DOW JONES NEWSWIRES 
 

The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Sunoco Inc. (SUN) on Dec. 1 said it began the process of shutting down its Marcus Hook, Pa., refinery, ahead of schedule. In Sept. the company said the plant would be idled by July 2012 if a buyer wasn't found.

Chevron Corp. (CVX) on Dec. 1 said its El Segundo, Calif., refinery was being returned to normal rates following an overnight power outage.

Sunoco Inc. idled operations at an isomerization unit in the Girard Point section of its Philadelphia refinery on Nov. 26 for an unspecified reason, a filing to environmental regulators made public on Dec. 2 said. No restart estimate was given.

Total Petrochemicals USA (TOT) shut Unit 890 at its Port Arthur, Texas, refinery on Nov. 29. Restart of the affected equipment would begin as quickly as possible. The No. 30 coker flare was listed as a source of emissions in a filing to state environmental regulators.

ConocoPhillips seeks a buyer for its Alliance refinery in Belle Chase, La., according to a Nov. 29 Bloomberg News report.

Tesoro Corp. (TSO) shut a distillation unit on Nov. 28 at its San Francisco-area refinery in Martinez, Calif.

Chevron's (CVX) El Segundo, Calif., reported a planned flaring event to regulators on Nov. 28. The event is set to being early on Nov. 29 and end early on Dec. 1. The flaring could be associated with the restart of an FCCU shut since late Oct. for what was expectd to be four weeks of maintenance.

PBF Energy said a power interruption within its Delaware City, Delaware, refinery on Nov. 27 caused process unit upsets and a boiler shutdown.

 
   For more detailed information, search Dow Jones Newswires using 
the code N/REF. 
 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
Suncor     Sarnia       85.0  Refinery restarted Nov. 26-27      Nov 26-27 
           Ontario            following week-long shut down 
                              to repair a leak, the co. said 
                              on Nov. 28. 
 
Syncrude   Alberta     300.0  Coker unit shut on Nov 22 due      N/A 
                              to operational upset. No re- 
                              start timing available. 
 
 
CARIBBEAN 
 
EAST COAST 
 
PBF      Delaware Cty  182.0  Power snag within refinery on      N/A 
Energy   Delaware             Nov 27 causes unit upsets and 
                              boiler shutdown. 
 
Sunoco   Philadelphia  335.0  Girard Point Isomerization Unit    N/A 
         PA                   placed in circulation mode on 
                              Nov. 26 - filing. 
 
                              Hydrotreater Unit shut Nov.15      N/A 
                              due to mechanical problem. 
 
GULF COAST 
 
Total    Port Arthur   174.0  Unit 890 shut on Nov. 29; No.      N/A 
         TX                   30 coker flare utilized. 
 
                              Major steam-producing unit shut 
                              on Nov. 24 due to equipment 
                              failure. 
 
Western  El Paso, TX   125.0  Diesel hydrotreating unit shut     N/A 
Refining                      on Nov 20 to replace valve. 
 
 
MIDWEST 
 
 
 
ROCKIES 
 
Sinclair  Sinclair      74.0  Refinery at reduced rates fol- 
          WY                  lowing fires at CDU on Sept. 3 
                              and Sept. 4. Repairs underway. 
                              Plant continues to operate at re- 
                              duced rates, sources said Nov. 11. 
 
WEST COAST 
 
Chevron  El Segundo    273.0  Power interruption on Dec 1 im- 
         CA                   pacts operations; power re- 
                              stored on the same day.Units 
                              in restart. 
 
Tesoro   Martinez, CA  166.0  Distillation unit shut on Nov.     N/A 
                              28 following naphtha release. 
                              No estimate on restart. 
 
 
PLANNED 
 
CANADA 
 
Irving   Saint John    300.0   Refinery at planned rates         End 
Oil      New Brunswick         the co. said on Nov. 29           Nov 
                               after 12-week turnaround.         2011 
 
CARIBBEAN 
 
Hovensa  St. Croix     350.0  Planned maintenance at a 
                              crude unit, reformer and 
                              coker unit in Oct. will 
                              last 2-4 weeks, the co. 
                              said on Oct. 3. On-going 
                              the co. said on Nov. 21. 
 
 
EAST COAST 
 
Conoco   Trainer, PA   185.0  Crude processing halted; 
                              operations winding down, 
                              the company said on Sept. 30. 
                              The refinery will be 
                              shuttered in six months if 
                              not sold. 
 
Sunoco   Philadelphia  335.0  Refineries up for sale on          July 
         Marcus Hook   190.0  Sept. 6; Marcus Hook shut        2012 
                              Dec. 1 ahead of schedule 
                              due to poor refining econo- 
                              mics. Phila. to shut in July. 
 
GULF COAST 
 
Conoco   Belle Chasse 247.0   Refinery up for sale a 
Phillips LA                   Nov. 29 Bloomberg News 
                              report said. 
 
CVR      Wynnewood     54.0   Maintenance turnaround for up      4Q 
Energy   OK                   to 40 days starting in 3Q 2013.    2012 
 
Holly    Artesia, NM  100.0   Crude runs will be reduced by      Early 
Frontier                      50% during 30 days of major turn-  2012 
                              maintenance in early 2012, the Co. 
                              said on Aug. 5. 
 
Motiva   Port Arthur   285.0  Expansion project to increase      1Q 
         TX                   throughput capacity by 325,000     2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Total    Port Arthur   232.0  Several units, including crude     mid-Nov 
USA      TX                   unit and FCCU shut for six weeks 
                              turnaround maintenance, a source 
                              said on Sept. 21. Work continues, 
                              a source said on Nov. 11. 
 
Valero   McKee    TX    170.0 Vacuum unit turnaround planned for 
                              first half of 2012, company said. 
 
                              Expansion project announced 
                              March 2011 to increase crude oil 
                              throughput by 25,000 b/d to 
                              195,000 b/d. 
 
Valero   Houston,TX    88.0   Seven weeks of FCCU maintnance    end-March 
                              starting in Feb. 2012 the Co. 
                              said on Nov. 1, 2011. 
 
Valero   Norco, LA     185.0  Ten weeks of work planned for      mid-April 
                              the crude and coker units start-   2012 
                              ing Feb. 2012, co said on Nov. 1, 
                              2011. 
 
Valero   Norco, LA     185.0  Hydrocracker project will pro-     2013 
                              ceed and be completed in late 
                              2013, the co. said on 7/27/10. 
 
                              Upgrade project to build           2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Hydrocracker project will pro-     2012 
         TX                   ceed and be completed in late 
                              2012. 
 
MIDWEST 
 
Cenovus  Roxana, IL    356.0  Coker and refinery expansion       Nov 30 
(Conoco/WRB)                  project completed, the company 
                              said on Nov. 30. Crude through- 
                              put increased by 50,000-b/d. 
 
CVR      Coffeyville   115.7  Second phase of turnaround work    Q1 
         KS                   planned for Feb. 2012; first       2012 
                              phase concluded in Nov. 2011. 
 
CVR      Wynnewood      54.0  30-40 days maintenance planned     Q3 
         OK                   in 3rd Q 2013, the co. said on     2013 
                              Nov. 3, 2011. 
 
Holly    Tulsa, OK     125.0  The entire refinery will be shut   Late 
Frontier                      while West Plant section under-    2012 
                              goes major turnaround maintenance 
                              in late 2012, the Co. said on 
                              Aug. 5, 2011. 
 
Husky    Lima, OH      160.0  15-days of maintenance planned at 
Energy                        at aromatics unit in the fall 
                              of 2012. 
 
Husky    Toledo, OH    140.0  Two turnarounds planned in 4Q      4thQ 
Energy                        2011; one for two weeks, one for   2011 
                              25 days. The plant will run at 
                              90% of capacity during work, 
                              the co. said on Nov. 3, 2011. 
 
Marathon Canton, OH     78.0  Chemical release reported on       N/A 
                              Nov. 26 due to unit shutdown 
                              for planned maintenance, the 
                              co. said on Nov. 27. 
 
Tesoro   Mandan, ND     58.0  Total crude-oil processing capa-   2nd Q 
                              city to increase by 17% to 68,000   2012 
                              b/d by 2nd quarter 2012. 
 
Valero   Memphis, TN   180.0  Five weeks of maintenance on       early-April 
                              crude unit starting in March.       2012 
                              2012, co. said on Nov. 1, 2011. 
 
WEST COAST 
 
BP       Carson, CA    265.0  Planned flaring will occur be-     Dec 27 
                              tween Nov 27 and Dec 27, a 
                              filing to regulators said. 
                              Flaring associated with planned 
                              maintenance, a source said. 
 
 
Chevron  El Segundo    280.0  Planned flaring event will be- 
         CA                   on Nov. 29 through Dec 1. Could 
                              be associated with FCCU restart. 
 
                              4 weeks of maintenance at FCCU     Early 
                              beginning late Oct. seen ending    Dec 
                              in December, sources said on Nov. 
                              18. 
 
Chevron  Richmond,     240.0  4-6 weeks of planned work under    Oct 30- 
         CA                   way at unspecified units, the      Nov 13 
                              company said on Oct. 4. Traders 
                              said the crude unit will be worked 
                              on during this 4-6 week period. 
 
Tesoro  West Coast     N/A    Q4 2011 maintenance at West 
                              Coast refineries delayed until 
                              2012. Further details not pro 
                              vided. 
 
Valero   Wilmington,   78.0   Four weeks of maintenance for      Feb. 2012 
         CA                   crude and coker units starting 
                              in January 2012, Co. said on 
                              Nov. 1, 2011. 
 
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Imperial Oil Charts.
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Imperial Oil Charts.