
N/A
(Translation of Registrant’s Name)
37A, Avenue J.F. Kennedy
L-1855, Luxembourg
Grand Duchy of Luxembourg
(Address of principal executive offices)
Indicate by check mark
whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
Indicate by check mark
if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ____
Indicate by check mark
if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ____
Indicate by check mark
whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission
pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
If “Yes” is marked,
indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): Not applicable.
SIGNATURES
Pursuant to the requirements
of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto
duly authorized.
Date: October 31, 2024
Nexa Resources S.A. |
By:/s/ José Carlos del Valle |
Name: José Carlos del Valle |
Title: Senior Vice President
of Finance and Group Chief Financial Officer |
|
|
EXHIBIT INDEX
Nexa Reports Third
Quarter 2024 Results including
Net Income of US$6 million and Adjusted EBITDA of US$183 million
Luxembourg, October
31, 2024 – Nexa Resources S.A. (“Nexa Resources”, “Nexa”, or the “Company”)
announces today its results for the three and nine-month periods ended on September 30, 2024.
CEO Message – Ignacio
Rosado
We are proud to report yet another favorable
quarter, underscoring our unwavering commitment to operational excellence and financial discipline. As anticipated, zinc prices have remained
resilient, buoyed by solid fundamentals, the recent Federal Reserve interest rate cut, and China’s announced economic stimulus,
which we expect will positively impact demand in the upcoming months. Copper prices also performed well, driven by low treatment charges
due to tight supply and a positive demand outlook fueled by the energy transition.
Our operations delivered consistent production
levels and a modest increase in smelting sales quarter-over-quarter, supported by higher demand in our home market in 3Q24. Benefiting
from an improved pricing environment, which positively impacted by-products, alongside our disciplined cost management and ongoing optimization
initiatives, we successfully reduced our cash cost guidance in the mining segment, further strengthening our competitive position.
Safety remains a core priority, and we are
pleased with the substantial progress made across all fronts, which was enhanced by the safety plan introduced in early 2Q24.
In line with our strategy to optimize our
portfolio, we executed strategic transactions, including the sale of the Chapi mine and Pukakaqa project, allowing us to focus on our
key assets and the most promising opportunities.
Finally, due to the increase in our LTM
Adjusted EBITDA and positive cash flow generation this quarter, we achieved another reduction in our net leverage ratio, highlighting
our commitment to generating positive cash flow and enhancing our financial health. This not only strengthens our financial flexibility
as we prepare for the next strategic steps but also solidifies our position as a company dedicated to creating shared value for our investors
and the communities we serve. Looking ahead, we remain confident that zinc and copper prices will continue to receive positive support
from global fundamentals, reinforcing our outlook for a strong close to the year.
Summary of Financial
Performance
US$ million (except per share amounts) |
3Q24 |
2Q24 |
3Q23 |
9M24 |
9M23 |
Net revenues |
709 |
736 |
649 |
2,026 |
1,943 |
Gross profit |
127 |
180 |
68 |
395 |
230 |
Net income (loss) |
6 |
(70) |
(64) |
(76) |
(183) |
EBITDA (1) |
167 |
94 |
72 |
388 |
149 |
Basic and diluted loss per share |
(0.04) |
(0.58) |
(0.57) |
(0.80) |
(1.49) |
Adjusted net income (loss) (1) |
22 |
42 |
(50) |
53 |
(35) |
Adjusted EBITDA (1) |
183 |
206 |
87 |
517 |
296 |
Adjusted basic and diluted earnings (loss) per share (1) |
0.02 |
0.14 |
(0.44) |
0.00 |
(0.41) |
Cash provided by operating activities before working capital (1) (2) |
198 |
138 |
52 |
423 |
229 |
Capex |
53 |
64 |
82 |
191 |
198 |
Free cash flow (1) |
51 |
149 |
14 |
56 |
(84) |
Total cash (3) |
525 |
474 |
422 |
525 |
422 |
Net debt (1) |
1,409 |
1,450 |
1,307 |
1,409 |
1,307 |
Net Debt/LTM Adj. EBITDA |
2.2x |
2.7x |
3.1x |
2.2x |
3.1x |
(1) Refer
to “Use of Non-IFRS Financial Measures” for further information. Adjusted EBITDA, adjusted net income (loss) and adjusted
EPS, exclude the items presented in the “Net Income (Loss) reconciliation to Adjusted EBITDA” section of this earnings release.
For details on segment definition and accounting policy, please refer to explanatory note 2 – “Information by business segment”
in the “Condensed consolidated interim financial statements at and for the three and nine-month periods ended on September 30, 2024.”
(2) Working
capital variations in 3Q24 had a negative impact of US$43 million, totaling US$184 million in 9M24. Working capital variations in 3Q23
had a positive impact of US$88 million, totaling positive impact of US$52 million in 9M23.
(3) Cash,
cash equivalents and financial investments.
Executive Summary
Operational Performance
| § | Zinc production for the quarter totaled 83kt, down by 5% from 3Q23, primarily
due to lower average zinc grades at Vazante and El Porvenir, as well as the absence of contributions from Morro Agudo, which ceased operations
on April 30, 2024. Compared to 2Q24, zinc production remained relatively flat, with higher volumes from Vazante, El Porvenir, and Atacocha,
partially offset by the absence of contributions from Morro Agudo and slightly lower volumes from Cerro Lindo and Aripuanã. |
| § | Run-of-mine mining cost in 3Q24 was US$46/t, up 6%
compared to 3Q23, due to lower treated ore volumes due to the cessation of mining operations at Morro Agudo, partially offset by lower
operating costs related to third-party services, personnel costs, energy costs and materials
(e.g. explosives and related items). Compared to 2Q24, run-of-mine mining cost decreased by 5%, primarily
due to lower third-party services, higher treated ore volumes and lower variable costs. Run-of-mine mining cost in 3Q24 and 9M24, performed
within the guidance range for the year. |
| § | Mining cash cost net of by-products[1]
in 3Q24 decreased to US$(0.01)/lb compared to US$0.34/lb in 3Q23. This decrease was
primarily due to lower TCs and higher by-products contribution, which were partially offset by increased operating costs. Compared to
2Q24, cash cost decreased by US$0.04/lb, impacted by lower operating costs related to third-party services and maintenance, as well as
slightly higher zinc sales volumes, which were partially offset by lower by-products contribution. Mining cash cost net of by-products
in 3Q24 was below the lower end of our updated annual guidance range, while the 9M24 mining cash cost net of by-products was within our
updated guidance range for the year. |
| § | The smelting segment produced a total of 153kt of zinc metal and oxide
in 3Q24, up 2% year-over-year, primarily driven by higher volumes at Cajamarquilla. Quarter-over-quarter, production was relatively flat,
as higher output was partially offset by lower production at the Juiz de Fora smelter due to scheduled maintenance in the period. |
| § | In 3Q24, zinc metal and oxide sales were 153kt, down 1% from 3Q23. Compared
to 2Q24, metal sales increased by 3%, following higher production volumes in Cajamarquilla and Três Marias, along with strong demand
in our domestic market. |
| § | Smelting conversion cost was US$0.32/lb in 3Q24 compared with US$0.29/lb
in 3Q23, mainly due to higher operational costs related to maintenance expenses, partially offset by the positive impact of foreign exchange
variations. Compared to 2Q24, conversion cost was up by 6%, driven by higher variable and energy costs mainly due to one-off effects in
Cajamarquilla, partially offset by a decrease in maintenance
expenses. Smelting conversion cost for both 3Q24 and 9M24 remained within the guidance
range. |
[1]
Our cash cost net of by-products credits is measured with respect to zinc sold.
| | |
| | 2 |
| § | Smelting cash cost1 was US$1.16/lb in
3Q24 compared to US$1.01/lb in 3Q23. This increase was mainly due to higher raw material costs
attributed to higher zinc prices and lower TCs, alongside increased operating expenses, partially offset by higher by-products contribution.
Compared to 2Q24, cash cost decreased by 3%, primarily due to lower zinc prices, impacting our concentrate purchases and higher by-products
contribution, which were partially offset by higher operating costs. Smelting cash cost in both
3Q24 and 9M24 also remained within the guidance range. |
Financial Performance
| § | Net revenues in 3Q24 were US$709 million, up 9% from US$649 million
in 3Q23. This increase was primarily driven by higher LME metal prices (except for lead), partially offset by slightly lower smelting
sales volumes and a lower net premium. The LME average prices for zinc and copper rose by 14% and 10%, respectively, while lead prices
decreased by 6% compared to the same period in 2023. Compared to 2Q24, net revenues decreased by 4%, mainly due to lower LME base metal
prices and lower by-products contribution, partially offset by higher smelting sales and a slight improvement net premium. For 9M24, net
revenues totaled US$2,026 million, up by 4% compared to the same period a year ago. |
| § | In 3Q24, net income amounted to US$6 million,
resulting in basic and diluted loss per share attributable to Nexa's shareholders of US$0.04. In 9M24,
net loss totaled US$76 million, resulting in basic and diluted loss per share attributable to Nexa's shareholders of US$0.80. |
| § | Adjusted
net income in 3Q24 was US$22 million, with adjusted net income attributable to Nexa’s shareholders
of US$2.4 million, resulting in adjusted basic and diluted earnings per share of US$0.02. In 9M24, adjusted
net income was US$53 million, with adjusted net income attributable to Nexa’s shareholders of US$0.4 million, resulting in adjusted
basic and diluted earnings per share of US$0.00. Refer to our “Net Income (Loss)” section for further details. |
| § | Adjusted EBITDA[2]
in 3Q24 was US$183 million compared to US$87 million in 3Q23 and US$206 million in
2Q24. The year-over-year increase was primarily driven by higher by-products contribution, higher zinc prices, and lower mineral exploration
and project evaluation expenses for the quarter. We reaffirmed our exploration and project expenses guidance for the year. The quarter-over-quarter
decrease was attributed to higher fixed and variable costs and lower by-products contribution, partially offset by increased
smelting sales volume. In 9M24, Adjusted EBITDA amounted to US$ 517 million, up by 75% compared to
the same period a year ago. |
| § | Adjusted EBITDA margin of 25.8% in 3Q24, decreased 2.2bps and increased
12.4bps compared to 2Q24 and 3Q23, respectively. |
| § | Adjusted EBITDA for the mining segment in 3Q24 was US$128 million compared
to US$136 million in 2Q24. This decrease was mainly driven by lower LME metal prices, higher fixed costs and lower mining sales volumes,
which were partially offset by higher by-products contribution. Compared to 3Q23, Adjusted EBITDA increased by 190%, mainly due to higher
by-products contribution, higher zinc prices, the positive impact from FX variations, and lower mineral exploration and project evaluation
expenses. |
| § | Adjusted EBITDA for the smelting segment in 3Q24 was US$55 million compared
with US$69 million in 2Q24. This decrease was mainly driven by higher variable costs and lower TCs, partially offset by lower zinc prices,
which positively impacted the purchase of zinc concentrate and slightly higher net premium, in addition to higher by-products contribution
and higher sales volume. Compared to 3Q23, Adjusted EBITDA increased by 10%. |
[2]
Adjusted EBITDA excludes the items presented in the “Net Income (Loss) reconciliation to Adjusted EBITDA” section of this
earnings release – US$16 million in 3Q24, totaling US$129 million in 9M24.
| | |
| | 3 |
Financial Position,
Investments and Financing
| § | Total cash[3]
at September 30, 2024, was US$525 million compared to US$474 million at June 30,
2024. Our available liquidity in 3Q24 was US$845 million, including our undrawn sustainability-linked revolving credit facility of US$320
million. This total available liquidity is sufficient to cover all financial commitments for the next 3.9 years. |
| § | In 3Q24, free cash flow was positive at US$51 million,
primarily driven by positive operating cash flows and lower CAPEX investments (including Sustaining and HS&E) of US$55 million. These
positive effects were partially offset by a negative working capital variation of US$43 million, mainly due to increased inventory levels,
a reduction in other liabilities, primarily from interest updates on provisions and asset retirement obligations payments, and a decrease
in trade payables. Despite a negative year-to-date position,
we remain focused on implementing initiatives such as enhanced receivable management to reverse this position in the next quarter. For
further details, please refer to the “Net cash flows from operating activities excluding working capital variations and free cash
flow - Reconciliation” section. |
| § | Net debt to Adjusted EBITDA ratio for the last twelve months (“LTM”)
decreased to 2.2x at the end of 3Q24, compared with 2.7x at the end of 2Q24 and 3.1x at the end of 3Q23. The quarter-over-quarter reduction
was primarily driven by higher LTM Adjusted EBITDA and a reduction in net debt, reflecting our ongoing commitment and strategy to reduce
leverage. |
Environmental,
Social and Governance (“ESG”) and Corporate Highlights
| § | In 3Q24, Nexa expanded its “Cloud Talent for Women” program,
benefiting an additional 75 women in the state of Mato Grosso and communities near our Aripuanã and Três Marias operations.
Developed in collaboration with Amazon Web Services Inc., this initiative provides digital training for women pursuing technology careers,
supporting Nexa’s income generation programs. |
| § | In August 2024, Nexa received the Gold Seal from the Brazilian GHG Protocol
Program, awarded by the Fundação Getúlio Vargas. This recognition underscores Nexa’s commitment to transparency
and excellence in greenhouse gas emissions reporting, based on 2023 data. With one of the lowest Scope 1 and Scope 2 CO₂ emission
intensities in the global zinc industry, Nexa remains dedicated to reducing its scope 1 emissions by 20% by 2030, reaffirming its commitment
to mitigate climate change. |
| § | In August 2024, as part of Nexa’s circular economy initiatives,
the Company announced a new partnership with WEG, a Brazilian multinational specialized in electrical equipment and automation systems.
WEG will work with Nexa to develop liquid anticorrosive paints using jarosite, a residue from zinc smelting. This project, stemming from
Nexa's open innovation program with universities, represents an expected investment of approximately US$0.5 million, supported by the
Brazilian Innovation Agency (“FINEP”). With tests completed, and pending further technical and economic viability, WEG may
purchase jarosite for production, potentially reducing waste levels at our Juiz de Fora smelter. The resulting product, tentatively named
“Jaropaint” could be applied to carbon steel surfaces to protect against corrosion. |
| § | In August 2024, Nexa also opened registrations for the Cajamarquilla
Children's Choir 2024. This program benefits 40 children from communities surrounding our Cajamarquilla smelter and aims to nurture musical
talent through in-person classes led by expert instructors, including the Director of the National Children’s Choir of Peru. Running
through December 2024, this initiative underscores Nexa’s commitment to cultural enrichment in the regions where we operate and
support community growth. |
| § | In August 2024, for the fifth consecutive year, Nexa was named one
of the five most innovative companies in the Mining, Metallurgy, and Steel sectors by the Valor Inovação Brasil 2024
Awards, one of the most prestigious innovation awards in in Brazil. Climbing 42 positions in the overall rankings, Nexa’s consistent recognition
underscores our commitment to innovation as a driver of business excellence, competitiveness, and socio-environmental growth in our operational
regions. |
[3]
Cash and cash equivalents and financial investments.
| | |
| | 4 |
| § | In September 2024, also as part of Nexa’s circular economy initiatives,
we completed a pilot test at a partner company’s site. On average, 0.5 tons of modified tailings (mainly SiO2 and CaCO3) from our
Atacocha mine were successfully evaluated as cementitious material, with the potential to replace 30% of traditional cement in standard
blends. This project aims to monetize waste by developing partnerships, evaluating viable technologies, and identifying trade routes for
these materials, while also reducing the need for disposal in our tailings dams and creating a new revenue stream for Nexa. |
| § | In September 2024, more than 3,500 employees across Peru and Brazil
joined Nexa’s Internal Workplace Accident Prevention Week 2024. United by a shared commitment to health and safety, employees engage
in activities including awareness sessions, challenges, fairs, workshops, and recognition programs. |
| § | In September 2024, Nexa received two honors at the Brazil Mining Best
Practices Awards during the Exposibram 2024, Latin America’s largest mining trade fair by the Brazilian Mining Institute (“IBRAM”).
Nexa earned first place in the energy efficiency category for pioneering bio-oil to reduce emissions in zinc oxide production at the Três
Marias smelter and placed third in the innovation category, reinforcing our dedication to sustainable technology and solutions. |
| § | In August and September 2024, S&P and Fitch Ratings, respectively,
reaffirmed Nexa’s 'BBB-' investment grade rating maintaining a 'stable' outlook. |
| § | On October 1, 2024, we announced changes to our Board of Directors and senior leadership team. Mr. João Schmidt, CEO of
Votorantim S.A., stepped down as a Director of Nexa Resources S.A., effective October 1, 2024, after serving in this role since 2016.
Simultaneously, we appointed Mr. Flavio Aidar to our Board of Directors. Mr. Aidar holds a degree in Business Administration from Fundação
Getúlio Vargas and brings experience in the industrial, infrastructure, and mining sectors. His extensive board experience across
various countries and financial markets will provide a unique and valuable perspective as we continue to explore new avenues for growth
and maximize shareholder value. |
| § | Also in October 2024, we announced that Mr. Marcio Godoy, Senior Vice
President of Technical Services and Projects at Nexa, resigned, effective October 15, 2024. His responsibilities were distributed across
other management functions to ensure continuity and maintain operational efficiency. |
Growth Strategy
and Asset Portfolio
| § | We remain committed to generating free cash flow and continually evaluate our capital allocation
framework, which prioritizes sustaining capital, brownfield mineral exploration, and ESG and Health, Safety, and Environment (“HS&E”)
initiatives. |
| § | In September 2024, we announced the sale of the Pukaqaqa
greenfield project and our non-operational Peruvian subsidiary, Minera Pampa de Cobre S.A.C (the owner of the Chapi mine). These
sales are in line with Nexa’s portfolio optimization strategy, ensuring efficient capital allocation to our highest-return assets. |
| § | In 3Q24, Nexa has achieved important
milestones in Cerro Pasco Integration Project, which encompasses two main phases. During the quarter, substantial strides were made
across various work fronts, particularly with the submission for internal approval of the Tailings Pumping System, the central
element of Phase I. This phase aims to expand tailings storage capacity at the Pasco Complex, thereby extending substantially the
operational life of the site.The investment plan includes constructing a tailings treatment plant and its auxiliary structures at El
Porvenir, and a 6 km pipeline on an existing route (mostly underground) to connect it to Atacocha’s tailings storage facility,
allowing the Complex to operate for over a decade and representing a pivotal step toward sustainability. |
The
investment plan includes constructing a tailings treatment plant and its auxiliary structures at El Porvenir, and a 6 km pipeline on an
existing route (mostly underground) to connect it to Atacocha’s tailings storage facility, allowing the Complex to operate for over
a decade and representing a pivotal step toward sustainability.
| | |
| | 5 |
The
capital expenditure for the Tailings Pumping System is estimated to be between US$85 million and US$90 million and is scheduled for execution
from 2025 to 2026, with operations expected to commence in 1H27. Additionally, Phase I also includes upgrades to the tailings facilities
at both El Porvenir and Atacocha, as well as water and effluent treatment systems, with construction planned for 2027-2028 following the
completion of environmental impact assessments.
Phase
II aims to link, through the construction of a 2.3 kilometers underground tunnel at a deeper level, the El Porvenir and Atacocha mines
and upgrade the El Porvenir shaft, which is expected to unlock access to high-grade minerals. To ensure efficient development, each phase
is designed to be adaptable. Support activities, such as technical reviews, environmental studies, and community engagement, are also
progressing as planned. We are confident in the long-term value this project will generate for Nexa and remain focused on its successful
execution.
| | |
| | 6 |
Outlook
Production and
Sales Guidance
Guidance is based on several assumptions
and estimates and is subject to the continuous evaluation of several factors, including, but not limited to, metal prices, operational
performance, maintenance, input costs and exchange rates.
| § | As of date of this Earnings Release, Nexa reaffirms its 2024 consolidated
production guidance for all metals, including zinc and lead, as updated per operation on October 24, 2024, based on the aforementioned
factors. The guidance and 4Q24 outlook for mining production, zinc sales, cash cost for mining and smelting segments, capital expenditures,
exploration, project evaluation, and other expenses is outlined below. |
| o | Cerro Lindo: as
per the mining plan for the year, zinc production in 4Q24 is expected to be slightly lower than in 3Q24,
primarily due to lower average head grades. Copper production is expected to increase, driven by access to areas with higher average grades. |
| o | El Porvenir: based on mine sequencing, zinc production in 4Q24
is expected to increase compared to 3Q24, driven by higher mined ore volumes and higher average grades. Additionally, lead and silver
production is expected to increase, following the same trend, as higher average head grades for these metals are anticipated. |
| o | Atacocha: we expect zinc production in 4Q24 to remain at the
same level as in 3Q24. Lead and silver production are also expected to increase, driven by mining activities in areas with higher grades. |
| o | Vazante: ore throughput, zinc head grade, and zinc production
in 4Q24 are expected to remain at the same level as in 3Q24. |
| o | Aripuanã: we anticipate improved operational performance
in 4Q24 compared to 3Q24, driven by sustained higher utilization capacity, enhanced plant feed and throughput rates, and stable concentrate
quality within commercial specifications. Additionally, we expect higher metallurgical recoveries, with zinc and lead production projected
to increase, while copper production is expected to remain at the same level as 3Q24. |
Mining segment – production
Mining production |
|
9M24 |
|
2024e |
(Metal in concentrate) |
|
Updated |
|
|
|
|
|
|
|
|
Zinc |
kt |
|
252 |
|
323 |
- |
381 |
Cerro Lindo |
|
|
71 |
|
84 |
- |
99 |
El Porvenir |
|
|
38 |
|
50 |
- |
58 |
Atacocha |
|
|
8 |
|
9 |
- |
11 |
Vazante |
|
|
106 |
|
140 |
- |
163 |
Morro Agudo (1) |
|
|
7 |
|
7 |
- |
7 |
Aripuanã |
|
|
22 |
|
31 |
- |
42 |
|
|
|
|
|
|
|
|
Copper |
kt |
|
27 |
|
30 |
- |
35 |
Cerro Lindo |
|
|
22 |
|
24 |
- |
28 |
El Porvenir |
|
|
0.2 |
|
0.2 |
- |
0.3 |
Aripuanã |
|
|
4.5 |
|
5.7 |
- |
7.3 |
|
|
|
|
|
|
|
|
Lead |
kt |
|
52 |
|
66 |
- |
82 |
Cerro Lindo |
|
|
12 |
|
13 |
- |
17 |
El Porvenir |
|
|
19 |
|
25 |
- |
32 |
Atacocha |
|
|
9 |
|
12 |
- |
13 |
Vazante |
|
|
0.7 |
|
1 |
- |
1 |
Morro Agudo (1) |
|
|
2.3 |
|
2.3 |
- |
2.3 |
Aripuanã |
|
|
8.5 |
|
12 |
- |
16 |
|
|
|
|
|
|
|
|
Silver |
MMoz |
|
9 |
|
11 |
- |
13 |
Cerro Lindo |
|
|
3.4 |
|
4.0 |
- |
4.2 |
El Porvenir |
|
|
3.3 |
|
4.6 |
- |
5.4 |
Atacocha |
|
|
0.9 |
|
1.1 |
- |
1.2 |
Vazante |
|
|
0.4 |
|
0.3 |
- |
0.5 |
Aripuanã |
|
|
0.8 |
|
1.0 |
- |
1.5 |
(1)
Considers only the four months of operations from January to April 2024.
| | |
| | 7 |
Smelting segment – sales
| § | Metal sales guidance also remains unchanged at 580-605kt. |
| o | Peru: we anticipate higher production at Cajamarquilla in 4Q24
compared to 3Q24, driven by stable performance and consistent production levels. |
| o | Brazil: at Três Marias, we expect production in 4Q24 to
be slightly lower than in 3Q24, while production at Juiz de Fora is expected to remain at similar levels. |
Smelting sales |
|
9M24 |
|
2024e |
|
|
|
|
|
|
|
|
Zinc metal |
kt |
|
413 |
|
545 |
- |
565 |
Cajamarquilla |
|
|
243 |
|
315 |
- |
325 |
Três Marias |
|
|
110 |
|
155 |
- |
160 |
Juiz de Fora |
|
|
60 |
|
75 |
- |
80 |
|
|
|
|
|
|
|
|
Zinc oxide |
kt |
|
26 |
|
35 |
- |
40 |
Três Marias |
|
|
26 |
|
35 |
- |
40 |
|
|
|
|
|
|
|
|
Metal Sales |
kt |
|
439 |
|
580 |
- |
605 |
Nexa will continue to monitor risks associated
with global supply chain disruptions, which could be exacerbated, among other factors, by the ongoing Russia-Ukraine war, the Middle-East
conflict, unusual weather conditions, the global recession, and its potential impact on the demand for our products, inflationary cost
pressure, metal price volatility, local community or union protests, and changes to the political situations or regulatory frameworks
in the countries in which we operate that could affect our production levels and our costs. Refer to “Risks and Uncertainties”
and “Cautionary Statement on Forward-Looking Statements” for further information.
Cash Costs
| § | Nexa reaffirms its 2024 cost ROM guidance at our mining operations,
along with the conversion cost and cash cost net of by-products credits at our smelting operations, despite a challenging inflationary
environment. However, on October 24, 2024, we reduced our 2024 cash cost guidance for the mining segment. This reduction was primarily
due to higher LME metal prices, year-to-date performance, increased by-products contribution (both in prices and volumes), and slightly
lower treatment charges (“TCs”). Nexa is confident that the adjusted 2024 consolidated cash cost guidance for its mining segment,
and the reaffirmed cash cost guidance for our smelting segment will be achieved. |
| o | Mining and smelting volumes are expected to slightly increase in 4Q24
compared to 3Q24, remaining within the guidance ranges noted above. |
| | |
| | 8 |
| o | We anticipate that ongoing improvements in operational efficiency and
cost management will positively impact on our overall performance. Several initiatives are already being implemented across our mines
and smelters. |
| o | Commodity prices have been revised for 2024e – (Zn: US$1.21/lb,
Cu: US$4.14/lb, Pb: US$0.95/lb, Ag: US$27.8/oz, Au: US$2,328/oz), versus previous 2024e – (Zn: US$1.13/lb, Cu: US$3.76/lb, Pb: US$0.95/lb,
Ag: US$23.5/oz, Au: US$1,945/oz). Nexa’s C1 cash cost is sensitive to by-products prices and volumes, which may affect the results
of our final costs. |
| o | Foreign exchange rates assumptions have been updated to (BRL/USD: 5.25
and Soles/USD: 3.74), versus previous 2024e – (BRL/USD: 4.90 and Soles/USD: 3.67). |
| o | Zinc TCs assumptions for the year have been updated to US$165/t concentrate,
versus the previous 2024e US$174/t concentrate. |
Mining Operating costs |
|
Cost ROM
(US$/t) |
|
Cash Cost
(US$/lb) |
|
Cost ROM
(US$/t) |
|
Cash Cost
(US$/lb) |
|
|
|
|
|
9M24 |
|
9M24 |
|
2024e |
|
2024e |
|
|
|
|
Updated |
|
|
|
|
|
|
|
|
|
|
|
|
|
Mining (1) |
|
46.0 |
|
0.09 |
|
44.0 |
- |
51.4 |
|
0.03 |
- |
0.20 |
Cerro Lindo |
|
42.6 |
|
(0.39) |
|
41.0 |
- |
45.0 |
|
(0.56) |
- |
(0.28) |
El Porvenir |
|
63.6 |
|
0.13 |
|
58.4 |
- |
71.6 |
|
(0.09) |
- |
0.18 |
Atacocha |
|
33.8 |
|
(0.69) |
|
34.3 |
- |
43.2 |
|
(0.85) |
- |
(0.59) |
Vazante |
|
48.9 |
|
0.50 |
|
55.8 |
- |
63.6 |
|
0.46 |
- |
0.52 |
Morro Agudo (2) |
|
40.8 |
|
0.93 |
|
27.9 |
- |
40.0 |
|
0.93 |
- |
0.93 |
(1) C1 Weighted Cash cost net of
by-products credits is measured with respect to zinc sold per mine.
(2) Considers only the four months
of operations from January to April 2024.
Note: Consolidated cash cost does not
include Aripuanã.
Smelting Operating costs |
|
Conversion cost
(US$/lb) |
|
Cash Cost
(US$/lb) |
|
Conversion cost
(US$/lb) |
|
Cash Cost
(US$/lb) |
|
|
|
|
|
9M24 |
|
9M24 |
|
2024e |
|
2024e |
|
|
|
|
|
|
|
|
|
|
|
|
|
Smelting (3) |
|
0.31 |
|
1.11 |
|
0.29 |
- |
0.32 |
|
1.07 |
- |
1.18 |
Cajamarquilla |
|
0.28 |
|
1.09 |
|
0.29 |
- |
0.32 |
|
1.02 |
- |
1.13 |
Três Marias |
|
0.30 |
|
1.12 |
|
0.25 |
- |
0.27 |
|
1.12 |
- |
1.23 |
Juiz de Fora |
|
0.43 |
|
1.21 |
|
0.38 |
- |
0.42 |
|
1.17 |
- |
1.28 |
(3) C1 Weighted Cash cost net
of by-products credits is measured with respect to zinc sold per smelter.
| § | In 9M24, Mining C1 cash cost of US$0.09/lb was in line with our updated
2024 guidance, primarily driven by higher by-products contribution, particularly from Cerro Lindo, and lower TCs across all units. The
run-of-mine mining costs of US$46.0/t was in line with our 2024 guidance. For further information, please see the section “Business
performance – Mining segment.” |
| § | In 9M24, Smelting C1 cash cost of US$1.11/lb and conversion cost of
US$0.31/lb were in line with our 2024 guidance. For further information, please see the section “Business performance – Smelting
segment.” |
Capital Expenditures
(“CAPEX”) Guidance
| § | Nexa invested US$53 million in 3Q24, nearly
all of which was sustaining, which includes CAPEX to sustain operations as well as mine development. In
9M24, total CAPEX amounted to US$191 million. |
| | |
| | 9 |
| § | The depreciation of the Brazilian real against the U.S. dollar resulted
in a positive impact of US$3.1 million in the quarter, totaling US$5 million in 9M24. |
| § | Our 2024 CAPEX guidance has been revised downward by US$11 million,
bringing the updated figure to US$300 million (vs. US$311 million in the previous guidance). |
CAPEX |
|
9M24 |
|
2024e |
(US$ million) |
|
|
Updated |
Non-Expansion |
|
198 |
|
297 |
Sustaining (1) |
|
185 |
|
261 |
HS&E |
|
7 |
|
20 |
Others (2) |
|
6 |
|
16 |
|
|
|
|
|
Expansion projects (3) |
|
2 |
|
3 |
Reconciliation to Financial Statements (4) |
|
(9) |
|
- |
TOTAL |
|
191 |
|
300 |
(1) Investments
in tailing dams are included in sustaining expenses.
(2) Modernization,
IT and others.
(3) Includes
Vazante deepening, among several other projects to improve operational performance.
(4) The amounts
are mainly related to capitalization of interest net of advanced payments for imported materials and tax credits.
Exploration &
Project Evaluation and Other Expenses Guidance
| § | In 3Q24, we invested US$15 million in exploration and project evaluation,
totaling US$45 million in 9M24. |
| § | In 3Q24, we also allocated a total of US$5 million to technology and
community initiatives, totaling US$12 million in 9M24. These investments aim to enhance our current operations and to further contribute
to the social and economic development of our host communities. |
| § | Our total 2024 guidance for exploration and project evaluation, and
other operating expenses remains unchanged at US$72 million and US$21 million, respectively. |
| § | As part of our long-term strategy, we remain focused on replacing and
increasing mineral reserves and resources. We expect to continue advancing our exploration activities, primarily by identifying new ore
bodies and upgrading resources classification through infill drilling campaigns. |
Other Operating Expenses |
|
9M24 |
|
Guidance 2024 |
(US$ million) |
|
|
Exploration |
|
37 |
|
58 |
Mineral Exploration |
|
28 |
|
42 |
Mineral rights |
|
4 |
|
6 |
Sustaining (mine development) |
|
4 |
|
10 |
|
|
|
|
|
Project Evaluation |
|
8 |
|
14 |
|
|
|
|
|
Exploration & Project Evaluation |
|
45 |
|
72 |
|
|
|
|
|
Other |
|
12 |
|
21 |
Technology |
|
2 |
|
4 |
Communities |
|
9 |
|
17 |
Note: Exploration and project evaluation expenses
consider several stages of development, from mineral potential definition, R&D, and subsequent scoping and pre-feasibility studies
(FEL1 and FEL2).
| | |
| | 10 |
Earnings Release
3Q24
This Earnings Release should be read
in conjunction with the “Condensed consolidated interim financial statements at and for the three and nine-month periods ended on
September 30, 2024.” This document contains forward-looking statements.
Table of contents
Consolidated performance |
12 |
Business performance – Mining |
18 |
Business performance – Smelting |
29 |
Liquidity and Indebtedness |
37 |
Cash flows |
39 |
Others |
40 |
Market scenario |
42 |
Risks and Uncertainties |
44 |
Use of Non-IFRS Financial Measures |
45 |
Cautionary Statement on Forward-Looking Statements |
47 |
Appendix |
49 |
UPCOMING EVENT
Earnings Conference
Call
Date: Friday, November 1, 2024 –
9:00am (EST)
Dial In
US: +1-833-816-1265
Canada: +1-647-484-8814
Brazil: +55 11 3181-8565
International: +1-412-317-5635
Conference ID: Nexa Resources
Live audio webcast with slide presentation
will be available on:
https://ir.nexaresources.com
| | |
| | 11 |
Consolidated performance
Selected financial
information
US$ million
(except where otherwise indicated) |
3Q24 |
2Q24 |
3Q23 |
9M24 |
9M23 |
|
|
|
|
|
|
Net Revenues |
709 |
736 |
649 |
2,026 |
1,943 |
Mining |
325 |
377 |
273 |
996 |
809 |
Smelting |
524 |
508 |
484 |
1,450 |
1,493 |
Intersegment results | Adjustments |
(140) |
(149) |
(107) |
(421) |
(358) |
|
|
|
|
|
|
Cost of Sales |
(583) |
(556) |
(581) |
(1,631) |
(1,714) |
Mining |
(247) |
(256) |
(245) |
(755) |
(744) |
Current Operations |
(203) |
(215) |
(203) |
(627) |
(600) |
Aripuanã |
(44) |
(42) |
(42) |
(128) |
(143) |
Smelting |
(474) |
(450) |
(439) |
(1,297) |
(1,322) |
Intersegment results | Adjustments |
139 |
150 |
102 |
421 |
352 |
|
|
|
|
|
|
Selling, general and administrative |
(29) |
(30) |
(33) |
(93) |
(94) |
Mining |
(14) |
(16) |
(16) |
(47) |
(45) |
Smelting |
(13) |
(14) |
(15) |
(43) |
(46) |
Intersegment results | Adjustments |
(2) |
0 |
(2) |
(3) |
(3) |
|
|
|
|
|
|
Depreciation and amortization |
82 |
74 |
76 |
234 |
224 |
Mining |
63 |
54 |
54 |
174 |
163 |
Smelting |
19 |
19 |
21 |
58 |
60 |
Intersegment results | Adjustments |
0 |
1 |
0 |
1 |
1 |
|
|
|
|
|
|
Adjusted EBITDA (1) |
183 |
206 |
87 |
517 |
296 |
Mining |
128 |
136 |
44 |
342 |
110 |
Smelting |
55 |
69 |
50 |
174 |
191 |
Intersegment results | Adjustments |
0 |
1 |
(7) |
1 |
(4) |
Adj. EBITDA margin (%) |
25.8% |
28.0% |
13.3% |
25.5% |
15.2% |
|
|
|
|
|
|
Net income (loss) |
6 |
(70) |
(64) |
(76) |
(183) |
Attributable to Nexa's shareholders |
(5) |
(77) |
(75) |
(107) |
(197) |
Attributable to non-controlling interests |
11 |
7 |
10 |
31 |
14 |
|
|
|
|
|
|
Basic and diluted loss per share |
(0.04) |
(0.58) |
(0.57) |
(0.80) |
(1.49) |
|
|
|
|
|
|
Adjusted net income (loss) (1) |
22 |
42 |
(50) |
53 |
(35) |
Attributable to Nexa's shareholders |
2.4 |
19 |
(58) |
0.4 |
(54) |
Attributable to non-controlling interests |
19 |
23 |
8 |
53 |
19 |
|
|
|
|
|
|
Adjusted basic and diluted earnings (loss) per share (1) |
0.02 |
0.14 |
(0.44) |
0.00 |
(0.41) |
(1) Refer to “Use of Non-IFRS Financial
Measures” for further information. Adjusted EBITDA, adjusted net income (loss) and adjusted EPS, exclude the items presented in
the “Net Income (Loss) reconciliation to Adjusted EBITDA” section of this earnings release. For details on segment definition
and accounting policy, please refer to explanatory note 2 – “Information by business segment” in the “Condensed
consolidated interim financial statements at and for the three and nine-month periods ended on September 30, 2024.” This is a note
about segments, and one of the explanations for the new adjustment for cash dividend at the consolidated level was to keep consistency
with segment information.
| | |
| | 12 |
Net revenues
In 3Q24, net revenues totaled US$709 million,
up 9% year-over-year, primarily driven by higher LME metal prices (except for lead), which was partially offset by slightly lower smelting
sales volumes and a lower net premium. The LME average prices for zinc and copper rose by 14% and 10%, respectively, while lead prices
decreased by 6%, compared to the same period in 2023. For further details on metal prices, please refer to the “Market Scenario”
section.
Compared to 2Q24, net revenues decreased
by 4%, mainly due to lower LME base metal prices and lower by-products contribution, partially offset by higher smelting sales volume
and a slightly higher net premium.
In 9M24, net revenues amounted to US$2,026
million, up by 4% compared to the same period a year ago, as a result of the aforementioned reasons.
Cost of Sales
In 3Q24, cost of sales amounted to US$583
million, remaining relatively flat year-over-year. This stability was primarily driven by slightly lower smelting and mining sales volumes,
and a positive hedge effect. These positive factors were offset by higher maintenance expenses in both segments, increased third-party
services in our mining segment, lower TCs from third-party concentrates, and higher energy expenses. Compared to 2Q24, cost of sales increased
by 5%, mainly due to increased smelting and mining sales volumes, higher operational costs, and lower TCs from third-party concentrates,
which were partially offset by the positive effect of lower zinc prices on zinc concentrates purchase, as well as slightly lower third-party
services and employee benefit expenses.
In 9M24, cost of sales amounted to US$1,631
million, down by 5% compared to the same period a year ago, largely due to the aforementioned reasons.
Mineral exploration
and Project evaluation
In 3Q24, mineral exploration and project
evaluation investments were US$15 million, compared to US$26 million in 3Q23, mainly driven by lower project evaluation expenses. In 9M24,
mineral exploration and project evaluation investments amounted to US$45 million.
For additional information about our exploration
results in the third quarter 2024, please refer to our 3Q24 Exploration Report published on October 24, 2024.
SG&A
In 3Q24, SG&A expenses totaled US$29
million, down by 11% compared to 3Q23. This reduction was primarily due to a decrease in the impairment provision for trade accounts receivable
and slightly lower third-party service costs in support areas, partially offset by higher employee benefit expenses. SG&A expenses
also decreased by 2% compared to 2Q24.
In 9M24, SG&A expenses amounted to
US$93 million, down by 1% compared to the same period a year ago, primarily due to higher employee benefit expenses.
Adjusted EBITDA
In 3Q24, Adjusted EBITDA was US$183 million
compared with US$87 million in 3Q23. The main factors that contributed to this increase were (i) higher by-products contribution of US$56
million, mainly due to higher prices and volumes; (ii) the positive net price effect of US$15 million, primarily attributed to higher
zinc prices; (iii) the positive impact of US$13 million from foreign exchange variations; (iv) the positive impact of US$10 million from
lower mineral exploration and project evaluation expenses; and (v) a positive hedge effect of US$4 million. These positive effects were
partially offset by (vi) the negative net impact of US$7 million due to higher costs, mainly from adjustments for Aripuanã’s
idleness in 3Q23, higher reagent consumption due to the processing of new ores in Aripuanã, and higher third-party services in
our Peruvian mines.
| | |
| | 13 |
Compared to 2Q24, Adjusted EBITDA decreased
by 11%. This decrease was primarily driven by (i) the negative net impact of US$40 million in costs, mainly due to adjustments for Aripuanã’s
idleness amounting to US$11 million in 2Q24, which costs are no longer adjusted commencing in 3Q24, and higher third-party services, energy,
and sales expenses in our smelting segment; (ii) lower by-products contribution of US$12 million, attributed to reduced copper and lead
sales volumes and lower prices, partially offset by higher payable values for silver and gold in our Peruvian operations and Aripuanã,
as well as increased copper cement sales volume and higher silver prices in Cajamarquilla. These were partially offset by (iii) a positive
net price effect of US$10 million, mainly in our smelting segment, driven by a positive sales effect from quotation period adjustments;
(iv) higher smelting sales volume of US$8 million, attributed to higher domestic market sales, which improved margins; and (v) the positive
impact of US$7 million from foreign exchange variations.
For 9M24, Adjusted EBITDA was US$517 million
compared to US$296 million for the same period a year ago. This increase was primarily driven by higher by-products contribution, higher
zinc prices, and lower TCs, positively impacting our zinc concentrate purchases. Additionally, lower costs, as well as reduced mineral
exploration and project evaluation expenses contributed to the increase. These positive factors were partially offset by a lower net premium
and lower smelting sales volume in Três Marias and Cajamarquilla.
| | |
| | 14 |
Net Income (Loss) reconciliation
to Adjusted EBITDA
US$ million |
3Q24 |
2Q24 |
3Q23 |
9M24 |
9M23 |
Net Income (Loss) |
6.0 |
(70.0) |
(64.5) |
(76.0) |
(183.1) |
Depreciation and amortization |
82.3 |
74.3 |
75.6 |
233.6 |
223.5 |
Share in the results of associates |
(5.4) |
(5.3) |
(6.3) |
(16.5) |
(17.4) |
Net financial results |
41.5 |
118.5 |
66.8 |
227.9 |
133.6 |
Income tax benefit (expense) |
42.8 |
(23.0) |
0.4 |
19.3 |
(8.1) |
EBITDA |
167.0 |
94.4 |
72.0 |
388.2 |
148.6 |
Changes in fair value of offtake agreement (2) |
2.5 |
17.2 |
(1.0) |
21.5 |
(1.0) |
Impairment loss (reversal) of long-lived assets (3) |
(17.6) |
60.2 |
1.9 |
25.4 |
59.1 |
Ramp-up expenses of greenfield projects (Aripuanã) (4) |
0.0 |
11.3 |
3.5 |
25.2 |
5.4 |
Impairment of other assets (5) |
0.0 |
0.0 |
0.0 |
0.3 |
0.0 |
Loss (gain) on sale and write-off of property, plant and equipment (6) |
6.7 |
0.0 |
(0.1) |
6.9 |
1.2 |
Remeasurement in estimates of asset retirement obligations (7) |
5.1 |
14.8 |
(2.6) |
22.5 |
(2.8) |
Remeasurement adjustment of streaming agreement (8) |
21.1 |
0.0 |
2.3 |
21.1 |
2.3 |
Energy forward contracts – Changes in Fair Value (9) |
(3.6) |
(3.8) |
(2.3) |
(11.8) |
7.4 |
Tax voluntary disclosure – Value added tax ("VAT") discussions (10) |
0.0 |
0.0 |
12.8 |
0.0 |
76.0 |
Other restoration obligations (11) |
(0.0) |
(0.2) |
0.0 |
1.1 |
0.0 |
Divestment and restructuring (12) |
(4.7) |
2.4 |
0.0 |
0.9 |
0.0 |
Dividends received from associate (13) |
6.5 |
9.7 |
0.0 |
16.2 |
0.0 |
Adjusted EBITDA (1) |
182.9 |
206.1 |
86.6 |
517.4 |
296.2 |
(1) Adjusted EBITDA excludes the items presented
above in the “Net Income (Loss) reconciliation to Adjusted EBITDA.” For details on segment definition and accounting policy,
please refer to explanatory note 2 – “Information by business segment” in the “Condensed consolidated interim
financial statements at and for the three and nine-month periods ended on September 30, 2024.”
(2) Non-cash adjustment: Derivative financial
instrument related to the “Offtake agreement” described in the section “Others—Offtake agreement” of this
earnings release.
(3) Non-cash adjustment: Cash generating unit
and individual PP&E assets impairment loss (reversal). Please refer to “Others – Impairment” section in this Earnings
Release for further details.
(4) Expenses related to pre-operating and ramp-up
expenses incurred during the commissioning and ramp-up phases of greenfield projects which have not achieved their expected production
capacity. Once the Aripuanã operation is stabilized and operational at its expected production capacity, such effects will no longer
be excluded. Commencing on July 1, 2024, we expect these effects to be no longer included since, at the end of June 2024, it was approaching
the final stage of its ramp-up phase, transitioning to an ongoing operation.
(5) Non-cash adjustment: Value-added-taxes impairment
loss.
(6) Non-cash adjustment: Results from sale and
disposal of certain non-current assets.
(7) Non-cash adjustment: Asset retirement obligation
remeasurement of discount rate and updated studies that are not subject to capitalization.
(8) Non-cash adjustment: Remeasurement of contractual
obligation related to the forward sale contract of Cerro Lindo's Silver contained in the ore.
(9) Non-cash adjustment: The fair value adjustment
of the energy surplus resulting from electric energy purchase contracts of the Company’s subsidiary, Pollarix.
(10) Expenses related to the impact of accruals
related to VAT discussions.
(11) Non-cash adjustment: Expenses related to
the remeasurement of provision related to estimated costs of anticipated additional obligations in relation to certain inactive industrial
waste containment structures in Brazil that have been closed for more than 20 years and that do not contain mining tailings, water or
liquid waste.
(12) Expenses related to the effects of obligations
of restructuring and divestment related to assets held for sale.
(13) Amount in cash dividend received from Enercan,
since the results from these dividends were not consolidated on prior periods.
Net financial
results
The net financial results in 3Q24 were
a loss of US$41 million, significantly lower than the US$118 million loss recorded in 2Q24. This improvement was primarily driven by
foreign exchange gains, and slightly lower financial expenses due to our bonds’ repurchase in 2Q24, partially offset by a slight
reduction in financial income.
| | |
| | 15 |
The foreign
exchange variation had a positive impact of US$11 million in 3Q24 compared to a negative impact of US$64 million in 2Q24, mainly due to
the 2% appreciation of the Brazilian real against the U.S. dollar[4]
in 3Q24.
Excluding the effect of foreign exchange
variations, the net financial results in 3Q24 were a loss of US$52 million compared to an expense of US$55 million in the previous quarter.
US$ thousand |
3Q24 |
2Q24 |
3Q23 |
|
|
|
|
Financial income |
6,206 |
6,775 |
7,802 |
|
|
|
|
Financial expenses |
(59,376) |
(62,506) |
(47,233) |
|
|
|
|
Other financial items, net |
11,710 |
(62,734) |
(27,400) |
Foreign exchange gain (loss) |
10,889 |
(63,766) |
(26,882) |
|
|
|
|
Net financial result |
(41,460) |
(118,465) |
(66,831) |
Net financial result excluding FX |
(52,349) |
(54,699) |
(39,949) |
Net Income (Loss)
In 3Q24,
net income amounted to US$6 million compared to a net loss of US$64 million in 3Q23 and US$70 million in 2Q24. The improvement from 2Q24
was primarily driven by foreign exchange gains, higher operating income due to the recognition of an impairment reversal[5],
and lower Other income and expenses[6]
related to changes in the fair value of the offtake agreement, adjustments to asset retirement, restoration,
and environmental obligations, reductions in slow-moving and obsolete inventory, and provisions for legal claims. Additionally, mineral
exploration and project evaluation expenses were lower in the period.
Net Loss attributable to Nexa’s
shareholders was US$5 million in 3Q24, resulting in basic and diluted loss per share attributable to Nexa's shareholders of US$0.04 per
share. In 9M24, Net Loss attributable to Nexa’s shareholders was US$107 million, resulting in basic and diluted loss per share attributable
to Nexa's shareholders of US$0.80.
Excluding miscellaneous adjustments, as
detailed in the Net Income (Loss) reconciliation to Adjusted EBITDA section, adjusted net income was US$22 million for the quarter, totaling
US$53 million in 9M24.
Adjusted Net Income attributable to Nexa’s
shareholders was US$2.4 million in 3Q24, resulting in adjusted earnings per share of US$0.02. In 9M24, Adjusted Net Income attributable
to Nexa’s shareholders was US$0.4 million, resulting in adjusted earnings per share of US$0.00.
[4]
In 3Q24, the Brazilian real / U.S. dollar (end of period) exchange rate was R$5.448/US$1.00 compared to R$5.559/US$1.00 in 2Q24.
[5]
For more information, please refer to explanatory note 19 – “Impairment of long-lived assets”
in the “Condensed consolidated interim financial statements at and for the three and nine-month periods ended on September 30, 2024.”
[6]
For more information, please refer to explanatory notes 10 (e) – “Financial instruments in the
offtake agreement: fair value” and 17 (ii) – “Changes in asset retirement, restoration and environmental obligations”
in the “Condensed consolidated interim financial statements at and for the three and nine-month periods ended on September 30, 2024.”
| | |
| | 16 |
US$ million
(except where otherwise indicated) |
3Q24 |
2Q24 |
3Q23 |
9M24 |
9M23 |
Net Income (loss) |
6.0 |
(70.0) |
(64.5) |
(76.0) |
(183.1) |
Attributable to Nexa's shareholders |
(5.2) |
(77.0) |
(74.9) |
(106.5) |
(197.4) |
Attributable to non-controlling interests |
11.1 |
7.0 |
10.4 |
30.5 |
14.4 |
Basic and diluted loss per share |
(0.04) |
(0.58) |
(0.57) |
(0.80) |
(1.49) |
|
|
|
|
|
|
Miscellaneous adjustments (1) |
15.9 |
111.6 |
14.6 |
129.2 |
147.6 |
Attributable to Nexa's shareholders |
8.7 |
95.9 |
16.6 |
108.2 |
143.3 |
Attributable to non-controlling interests |
7.1 |
15.7 |
(2.0) |
21.0 |
4.3 |
Basic and diluted miscellaneous adjustments per share |
0.07 |
0.72 |
0.13 |
0.82 |
1.08 |
|
|
|
|
|
|
Adjusted net income (loss) |
21.9 |
41.7 |
(49.9) |
53.2 |
(35.4) |
Attributable to Nexa's shareholders |
2.4 |
18.9 |
(58.3) |
0.4 |
(54.1) |
Attributable to non-controlling interests |
19.5 |
22.8 |
8.4 |
52.8 |
18.7 |
Weighted average number of outstanding shares - in thousand |
132,439 |
132,439 |
132,439 |
132,439 |
132,439 |
Adjusted basic and diluted earnings (loss) per share |
0.02 |
0.14 |
(0.44) |
0.00 |
(0.41) |
(1) Miscellaneous adjustments include: (i)
Changes in fair value of the offtake agreement; (ii) Impairment loss (reversal) of long-lived assets; (iii) Ramp-up expenses of greenfield
projects (Aripuanã); (iv) Impairment of other assets; (v) Loss on sale of property, plant and equipment; (vi) Remeasurement in
estimates of asset retirement obligations; (vii) Remeasurement adjustment of streaming agreement; (viii) Changes in fair value of energy
forward contracts; (ix) Tax voluntary disclosure – VAT discussions; (x) Other restoration obligations; (xi) Divestment and restructuring;
and (x) Cash dividend received from Enercan.
| | |
| | 17 |
Business Performance
Mining segment
Consolidated |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
Ore Mined |
kt |
3,426 |
3,216 |
3,284 |
4.3% |
9,904 |
9,437 |
5.0% |
Treated Ore |
kt |
3,381 |
3,281 |
3,470 |
(2.6%) |
10,055 |
10,147 |
(0.9%) |
|
|
|
|
|
|
|
|
|
Grade |
|
|
|
|
|
|
|
|
Zinc |
% |
2.90 |
2.99 |
3.03 |
(13 bps) |
2.97 |
2.90 |
7 bps |
Copper |
% |
0.36 |
0.38 |
0.37 |
(1 bps) |
0.35 |
0.33 |
2 bps |
Lead |
% |
0.65 |
0.65 |
0.67 |
(2 bps) |
0.67 |
0.67 |
(1 bps) |
Silver |
oz/t |
1.14 |
1.12 |
1.01 |
12.9% |
1.14 |
1.02 |
11.3% |
Gold |
oz/t |
0.006 |
0.006 |
0.005 |
19.1% |
0.006 |
0.005 |
16.0% |
|
|
|
|
|
|
|
|
|
Production | metal contained |
|
|
|
|
|
|
|
Zinc |
kt |
82.7 |
82.5 |
87.4 |
(5.4%) |
252.5 |
242.9 |
3.9% |
Copper |
kt |
9.3 |
9.7 |
9.3 |
0.6% |
26.6 |
24.0 |
10.6% |
Lead |
kt |
17.0 |
16.7 |
16.5 |
3.3% |
52.0 |
47.6 |
9.1% |
Silver |
MMoz |
2.9 |
2.8 |
2.6 |
13.9% |
8.7 |
7.6 |
15.6% |
Gold |
koz |
9.3 |
8.6 |
6.6 |
41.3% |
26.6 |
19.9 |
33.3% |
Zinc Equivalent (1) |
kt |
158.9 |
159.1 |
160.8 |
(1.2%) |
477.0 |
445.7 |
7.0% |
(1) Consolidated mining production in kt
of zinc equivalent is calculated by converting copper, lead, silver, and gold contents to a zinc equivalent grade, assuming 2023 LME average
prices: Zn: US$1.20/lb; Cu: US$3.85/lb; Pb: US$0.97/lb; Ag: US$23.4/oz; Au: US$1,943/oz.
In 3Q24, treated ore volume reached 3,381kt,
reflecting a 3% year-over-year decrease, primarily due to the cessation of operations at Morro Agudo following its sale, which impacted
overall performance, partially offset by higher plant performance across all mines, except for El Porvenir.
Compared to 2Q24, treated ore volume increased
by 3%, driven by positive performance from all mines, although still impacted by the absence of contributions from Morro Agudo.
The ore throughput, year-over-year, increased
at Atacocha (+37%), Aripuanã (+30%), Vazante (+5%), and Cerro Lindo (+1%). Conversely, El Porvenir slightly decreased by (-1%).
Overall treated ore throughput was affected by the absence of contributions from Morro Agudo.
Zinc equivalent production totaled 159kt
in 3Q24, remaining relatively flat compared to 3Q23. The average head grades for zinc, copper, and lead decreased by 13bps to 2.90%, 1bps
to 0.36%, and 2bps to 0.65%, respectively, while silver head grades increased by 13% to 1.14oz/t. Compared to 2Q24, zinc equivalent production
was also relatively flat.
Zinc production of 83kt in the quarter
decreased by 5% from 3Q23, mainly due to lower average head grades at Vazante and El Porvenir, and the absence of contributions from Morro
Agudo, partially offset by higher volumes from Aripuanã. Compared to 2Q24, zinc production was relatively flat, with higher volumes
from Vazante, El Porvenir and Atacocha, offset by the absence of contributions from Morro Agudo and slightly lower volumes from Cerro
Lindo and Aripuanã.
Copper production of 9kt remained flat
compared to 3Q23. Compared to 2Q24, copper production decreased by 4%, primarily driven by a lower contribution from Cerro Lindo.
| | |
| | 18 |
Lead production increased by 3% year-over-year,
mainly explained by higher contributions from Atacocha and Aripuanã, and increased by 2% quarter-over-quarter, driven by higher
contributions from Atacocha and Cerro Lindo, despite the absence of contributions from Morro Agudo in the period.
In 9M24, treated ore volume was slightly
lower year-over-year, totaling 10,055kt. Zinc average grade was up 7bps to 2.97%. Therefore, zinc production totaled 252kt, 4% higher
than in 9M23. Copper production of 27kt was 11% higher and lead production increased by 9% to 52kt.
Cerro Lindo
Cerro Lindo
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ore Mined |
kt |
1,593 |
1,484 |
1,457 |
4,534 |
1,617 |
1,515 |
1,595 |
1,254 |
4,365 |
|
Treated Ore |
kt |
1,560 |
1,472 |
1,471 |
4,503 |
1,644 |
1,540 |
1,530 |
1,277 |
4,347 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Grade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
% |
1.67 |
1.86 |
1.87 |
1.80 |
1.70 |
1.63 |
1.31 |
1.38 |
1.44 |
|
Copper |
% |
0.56 |
0.66 |
0.51 |
0.58 |
0.58 |
0.63 |
0.57 |
0.48 |
0.57 |
|
Lead |
% |
0.30 |
0.31 |
0.44 |
0.35 |
0.32 |
0.32 |
0.33 |
0.25 |
0.30 |
|
Silver |
oz/t |
0.89 |
0.92 |
1.14 |
0.98 |
0.83 |
0.81 |
0.83 |
0.72 |
0.79 |
|
Gold |
oz/t |
0.003 |
0.002 |
0.003 |
0.003 |
0.003 |
0.002 |
0.002 |
0.002 |
0.002 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Production | metal contained |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
kt |
23.1 |
24.1 |
24.3 |
71.5 |
24.6 |
21.7 |
16.9 |
15.0 |
53.6 |
|
Copper |
kt |
7.5 |
8.4 |
5.9 |
21.8 |
7.9 |
8.1 |
7.4 |
5.2 |
20.7 |
|
Lead |
kt |
3.7 |
3.3 |
4.9 |
11.9 |
3.8 |
3.6 |
3.6 |
2.1 |
9.3 |
|
Silver |
MMoz |
1.1 |
1.0 |
1.3 |
3.4 |
1.0 |
0.9 |
0.9 |
0.6 |
2.5 |
|
Gold |
koz |
1.3 |
1.0 |
1.2 |
3.5 |
1.2 |
0.7 |
0.8 |
0.7 |
2.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc sales |
kt |
24.1 |
24.4 |
22.8 |
71.3 |
25.3 |
20.8 |
17.5 |
14.8 |
53.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales |
US$ mm |
88.5 |
92.9 |
84.9 |
266.2 |
98.1 |
88.6 |
86.5 |
81.6 |
256.7 |
|
Cost ROM (2) |
US$/t |
40.6 |
45.8 |
41.6 |
42.6 |
41.5 |
41.3 |
39.8 |
39.6 |
40.3 |
|
Cash cost (1) |
US$/lb |
(0.36) |
(0.58) |
(0.23) |
(0.39) |
0.06 |
(0.18) |
(0.13) |
(0.02) |
(0.12) |
|
Sustaining cash cost (1) |
US$/lb |
(0.15) |
(0.36) |
(0.06) |
(0.20) |
0.29 |
0.07 |
0.15 |
0.23 |
0.14 |
|
|
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
11.0 |
11.5 |
8.5 |
30.9 |
11.2 |
9.1 |
9.4 |
8.0 |
26.5 |
|
Other |
|
0.2 |
0.1 |
0.0 |
0.2 |
1.7 |
2.0 |
1.5 |
0.4 |
3.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per mine. For a cash cost reconciliation to COGS, please refer to Appendix
– All in Sustaining Cash Cost | Mining.
(2) Our cost per ROM is measured with respect
to treated ore volume. Refer to “Use of Non-IFRS Financial Measures” for further information.
In 3Q24, treated ore volume was 1,560kt,
up by 1% and 6% year-over-year and quarter-over-quarter, respectively.
| | |
| | 19 |
Zinc production of 23kt increased by 7%
compared to 3Q23, primarily driven by the prioritization of areas with higher zinc grades, in line with the mine sequencing plan. Compared
to 2Q24, zinc production decreased by 4%, due to mine development and rehabilitation activities in areas with lower zinc grades in the
period.
The average zinc head grade for the quarter
was 1.67%, up 4bps and down 19bps compared to 3Q23 and 2Q24, respectively.
Copper production totaled 7.5kt, down
8% year-over-year and 10% quarter-over-quarter, attributed to operations in areas with lower copper grades. The average copper grade was
0.56% in 3Q24, compared to 0.63% in 3Q23 and 0.66% in 2Q24.
Lead production reached 3.7kt, slightly
up from 3.6kt in 3Q23 and 3.3kt in 2Q24, despite lower average lead grade in the period, which decreased by 1bps both year-over-year and
quarter-over-quarter.
In the first nine months of 2024, zinc
production totaled 71kt, up 33% compared to 9M23, mainly driven by higher zinc grades and higher treated ore volumes. Copper production
rose by 5% to 22kt, while lead production increased by 28% to 12kt, both attributed to higher average grades.
Cost
Cost of sales was US$88 million in 3Q24
compared to US$89 million in the same period last year. This slight decrease was primarily due to lower third-party services expenses,
partially offset by higher maintenance costs. Compared to 2Q24, cost of sales decreased by 5%, mainly driven by lower third-party services
and maintenance costs, partially offset by higher variable costs associated with royalties, freights expenses, and an increase in personnel
costs.
Run-of-mine mining cost was US$41/t in
the quarter, down 2% year-over-year, mainly explained by lower variable costs and higher treated ore volumes. Compared to 2Q24, run-of-mine
mining cost decreased by 11% due to higher treated ore volumes, lower maintenance expenses, and reductions in third-party services and
variable costs.
Cash cost net of by-products in 3Q24 decreased
to US$(0.36)/lb compared with US$(0.18)/lb in 3Q23 but increased compared with US$(0.58)/lb in 2Q24. The year-over-year improvement was
mainly due to lower TCs, and higher by-products contribution supported by higher LME metal prices (except lead). The quarter-over-quarter
increase was mainly attributed to a lower contribution from by-products, mainly driven by decreased copper volumes and prices, as well
as lower zinc volumes, which were partially offset by lower operational costs.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$11 million, primarily allocated to mine development, maintenance, and equipment acquisition, totaling US$31 million in
9M24.
| | |
| | 20 |
El Porvenir
El Porvenir
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Ore Mined |
kt |
571 |
538 |
530 |
1,638 |
562 |
568 |
546 |
544 |
1,658 |
Treated Ore |
kt |
564 |
538 |
530 |
1,631 |
562 |
568 |
546 |
544 |
1,658 |
|
|
|
|
|
|
|
|
|
|
|
Grade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
% |
2.58 |
2.56 |
2.76 |
2.63 |
2.83 |
2.89 |
2.89 |
2.82 |
2.87 |
Copper |
% |
0.14 |
0.14 |
0.16 |
0.15 |
0.16 |
0.16 |
0.17 |
0.15 |
0.16 |
Lead |
% |
1.35 |
1.41 |
1.48 |
1.41 |
1.39 |
1.36 |
1.35 |
1.38 |
1.36 |
Silver |
oz/t |
2.34 |
2.42 |
2.47 |
2.41 |
2.20 |
2.22 |
2.42 |
2.55 |
2.39 |
Gold |
oz/t |
0.009 |
0.009 |
0.011 |
0.010 |
0.010 |
0.010 |
0.011 |
0.011 |
0.011 |
|
|
|
|
|
|
|
|
|
|
|
Production | metal contained |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
kt |
12.8 |
12.1 |
12.9 |
37.8 |
13.9 |
14.4 |
13.8 |
13.6 |
41.9 |
Copper |
kt |
0.1 |
0.1 |
0.1 |
0.2 |
0.1 |
0.1 |
0.1 |
0.1 |
0.3 |
Lead |
kt |
6.4 |
6.4 |
6.6 |
19.3 |
6.5 |
6.3 |
6.0 |
6.2 |
18.5 |
Silver |
MMoz |
1.1 |
1.1 |
1.1 |
3.3 |
1.0 |
1.0 |
1.1 |
1.2 |
3.3 |
Gold |
koz |
1.8 |
1.7 |
2.2 |
5.6 |
2.1 |
2.0 |
2.2 |
2.3 |
6.6 |
|
|
|
|
|
|
|
|
|
|
|
Zinc sales |
kt |
12.6 |
12.0 |
12.7 |
37.4 |
14.2 |
14.5 |
14.5 |
14.4 |
43.5 |
|
|
|
|
|
|
|
|
|
|
|
Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales |
US$ mm |
51.2 |
50.2 |
49.0 |
150.4 |
57.4 |
47.8 |
48.1 |
51.8 |
147.7 |
Cost ROM (2) |
US$/t |
63.1 |
65.7 |
62.0 |
63.6 |
70.6 |
57.5 |
63.1 |
60.1 |
60.2 |
Cash cost (1) |
US$/lb |
0.18 |
(0.05) |
0.24 |
0.13 |
0.37 |
0.20 |
0.35 |
0.22 |
0.26 |
Sustaining cash cost (1) |
US$/lb |
0.52 |
0.40 |
1.14 |
0.69 |
1.30 |
0.73 |
0.65 |
0.64 |
0.67 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
9.1 |
12.0 |
25.2 |
46.3 |
28.8 |
16.7 |
9.7 |
13.4 |
39.8 |
Other |
|
0.3 |
0.0 |
0.0 |
0.3 |
0.0 |
- |
(0.0) |
(0.0) |
(0.0) |
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per mine. For a cash cost reconciliation to COGS, please refer to Appendix
– All in Sustaining Cash Cost | Mining.
(2) Our cost per ROM is measured with respect
to treated ore volume. Refer to “Use of Non-IFRS Financial Measures” for further information.
In 3Q24, treated ore volume was 564kt,
down 1% year-over-year and up 5% quarter-over-quarter.
In 3Q24, zinc production totaled 13kt,
down 11% from 3Q23, mainly explained by activities in areas with lower zincs grades. Compared to 2Q24, zinc production increased by 6%
due to better plant performance, following the successful preventive maintenance of the mill circuit last quarter, and slightly higher
grades.
Lead production in 3Q24 increased by 1%
from 3Q23 and decreased by 1% from 2Q24, while silver production rose by 8% year-over-year and relatively flat quarter-over-quarter.
In the first nine months of 2024, zinc
production totaled 38kt, down 10% compared to 9M23. Lead and silver production increased by 5% to 19kt and down 2% to 3.3MMoz, respectively.
Cost
Cost of sales amounted to US$51 million
in 3Q24 compared to US$48 million in 3Q23, mainly due to higher depreciation and amortization, as well as increased operating costs associated
with maintenance and energy. These were partially offset by reduced third-party services and lower workers participation. Compared to
2Q24, cost of sales was up 2%, also driven by higher depreciation and amortization, higher operating costs associated with maintenance
and energy, in addition to an increase in personnel and fixed costs, which were partially offset by lower variable costs and lower workers
participation.
| | |
| | 21 |
Run-of-mine mining cost was US$63/t in
the quarter, up 10% from 3Q23, mainly due to higher maintenance and energy expenses. Compared with 2Q24, run-of-mine mining cost decreased
by 4%, mainly driven by higher treated ore volumes and lower variable costs, which were partially offset by increased personnel costs
and fixed costs related to maintenance and energy.
Cash cost net of by-products in 3Q24 decreased
to US$0.18/lb compared to US$0.20/lb in 3Q23 due to higher by-products contribution and lower TCs, which were partially offset by lower
zinc volumes and higher operational costs. Compared to 2Q24, cash cost increased by US$0.23/lb, driven by lower by-products contribution,
impacted by lower lead and copper prices, partially offset by lower operational costs and higher silver and gold prices.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$9 million, mainly related to mine development, equipment acquisition, and the tailings dam project, totaling US$46 million
in 9M24.
Atacocha
Atacocha
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Ore Mined |
kt |
365 |
379 |
347 |
1,090 |
399 |
290 |
363 |
342 |
995 |
Treated Ore |
kt |
398 |
379 |
347 |
1,123 |
393 |
290 |
373 |
342 |
1,004 |
|
|
|
|
|
|
|
|
|
|
|
Grade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
% |
0.98 |
0.86 |
0.89 |
0.91 |
0.87 |
0.58 |
0.67 |
0.94 |
0.73 |
Lead |
% |
1.14 |
0.90 |
0.81 |
0.96 |
0.86 |
0.84 |
0.80 |
1.23 |
0.96 |
Silver |
oz/t |
1.18 |
0.98 |
1.02 |
1.07 |
1.20 |
1.33 |
1.11 |
1.24 |
1.21 |
Gold |
oz/t |
0.012 |
0.010 |
0.008 |
0.010 |
0.007 |
0.009 |
0.010 |
0.012 |
0.010 |
|
|
|
|
|
|
|
|
|
|
|
Production | metal contained |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
kt |
2.9 |
2.4 |
2.4 |
7.7 |
2.6 |
1.2 |
1.9 |
2.5 |
5.5 |
Lead |
kt |
3.9 |
2.9 |
2.3 |
9.2 |
2.9 |
2.1 |
2.6 |
3.6 |
8.2 |
Silver |
MMoz |
0.4 |
0.3 |
0.3 |
0.9 |
0.4 |
0.3 |
0.3 |
0.4 |
1.0 |
Gold |
koz |
2.9 |
2.1 |
1.4 |
6.4 |
1.4 |
1.4 |
2.2 |
2.6 |
6.2 |
|
|
|
|
|
|
|
|
|
|
|
Zinc sales |
kt |
3.0 |
2.4 |
2.1 |
7.5 |
2.7 |
1.1 |
2.4 |
2.3 |
5.8 |
|
|
|
|
|
|
|
|
|
|
|
Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales |
US$ mm |
28.3 |
16.5 |
16.3 |
61.2 |
20.4 |
13.1 |
19.8 |
16.5 |
49.5 |
Cost ROM (2) |
US$/t |
35.2 |
32.5 |
33.7 |
33.8 |
32.4 |
30.7 |
31.7 |
36.6 |
33.1 |
Cash cost (1) |
US$/lb |
(0.93) |
(1.05) |
0.05 |
(0.69) |
0.17 |
(1.22) |
(1.05) |
(0.12) |
(0.72) |
Sustaining cash cost (1) |
US$/lb |
(0.50) |
(0.40) |
0.95 |
(0.06) |
1.25 |
(0.19) |
(0.58) |
0.81 |
0.05 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
2.9 |
3.4 |
4.2 |
10.5 |
6.4 |
2.6 |
2.5 |
4.7 |
9.7 |
Other |
|
0.0 |
0.0 |
0.0 |
0.0 |
0.1 |
0.0 |
0.0 |
(0.0) |
0.0 |
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per mine. For a cash cost reconciliation to COGS, please refer to Appendix
– All in Sustaining Cash Cost | Mining.
(2) Our cost per ROM is measured with respect
to treated ore volume. Refer to “Use of Non-IFRS Financial Measures” for further information.
| | |
| | 22 |
Treated ore volume of 398kt in 3Q24 increased
by 37% compared to 3Q23 and 5% compared to 2Q24.
Zinc production was 2.9kt in 3Q24, increasing
from 1.2kt in 3Q23 and 2.4kt from 2Q24, respectively. This performance was primarily driven by improved plant stability, following no
community-related disruptions in 2024, as opposed to 2023. As a result, we were able to prioritize mining activities, including operations
in areas with higher zinc grades.
Zinc average grade in the quarter was
0.98%, up 40bps year-over-year and 12bps quarter-over-quarter.
Lead production increased to 3.9kt compared
to 2.1kt in 3Q23 and 2.9kt in 2Q24, while silver production was 374koz, up by 17% and 29% year-over-year and quarter-over-quarter, respectively.
In 9M24, treated ore volume totaled 1,123kt,
up 12% compared to the same period last year. Zinc and lead production increased by 39% and 12%, to 7.7kt and 9.2kt, respectively, while
silver decreased by 9% to 932koz.
Cost
Cost of sales was US$28 million in 3Q24,
up 116% year-over-year, driven primarily by higher production levels across all metals and an increase (+172%) in zinc sales, in addition
to higher operating costs associated with maintenance, energy and third-party services. Compared to 2Q24, cost of sales increased by 72%,
also driven by the aforementioned reasons.
Run-of-mine mining cost was US$35/t in
the quarter, up 15% from 3Q23, mainly due to higher operational costs related to maintenance, energy and other variable costs, partially
offset by increased treated ore volumes. Compared to 2Q24, run-of-mine mining costs increased by 8%, mainly due to increased third-party
services and maintenance expenses, partially offset by slightly higher treated ore volumes.
Cash cost net of by-products was US$(0.93)/lb
in 3Q24, up 24% from 3Q23, driven by higher operational costs, which were partially offset by increased zinc volumes. Compared to 2Q24,
cash cost increased by US$0.11/lb, driven by higher operational costs, partially offset by higher zinc volumes.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$2.9 million, mainly related to the tailings dam deposit area, totaling US$10 million in 9M24.
| | |
| | 23 |
Vazante
Vazante
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Ore Mined |
kt |
384 |
381 |
374 |
1,139 |
382 |
384 |
366 |
385 |
1,135 |
Treated Ore |
kt |
449 |
444 |
427 |
1,320 |
407 |
427 |
405 |
394 |
1,226 |
|
|
|
|
|
|
|
|
|
|
|
Grade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
% |
9.39 |
9.18 |
9.55 |
9.37 |
9.86 |
10.22 |
10.25 |
10.44 |
10.30 |
Lead |
% |
0.29 |
0.28 |
0.26 |
0.28 |
0.29 |
0.35 |
0.35 |
0.34 |
0.35 |
Silver |
oz/t |
0.62 |
0.62 |
0.58 |
0.61 |
0.66 |
0.70 |
0.66 |
0.69 |
0.68 |
|
|
|
|
|
|
|
|
|
|
|
Production | metal contained |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
kt |
36.4 |
34.5 |
34.9 |
105.8 |
34.9 |
38.4 |
36.6 |
35.8 |
110.8 |
Lead |
kt |
0.3 |
0.3 |
0.1 |
0.7 |
0.3 |
0.4 |
0.4 |
0.4 |
1.2 |
Silver |
MMoz |
0.1 |
0.1 |
0.1 |
0.4 |
0.1 |
0.2 |
0.2 |
0.1 |
0.4 |
|
|
|
|
|
|
|
|
|
|
|
Zinc sales |
kt |
36.4 |
34.5 |
34.9 |
105.8 |
34.9 |
38.4 |
36.6 |
35.8 |
110.8 |
|
|
|
|
|
|
|
|
|
|
|
Costs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales |
US$ mm |
31.0 |
31.6 |
33.2 |
95.8 |
29.2 |
33.3 |
31.7 |
29.8 |
94.8 |
Cost ROM (2) |
US$/t |
51.7 |
48.6 |
46.1 |
48.9 |
54.8 |
54.9 |
53.9 |
54.2 |
54.3 |
Cash cost (1) |
US$/lb |
0.48 |
0.50 |
0.54 |
0.50 |
0.55 |
0.61 |
0.60 |
0.62 |
0.61 |
Sustaining cash cost (1) |
US$/lb |
0.54 |
0.59 |
0.61 |
0.58 |
0.63 |
0.71 |
0.71 |
0.70 |
0.71 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
4.8 |
7.3 |
5.9 |
18.1 |
5.9 |
7.2 |
8.8 |
6.2 |
22.2 |
Other |
|
0.4 |
0.9 |
0.7 |
2.0 |
0.8 |
1.7 |
0.8 |
0.2 |
2.7 |
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per mine. For a cash cost reconciliation to COGS, please refer to Appendix
– All in Sustaining Cash Cost | Mining.
(2) Our cost per ROM is measured with respect
to treated ore volume. Refer to “Use of Non-IFRS Financial Measures” for further information.
In 3Q24, treated ore volume was 449kt,
up 5% year-over-year and 1% quarter-over-quarter.
Zinc production totaled 36kt in 3Q24,
down 5% compared to 3Q23, primarily due to lower zinc grades in the period. Compared to 2Q24, zinc production increased by 5%, attributed
to the increase in the mill’s capacity (treated ore) and higher zinc grades.
The average zinc grade in the quarter
was 9.39%, down 83bps and up 21bps from 3Q23 and 2Q24, respectively.
Lead production was 0.3kt in 3Q24 compared
to 0.4kt in 3Q23 and 0.3kt in 2Q24, while silver production of 0.1MMoz decreased by 24% from 3Q23 and 12% from 2Q24.
In 9M24, treated ore volume totaled 1,320kt,
up 8% from the same period of last year. Zinc production decreased by 5% to 106kt from 9M23.
Cost
Cost of sales was US$31 million in 3Q24,
down 7% year-over-year, driven by lower zinc production and sales, as well as a reduction in operating costs due to lower energy expenses
and variable costs. Compared to 2Q24, cost of sales was down 2%, primarily due to lower operating costs.
Run-of-mine mining cost was US$52/t in
3Q24 compared to US$55/t in 3Q23, mainly due to higher treated ore volumes and lower energy and variable costs. Compared to 2Q24, run-of-mine
mining cost was up 6%, mainly explained by higher variable costs.
Cash cost net of by-products decreased
to US$0.48/lb compared with US$0.61/lb in 3Q23, primarily due to lower TCs, partially offset by lower zinc volumes. Compared to 2Q24,
cash cost decreased by US$0.01/lb, driven by lower operational costs, partially offset by lower by-products contribution and lower zinc
volumes.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$4.8 million, mainly related to mine development to support life of mine extension, maintenance, and other expenses related
to infrastructure and equipment, totaling US$18 million in 9M24.
| | |
| | 24 |
Aripuanã
Aripuanã
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Ore Mined |
kt |
513 |
359 |
299 |
1,171 |
276 |
237 |
61 |
148 |
446 |
Treated Ore |
kt |
410 |
367 |
322 |
1,099 |
347 |
315 |
372 |
277 |
965 |
|
|
|
|
|
|
|
|
|
|
|
Grade |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
% |
2.77 |
2.99 |
3.11 |
2.94 |
3.66 |
3.66 |
2.92 |
2.98 |
3.18 |
Copper |
% |
0.59 |
0.54 |
0.70 |
0.60 |
0.75 |
0.65 |
0.74 |
0.57 |
0.66 |
Lead |
% |
0.92 |
1.05 |
0.97 |
0.98 |
1.12 |
1.14 |
0.94 |
1.04 |
1.03 |
Silver |
oz/t |
0.98 |
1.07 |
0.91 |
0.99 |
1.09 |
0.97 |
0.89 |
0.86 |
0.91 |
Gold |
oz/t |
0.012 |
0.018 |
0.026 |
0.018 |
0.016 |
0.017 |
0.013 |
0.013 |
0.015 |
|
|
|
|
|
|
|
|
|
|
|
Production | metal contained |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
kt |
7.5 |
7.7 |
7.2 |
22.4 |
7.4 |
5.8 |
6.5 |
2.5 |
14.7 |
Copper |
kt |
1.7 |
1.3 |
1.5 |
4.5 |
1.4 |
1.0 |
1.2 |
0.9 |
3.1 |
Lead |
kt |
2.7 |
3.2 |
2.6 |
8.5 |
2.3 |
1.5 |
1.5 |
1.1 |
4.1 |
Silver |
MMoz |
0.3 |
0.3 |
0.2 |
0.8 |
0.2 |
0.1 |
0.1 |
0.1 |
0.3 |
Gold |
koz |
3.4 |
3.7 |
4.0 |
11.1 |
3.0 |
2.4 |
1.7 |
0.9 |
5.0 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
5.9 |
9.6 |
14.4 |
30.0 |
28.4 |
19.9 |
15.9 |
15.2 |
51.0 |
Other (1) |
|
2.0 |
0.4 |
0.2 |
2.6 |
0.1 |
3.1 |
(19.3) |
(2.8) |
(19.1) |
(1) The negative amounts are mainly related
to reclassifications between Aripuanã and Corporate, and capitalization of interest net of advanced payments for imported materials
and tax credits.
In 3Q24, treated ore volume totaled 410kt,
up 30% from 315kt in 3Q23 and 12% from 367kt in 2Q24. This substantial improvement was primarily attributed to enhanced plant performance
and stability, resulting in increased treated ore capacity and a notable reduction in plant downtime (-33% versus 2Q24 and -40% versus
1Q24). The corrective maintenance hours were significantly lowered by 51 hours compared to 2Q24 (averaged 44 hours in 3Q24 versus 95 hours
in 2Q24), which contributed to our operational efficiency.
Throughout the quarter, utilization capacity
peaked at 90% in some days and averaged 76%. This relatively stable performance, along with consistent feed rates, allowed us to increase
throughput to approximately 140kt per month. Additionally, concentrate quality remains within market specifications.
Zinc production reached 7.5kt in 3Q24,
up 30% compared to 5.8kt in 3Q23, mainly due to higher treated ore volumes and plant improved stability. Compared to 2Q24, zinc production
was down by 2% from 7.7kt, mainly due to lower average ore grades and unexpected increases in talc levels during the flotation process,
which adversely affected recoveries.
Copper production in 3Q24 was 1.7kt, up
67% year-over-year and 32% quarter-over-quarter, primarily attributed to higher treated ore volumes and higher grades quarter-over-quarter.
Zinc recovery rates averaged 66% during
the quarter, compared to 70% in 2Q24. In September, the zinc recovery rate improved to 73%, following remediation efforts earlier in the
quarter to address the issue of excess talc in the flotation circuit. Copper and lead recovery rates averaged 72% each, compared to 66%
and 83%, respectively, in the previous quarter.
| | |
| | 25 |
In 9M24, zinc production totaled 22kt,
up from 15kt in the same period last year. Lead and Copper totaled 8.5kt and 4.5kt, up from 4.1kt and 3.1kt, respectively.
We continue to actively improve operational
performance, with a particular focus on the tailings filter circuit. Although the circuit has significantly increased capacity since production
startup, it still faces challenges related to available capacity. To further enhance and sustain utilization capacity at optimal levels,
we are adding a fourth filter, which is scheduled for delivery and installation planned for 2025. This addition is expected to address
current challenges while expanding capacity. Additionally, we have been actively working to reduce the levels of talc in the flotation
circuit, and we anticipate improvements in 4Q24. We also implemented several initiatives related to drainage, wetland enhancement, and
dam basin cleanliness that we expect will achieve better control over key operational and environmental processes as we enter the rainfall
season.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$5.9 million, mainly related to mine development and other sustaining activities, totaling US$30 million in 9M24.
Financial performance
US$ million |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
Net Revenues |
324.7 |
377.3 |
272.6 |
19.1% |
996.0 |
808.5 |
23.2% |
Cost of Sales (1) |
(247.4) |
(256.5) |
(244.9) |
1.0% |
(755.3) |
(743.6) |
1.6% |
Gross Profit |
77.3 |
120.9 |
27.7 |
179.0% |
240.7 |
65.0 |
270.6% |
Adjusted EBITDA |
128.1 |
136.2 |
44.2 |
189.8% |
342.3 |
109.6 |
212.3% |
Adjusted EBITDA Mrg. |
39.5% |
36.1% |
16.2% |
23.2pp |
34.4% |
13.6% |
20.8pp |
Note: Financial performance pre intersegment
eliminations. (1) Includes the cost of sales of Aripuanã of US$44 million in 3Q24, US$42 million in 3Q23 and US$42 million
in 2Q24. Totaling US$128 million in 9M24 and US$143 million in 9M23.
Net revenues for the mining segment
totaled US$325 million in 3Q24, up 19% versus 3Q23. This performance was mainly driven by higher LME metal prices (except for lead), increased
sales volumes across all metals (except for zinc, impacted by the sale of Morro Agudo mine), and lower TCs. Compared to 2Q24, net revenues
decreased by 14%, mainly due to lower LME base metal prices and lower copper and zinc sales volumes, partially offset by higher silver
volumes and prices.
In 9M24, net revenues amounted to US$996
million, 23% higher compared to the same period a year ago, primarily explained by increased sales volume across all metals, higher copper
prices, and lower TCs.
Cost of sales in 3Q24 was US$247
million, including US$44 million attributed to Aripuanã. Excluding the impact of Aripuanã, cost of sales of US$203 million
was relatively flat compared to 3Q23 due to slightly lower mining sales volumes, and a decrease in operating costs associated with lower
third-party services, energy and personnel costs, which were partially offset by higher royalties paid. Compared to 2Q24, cost of sales
was down by 5%, excluding the impact of Aripuanã due to lower operating costs related to third-party services, in addition to lower
workers participation, which was partially offset by higher energy expenses.
In 9M24, cost of sales amounted to US$755
million, 2% higher compared to the same period a year ago, primarily explained by the increase in sales volumes across all metals.
Reconciliation of realized prices
Revenues are recorded at provisional prices
and, typically, an adjustment is then made after delivery, based on the pricing terms under the relevant contract. In addition, the difference
between the provisional and the final price received is recognized by adjusting the price in the period in which the sale is concluded.
| | |
| | 26 |
Adjusted EBITDA for the mining
segment in 3Q24 was US$128 million compared to US$44 million in 3Q23. This increase was attributed to (i) the positive net price effect
of US$29 million, primarily driven by higher zinc and copper prices; (ii) higher by-products contribution of US$28 million, mainly due
to higher silver and gold prices, along with increased lead and copper volumes, particularly from the Aripuanã and Atacocha operations;
(iii) lower TCs of US$22 million; (iv) the positive impact of US$15 million, primarily from higher zinc sales volumes in Cerro Lindo,
Aripuanã, and Atacocha, as well as higher lead sales volume in Aripuanã and Atacocha; and (v) the positive impact of US$9
million from FX variations, which were partially offset by (vi) a negative impact of US$20 million in costs, mainly related to adjustments
for Aripuanã’s idleness in the 3Q23, which are no longer adjusted since 3Q24, and higher reagent consumption due to the processing
of new ores in Aripuanã.
Compared to 2Q24, Adjusted EBITDA decreased
by 6%. This performance was primarily driven by (i) the negative net price effect of US$20 million, mainly due to lower LME metal prices;
(ii) a negative impact of US$5 million in costs, mainly related to the adjustments for Aripuanã’s idleness in the previous
quarter, along with higher maintenance expenses and third-party services in El Porvenir; (iii) a negative impact of US$3 million in lower
sales volumes, mainly due to reduced zinc and copper sales volumes in Cerro Lindo from lower ore grades, as well as decreased zinc sales
in Aripuanã, partially offset by higher volumes in Vazante and Cerro Pasco, which were partially offset by (iv) the positive impact
of US$13 million from other expenses, mainly attributed to the sale of Morro Agudo and lower turnover and contingency provisions in Peru;
(v) the positive impact of US$4 million from FX variations; and (vi) higher by-products contribution of US$3 million, primarily due to
higher payable values for silver and gold in Cerro Lindo, as well as increased silver and gold prices and volumes in Aripuanã and
Atacocha.
| | |
| | 27 |
Cash cost and AISC [7],[8]
Consolidated cash cost |
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
Run-of-mine mining cost |
US$/t |
45.6 |
47.9 |
43.1 |
5.8% |
46.0 |
43.8 |
5.0% |
Cash cost net of by-products |
US$/t |
(31) |
51 |
751 |
(104.1%) |
204 |
828 |
(75.3%) |
AISC net of by-products |
US$/t |
662 |
889 |
1,692 |
(60.9%) |
1,049 |
1,642 |
(36.1%) |
Cash cost net of by-products |
US$/lb |
(0.01) |
0.02 |
0.34 |
(104.1%) |
0.09 |
0.38 |
(75.3%) |
AISC net of by-products |
US$/lb |
0.30 |
0.40 |
0.77 |
(60.9%) |
0.48 |
0.74 |
(36.1%) |
Note: Cash cost and AISC per ton sold does
not include the impact of the cost of idleness capacity of US$2.7 million in El Porvenir in 9M24, and US$1.7 million in Atacocha in 3Q23,
totaling US$2.6 million in 9M23, and US$5.2 million in Cerro Lindo in 9M23.
Cash cost net of by-products for
the mining segment in 3Q24 decreased to US$(0.01)/lb compared to US$0.34/lb in 3Q23. This decrease was primarily driven by lower TCs,
higher zinc volume, and higher by-products contribution, which were partially offset by higher operating costs due to increased variable
costs associated with royalties and freight expenses.
Compared to 2Q24, cash cost decreased
by US$0.04/lb, driven by lower operating costs and higher zinc volumes, which were partially offset by lower by-products contribution,
particularly in Cerro Lindo, due to decreasing prices and volumes.
Run-of-mine mining cost was US$46/t in
the quarter up 6% from 3Q23, mainly due to lower treated ore volumes, impacted by the cessation of Morro Agudo operations, partially offset
by lower operating costs related to third-party services, personnel, energy, and materials (e.g. explosives and related items). Compared
to 2Q24, run-of-mine mining cost decreased by 5%, primarily due to lower third-party services, higher treated ore volumes, and lower variable
costs.
AISC net of by-products in 3Q24 was US$0.30/lb,
down 61% and 26% compared to US$0.77/lb in 3Q23 and US$0.40/lb in 2Q24, respectively.
For a reconciliation of cash cost and
AISC net of by-products, please refer to the appendix section “All in Sustaining Cash Cost | Mining.”
[7]
Our cash cost and AISC are net of by-products credits, measured with respect to zinc sold.
[8]
AISC does not include Aripuanã.
| | |
| | 28 |
Smelting segment
Consolidated |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
Production |
|
|
|
|
|
|
|
|
Zinc metal |
kt |
143.3 |
143.5 |
140.1 |
2.3% |
417.4 |
417.2 |
0.1% |
Zinc oxide |
kt |
9.7 |
8.8 |
9.6 |
1.5% |
26.2 |
26.2 |
0.3% |
Total |
kt |
153.0 |
152.4 |
149.7 |
2.2% |
443.7 |
443.4 |
0.1% |
Sales |
|
|
|
|
|
|
|
|
Zinc metal |
kt |
142.8 |
139.3 |
144.5 |
(1.1%) |
413.1 |
420.6 |
(1.8%) |
Zinc oxide |
kt |
10.1 |
8.7 |
9.4 |
7.8% |
26.4 |
25.9 |
1.8% |
Total |
kt |
152.9 |
148.0 |
153.9 |
(0.6%) |
439.5 |
446.5 |
(1.6%) |
In 3Q24, total production reached 153kt,
up 2% year-over-year and 0.4% quarter-over-quarter, mainly driven by higher volumes at the Cajamarquilla and improved performance at the
Três Marias, which enhanced production stability in the period.
In 3Q24, zinc metal and oxide sales were
153kt, down by 0.6% from 3Q23. Compared to 2Q24, total sales were up 3%, following higher production volumes in Cajamarquilla and strong
demand in our domestic market.
In 9M24, total production amounted to
444kt, relatively flat compared to the same period a year ago. Total sales decreased by 2% to 439kt.
Lima, Peru
Cajamarquilla
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Zinc metal production |
kt |
87.6 |
85.4 |
73.9 |
246.9 |
78.2 |
80.8 |
82.7 |
81.3 |
244.9 |
Global Recovery |
% |
94.4 |
93.8 |
95.8 |
94.7 |
95.3 |
92.6 |
93.8 |
94.0 |
93.4 |
Zinc metal sales |
kt |
86.9 |
83.7 |
72.7 |
243.3 |
79.4 |
87.1 |
81.2 |
78.8 |
247.0 |
|
|
|
|
|
|
|
|
|
|
|
Zinc content in products |
kt |
86.8 |
83.5 |
72.6 |
242.9 |
79.3 |
87.0 |
81.1 |
78.6 |
246.7 |
|
|
|
|
|
|
|
|
|
|
|
Cost of sales (2) |
US$ mm |
274 |
262 |
201 |
737 |
221 |
261 |
218 |
261 |
739 |
(-) Raw material |
|
(206) |
(181) |
(142) |
(528) |
(128) |
(147) |
(156) |
(199) |
(502) |
(+) By-product |
|
(5.9) |
(6.7) |
(7.3) |
(19.9) |
(8.4) |
(9.1) |
(7.6) |
(6.7) |
(23.5) |
(+/-) Consolidation effects |
(0.2) |
(14.7) |
(11.7) |
(26.6) |
(34.3) |
(48.5) |
(8.5) |
(6.4) |
(63.4) |
(+) Others |
|
(5.9) |
(9.6) |
3.1 |
(12.4) |
(5.1) |
(5.5) |
7.7 |
2.2 |
4.4 |
(=) Conversion cost |
US$ mm |
55.7 |
50.6 |
43.8 |
150.1 |
45.1 |
50.8 |
53.4 |
50.4 |
154.5 |
Conversion cost |
US$/lb |
0.29 |
0.27 |
0.27 |
0.28 |
0.26 |
0.26 |
0.30 |
0.29 |
0.28 |
|
|
|
|
|
|
|
|
|
|
|
Cash cost (1) |
US$/lb |
1.14 |
1.18 |
0.92 |
1.09 |
0.94 |
0.97 |
1.06 |
1.17 |
1.07 |
Sustaining cash cost (1) |
US$/lb |
1.19 |
1.24 |
0.99 |
1.15 |
1.05 |
1.01 |
1.09 |
1.20 |
1.09 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
8.7 |
11.4 |
11.7 |
31.8 |
16.4 |
6.2 |
3.2 |
4.0 |
13.4 |
Other |
|
1.2 |
0.8 |
0.4 |
2.3 |
2.4 |
1.1 |
1.3 |
0.5 |
2.9 |
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per smelter. For a cash cost reconciliation to COGS, please refer to
Appendix - Conversion and All in Sustaining Cash Cost | Smelting.
(2) Cost of sales does not include resale
operations from third parties.
| | |
| | 29 |
In 3Q24, Cajamarquilla smelter production
reached 88kt, up 8% year-over-year and 3% quarter-over-quarter. This increase was primarily driven by plant stabilization, which contributed
to higher production volumes, coupled with improvements in calcine inventory levels.
Recovery rates averaged 94.4% during the
quarter, improving from 92.6% in 3Q23 and 93.8% in 2Q24.
Metal sales totaled 87kt in 3Q24, relatively
flat year-over-year and rose by 4% quarter-over-quarter, reflecting higher production volumes and supportive demand in the period.
For 9M24, smelter production totaled 247kt,
up 1% compared to 9M23, while sales amounted to 243kt, down 2% from the same period last year, largely due to lower production in 1Q24,
impacted by scheduled preventive maintenance in the period.
Costs
Cost of sales was US$274 million in 3Q24
compared to US$261 million in 3Q23 and US$262 million in 2Q24. This increase was mainly driven by higher zinc prices and lower TCs in
the period, which impacted on our raw material costs, in addition to higher energy expenses.
In 3Q24, conversion cost was US$0.29/lb,
up by US$0.03/lb compared to 3Q23, primarily due to higher energy costs, including a one-off increase spike in peak-hour pricing in Peru
during a holiday in the quarter, and higher variable costs, which were partially offset by lower personnel cost and reduced third-party
services. Compared to 2Q24, conversion cost rose by 6%, also due to higher energy costs.
Cash cost net of by-products in 3Q24 was
US$1.14/lb compared to US$0.97/lb in 3Q23, mainly due to higher zinc prices affecting raw material costs and lower TCs, which were partially
offset by higher by-products contribution. Compared to 2Q24, cash cost decreased by US$0.04/lb, driven by lower operating costs and higher
by-products contribution, which were partially offset by lower TCs.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$8.7 million, mainly due to the acquisition and repairs of equipment, maintenance and other expenses related to infrastructure,
totaling US$32 million in 9M24.
Três Marias, Brazil
Três Marias
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Zinc metal production |
kt |
35.6 |
36.3 |
37.5 |
109.4 |
35.8 |
39.0 |
35.7 |
37.9 |
112.6 |
Zinc oxide production |
kt |
9.7 |
8.8 |
7.7 |
26.2 |
7.8 |
9.6 |
8.4 |
8.2 |
26.2 |
Global Recovery |
% |
90.6 |
91.1 |
90.5 |
90.5 |
90.5 |
89.3 |
91.7 |
91.4 |
89.7 |
Zinc metal sales |
kt |
37.2 |
34.4 |
38.4 |
110.0 |
33.4 |
38.0 |
38.9 |
36.8 |
113.7 |
Zinc oxide sales |
kt |
10.1 |
8.7 |
7.6 |
26.4 |
7.9 |
9.4 |
8.5 |
8.1 |
25.9 |
|
|
|
|
|
|
|
|
|
|
|
Zinc content in products |
kt |
47.2 |
43.0 |
45.3 |
129.2 |
40.7 |
45.4 |
45.6 |
43.1 |
134.1 |
|
|
|
|
|
|
|
|
|
|
|
Cost of sales (2) |
US$ mm |
135 |
127 |
115 |
377 |
119 |
113 |
131 |
138 |
383 |
(-) Raw material |
|
(73) |
(67) |
(55) |
(196) |
(52) |
(43) |
(61) |
(85) |
(189) |
(+) By-product |
|
(12.9) |
(13.9) |
(15.0) |
(41.8) |
(17.3) |
(17.5) |
(19.7) |
(12.9) |
(50.1) |
(+/-) Consolidation effects |
(1.2) |
(0.3) |
1.8 |
0.3 |
(5.5) |
(5.6) |
2.1 |
0.9 |
(2.5) |
(+) Others |
|
(15.1) |
(17.8) |
(18.4) |
(51.3) |
(22.8) |
(21.9) |
(23.0) |
(19.1) |
(63.9) |
(=) Conversion cost |
US$ mm |
32.4 |
28.0 |
28.1 |
88.5 |
21.2 |
25.5 |
29.9 |
22.3 |
77.7 |
Conversion cost |
US$/lb |
0.31 |
0.30 |
0.28 |
0.31 |
0.24 |
0.25 |
0.30 |
0.23 |
0.26 |
|
|
|
|
|
|
|
|
|
|
|
Cash cost (1) |
US$/lb |
1.14 |
1.21 |
1.02 |
1.17 |
1.12 |
0.96 |
1.17 |
1.35 |
1.16 |
Sustaining cash cost (1) |
US$/lb |
1.18 |
1.26 |
1.05 |
1.22 |
1.19 |
1.01 |
1.24 |
1.39 |
1.21 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
2.9 |
4.4 |
2.4 |
9.8 |
5.0 |
3.5 |
5.2 |
2.4 |
11.1 |
Other |
|
0.7 |
0.8 |
0.8 |
2.4 |
1.4 |
1.2 |
2.1 |
1.4 |
4.7 |
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per smelter. For a cash cost reconciliation to COGS, please refer to
Appendix – Conversion and All in Sustaining Cash Cost | Smelting.
(2) Cost of sales does not include resale
operations from third parties.
| | |
| | 30 |
In Três Marias, total production
(zinc metal + oxide) totaled 45kt in 3Q24, down 7% from 3Q23 due to lower volumes in 1H24, which were impacted by operational instabilities
in the roaster that required certain maintenance interventions in the period. Compared to 2Q24, total production was up by 1%, reflecting
improved performance.
Recovery rates averaged 90.6% during the
quarter, up from 89.3% in 3Q23 and slightly down from 91.1% in 2Q24.
In 3Q24, metallic zinc sales amounted
to 37kt, down 2% year-over-year, driven by lower production volumes in 1H24. Compared to 2Q24, metallic zinc sales increased by 8%, mainly
attributed to supportive demand and the success of an implemented sales strategy aimed at expanding market share in Brazil.
Zinc oxide sales totaled 10kt, up 8% year-over-year
and 16% quarter-over-quarter, supported by higher production volumes and robust demand in our domestic market, particularly from the tire
manufacturing industry and other zinc oxide-related applications.
In 9M24, Três Marias total production
amounted to 136kt, a 2% decrease compared to 9M23. Zinc metal sales decreased by 3% to 110kt and zinc oxide sales increased by 2% to 26kt,
respectively.
Costs
Cost of sales of US$135 million in 3Q24
increased 19% from 3Q23, primarily due to higher raw materials costs, partially offset by a decrease in energy expenses. Compared to 2Q24,
cost of sales increased by 7%, mainly explained by higher zinc sales volume, which was partially offset by lower raw materials costs due
to a decline in zinc prices in the period.
In 3Q24, conversion cost was US$0.31/lb,
up 22% compared to 3Q23. This increase is mainly driven by the implementation of the cementation project, which changes the method of
tailings storage. Part of the tailings are now mixed with cementitious products and stored dry in a designated area. While this method
has a higher operational cost, it ensures less dam capacity utilization, and contributes to extending the operational lifespan of the
asset. Compared to 2Q24, conversion cost increased by US$0.02/lb, mainly due to higher energy and maintenance expenses.
Cash cost net of by-products in 3Q24
increased to US$1.14/lb compared to US$0.96/lb in 3Q23 and US$1.21/lb in 2Q24. The year-over-year increase was driven by lower TCs, increased
raw material costs due to higher zinc prices, and higher operating costs, partially offset by higher sales volume and the positive impact
of foreign exchange variations. The quarter-over-quarter performance was primarily due to the decrease in raw material costs due to lower
zinc prices, and the positive impact of foreign exchange variations.
| | |
| | 31 |
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$2.9 million, mainly due to scheduled maintenance in the period, acquisition of equipment, as well as disbursements related
to the tailings dam, totaling US$9.8 million in 9M24.
Juiz de Fora, Brazil
Juiz de Fora
(100% basis) |
|
3Q24 |
2Q24 |
1Q24 |
9M24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
9M23 |
|
|
|
|
|
|
|
|
|
|
|
Zinc metal production |
kt |
20.0 |
21.9 |
19.2 |
61.2 |
22.4 |
20.3 |
20.7 |
18.7 |
59.7 |
Global Recovery |
% |
94.7 |
94.4 |
91.6 |
93.6 |
94.6 |
93.8 |
94.0 |
92.3 |
93.4 |
Zinc metal sales |
kt |
18.7 |
21.2 |
19.8 |
59.8 |
22.6 |
19.4 |
20.3 |
20.2 |
59.9 |
|
|
|
|
|
|
|
|
|
|
|
Zinc content in products |
kt |
18.6 |
21.1 |
19.7 |
59.4 |
22.5 |
19.2 |
20.2 |
20.0 |
59.5 |
|
|
|
|
|
|
|
|
|
|
|
Cost of sales |
US$ mm |
66 |
66 |
59 |
191 |
65 |
66 |
66 |
71 |
203 |
(-) Raw material |
|
(38) |
(37) |
(32) |
(106) |
(35) |
(36) |
(47) |
(43) |
(126) |
(+) By-product |
|
(0.6) |
(0.4) |
(1.1) |
(2.1) |
(0.5) |
(0.1) |
(0.4) |
(1.0) |
(1.5) |
(+/-) Consolidation effects |
(2.4) |
(0.3) |
(0.8) |
(3.4) |
3.0 |
2.0 |
5.1 |
1.2 |
8.3 |
(+) Others |
|
(7.4) |
(9.9) |
(6.0) |
(23.2) |
(9.6) |
(10.3) |
(4.5) |
(4.4) |
(19.2) |
(=) Conversion cost |
US$ mm |
18.1 |
18.5 |
19.5 |
56.1 |
23.6 |
21.0 |
20.0 |
24.0 |
64.9 |
Conversion cost |
US$/lb |
0.44 |
0.40 |
0.45 |
0.43 |
0.48 |
0.50 |
0.45 |
0.54 |
0.50 |
|
|
|
|
|
|
|
|
|
|
|
Cash cost (1) |
US$/lb |
1.31 |
1.21 |
1.12 |
1.21 |
1.00 |
1.26 |
1.23 |
1.35 |
1.28 |
Sustaining cash cost (1) |
US$/lb |
1.42 |
1.25 |
1.14 |
1.27 |
1.09 |
1.38 |
1.29 |
1.40 |
1.36 |
|
|
|
|
|
|
|
|
|
|
|
CAPEX |
US$ mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sustaining |
|
4.4 |
1.8 |
0.7 |
6.9 |
4.1 |
4.5 |
2.5 |
1.5 |
8.6 |
Other |
|
0.2 |
0.1 |
0.1 |
0.4 |
0.3 |
0.3 |
0.4 |
0.8 |
1.5 |
(1) Our cash cost and sustaining cash cost
are net of by-products credits, measured with respect to zinc sold per smelter. For a cash cost reconciliation to COGS, please refer to
Appendix - Conversion and All in Sustaining Cash Cost | Smelting.
In 3Q24, Juiz de Fora production reached
20kt, down 1% year-over-year and 8% quarter-over-quarter, primarily due to scheduled maintenance in the roaster, which took 18 days in
August, as well as instabilities in the electrolysis process, both of which reduced production and impacted on the unit’s overall
performance.
Recovery rates averaged 94.7% during the
quarter, an improvement over 93.8% in 3Q23 and 94.4% in 2Q24.
Zinc metal sales totaled 19kt in 3Q24,
down 3% from 3Q23 and 12% from 2Q24, mainly attributed to lower production volumes in the period.
In the first nine months of 2024, zinc
metal production increased by 2% to 61kt, and sales of 60kt were relatively flat compared to 9M23.
| | |
| | 32 |
Costs
Cost of sales was US$66 million in 3Q24,
flat compared to US$66 million in 3Q23, primarily due to higher raw material costs associated with higher zinc prices, partially offset
by lower energy and personnel expenses. Similarly, cost of sales remained flat compared to 2Q24, mainly driven by slightly higher operating
costs, partially offset by lower sales volume.
In 3Q24, conversion cost decreased to
US$0.44/lb from US$0.50/lb in 3Q23, mainly due to lower variable costs and the positive effect of foreign exchange variations, in addition
to lower energy costs, which were partially offset by lower sales volumes associated with lower production due to scheduled maintenance
in the roaster in the period. Compared to 2Q24, conversion cost increased by US$0.04/lb, driven by lower production and sales volumes,
higher energy costs, and increased variable costs, which were partially offset by lower maintenance and personnel expenses, as well as
the positive effect of foreign exchange variations.
Cash cost net of by-products in 3Q24 was
US$1.31/lb, up from US$1.26/lb in 3Q23, mainly due to lower TCs and increased raw material costs due to higher zinc prices, partially
offset by lower operating expenses and higher by-products contribution. Compared to 2Q24, cash cost net of by-products increased by 8%,
driven by higher raw material costs from quotation period adjustments, lower TCs, and increased operating expenses, which were partially
offset by higher by-products contribution.
CAPEX
In 3Q24, sustaining capital expenditures
amounted to US$4.4 million, mainly driven by the scheduled maintenance in the period, and acquisition, replacement, and repairs of equipment,
totaling US$6.9 million in 9M24.
Financial performance
US$ million |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
Net Revenues |
524.4 |
507.6 |
484.2 |
8.3% |
1,450.4 |
1,492.6 |
(2.8%) |
Cost of Sales |
(474.5) |
(449.9) |
(438.7) |
8.2% |
(1,296.9) |
(1,322.3) |
(1.9%) |
Gross Profit |
49.9 |
57.7 |
45.5 |
9.8% |
153.4 |
170.3 |
(9.9%) |
Adjusted EBITDA |
54.7 |
68.6 |
49.8 |
9.7% |
174.0 |
190.8 |
(8.8%) |
Adjusted EBITDA Mrg. |
10.4% |
13.5% |
10.3% |
0.1pp |
12.0% |
12.8% |
(0.8pp) |
Note: Financial performance pre intersegment
eliminations.
Net revenues were US$524 million
in 3Q24, up by 8% compared to US$484 million in 3Q23, mainly driven by higher zinc prices, partially offset by slightly lower sales volumes
and lower net premium in the period. Compared to 2Q24, net revenues increased by 3%, mainly due to higher sales volumes, and the positive
impact due to quotation period adjustments in the period, offsetting lower zinc prices.
In 9M24, net revenues amounted to US$1,450
million, 3% lower compared to the same period a year ago, primarily explained by lower sales volumes and lower net premium.
Cost
of sales increased by 8% in 3Q24, totaling US$474 million compared to US$439 million in 3Q23. This was mainly due to higher raw material
costs associated with higher zinc prices and lower TCs, partially offset by the positive hedge effect. Compared to 2Q24, cost of sales
rose by 5%, mainly driven by higher raw materials costs from increased sales volumes, higher unitary costs, higher energy expenses
and third-party services costs, and lower TCs negatively impacting our raw material purchase, which were
partially offset by the positive hedge effect in the period.
In 9M24, cost of sales amounted to US$1,297
million, down by 2% compared to the same period a year ago, primarily attributed to lower sales volumes.
| | |
| | 33 |
Reconciliation of realized prices
Purchases of zinc in concentrate are recorded
at provisional prices and, typically, an adjustment is made after delivery, which is based on the pricing terms provided for under the
respective contract. In addition, the difference between the provisional and the final price received is recognized by adjusting the price
in the period in which the purchase is concluded.
Sources
of Zinc Concentrate to Nexa Smelters (kt) – 3Q24
In 3Q24, Nexa acquired 53% of zinc from
its own mines, with the remainder supplied by third parties and secondary feed. The smelters use zinc concentrate as feedstock, which
is supplied from our mines, and we apply a benchmark TC for our operations. From third-party suppliers, the treatment charge is based
on the benchmark TC, spot TCs, or TCs negotiated annually, which remained relatively flat throughout the year.
|
|
The 2024 benchmark TC, negotiated in April
2024, was US$165/t concentrate, down 40% from 2023 (US$274/t). To reduce volatility, for the majority of our third-party contracts, which
are renewed during different periods throughout the year, we consider the 3-year benchmark TC. The reference benchmark for TC 2024, 2023
and 2022 is US$165/t concentrate, US$274/t concentrate, and US$230/t concentrate, respectively.
Adjusted
EBITDA for the smelting segment totaled US$55 million in 3Q24 compared to US$50 million reported in 3Q23. This improvement was primarily
attributed to (i) higher by-products contribution of US$17 million, driven primarily by higher silver prices and higher sulphuric acid
sales volume; (ii) the positive net impact of US$16 million in costs, mainly due to favorable raw material inventory effect and reduced
zinc oxide inventory consumption, partially offset by higher energy expenses; (iii) the recognized positive net impact of US$7 million
in other expenses, mainly from the cash dividend received from Enercan[9];
(iv) the positive impact of US$4 million from FX variations; and (v) the hedge effect of US$4 million, which were partially offset by
(vi) lower TCs of US$31 million; and (vii) the negative net price effect of US$12 million, mainly due to lower net premium.
[9]
Amount in cash dividend received from Enercan, as the results from these dividends were not consolidated
in prior periods. As the purpose of Nexa’s investment in Enercan is to secure long-term energy supply for its operations in Brazil,
management reviews Nexa’s energy costs for a given period together with dividends received from Enercan during such period.
| | |
| | 34 |
Compared to 2Q24, Adjusted EBITDA decreased
by 20%, mainly driven by (i) the negative net impact of US$22 million in costs, primarily due to higher third-party, energy, and sales
expenses, and higher inventory consumption associated with higher unitary costs in Cajamarquilla; (ii) the negative net impact of US$7
million in other expenses, mainly due to lower cash dividend received from Enercan; and (iii)
lower TCs of US$6 million, which were partially offset by (iv) the positive net price effect of US$13 million, resulted from lower
zinc prices, which positively impacted zinc concentrate purchases and slightly higher net premium;
(v) higher by-products contribution of US$3 million, primarily related to higher silver prices and increased copper cement volumes; (vi)
the positive impact of US$3 million from FX variations; and (vii) higher sales volume of US$3 million attributed to an increase
in sales to the domestic market, resulting in improved margins.
Conversion cost, Cash cost and
AISC [10]
Consolidated |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
Smelting conversion cost |
US$/t |
696 |
658 |
641 |
8.5% |
673 |
675 |
(0.3%) |
Cash cost net of by-products |
US$/t |
2,555 |
2,623 |
2,217 |
15.2% |
2,453 |
2,475 |
(0.9%) |
AISC net of by-products |
US$/t |
2,751 |
2,855 |
2,403 |
14.5% |
2,644 |
2,672 |
(1.1%) |
Smelting conversion cost |
US$/lb |
0.32 |
0.30 |
0.29 |
8.5% |
0.31 |
0.31 |
(0.3%) |
Cash cost net of by-products |
US$/lb |
1.16 |
1.19 |
1.01 |
15.2% |
1.11 |
1.12 |
(0.9%) |
AISC net of by-products |
US$/lb |
1.25 |
1.29 |
1.09 |
14.5% |
1.20 |
1.21 |
(1.1%) |
Note: Cash cost and AISC per ton sold does
not include the impact of the cost of metal purchased for resale.
[10]
Our conversion cost, cash cost and AISC net of by-products credits are measured with respect to zinc sold.
| | |
| | 35 |
Cash
cost net of by-products for the smelting segment was US$1.16/lb in 3Q24, up from US$1.01/lb in 3Q23.
This increase was primarily attributed to higher zinc prices affecting concentrate purchases, lower TCs, and higher operating costs, partially
offset by higher by-products credits. Compared to 2Q24, cash cost decreased by 3%, driven by lower zinc prices, impacting our concentrate
purchases and higher by-products credits, which were partially offset by higher operating costs.
AISC net of by-products in 3Q24 was US$1.25/lb,
up 14% and down 4%, from US$1.09/lb in 3Q23 and US$1.29/lb in 2Q24, respectively.
Conversion cost for the smelting
segment in 3Q24 was US$0.32/lb compared to US$0.29/lb in 3Q23, primarily due to higher operational costs related to maintenance expenses,
partially offset by the positive effect of foreign exchange variations. Compared to 2Q24, conversion cost was up by 6%, mainly driven
by higher variable and energy costs, partially offset by decreased maintenance expenses.
For a reconciliation of conversion cost,
cash cost and AISC, please refer to the appendix section “Conversion and All in Sustaining Cash Cost | Smelting.”
| | |
| | 36 |
Liquidity and
Indebtedness
On September
30, 2024, Nexa’s consolidated gross debt[11]
amounted to US$1,863 million, 1% higher compared to the balance at June 30, 2024, mainly due to the 2%
appreciation of the Brazilian real (end of period) against the U.S. dollar.
At the end of the period, 79% (or US$1,472
million) of the gross debt was denominated in U.S. dollars and 21% (or US$392 million) in Brazilian reais. The following charts show Nexa’s
gross debt by category and currency.
Cash and cash equivalents and financial
investments (“total cash”) amounted to US$525 million on September 30, 2024, 11% higher compared to June 30, 2024, mainly
driven by positive operating cash flows, partially offset by working capital investment of US$43 million during the quarter.
Total cash, including the RCF, at the
end of 3Q24 is sufficient to cover the payment of all obligations maturing over the next 3.9 years. At the end of 3Q24, the average maturity
of the total debt was 5.7 years at an average interest rate of 6.36% per year with only 2% (US$41 million) of the total debt maturing
in 2024, 5% (US$100 million) maturing between 2025 and 2026, 43% (US$797 million) maturing between 2027 and 2028 and 50% (US$926 million)
of the total debt maturing in and after 2029.
On
September 30, 2024, Nexa’s net debt[12]
was US$1,409 million compared with US$1,450 million at the end of 2Q24.
US$ million |
Sep 30, 2024 |
Jun 30, 2024 |
Gross Debt |
1,863.3 |
1,854.0 |
Net debt |
1,408.9 |
1,449.8 |
LTM Adj. EBITDA |
627.3 |
530.9 |
Net debt/LTM Adj. EBITDA |
2.2x |
2.7x |
[11]
Loans and financing (“gross debt”)
[12]
Gross debt (US$1,863 million) minus cash and cash equivalents (US$513 million), minus financial investments (US$12 million), plus negative
derivatives (US$0.6 million), plus Lease Liabilities (US$71 million). It does not include the financial instrument related to the offtake
agreement.
| | |
| | 37 |
In addition to continuing to assess short-term
and mid-term commodities prices, management continuously reviews Nexa’s capital structure, financial position, and the maturity
profile of our debt. Actions to improve the quantum and profile of outstanding debt, focusing on extending maturity, reducing average
cost of debt and assessing financing alternatives, continue to be constantly evaluated.
Credit Ratings
In August 2024, S&P reaffirmed Nexa’s
'BBB-' rating with a 'stable' outlook. S&P’s assessment was supported by higher zinc prices and increased volumes, which are
expected to enhance Nexa’s deleveraging efforts. The agency anticipates positive free cash flow in 2024 and 2025, driven by Nexa’s
cost-cutting initiatives and prioritization of core assets, including the ramp-up of the Aripuanã mine. Additionally, S&P forecasts
a gradual reduction in Nexa’s net debt to adjusted EBITDA ratio, expecting it to fall to 1.5x-2.0x in the coming years.
Similarly, in September 2024, Fitch Ratings
also reaffirmed Nexa Resources S.A.'s (Nexa) Long-Term Foreign and Local Currency Issuer Default Ratings at 'BBB-', and its national scale
long-term rating at 'AAA(bra)'. The stable outlook reflects Nexa’s relationship with its ultimate parent, Votorantim S.A. (VSA;
BBB/Stable), and a Top Down -1 rating approach. Nexa's stand-alone credit profile benefits from a competitive cost position in both mining
and smelting, integrated zinc operations, and moderate leverage. Nexa's ratings are constrained by its moderate size, asset concentration,
and relatively short mine life compared to peers, as assesses by Fitch’s Mining Navigator rating factor.
This stable credit outlook from both S&P
and Fitch highlights Nexa’s ongoing financial strength, supported by strategic operational improvements and market conditions.
| | |
| | 38 |
Cash flows
US$ million |
3Q24 |
9M24 |
Cash provided by operating activities before working capital |
198.1 |
423.1 |
Variations in operating assets and liabilities ("Working Capital") |
(42.9) |
(184.2) |
Net cash flows provided by (used in): |
|
|
Operating activities |
111.9 |
107.6 |
Investing activities |
(43.8) |
(174.0) |
Financing activities |
(18.4) |
129.2 |
Increase in cash and cash eq. |
51.3 |
56.0 |
Cash and cash eq. at the beginning of the period |
461.9 |
457.3 |
Cash and cash eq. at the end of the period (1) |
513.2 |
513.2 |
(1) Does not include financial investments
totaling US$12 million at September 30, 2024.
Note: For details on Cash flows, please refer
to the “Condensed consolidated interim financial statements at and for the three and nine-month periods ended on September 30, 2024.”
In 3Q24,
the cash provided by operating activities before working capital variations was US$198 million. Working capital variations had a negative
impact of US$43 million, primarily due to (i) the increase in inventories of US$16 million mainly due to the increase
in semifinished products in both segments, partially offset by a decrease in raw materials, mainly in Cajamarquilla due to increased production;
(ii) the decrease in other liabilities of US$15 million, primarily from updates in interest on provisions, asset retirement obligation
payments, and credit and property insurance provisions; (iii) the decrease in trade payables of US$9 million; (iv) the increase in other
assets of US$5 million, mainly related to the utilization of tax credits for VAT-related payments; partially offset by (v) the increase
in confirming payables of US$3 million. In 3Q24, we paid US$29 million in interest and US$10 million in taxes. Consequently, net cash
flows from operating activities amounted to US$112 million.
We used US$44 million of net cash flows
for investing activities in 3Q24, primarily including US$55 million of CAPEX, nearly all of which was sustaining CAPEX, partially offset
by a cash dividend received from Enercan of US$6 million and net sales of financial investments of US$4 million.
Net cash flows used in financing activities
in the quarter totaled US$20 million, primarily due to payments of loans and financings, and lease liabilities in the total amount of
US$13 million, along with dividends paid to non-controlling interests (Pollarix) of US$7 million.
Foreign exchange effects on cash and cash
equivalents had a positive impact of US$2 million in the quarter, with a negative impact of US$7 million in 9M24.
As a result, cash and cash equivalents
excluding financial investments increased by US$51 million to US$513 million at the end of 3Q24.
| | |
| | 39 |
Others
Offtake agreement
As previously disclosed, in January 2022
Nexa signed an offtake agreement with a third-party international player (the “Offtaker”), in which Nexa agreed to sell 100%
of the copper concentrate produced by Aripuanã for a 5-year period starting in February 2023 and limited to 30,810 tonnes, at the
lower of current market prices or a price cap.
In September 2023, the parties agreed
to amend the offtake agreement, which states that no penalty will be applied in case of delays in the agreed shipment schedule per year.
However, if lower volumes are delivered in any given year within the contract period, the remaining balance will be shipped at the end
of the contract period, totaling 30,018 tonnes. The offtake agreement was structured to completely extinguish a previously existing future
royalty obligation that Nexa had with the Offtaker.
The offtake agreement resulted from negotiations
with the Offtaker to sell the copper concentrate in lieu of paying future royalties related to the previous acquisition of the Aripuanã
project mining rights from the Offtaker. Additionally, the Company opted to voluntarily and irrevocably designate the entire offtake agreement
at fair value through profit and loss within the scope of IFRS 9, rather than separate the value of the embedded derivative associated
with the price cap. This resulted in a non-cash accumulated loss of US$24 million recognized in the income statement for the period ended
on September 30, 2024.
For further information, please refer
to explanatory note 10 (e) – “Financial instruments in the offtake agreement: fair value” in the “Condensed consolidated
interim financial statements at and for the three and nine-month periods ended on September 30, 2024.”
Adjustment to
Lease Accounting and Financial Statements
The Company identified an error in the
recognition of lease arrangements, resulting in the non-recognition of right-of-use assets and lease liabilities as well as the misclassification
of associated costs. These amounts should have been appropriately reflected as amortization of right-of-use assets and interest expenses
on the lease liability, rather than being recorded as costs and operational expenses related to third-party services. The Company has
determined that these adjustments are not material to its previously issued consolidated financial statements; therefore, the Company
has corrected the error in the current period, has revised the prior period information in the comparative financial statements and is
currently reviewing the impact considering its Policy for Recovery of Erroneously Awarded Compensation. Following this adjustment, the
Company has now recognized US$64 million in right-of-use assets and US$68 million in lease liabilities, with the corresponding impact
on financial results. Furthermore, the variance between the misclassified expenses in prior periods and the amortization of right-of-use
assets has been recorded to retained earnings (or cumulative deficit) within shareholders’ equity. This correction identified during
the period ending September 30, 2024.
For further details, please refer to explanatory
note 3.1 (a) – “Revision of the consolidated financial statements: ‘Right-of-use assets and lease liabilities’
in the Condensed Consolidated Interim Financial Statements for the three-and nine-month periods ended on September 30, 2024.”
In addition to the adjustments highlighted
above, certain financial and operational figures have also been adjusted, including, but not limited to: (i) Mineral Exploration and Project
Evaluation; (ii) Net Debt; (iii) Net Debt/LTM Adjusted EBITDA ratio; (iv) Adjusted Net Income (Loss); (v) Adjusted EPS; and (vi) All Cash
Costs for both segments. For further details on these figures, please refer to our “Results Spreadsheet” for 3Q24, available
on our website.
| | |
| | 40 |
Impairment
In 3Q24, Nexa recorded a non-cash net
impairment reversal of US$18 million, consisting of: (i) a US$22 million impairment reversal in the Cerro Pasco cash-generating unit (“CGU”)
associated with the increase in short-term and long-term metal prices; (ii) US$0.2 million impairment loss in the Pukaqaqa mining project,
which was sold and was previously part of Nexa Peru’s portfolio; and (iii) impairments of individual assets totaling US$4 million,
primarily related to assets and projects under construction.
For further information, please refer
to note 19 – “Impairment of long-lived assets” in the “Condensed consolidated interim financial statements at
and for the three and nine-month periods ended on September 30, 2024.”
| | |
| | 41 |
Market Scenario
3Q24
LME Prices |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc |
US$/t |
2,779 |
2,833 |
2,428 |
14.4% |
2,688 |
2,696 |
(0.3%) |
Copper |
US$/t |
9,210 |
9,753 |
8,356 |
10.2% |
9,131 |
8,585 |
6.4% |
Lead |
US$/t |
2,044 |
2,167 |
2,170 |
(5.8%) |
2,095 |
2,143 |
(2.3%) |
Silver |
US$/oz |
29.43 |
28.84 |
23.57 |
24.9% |
27.22 |
23.40 |
16.3% |
Gold |
US$/oz |
2,474 |
2,338 |
1,928 |
28.3% |
2,296 |
1,930 |
18.9% |
Source: Bloomberg
In 3Q24, the LME zinc price averaged US$2,779/t
(or US$1.26/lb), up 14% from 3Q23 and down 2% from 2Q24.
From mid-July to early August, zinc price
trended downward, driven by concerns over the global demand outlook. However, prices rallied in mid to late September, bolstered by the
Federal Reserve’s rate cut and further supported by positive news from China on new stimulus policies aimed at revitalizing economic
growth.
On the fundamentals side, zinc spot TCs
reached historic lows due to persistently tight zinc concentrate market, driven by supply constraints and operational challenges in key
producing regions, including China.
Regarding
global supply, new zinc mining operations began production this quarter. The Kipushi mine in the Democratic Republic of Congo commenced
operations in early July, and the Ozernoye mine in Russia launched in early September. Ozernoye’s concentrate is expected to supply
Chinese smelters, which have been experiencing negative spot TCs due to the current concentrate scarcity.
While these new capacities are entering
the market, we believe the volumes from these operations, which are still ramping-up, will only partially offset the current concentrate
deficit and are unlikely to have a meaningful short-term negative impact on price. In the long-term, if these mines reach full capacity,
we expect their volumes to mitigate future concentrate shortfalls stemming from mine closures, grade reductions in existing mines, and
the production disruptions commonly experienced each year.
On the demand side, despite lower activity
in the Chinese property sector compared to previous years, the recent stimulus package in China, coupled with growing global investments
in renewable energy, particularly in solar farms and offshore wind, where zinc is widely used in galvanized steel – supports demand.
This, combined with supply fundamentals, could sustain zinc LME prices at higher levels for a longer period.
The LME copper price averaged US$9,210/t
(or US$4.18/lb) in 3Q24, up 10% from 3Q23 and down 6% from 2Q24. Price volatility was partly influenced by labor strikes at the Escondida
and Casarones mines in Chile, which constrained copper supply and provided upward price support. However, this impact was offset by weaker-than-expected
economic data from China in September, which pressured copper demand, especially in construction and automotive sectors, driving prices
to levels last observed in March 2024.
LME copper inventories reached their highest
quarterly levels, mirroring the subdued demand in China. Additionally, copper spot TCs remained at record lows, indicating tight supply
conditions for concentrate despite the sluggish demand.
| | |
| | 42 |
In 3Q24, zinc demand in our Home Market
(Latin America, excluding Mexico) continued its growth trend, marking the third consecutive quarterly increase (up 1%), largely driven
by Brazil, which grew 6%. Other countries in LatAm showed modest improvement, indicating signs of recovery.
With a positive outlook for 4Q24, this growth
trend is supported by favorable macroeconomic conditions, particularly in Brazil, where economic performance has exceeded expectations.
The construction industry is expected to grow by 3% compared to 3Q24, while light vehicle production may decline by 13%, and vehicle exports
remain weak across the region, notably in Argentina.
Foreign Exchange
FX |
|
3Q24 |
2Q24 |
3Q23 |
3Q24 vs. 3Q23 |
9M24 |
9M23 |
9M24 vs. 9M23 |
BRL/USD (Average) |
5.545 |
5.213 |
4.880 |
13.6% |
5.244 |
5.008 |
4.7% |
BRL/USD (End of period) |
5.448 |
5.559 |
5.007 |
8.8% |
5.448 |
5.007 |
8.8% |
PEN/USD (Average) |
3.757 |
3.744 |
3.678 |
2.1% |
3.753 |
3.732 |
0.6% |
PEN/USD (End of period) |
3.704 |
3.843 |
3.785 |
(2.1%) |
3.704 |
3.785 |
(2.1%) |
Source: Bloomberg
The average exchange rate for the Brazilian
real in 3Q24 was 5.545 BRL/US$, a depreciation of 6% and 14% compared to 2Q24 (5.213 BRL/US$) and 3Q23 (4.880 BRL/US$), respectively.
At the end of September, the Brazilian real/US$ exchange rate was 5.448. The primary factor weighing on the Brazilian currency remains
the Brazilian government's potential shortfall in meeting fiscal targets.
The average exchange rate for the Peruvian
soles in 3Q24 was 3.757 soles/US$ and remained relatively flat compared to 2Q24 and depreciated 2% compared to 3Q23. At the end of June,
the Peruvian soles/US$ exchange rate was 3.704.
The 2024 LME Week in London, held in early
October, showcased a more optimistic sentiment among participants than in recent years. Despite ongoing geopolitical concerns, including
the upcoming U.S. elections and Middle East tensions, an improved global economic outlook, driven by interest rate cuts and economic stimulus
in China has bolstered optimism across base metal markets.
In a surprising move, China’s government
held an additional Politburo meeting in September focused on supporting the property market. Measures included mortgage rate cuts, eased
home-buying restrictions, and a new cap on housing supply. Additionally, the PBoC cut rates by 20bps, while the Ministry of Finance announced
2 trillion yuan (~US$285 billion) in special bonds aimed at boosting the economy by 0.2%, contributing to achieve the annual 5% GDP growth
target. Further stimulus in October is driving metal prices upward, with China remaining the key driver of demand growth, particularly
for essential metals to energy transition and property sector.
In the U.S., the Federal Reserve cut interest
rates by 50bps (also in September), its first cut in four years. Further anticipated cuts into 2025 are expected to weaken the U.S. dollar,
which could support base metal prices positively.
On the supply side, as mentioned above,
the current tight concentrate market has driven TCs to historic lows, a trend expected to continue through mid-2025, supporting prices,
with zinc expected to trade between US$2,800-US$3,000 according to participants. The copper concentrate
market is also expected to remain tight, with demand sustained by global economic recovery and continued energy transition investments.
| | |
| | 43 |
Risks and Uncertainties
Risk management is one of the key points
in our business strategy and contributes to value creation and increasing the level of confidence in the Company held by its main stakeholders,
including shareholders, employees, customers, suppliers and the local communities.
As a result, we have adopted an Enterprise
Risk Management (“ERM”) Policy that describes Nexa’s Risk management model. The ERM forms an integral part of the processes
in our operational units, corporate departments and projects, and provides support for decision-making by our Executive Officers and Board
of Directors.
The risk assessment cycle is performed
annually focusing on our strategy, operations and key projects. We seek to identify material risks, which are then assessed with consideration
of the potential health, safety, environmental, social, reputational, legal and financial impacts. By embedding risk management into our
work processes and critical business systems, we work to ensure we make decisions based on relevant inputs and valid data. The material
risks identified during the risk management process are monitored and reported to the Executive Team, Audit Committee and Board of Directors.
Our operations are exposed to a number
of inherent risks and uncertainties, and our results may be influenced by the following factors, including, among others:
| · | cyclical and volatile commodity prices driven by changes in global supply and demand |
| · | foreign exchange rates, fluctuations, inflation, and interest rate volatility; |
| · | economic and political uncertainties in the countries in which we operate; |
| · | changes in global market conditions, impacting demand and pricing stability; |
| · | the impact of expanded regional or global conflict, including the conflicts between Russia and Ukraine,
and the Middle-East conflict, and the resulting potential impacts on supply and demand for commodities, global security concerns, and
market volatility; |
| · | outbreaks of contagious diseases or health crises impacting overall economic activity regionally or globally,
such as the coronavirus (“COVID-19”) pandemic, and the potential impact thereof on commodity prices and exchange rate variations
in the currencies to which we are exposed to, our business and operating sites, and the global economy; |
| · | increasing demand and evolving expectations from stakeholders with respect to our environmental, social
and governance (“ESG”) practices, performance and disclosures, including the ability to meet energy requirements while complying
with greenhouse gas emissions regulations and other energy transition policy changes and laws in the countries in which we operate; |
| · | severe natural disasters, such as storms and earthquakes, disrupting our operations; |
| · | the impact of climate change on our operations, workforce and value chain; |
| · | environmental, safety and engineering challenges and risks inherent to mining; |
| · | operational risks, such as operator errors, mechanical failures and other accidents; |
| · | the availability of materials, supplies, insurance coverage, equipment, required permits or approvals
and financing; |
| · | supply-chain and logistic related interruptions, including impacts to international freight and transportation
networks; |
| · | the implementation of our growth strategy and risks associated with related capital expenditures; |
| · | failure to obtain financial assurance to meet closure and remediation obligations; |
| | |
| | 44 |
| · | the possible material differences between our estimates of Mineral Reserves and Mineral Resources and
the mineral quantities we actually recover; |
| · | the possibility that permits, concessions, environmental studies, modificatory
environmental studies and other governmental authorities requests may be terminated, not renewed, or not granted impacting, therefore,
the carrying amount of certain assets potentially resulting in impairment charges, fines and/or penalties. |
| · | the impact of political and government changes in the countries in which we operate, and the effects of
potential new legislation, including changes in taxation laws and any related agreements that Nexa has entered or may enter into with
local governments; |
| · | legal and regulatory risks, related to ongoing or future investigations by local authorities with respect
to our business and operations, as well as the conduct of our customers, as well as the impact to our financial statements regarding the
resolution of any such matters; |
| · | labor disputes or disagreements with local communities or unions in the countries in which we operate; |
| · | loss of reputation due to unanticipated operational failures or significant occupational incidents; |
| · | failure or outage of our digital infrastructure or information and operating technology systems; |
| · | cyber events or attacks (including ransomware, state-sponsored and other cyberattacks) due to negligence
or IT security failures; |
For a broader discussion of risks please
refer to our annual report on form 20-F filed with the SEC (www.sec.gov), on SEDAR (www.sedarplus.ca) and available on the Company’s
website (ir.nexaresources.com).
Use of Non-IFRS
Financial Measures
Nexa’s management uses Consolidated
Adjusted EBITDA as an additional performance measure on a consolidated basis, in addition to, and not as a substitute for, net income.
We believe this measure provides useful information about the performance of our operations as it facilitates consistent comparisons between
periods, planning and forecasting of future operating results reflecting the operational performance of our existing business without
the impact of interest, taxes, amortization, depreciation, non-cash items that do not reflect our operational performance for the specific
reporting period and the impact of pre-operating and ramp-up expenses during the commissioning and ramp-up phases of greenfield projects
(currently, only Aripuanã has reached these stages). Pre-operating and ramp-up expenses incurred during the commissioning and ramp-up
of phases of Aripuanã are not considered infrequent, unusual or non-recurring expenses, as they have recurred in prior years with
respect to Aripuanã and may recur in the future with respect to Aripuanã or any other projects that may reach the commissioning
or ramp-up phases. Our management believes this adjustment is helpful because it shows our performance without the impact of specific
expenses relating to a greenfield project that has reached the commissioning or ramp-up phases, with no connection with the performance
of our other existing operations.
When applicable, Adjusted EBITDA also
excludes the impact of (i) events that are non-recurring, unusual or infrequent, and (ii) other specific events that, by their nature
and scope, do not reflect our operational performance for the specific period in our management’s view. These events did not impact
our Adjusted EBITDA in 2023 and 2022 but may impact future periods.
In this report, we present Consolidated
Adjusted EBITDA, which we define as net income (loss) for the year/period, adjusted by (i) share in the results of associates, depreciation
and amortization, net financial results and income tax; (ii) addition of cash dividend received from Enercan; (iii) non-cash events and
non-cash gains or losses that do not specifically reflect our operational performance for the specific period (including: (loss) gain
on sale of investments; impairment and impairment reversals; (loss) gain on sale of long-lived assets; write-offs of long-lived assets;
remeasurement in estimates of asset retirement obligations; and other restoration obligations); and (iv)
pre-operating and ramp-up expenses incurred during the commissioning and ramp-up phases of greenfield projects (currently, Aripuanã).
| | |
| | 45 |
Our calculation of Adjusted EBITDA may
be different from the calculation used by other companies, including our competitors in the mining industry, so our measures may not be
comparable to those of other companies.
Mining segment | Cash cost net of by-products
credits: for our mining operations, cash cost after by-products credits includes all direct costs associated with mining, concentrating,
leaching, solvent extraction, on-site administration and general expenses, any off-site services essential to the operation, concentrate
freight costs, marketing costs and property and severance taxes paid to state or federal agencies that are not profit-related. Treatment
and refining charges on metal sales, which are typically recognized as a deduction component of sales revenues, are added to cash cost.
Cash cost net of by-products credits is measured with respect to zinc sold per mine.
Mining segment | Cost ROM: includes all
direct production costs for mining, concentrating, leaching, on-site mineral transportation, and other on-site administration expenses,
excluding royalties and workers’ participation costs. Cost ROM is measured with respect to total treated ore volume and non-metallic
products revenue (such as limestone and stones) are considered as cost-reduction for our mining operations.
Smelting segment | Cash cost net of by-products
credits: for our smelting operations, cash cost, after by-products credits includes all the costs of smelting, including costs associated
with labor, net energy, maintenance, materials, consumables and other on-site costs, as well as raw material costs. Cash cost net of by-products
credits is measured with respect to zinc sold per smelter.
Smelting segment | Conversion cost: costs
incurred to convert zinc concentrate (feed) into final products measured with respect to contained zinc sold per smelter, including energy,
consumables, and other fixed and on-site expenses. Conversion cost does not include raw material, alloys, and by-products related cost.
Sustaining cost net of by-products credits
is defined as the cash cost, net of by-product credits plus non-expansion capital expenditure, including sustaining, health, safety and
environment, modernization and other non-expansion-related capital expenditures. Sustaining cash cost net of by-products credits is measured
with respect to zinc sold.
All in sustaining cost (“AISC”)
net of by-products credits is defined as sustaining cash cost, net of by-products credits plus corporate general and administrative expenses,
royalties and workers’ participation. AISC net of by-products credits is measured with respect to zinc sold.
Net debt: defined as (i) loans and financing
(the most comparable IFRS measure), less (ii) cash and cash equivalents, less (iii) financial investments, plus or less (iv) the fair
value of derivative financial instruments, plus (v) leases liabilities. Our management believes that net debt is an important figure because
it indicates our ability to repay outstanding debts that become due simultaneously using available cash and highly liquid assets.
All forward-looking non-IFRS financial
measures in this release, including cash cost guidance, are provided only on a non-IFRS basis. This is due to the inherent difficulty
of forecasting the timing or amount of items that would be included in the most directly comparable forward-looking IFRS financial measures.
As a result, reconciliation of the forward-looking non-IFRS financial measures to IFRS financial measures is not available without unreasonable
effort and the Company is unable to assess the probable significance of the unavailable information.
See “Cautionary Statement on Forward-Looking
Statements” below.
| | |
| | 46 |
Technical information
Jose Antonio Lopes, FMAusIMM (Geo): 224829,
a Mineral Resources manager, a qualified person for purposes of National Instrument 43-101 and a Nexa employee, has approved the scientific
and technical information contained in this Earnings Release. Please note that the mineral reserves included in this Earnings Release
were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) 2014 Definition Standards
for Mineral Reserves and Mineral Resources, whose definitions are incorporated by reference in National Instrument 43-101. Accordingly,
such information may not be comparable to similar information prepared in accordance with Subpart 1300 of Regulation S-K (“S-K 1300”).
Our estimates of mineral reserves may be materially different from mineral quantities we actually recover, and market price fluctuations
and changes in operating capital costs may render certain mineral reserves uneconomical to mine.
CAUTIONARY STATEMENT
ON FORWARD-LOOKING STATEMENTS
This Earnings
Release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively
referred to in this Earnings Release as “forward-looking statements”). All statements other than statements of historical
fact are forward-looking statements. The words “believe,” “will,” “may,” “may have,” “would,”
“estimate,” “continues,” “anticipates,” “intends,” “plans,” “expects,”
“budget,” “scheduled,” “forecasts” and similar words are intended to identify estimates and forward-looking
statements. Forward-looking statements are not guarantees and involve known and unknown risks, uncertainties and other factors which may
cause the actual results, performance or achievements of Nexa to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking statements. Actual results and developments may be substantially different from the expectations
described in the forward-looking statements for a number of reasons, many of which are not under our control, among them, the activities
of our competition, the future global economic situation, weather conditions, market prices and conditions, exchange rates, and operational
and financial risks. The unexpected occurrence of one or more of the abovementioned events may significantly change the results of our
operations on which we have based our estimates and forward-looking statements. Our estimates and forward-looking statements may also
be influenced by, among others, legal, political, environmental or other risks that could materially affect the potential development
of our projects, including risks related to outbreaks of contagious diseases or health crises impacting overall economic activity regionally
or globally, as well as risks relating to ongoing or future investigations by local authorities with respect to our business and
operations and the conduct of our customers, including the impact to our financial statements regarding the resolution of any such matters.
These forward-looking statements related
to future events or future performance and include current estimates, predictions, forecasts, beliefs and statements as to management’s
expectations with respect to, but not limited to, the business and operations of the Company and mining production our growth strategy,
the impact of applicable laws and regulations, future zinc and other metal prices, smelting sales, CAPEX, expenses related to exploration
and project evaluation, estimation of mineral reserves and mineral resources, mine life and our financial liquidity.
Forward-looking statements are necessarily
based upon a number of factors and assumptions that, while considered reasonable and appropriate by management, are inherently subject
to significant business, economic and competitive uncertainties and contingencies and may prove to be incorrect. Statements concerning
future production costs or volumes are based on numerous assumptions of management regarding operating matters and on assumptions that
demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, full integration
of mining and smelting operations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability
of parts and supplies, labor disturbances, interruption in transportation or utilities, and adverse weather conditions, and that there
are no material unanticipated variations in metal prices, exchange rates, or the cost of energy, supplies or transportation, among other
assumptions.
| | |
| | 47 |
We assume no obligation to update forward-looking
statements except as required under securities laws. Estimates and forward-looking statements refer only to the date when they were made,
and we do not undertake any obligation to update or revise any estimate or forward-looking statement due to new information, future events
or otherwise, except as required by law. Estimates and forward-looking statements involve risks and uncertainties and do not guarantee
future performance, as actual results or developments may be substantially different from the expectations described in the forward-looking
statements. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can
be found in our annual report on Form 20-F and in our other public disclosures available on our website and filed under our profile on
SEDAR (www.sedarplus.ca) and on EDGAR (www.sec.gov).
| | |
| | 48 |
Appendix
Income Statement |
50 |
Net cash flows from operating activities excluding working capital variations
and free cash flow – Reconciliation |
51 |
CAPEX |
52 |
All in Sustaining Cash Cost | Mining |
53 |
Conversion and All in Sustaining Cash Cost | Smelting |
57 |
| | |
| | 49 |
Income Statement
US$ million |
1Q23 |
2Q23 |
3Q23 |
4Q23 |
1Q24 |
2Q24 |
3Q24 |
Net Revenues |
667.3 |
626.7 |
649.3 |
629.9 |
579.8 |
736.3 |
709.5 |
Cost of sales |
(568.0) |
(564.4) |
(581.3) |
(560.7) |
(491.9) |
(556.0) |
(582.9) |
Gross Profit |
99.4 |
62.3 |
68.0 |
69.2 |
87.8 |
180.3 |
126.6 |
SG&A |
(28.5) |
(32.5) |
(33.0) |
(32.6) |
(33.5) |
(30.2) |
(29.5) |
Mineral Exploration and Project Evaluation |
(22.0) |
(21.3) |
(29.6) |
(26.8) |
(12.7) |
(18.0) |
(16.1) |
Impairment (loss) reversal of long-lived assets |
- |
(57.2) |
(1.9) |
(55.5) |
17.2 |
(60.2) |
17.6 |
Other income and expenses, net |
(5.5) |
(66.1) |
(7.2) |
(31.8) |
(9.0) |
(51.9) |
(13.9) |
Operating income (loss) |
43.4 |
(114.7) |
(3.6) |
(77.7) |
49.8 |
20.1 |
84.8 |
Share in the results of associates |
5.4 |
5.7 |
6.3 |
6.1 |
5.7 |
5.3 |
5.4 |
Net Financial Results |
(39.6) |
(27.2) |
(66.8) |
(33.5) |
(67.9) |
(118.5) |
(41.5) |
Financial income |
5.6 |
7.5 |
7.8 |
4.8 |
5.0 |
6.8 |
6.2 |
Financial expenses |
(46.8) |
(60.9) |
(47.2) |
(55.0) |
(50.9) |
(62.5) |
(59.4) |
Other financial items, net |
1.6 |
26.1 |
(27.4) |
16.7 |
(22.0) |
(62.7) |
11.7 |
Depreciation and amortization |
(73.1) |
(74.8) |
(75.6) |
(87.0) |
(77.0) |
(74.3) |
(82.3) |
Adjusted EBITDA |
134.3 |
75.3 |
86.6 |
109.8 |
128.4 |
206.1 |
182.9 |
Adj. EBITDA margin |
20.1% |
12.0% |
13.3% |
17.4% |
22.2% |
28.0% |
25.8% |
Income tax benefit (expense) |
(25.1) |
33.5 |
(0.4) |
(3.8) |
0.4 |
23.0 |
(42.8) |
Net Income (loss) |
(15.9) |
(102.7) |
(64.5) |
(108.8) |
(12.0) |
(70.0) |
6.0 |
Attributable to Nexa's shareholders |
(20.2) |
(102.4) |
(74.9) |
(94.5) |
(24.4) |
(77.0) |
(5.2) |
Attributable to non-controlling interests |
4.3 |
(0.3) |
10.4 |
(14.2) |
12.4 |
7.0 |
11.1 |
Weighted average number of outstanding shares - in thousand |
132,439 |
132,439 |
132,439 |
132,439 |
132,439 |
132,439 |
132,439 |
Basic and diluted earnings (loss) per share - (in US$) |
(0.15) |
(0.77) |
(0.57) |
(0.71) |
(0.18) |
(0.58) |
(0.04) |
Adjusted Net Income (loss) |
1.9 |
12.5 |
(49.9) |
(8.2) |
(10.4) |
41.7 |
21.9 |
Adjusted basic and diluted earnings (loss) per share - (in US$) |
(0.01) |
0.05 |
(0.44) |
(0.02) |
(0.16) |
0.14 |
0.02 |
| | |
| | 50 |
Net cash flows
from operating activities excluding working capital variations and free cash flow – Reconciliation
Nexa manages and reports cash flows from
operating activities excluding variations in working capital. Working capital can be volatile due to several factors, including prices
and a build-up or reduction of inventories.
Furthermore, we also exclude from the
analysis interest and income tax payments. Management believes excluding these measures provides investors with better visibility of the
operating cash flow performance and our capital allocation strategy.
The following table provides a reconciliation
of the cash from operating activities before variations in working capital to free cash flow.
US$ million |
3Q24 |
9M24 |
|
|
|
Cash provided by operating activities |
155 |
239 |
(-) Working capital variations |
(43) |
(184) |
Trade accounts receivables |
(1) |
(73) |
Inventory |
(16) |
(89) |
Other assets |
(4) |
(63) |
Payables |
(6) |
9 |
Other liabilities |
(15) |
32 |
|
|
|
Cash flows from operations excluding working capital variations |
198 |
423 |
|
|
|
Interest paid |
(28) |
(89) |
Income tax |
(10) |
(35) |
Sustaining CAPEX (1) |
(54) |
(192) |
|
|
|
Net cash flows from operations excluding working capital variations |
106 |
107 |
|
|
|
Other investments (2) |
(1) |
(5) |
Loans and investments (3) |
(6) |
156 |
Dividends and share premium |
(7) |
(11) |
Foreign exchange effects |
2 |
(7) |
Working capital changes |
(43) |
(184) |
|
|
|
Free cash flow |
51 |
56 |
(1) Non expansion investments related to sustaining
and HS&E.
(2) Other non-expansion investments. Refer to
page 9 of this earnings release for CAPEX breakdown.
(3) Loans and financing, bonds repurchase, net
sales of financial investments and other high liquid short term investments.
For details on cash flows, please refer to the
“Condensed consolidated interim financial statements at and for the three and nine-month periods ended on September 30, 2024.”
| | |
| | 51 |
CAPEX
US$ million |
3Q24 |
2Q24 |
1Q24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
2023 |
Mining |
36.6 |
45.1 |
59.2 |
84.1 |
63.1 |
30.4 |
45.4 |
223.1 |
Cerro Lindo |
11.1 |
11.5 |
8.5 |
12.9 |
11.1 |
10.9 |
8.3 |
43.3 |
El Porvenir |
9.3 |
12.0 |
25.2 |
28.8 |
16.7 |
9.7 |
13.4 |
68.6 |
Atacocha |
2.9 |
3.4 |
4.2 |
6.5 |
2.6 |
2.5 |
4.7 |
16.2 |
Vazante |
5.3 |
8.2 |
6.6 |
6.7 |
8.9 |
9.6 |
6.4 |
31.6 |
Morro Agudo |
0.0 |
0.1 |
0.0 |
0.8 |
0.8 |
1.1 |
0.2 |
3.0 |
Aripuanã (1) |
8.0 |
10.0 |
14.6 |
28.4 |
23.0 |
(3.4) |
12.4 |
60.4 |
Smelting |
18.2 |
19.4 |
16.1 |
29.6 |
16.7 |
14.7 |
10.7 |
71.7 |
Cajamarquilla |
9.9 |
12.2 |
12.1 |
18.8 |
7.3 |
4.5 |
4.5 |
35.0 |
Três Marias |
3.7 |
5.3 |
3.3 |
6.4 |
4.6 |
7.3 |
3.9 |
22.2 |
Juiz de Fora |
4.6 |
2.0 |
0.8 |
4.4 |
4.8 |
2.9 |
2.3 |
14.4 |
Other |
(1.5) |
(0.8) |
(1.2) |
(3.1) |
2.5 |
14.8 |
0.1 |
14.3 |
Total |
53.3 |
63.8 |
74.1 |
110.5 |
82.4 |
59.9 |
56.2 |
309.0 |
|
|
|
|
|
|
|
|
|
Sustaining (US$ million) |
3Q24 |
2Q24 |
1Q24 |
4Q23 |
3Q23 |
2Q23 |
1Q23 |
2023 |
Mining |
33.7 |
43.9 |
58.3 |
81.4 |
56.3 |
47.3 |
47.7 |
232.7 |
Cerro Lindo |
11.0 |
11.5 |
8.5 |
11.2 |
9.1 |
9.4 |
8.0 |
37.7 |
El Porvenir |
9.1 |
12.0 |
25.2 |
28.8 |
16.7 |
9.7 |
13.4 |
68.7 |
Atacocha |
2.9 |
3.4 |
4.2 |
6.4 |
2.6 |
2.5 |
4.7 |
16.1 |
Vazante |
4.8 |
7.3 |
5.9 |
5.9 |
7.2 |
8.8 |
6.2 |
28.0 |
Morro Agudo |
0.0 |
0.1 |
0.0 |
0.8 |
0.8 |
1.0 |
0.2 |
2.8 |
Aripuanã |
5.9 |
9.6 |
14.4 |
28.4 |
19.9 |
15.9 |
15.2 |
79.4 |
Smelting |
16.0 |
17.7 |
14.9 |
25.5 |
14.2 |
10.9 |
7.9 |
58.5 |
Cajamarquilla |
8.7 |
11.4 |
11.7 |
16.4 |
6.2 |
3.2 |
4.0 |
29.8 |
Três Marias |
2.9 |
4.4 |
2.4 |
5.0 |
3.5 |
5.2 |
2.4 |
16.1 |
Juiz de Fora |
4.4 |
1.8 |
0.7 |
4.1 |
4.5 |
2.5 |
1.5 |
12.6 |
Total Operations Sustaining |
49.7 |
61.5 |
73.1 |
106.9 |
70.5 |
58.2 |
55.6 |
291.2 |
Corporate Sustaining (2) |
0.2 |
0.4 |
0.1 |
0.5 |
0.3 |
0.3 |
0.4 |
1.6 |
Total Sustaining |
49.9 |
62.0 |
73.2 |
107.4 |
70.8 |
58.5 |
56.0 |
292.8 |
(1) The negative amounts are mainly related
to reclassifications between Aripuanã and Corporate, and capitalization of interest net of advanced payments for imported materials
and tax credits.
(2) Until 4Q22, Aripuanã sustaining expenses
were included in Corporate Sustaining.
| | |
| | 52 |
All in Sustaining
Cash Cost | Mining (1)
3Q24
|
US$ million
(excepted indicated otherwise) |
Vazante |
Morro Agudo |
Cerro Lindo |
El Porvenir |
Atacocha |
Consolidation of Operations |
Corporate & Others |
Mining |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
|
|
Tonnes |
36,351 |
0 |
24,069 |
12,633 |
3,049 |
76,102 |
|
76,102 |
(+) |
COGS |
31.0 |
0.0 |
88.5 |
51.2 |
28.3 |
199.0 |
3.4 |
202.4 |
(+) |
On-site G&A |
(0.1) |
0.0 |
0.3 |
0.8 |
0.8 |
1.9 |
|
1.9 |
(-) |
By-products revenue |
(2.7) |
0.0 |
(96.1) |
(38.2) |
(24.3) |
(161.2) |
(23.9) |
(185.1) |
(+) |
Treatment Charges |
17.2 |
0.0 |
8.4 |
5.6 |
1.3 |
32.4 |
|
32.4 |
(+) |
Selling Expenses |
0.0 |
0.0 |
0.3 |
0.2 |
0.1 |
0.6 |
|
0.6 |
(-) |
Depreciation, amortization and depletion |
(6.3) |
0.0 |
(19.3) |
(12.5) |
(12.4) |
(50.5) |
0.0 |
(50.5) |
(-) |
Royalties |
(0.5) |
0.0 |
(1.5) |
(0.7) |
(0.3) |
(3.0) |
|
(3.0) |
(-) |
Workers participation & Bonus |
(0.4) |
0.0 |
(1.0) |
(1.0) |
(0.6) |
(2.9) |
|
(2.9) |
(+) |
Others |
0.3 |
0.0 |
1.2 |
(0.4) |
0.7 |
1.8 |
|
1.8 |
(=) |
Cash Cost (Sold) |
38.6 |
0.0 |
(19.2) |
5.0 |
(6.3) |
18.1 |
(20.5) |
(2.4) |
|
Cash Cost (Sold) (per ton) |
1,062.1 |
0.0 |
(798.0) |
396.4 |
(2,054.8) |
238.4 |
0.0 |
(31.1) |
(+) |
Sustaining Capital Expenditure |
5.0 |
0.0 |
11.1 |
9.3 |
2.9 |
28.3 |
8.1 |
36.4 |
(=) |
Sustaining Cash Cost (Sold) |
43.6 |
0.0 |
(8.1) |
14.4 |
(3.3) |
46.5 |
(12.4) |
34.1 |
|
Sustaining Cash Cost (Sold) (per ton) |
1,198.6 |
0.0 |
(336.6) |
1,136.2 |
(1,097.8) |
610.7 |
0.0 |
447.6 |
(+) |
Workers participation & Bonus |
0.4 |
0.0 |
1.0 |
1.0 |
0.6 |
2.9 |
|
2.9 |
(+) |
Royalties |
0.5 |
0.0 |
1.5 |
0.7 |
0.3 |
3.0 |
|
3.0 |
(+) |
Corporate G&A |
|
|
|
|
|
|
10.3 |
10.3 |
(=) |
AISC (Sold) |
|
|
|
|
|
|
|
50.4 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
|
|
661.8 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
|
|
0.30 |
(1) Our cash cost, sustaining cash cost and
AISC are net of by-products credits, measured with respect to zinc sold.
| | |
| | 53 |
3Q23
|
US$ million
(excepted indicated otherwise) |
Vazante |
Morro Agudo |
Cerro Lindo |
El Porvenir |
Atacocha |
Consolidation of Operations |
Corporate & Others |
Mining |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
|
|
Tonnes |
38,360 |
6,004 |
20,833 |
14,533 |
1,146 |
80,876 |
|
80,876 |
(+) |
COGS |
33.3 |
16.6 |
88.6 |
47.8 |
13.1 |
199.4 |
(0.4) |
198.9 |
(+) |
On-site G&A |
0.1 |
0.1 |
0.1 |
0.2 |
0.1 |
0.5 |
|
0.5 |
(-) |
By-products revenue |
(4.1) |
(11.6) |
(85.6) |
(37.7) |
(13.1) |
(152.1) |
6.4 |
(145.7) |
(+) |
Treatment Charges |
30.2 |
3.8 |
11.2 |
9.4 |
0.7 |
55.4 |
|
55.4 |
(+) |
Selling Expenses |
0.1 |
0.1 |
0.4 |
0.1 |
0.1 |
0.8 |
|
0.8 |
(-) |
Depreciation, amortization and depletion |
(7.0) |
(0.7) |
(20.7) |
(9.8) |
(3.5) |
(41.6) |
(0.1) |
(41.7) |
(-) |
Royalties |
(0.6) |
(0.3) |
0.0 |
(0.3) |
0.0 |
(1.2) |
|
(1.2) |
(-) |
Workers participation & Bonus |
(0.4) |
(0.2) |
(1.6) |
(1.4) |
(0.1) |
(3.7) |
|
(3.7) |
(+) |
Others |
0.1 |
0.0 |
(0.5) |
(1.8) |
(0.5) |
(2.7) |
|
(2.7) |
(=) |
Cash Cost (Sold) |
51.7 |
7.8 |
(8.1) |
6.5 |
(3.1) |
54.9 |
5.9 |
60.7 |
|
Cash Cost (Sold) (per ton) |
1,347.7 |
1,302.5 |
(390.1) |
450.5 |
(2,690.8) |
678.2 |
0.0 |
751.0 |
(+) |
Sustaining Capital Expenditure |
8.0 |
0.8 |
11.1 |
16.7 |
2.6 |
39.3 |
19.7 |
59.0 |
(=) |
Sustaining Cash Cost (Sold) |
59.7 |
8.6 |
3.0 |
23.3 |
(0.5) |
94.2 |
25.6 |
119.8 |
|
Sustaining Cash Cost (Sold) (per ton) |
1,557.4 |
1,437.2 |
143.5 |
1,601.7 |
(424.3) |
1,164.1 |
0.0 |
1,480.9 |
(+) |
Workers participation & Bonus |
0.4 |
0.2 |
1.6 |
1.4 |
0.1 |
3.7 |
|
3.7 |
(+) |
Royalties |
0.6 |
0.3 |
0.0 |
0.3 |
0.0 |
1.2 |
|
1.2 |
(+) |
Corporate G&A |
|
|
|
|
|
|
12.2 |
12.2 |
(=) |
AISC (Sold) |
|
|
|
|
|
|
|
136.9 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
|
|
1,692.4 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
|
|
0.77 |
Note: Cash cost and AISC per ton sold does not
include the impact of the cost of idleness capacity of US$1.7 million in Atacocha in 3Q23.
| | |
| | 54 |
9M24
|
US$ million
(excepted indicated otherwise) |
Vazante |
Morro Agudo |
Cerro Lindo |
El Porvenir |
Atacocha |
Consolidation of Operations |
Corporate & Others |
Mining |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
|
|
Tonnes |
105,754 |
7,394 |
71,324 |
37,396 |
7,529 |
229,398 |
|
229,398 |
(+) |
COGS |
95.8 |
18.4 |
266.2 |
150.4 |
61.2 |
592.0 |
4.8 |
596.8 |
(+) |
On-site G&A |
0.4 |
0.3 |
0.8 |
2.4 |
2.1 |
6.0 |
|
6.0 |
(-) |
By-products revenue |
(9.9) |
(5.6) |
(289.7) |
(116.7) |
(56.2) |
(478.0) |
(27.5) |
(505.6) |
(+) |
Treatment Charges |
53.0 |
3.4 |
24.9 |
16.0 |
3.2 |
100.5 |
|
100.5 |
(+) |
Selling Expenses |
0.2 |
0.1 |
1.0 |
0.8 |
0.2 |
2.4 |
|
2.4 |
(-) |
Depreciation, amortization and depletion |
(19.9) |
(0.7) |
(56.9) |
(36.5) |
(20.2) |
(134.1) |
|
(134.1) |
(-) |
Royalties |
(1.7) |
(0.4) |
(4.3) |
(2.0) |
(0.7) |
(9.0) |
|
(9.0) |
(-) |
Workers participation & Bonus |
(1.6) |
(0.4) |
(5.3) |
(3.3) |
(1.4) |
(12.1) |
|
(12.1) |
(+) |
Others |
1.2 |
0.1 |
1.2 |
(0.7) |
0.2 |
2.0 |
|
2.0 |
(=) |
Cash Cost (Sold) |
117.5 |
15.1 |
(62.0) |
10.5 |
(11.5) |
69.6 |
(22.8) |
46.9 |
|
Cash Cost (Sold) (per ton) |
1,111.2 |
2,041.0 |
(868.7) |
279.7 |
(1,525.6) |
303.5 |
0.0 |
204.3 |
(+) |
Sustaining Capital Expenditure |
18.3 |
0.0 |
31.1 |
46.5 |
10.5 |
106.5 |
32.9 |
139.5 |
(=) |
Sustaining Cash Cost (Sold) |
135.8 |
15.1 |
(30.8) |
57.0 |
(1.0) |
176.1 |
10.2 |
186.3 |
|
Sustaining Cash Cost (Sold) (per ton) |
1,284.3 |
2,046.3 |
(432.1) |
1,524.3 |
(131.8) |
464.3 |
0.0 |
812.2 |
(+) |
Workers participation & Bonus |
1.6 |
0.4 |
5.3 |
3.3 |
1.4 |
12.1 |
|
12.1 |
(+) |
Royalties |
1.7 |
0.4 |
4.3 |
2.0 |
0.7 |
9.0 |
|
9.0 |
(+) |
Corporate G&A |
|
|
|
|
|
|
33.2 |
33.2 |
(=) |
AISC (Sold) |
|
|
|
|
|
|
|
240.6 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
|
|
1,049.0 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
|
|
0.48 |
Note: Cash cost and AISC per ton sold does not
include the impact of the cost of idleness capacity of US$2.7 million in El Porvenir in 9M24.
| | |
| | 55 |
9M23
|
US$ million
(excepted indicated otherwise) |
Vazante |
Morro Agudo |
Cerro Lindo |
El Porvenir |
Atacocha |
Consolidation of Operations |
Corporate & Others |
Mining |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
|
|
Tonnes |
110,753 |
16,405 |
53,134 |
43,474 |
5,774 |
229,540 |
|
229,540 |
(+) |
COGS |
94.8 |
49.7 |
256.7 |
147.7 |
49.5 |
598.4 |
(3.8) |
594.6 |
(+) |
On-site G&A |
0.3 |
0.3 |
0.3 |
0.4 |
0.2 |
1.5 |
|
1.5 |
(-) |
By-products revenue |
(11.6) |
(24.6) |
(224.9) |
(108.2) |
(47.2) |
(416.5) |
13.4 |
(403.0) |
(+) |
Treatment Charges |
87.1 |
10.6 |
27.8 |
26.4 |
3.4 |
155.4 |
|
155.4 |
(+) |
Selling Expenses |
0.2 |
(0.2) |
1.8 |
0.5 |
0.2 |
2.4 |
|
2.4 |
(-) |
Depreciation, amortization and depletion |
(20.0) |
(4.6) |
(62.5) |
(30.2) |
(11.5) |
(128.8) |
(0.1) |
(128.8) |
(-) |
Royalties |
(1.6) |
(1.0) |
(0.7) |
(1.9) |
(0.2) |
(5.4) |
|
(5.4) |
(-) |
Workers participation & Bonus |
(1.6) |
(0.8) |
(4.1) |
(3.3) |
(0.6) |
(10.3) |
|
(10.3) |
(+) |
Others |
1.3 |
0.4 |
(8.3) |
(6.8) |
(3.0) |
(16.3) |
|
(16.3) |
(=) |
Cash Cost (Sold) |
149.0 |
29.8 |
(13.9) |
24.6 |
(9.2) |
180.4 |
9.6 |
190.0 |
|
Cash Cost (Sold) (per ton) |
1,345.6 |
1,817.2 |
(262.2) |
566.8 |
(1,586.4) |
785.9 |
0.0 |
827.6 |
(+) |
Sustaining Capital Expenditure |
23.2 |
2.2 |
30.3 |
39.8 |
9.7 |
105.3 |
31.8 |
137.0 |
(=) |
Sustaining Cash Cost (Sold) |
172.2 |
32.0 |
16.4 |
64.5 |
0.6 |
285.7 |
41.3 |
327.0 |
|
Sustaining Cash Cost (Sold) (per ton) |
1,554.8 |
1,950.8 |
308.9 |
1,483.0 |
99.4 |
458.6 |
0.0 |
1,424.6 |
(+) |
Workers participation & Bonus |
1.6 |
0.8 |
4.1 |
3.3 |
0.6 |
10.3 |
|
10.3 |
(+) |
Royalties |
1.6 |
1.0 |
0.7 |
1.9 |
0.2 |
5.4 |
|
5.4 |
(+) |
Corporate G&A |
|
|
|
|
|
|
34.2 |
34.2 |
(=) |
AISC (Sold) |
|
|
|
|
|
|
|
376.9 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
|
|
1,641.9 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
|
|
0.74 |
Note: Cash cost and AISC per ton sold does not
include the impact of the cost of idleness capacity of US$2.6 million in Atacocha and US$5.2 million in Cerro Lindo in 9M23.
| | |
| | 56 |
Conversion and
All in Sustaining Cash Cost | Smelting (2)
3Q24
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Consolidation of Operations |
Corporate |
Smelting |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
Tonnes |
47,169 |
18,615 |
86,796 |
152,580 |
|
152,580 |
(+) |
COGS |
135.0 |
66.0 |
273.7 |
474.7 |
(1.2) |
473.5 |
(-) |
Cost of freight |
(3.6) |
(1.5) |
(12.9) |
(18.0) |
|
(18.0) |
(+) |
On-site G&A |
0.5 |
0.3 |
1.3 |
2.1 |
0.0 |
2.1 |
(-) |
Depreciation, amortization and depletion |
(9.1) |
(4.4) |
(10.4) |
(23.8) |
|
(23.8) |
(-) |
By-products revenue |
(3.8) |
(7.5) |
(41.6) |
(53.0) |
1.2 |
(51.8) |
(-) |
Workers participation & Bonus |
(1.9) |
(0.3) |
(1.0) |
(3.2) |
|
(3.2) |
(+) |
Others |
1.4 |
1.1 |
8.4 |
11.0 |
|
11.0 |
(=) |
Cash Cost (Sold) |
118.6 |
53.7 |
217.5 |
389.8 |
0.0 |
389.8 |
|
Cash Cost (Sold) (per ton) |
2,515.3 |
2,883.0 |
2,506.0 |
2,554.9 |
|
2,554.9 |
(+) |
Sustaining Capital Expenditure |
3.7 |
4.6 |
9.9 |
18.2 |
1.6 |
19.8 |
(=) |
Sustaining Cash Cost (Sold) |
122.3 |
58.3 |
227.4 |
408.0 |
1.6 |
409.6 |
|
Sustaining Cash Cost (Sold) (per ton) |
2,593.3 |
3,131.3 |
2,619.8 |
2,674.0 |
|
2,684.6 |
(+) |
Workers participation & Bonus |
1.9 |
0.3 |
1.0 |
3.2 |
|
3.2 |
(+) |
Corporate G&A |
|
|
|
|
6.9 |
6.9 |
(=) |
AISC (Sold) |
|
|
|
|
|
419.7 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
2,750.6 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
1.25 |
Note: Cash cost and AISC per ton sold does
not include the impact of the cost of metal purchased for resale.
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Smelting |
|
Contained Zinc Sales |
|
|
|
|
|
Tonnes |
47,169 |
18,615 |
86,796 |
152,580 |
|
COGS |
135.0 |
66.0 |
273.7 |
474.7 |
(-) |
Raw Material |
(73.5) |
(37.6) |
(205.9) |
(317.0) |
(+) |
By product cost |
(12.9) |
(0.6) |
(5.9) |
(19.4) |
(+/-) |
Consolidation effects |
(1.2) |
(2.4) |
(0.2) |
(3.8) |
(+) |
Others |
(15.1) |
(7.4) |
(5.9) |
(28.4) |
(=) |
Conversion Cost |
32.4 |
18.1 |
55.7 |
106.2 |
(=) |
Conversion Cost in US$/t |
686.4 |
971.2 |
641.7 |
695.7 |
(=) |
Conversion Cost in US$/lb |
0.31 |
0.44 |
0.29 |
0.32 |
(2) Our conversion cost, cash cost, sustaining
cash cost and AISC net of by-products credits are measured with respect to zinc sold.
| | |
| | 57 |
3Q23
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Consolidation of Operations |
Corporate |
Smelting |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
Tonnes |
45,415 |
19,213 |
86,970 |
151,598 |
|
151,598 |
(+) |
COGS |
113.4 |
65.8 |
260.7 |
439.8 |
(1.2) |
438.6 |
(-) |
Cost of freight |
(6.3) |
(1.7) |
(9.3) |
(17.3) |
|
(17.3) |
(+) |
On-site G&A |
0.5 |
0.2 |
1.4 |
2.1 |
0.0 |
2.1 |
(-) |
Depreciation, amortization and depletion |
(6.5) |
(3.5) |
(11.0) |
(21.0) |
|
(21.0) |
(-) |
By-products revenue |
(4.2) |
(6.5) |
(34.3) |
(45.1) |
1.2 |
(43.8) |
(-) |
Workers participation & Bonus |
(0.4) |
(0.3) |
(1.4) |
(2.1) |
|
(2.1) |
(+) |
Others |
(0.3) |
(0.4) |
(19.6) |
(20.2) |
|
(20.2) |
(=) |
Cash Cost (Sold) |
96.1 |
53.5 |
186.5 |
336.2 |
0.0 |
336.2 |
|
Cash Cost (Sold) (per ton) |
2,116.9 |
2,782.9 |
2,144.9 |
2,217.4 |
|
2,217.4 |
(+) |
Sustaining Capital Expenditure |
4.6 |
4.8 |
7.0 |
16.5 |
2.5 |
19.0 |
(=) |
Sustaining Cash Cost (Sold) |
100.8 |
58.3 |
193.6 |
352.6 |
2.5 |
355.2 |
|
Sustaining Cash Cost (Sold) (per ton) |
2,218.9 |
3,034.3 |
2,225.8 |
2,326.2 |
|
2,342.9 |
(+) |
Workers participation & Bonus |
0.4 |
0.3 |
1.4 |
2.1 |
|
2.1 |
(+) |
Corporate G&A |
|
|
|
|
6.9 |
6.9 |
(=) |
AISC (Sold) |
|
|
|
|
|
364.2 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
2,402.6 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
1.09 |
Note: Cash cost and AISC per ton sold does
not include the impact of the cost of metal purchased for resale.
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Smelting |
|
Contained Zinc Sales |
|
|
|
|
|
Tonnes |
45,415 |
19,213 |
86,970 |
151,598 |
|
COGS |
113.4 |
65.8 |
260.7 |
439.8 |
(-) |
Raw Material |
(42.9) |
(36.3) |
(146.7) |
(225.9) |
(+) |
By product cost |
(17.5) |
(0.1) |
(9.1) |
(26.8) |
(+/-) |
Consolidation effects |
(5.6) |
2.0 |
(48.5) |
(52.1) |
(+) |
Others |
(21.9) |
(10.3) |
(5.5) |
(37.8) |
(=) |
Conversion Cost |
25.5 |
21.0 |
50.8 |
97.2 |
(=) |
Conversion Cost in US$/t |
561.0 |
1,091.8 |
583.8 |
641.4 |
(=) |
Conversion Cost in US$/lb |
0.25 |
0.50 |
0.26 |
0.29 |
(2) Our conversion cost, cash cost, sustaining
cash cost and AISC net of by-products credits are measured with respect to zinc sold.
| | |
| | 58 |
9M24
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Consolidation of Operations |
Corporate |
Smelting |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
Tonnes |
135,482 |
59,443 |
242,925 |
437,850 |
|
437,850 |
(+) |
COGS |
376.8 |
190.8 |
737.3 |
1,304.9 |
(2.9) |
1,302.0 |
(-) |
Cost of freight |
(10.6) |
(4.4) |
(34.7) |
(49.7) |
|
(49.7) |
(+) |
On-site G&A |
1.5 |
0.8 |
3.9 |
6.2 |
|
6.2 |
(-) |
Depreciation, amortization and depletion |
(21.0) |
(11.2) |
(31.1) |
(63.3) |
|
(63.3) |
(-) |
By-products revenue |
(11.7) |
(20.2) |
(112.0) |
(144.0) |
2.9 |
(141.1) |
(-) |
Workers participation & Bonus |
(6.0) |
(1.4) |
(4.7) |
(12.2) |
|
(12.2) |
(+) |
Others |
5.4 |
4.1 |
22.8 |
32.3 |
|
32.3 |
(=) |
Cash Cost (Sold) |
334.4 |
158.5 |
581.4 |
1,074.2 |
0.0 |
1,074.2 |
|
Cash Cost (Sold) (per ton) |
2,468.3 |
2,665.9 |
2,393.1 |
2,453.4 |
|
2,453.4 |
(+) |
Sustaining Capital Expenditure |
12.2 |
7.4 |
34.2 |
53.7 |
(4.0) |
49.7 |
(=) |
Sustaining Cash Cost (Sold) |
346.6 |
165.8 |
615.5 |
1,128.0 |
(4.0) |
1,123.9 |
|
Sustaining Cash Cost (Sold) (per ton) |
2,558.3 |
2,789.7 |
2,533.9 |
2,576.2 |
|
2,567.0 |
(+) |
Workers participation & Bonus |
6.0 |
1.4 |
4.7 |
12.2 |
|
12.2 |
(+) |
Corporate G&A |
|
|
|
|
21.5 |
21.5 |
(=) |
AISC (Sold) |
|
|
|
|
|
1,157.6 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
2,643.8 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
1.20 |
Note: Cash cost and AISC per ton sold does
not include the impact of the cost of metal purchased for resale.
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Smelting |
|
Contained Zinc Sales |
|
|
|
|
|
Tonnes |
135,482 |
59,443 |
242,925 |
437,850 |
|
COGS |
376.8 |
190.8 |
737.3 |
1,304.9 |
(-) |
Raw Material |
(195.6) |
(105.9) |
(528.3) |
(829.7) |
(+) |
By product cost |
(41.8) |
(2.1) |
(19.9) |
(63.8) |
(+/-) |
Consolidation effects |
0.3 |
(3.4) |
(26.6) |
(29.7) |
(+) |
Others |
(51.3) |
(23.2) |
(12.4) |
(86.9) |
(=) |
Conversion Cost |
88.5 |
56.1 |
150.1 |
294.7 |
(=) |
Conversion Cost in US$/t |
653.3 |
943.5 |
618.0 |
673.1 |
(=) |
Conversion Cost in US$/lb |
0.30 |
0.43 |
0.28 |
0.31 |
(2) Our conversion cost, cash cost, sustaining
cash cost and AISC net of by-products credits are measured with respect to zinc sold.
| | |
| | 59 |
9M23
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Consolidation of Operations |
Corporate |
Smelting |
|
Sales Volume (Zinc content in Products) |
|
|
|
|
|
|
|
Tonnes |
134,112 |
59,456 |
246,673 |
440,240 |
|
440,240 |
(+) |
COGS |
382.9 |
203.2 |
739.3 |
1,325.5 |
(3.6) |
1,321.9 |
(-) |
Cost of freight |
(16.3) |
(6.7) |
(33.2) |
(56.3) |
|
(56.3) |
(+) |
On-site G&A |
1.1 |
0.5 |
4.0 |
5.6 |
|
5.6 |
(-) |
Depreciation, amortization and depletion |
(16.7) |
(10.2) |
(32.6) |
(59.5) |
|
(59.5) |
(-) |
By-products revenue |
(10.8) |
(19.3) |
(101.3) |
(131.3) |
3.6 |
(127.8) |
(-) |
Workers participation & Bonus |
(1.2) |
(1.2) |
(6.2) |
(8.6) |
|
(8.6) |
(+) |
Others |
3.3 |
1.6 |
9.6 |
14.4 |
|
14.4 |
(=) |
Cash Cost (Sold) |
342.3 |
167.9 |
579.6 |
1,089.8 |
0.0 |
1,089.8 |
|
Cash Cost (Sold) (per ton) |
2,552.4 |
2,823.1 |
2,349.7 |
2,475.4 |
|
2,475.4 |
(+) |
Sustaining Capital Expenditure |
15.8 |
10.1 |
15.8 |
41.6 |
16.9 |
58.5 |
(=) |
Sustaining Cash Cost (Sold) |
358.1 |
177.9 |
595.4 |
1,131.4 |
16.9 |
1,148.3 |
|
Sustaining Cash Cost (Sold) (per ton) |
2,670.2 |
2,992.4 |
2,413.6 |
2,569.9 |
|
2,608.3 |
(+) |
Workers participation & Bonus |
1.2 |
1.2 |
6.2 |
8.6 |
|
8.6 |
(+) |
Corporate G&A |
|
|
|
|
19.6 |
19.6 |
(=) |
AISC (Sold) |
|
|
|
|
|
1,176.5 |
(=) |
AISC (Sold) (per ton) |
|
|
|
|
|
2,672.3 |
(=) |
AISC (Sold) in US$/lb |
|
|
|
|
|
1.21 |
Note: Cash cost and AISC per ton sold does
not include the impact of the cost of metal purchased for resale.
|
US$ million
(excepted indicated otherwise) |
Três Marias |
Juiz de Fora |
Cajamarquilla |
Smelting |
|
Contained Zinc Sales |
|
|
|
|
|
Tonnes |
134,112 |
59,455 |
246,673 |
440,240 |
|
COGS |
382.9 |
203.2 |
739.3 |
1,325.5 |
(-) |
Raw Material |
(188.7) |
(125.9) |
(502.3) |
(816.9) |
(+) |
By product cost |
(50.1) |
(1.5) |
(23.5) |
(75.1) |
(+/-) |
Consolidation effects |
(2.5) |
8.3 |
(63.4) |
(57.7) |
(+) |
Others |
(63.9) |
(19.2) |
4.4 |
(78.7) |
(=) |
Conversion Cost |
77.7 |
64.9 |
154.5 |
297.1 |
(=) |
Conversion Cost in US$/t |
579.6 |
1,092.1 |
626.3 |
675.0 |
(=) |
Conversion Cost in US$/lb |
0.26 |
0.50 |
0.28 |
0.31 |
(2) Our conversion cost, cash cost, sustaining
cash cost and AISC net of by-products credits are measured with respect to zinc sold.
| | |
| | 60 |
Nexa Resources (NYSE:NEXA)
Historical Stock Chart
From Nov 2024 to Dec 2024
Nexa Resources (NYSE:NEXA)
Historical Stock Chart
From Dec 2023 to Dec 2024