DOW JONES NEWSWIRES 
 

The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Tesoro's 98,000 barrel-a-day refinery in Wilmington, Calif, is back on line after experiencing a temporary power outage on Aug 21, which resulted in some flaring. No impact to supply was evident.

A 114,000 barrel-a-day fluid catalytic cracker at ExxonMobil's 561,000 barrel-a-day refinery in Baytown, Tx, is back on line following 60 hours of down time in the unit due to a breakdown on Aug. 17, according to trading sources.

A fluid catalytic cracker at BP's 407,000 barrel-a-day refinery in Texas City, Tx, tripped off line on Saturday, Aug. 20, causing a flaring event from 10:10 am to 6:04 pm, according to the Texas Commission on Environmental Quality. It wasn't know how much gasoline production was lost during the event.

An emissions event occurred at the Valero refinery in McKee, Texas over the weekend with a compressor going down and causing a flaring event from midnight Friday, Aug. 19 until 8:00 am Saturday in complex number three. No serious outages wre reorted, according to the Texas Commission on Environmental Quality.

ExxonMobil Corp. (XOM) told Texas environmental regulators that FCCU No. 3 tripped Aug. 17 at its 560,600-barrel-a-day refinery in Baytown, Texas. A spokeswoman also said the catalytic lighting unit at the nation's largest refinery was impacted. The company said there was a "minimal impact on production and all customer needs were met" as the FCCU was put on hot standby. Exxon told regulators that emissions could continue until Aug. 20.

Valero Energy Corp. (VLO) said Aug. 18 it will begin restarting one of the crude distillation units, its fluid catalytic cracker and other key units at its Memphis refinery. The 195,000-barrel-a-day refinery has been shut down since an Aug. 5 fire. Valero said it expects to restart the second distillation unit by September.

ConocoPhillips (COP) reported an upset of the alkylation united at its 100,000-barrel-a-day refinery in Ferndale, Wash., Aug. 15. Impact to production is unknown.

Tesoro Corp. (TSO) restarted units at its 94,000 barrel-a-day refinery in Hawaii Wednesday is bringing them to planned operating rates, the company said. Tesoro had shut down unspecified process units at the refinery Monday after a piping component failure.

PBF Energy Company LLC said it reduced the production rate of a key gasoline-making unit Aug. 15 at its 170,000-barrel-a-day Toledo refinery for up to four days while it performs maintenance work, according to a notice filed with Ohio regulators.

ConocoPhillips said on Aug. 11 it was planning to repair the transistors at its 247,000 barrel-a-day refinery in Sweeny, Texas, which could effect the refinery's FCCU, according to a government filing.

Irving Oil said its 300,000 barrel-a-day refinery in Saint John, New Brunswick, Canada, had a "minor upset" on Aug. 11 that did not effect supply.

ConocoPhillips said on Aug. 9 its 195,000 barrel-a-day refinery in Ponca City, Okla., was restarting after a storm-related power outage on Monday.

Western Refining (WNR) said on Aug. 9 that its 125,000 barrel-a-day refinery in El Paso, Texas, was at normal processing rates after a power outage on Sunday forced a shutdown of the FCCU.

Motiva Enterprises LLC said on Aug. 6 that the hydrocracker at its 233,500 barrel-a-day refinery in Norco, La., was shut down because of unspecified reasons.

Alon USA Energy Inc. (ALJ) said Aug. 4 a compressor trip forced the shutdown of the FCCU at its 67,000 barrel-a-day refinery in Big Spring, Texas.

BP Plc (BP) shut one of three crude units at its 405,000 barrel-a-day refinery in Whiting, Ind., for unplanned repairs, a person familiar with operations said Aug. 3.

Alon USA Energy Inc. (ALJ) recently began turnaround maintenance at a key gasoline-making unit at its oil refinery in Big Spring, Texas, a report to Texas state environmental regulators made public on July 25 said. The date of the unit's return to normal service wasn't provided.

 
   For more detailed information, search Dow Jones Newswires using 
the code N/REF. 
 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
EAST COAST 
 
GULF COAST 
 
Alon     Big Spring     67.0  FCCU down after compressor trip. 
         TX 
 
Conoco-  Sweeny, TX    247.0  Transistor repair may effect 
Phillips                      FCCU, company said Aug. 11. 
 
 
 
Exxon    Baytown, TX   560.6  FCCU No. 3 tripped Aug. 17 and 
Mobil                         was placed in hot standby. Exxon 
                              says production impact minimal. 
 
 
Motiva   Norco, LA.    233.5  HCU down for repair for unknown 
                              reason, company said Aug. 6. 
 
Total   Port Arthur    232.0   Several unspecified process units 
USA     TX                    restarted on July 26 after light- 
                              ning strike earlier on 7/16 shut 
                              them down. 
 
MIDWEST 
 
 
PBF     Toledo, OH    170.0   Reduced rate of FCCU Aug. 15 for 
                              up to four days for planned 
                              replacement of boiler parts. 
 
BP      Whiting, IN   405.0   Crude unit shut down Aug. 3. for 
                              unplanned repair. 
 
 
Exxon   Channanhon,   238.6   July 24 equipment malfunction 
Mobil   IL (Joliet)           and emissions confirmed by Co. 
                              on 7/25. No further details 
                              provided. 
 
Valero  Memphis, TN   195.0   Restarting one CDU, FCCU and other 
                              key units after Aug. 5 fire shut 
                              down facility. Plans To restart 
                              second CDU by Sept. 
 
 
ROCKIES 
 
Exxon    Billings,     60.0   Production at minimum rates due 
         MT                   to ruptured Silvertip Pipeline. 
                              Company looking for alternative 
                              crude sources, to co. said on 
                              July 5. 
 
WEST COAST 
 
Conoco-   Ferndale,   100.0  Reported an upset of its alkyla- 
Phillips  WA                 tion unit Aug. 15. Production 
                             impact unknown. 
 
PLANNED 
 
CANADA 
 
North    St. John's   115.0   Refinery in restart on July 29.    End of 
Atlantic                      Plant-wide maintenance began in    July 
                              early May and was extended on 
                              July 5. 
 
CARIBBEAN 
 
EAST COAST 
 
GULF COAST 
 
Alon     Big Spring     67.0  FCCU turnaround maintenance under- 
         TX                   way, a filing to environmental reg- 
                              ulators made public on July 24 said 
 
Conoco  Borger, TX     146.0  Planned maintenance of Unit 29     July 16 
                              electrostatic precipitators start- 
                              ing July 6. 
 
Exxon   Baytown, TX    560.0  The planned shutdown of hydro-     N/A 
Mobil                         finer unit 3 caused emissions on; 
                              July 30 reason for unit shutdown 
                              not clear; restart information not 
                              available. 
 
 
 
Motiva   Port Arthur   285.0  Expansion project to increase      1Q 
         TX                   throughput capacity by 325,000     2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Valero   Corpus        315.0  Crude & coker unit turnaround      Oct. 
                              to start in Oct. for three         2011 
                              weeks. 
 
Valero   McKee    TX    170.0 Crude Unit and FCCU to undergo     3Q 2011 
                              turnaround maintenance for six 
                              weeks starting in Oct. 2011, the 
                              co. said on July 26. 
 
                              Vacuum unit turnaround planned for 
                              first half of 2012, co. said. 
 
                              Expansion project announced 
                              March 2011 to increase crude oil 
                              throughput by 25,000 b/d to 
                              195,000 b/d. 
 
Valero   Norco, LA     185.0  Hydrocracker project will pro-     2013 
                              ceed and be completed in late 
                              2013, the co. said on 7/27/10. 
 
                              Upgrade project to build           2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Hydrocracker project will pro-     2012 
         TX                   ceed and be completed in late 
                              2012. 
 
MIDWEST 
 
BP       Whiting, IN   405.0  Turnaround at Pipestill 12 de- 
                              layed by 3 months; it was sup- 
                              posed to begin in November, a 
                              source said on Mar 25. 
 
Cenovus  Roxana, IL    306.0  Coker and refinery expansion       Q4 2011 
(Conoco/WRB)                  project on track for comple- 
                              tion 4thQ 2011, the co. said 
                              on July 26, 2011. 
 
CVR      Coffeyville   115.7  Periodic turnaround will take      2012 
         KS                   place in two phases beginning in 
                              Fall 2011 and completed in Spring 
                              2012. 
 
Husky    Lima, OH      160.0  15-day isocracker maintenance to 
Energy                        replace reactor catalyst will be- 
                              gin in 3rd Q 2011. Refinery will 
                              operate at 90% of capacity during 
                              that time. 
 
                              15-days of maintenance planned     Autumn 
                              at aromatics unit in the fall      2012 
                              of 2012. 
 
Husky    Toledo, OH    140.0  Isocracker maintenance and gen- 
Energy                        eral maintenance for 38 days will 
                              commence in Q3 2011, the Co. said 
                              on July 28. 
 
                              Minor maintenance planned in 4Q 
                              2011, the co. said on July 28; 
                              no details provided. 
 
Tesoro   Mandan, ND     58.0  Total crude-oil processing capa-   2nd Q 
                              city to increase by 17% to 68,000   2012 
                              b/d by 2nd quarter 2012. 
 
WEST COAST 
 
 
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Imperial Oil Charts.
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Imperial Oil Charts.