The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

A person familiar with operations at BP's (BP, BP.LN) Texas City, Texas, refinery on April 28 said the refinery awaits final preparations for reliable power supply by TNMP at its Texas City, Texas, before restarting. The entire plant was taken off line due to power outages on April 25/26; all units were placed in circulation mode.

Valero Energy Corp. (VLO) said restart procedures got under way on April 28 at the East Plant of its Corpus Christi, Texas, refinery after a transformer failure caused a power outage loss.

Valero Energy Corp. also said the restart of its Texas City, Texas, refinery was making progress following Apr 25/26 power outages forced the shutdown of the entire refinery. Its return to normal operating rates hinges on reliable power supply, the company said the day before.

Marathon Oil Corp. (MRO) on April 27 said operations at its Texas City, Texas, refinery had returned to normal following outages at specific units as a result of overnight power outages on April 25/26.

Marathon Oil, also on April 27, said operations at its Canton, Ohio, refinery were returning to normal following planned turnaround maintenance underway at unspecified units since early March.

ConocoPhillips (COP) said operations at its Sweeny, Texas, refinery had returned to normal on April 26 after temporary power interruptions earlier in the day.

Operations at Suncor Energy's (SU) refinery in Commerce City, Colorado, had returned to normal following planned maintenance that began on March 19, the company said on April 26.

Holly Corp. (HOC) said on April 25 that crude oil throughput at its 125,000-b/d Tulsa, Oklahoma, refinery was reduced by 50% following a mechanical failure that was discovered on April 22.

ConocoPhillips said on April 25 that planned maintenance is under way at unspecified processing units at its Carson, Calif., refinery. Traders said the work is being performed at the plant's crude and coker units; filings to environmental regulators said flaring was planned between April 17 and 24.

Valero Energy said on April 25 that West Plant operations at its Corpus Christi, Texas, refinery returned to normal following a power outage on April 19.

Valero Energy said on April 25 that turnaround maintenance at an FCCU and alkylation unit at its St. Charles refinery in Norco, La., underway since early March, would be completed by mid-May.

Suncor Energy Inc. said April 19 it would begin planned maintenance at its Edmonton refinery starting April 22 that will last about four weeks. This work will take place on one of the refinery's crude units and associated processing units, and will include tie-in work for several capital projects, the company said.

 
 
   For more detailed information, search Dow Jones Newswires using the code N/REF. 
 
 
Operator   Refinery    Capacity   Description                   Restart 
                       (in 000s 
                       bbl/day) 
UNPLANNED 
 
CANADA 
 
CARIBBEAN 
 
Valero     Aruba       235.0  One of two crude units shut      N/A 
                              Apr 25/26 to repair a leak. 
                              No restart estimate, but co. 
                              does not expect it to be a 
                              lengthy outage. 
 
EAST COAST 
 
Sunoco   Marcus Hook   178.0 
 
 
GULF COAST 
 
BP       Texas City    437.0  Refinery ready to restart, a 
         TX                   source said on Apr 28. Awaiting 
                              reliable power supply from third 
                              party provider. Power outage on 
                              Apr 25/26 resulted in plant wide 
                              shutdown. 
 
Conoco   Sweeny        247.0  Operations returned to normal on    Apr 26 
Phillips TX                   April 26 following power problems 
                              caused by a broken power pole at 
                              an electrical substation. 
 
Marathon Texas City     76.0  Refinery resumes normal operations  Apr 27 
         TX                   on Apr 27 following power outages 
                              on April 25/26 impacted certain 
                              units; this was not a plant wide 
                              outage. 
 
Valero   Corpus        315.0  Restart procedures underway on      N/A 
         Christi, TX          April 28 in the East Plant after 
                              a transformer failure caused 
                              a power outage. 
 
                              West Plant operations returned      Apr 25 
                              to normal the co. said on Apr 25 
                              following power outage on Apr 19. 
 
Valero   Texas City    214.0  Restart procedures continue, the 
         TX                   co. said on Apr 28. following a 
                              plant wide shutdown on Apr 26 due 
                              to a power failure. 
 
 
MIDWEST 
 
Holly    Tulsa, OK     125.0  Crude throughput cut by 50% due 
Corp                          to a mechanical failure dis- 
                              covered on April 22, the co. 
                              said on April 25. 
 
ROCKIES 
 
WEST COAST 
 
Tesoro   Wilmington     97.0  Unidentified unit returns to 
         CA                   service, co. said on Apr 25. 
                              after going off line on Apr 
                              19 due to power snag. Unit 
                              identified by traders as a 
                              hydrocracker. 
 
PLANNED 
 
CANADA 
 
Suncor   Edmonton      135.0  4 weeks of planned work starts 
                              Apr 22 at one of two crude units 
                              and associated equip. 
 
CARIBBEAN 
 
Hovensa  St. Croix     350.0  Restarting distillate desulfurizer  May 
                              unit No. 4 in May, Co. said April 
                              15. Unit was damaged by Feb. 11 
                              fire and a replacement one was 
                              brought online. 
EAST COAST 
 
PBF      Delaware      210.0  Plant expected to start up in       2nd Q 
                              in 2Q of 2011.                      2011 
GULF COAST 
 
Exxon    Chalmette      90.0  Cooling exchanger leak con- 
         LA                   tained, the co. said on Apr 
                              28. Impact on operations not 
                              known; co. wouldn't comment.                   2011 
 
Lyondell Houston, TX   270.0  FCCU rate cut on Apr 22 follow-       Mar 
Basell                        upset; the event caused a brief 
                              period of flaring. Unit status 
                              unclear. 
 
Motiva   Port Arthur   285.0  Expansion project to increase       1Q 
                              throughput capacity by 325,000      2012 
                              b/d, to 610,000-b/d, slowed. 
                              Completion now seen 1Q 
                              2012, from 2010. 
 
Pasadena Pasadena, TX   56.0  FCCU, 56,000-b/d, will be taken 
                              out of service Feb. 28 for 44 days 
                              days planned work.  Restart seen 
                              in mid-April. 
 
Valero   McKee    TX   170.0  Hydrocracker in restart following   April 28 
                              planned upgrade work that began in 
                              early April. 
                              Vacuum unit turnaround planned for 
                              first half of 2012, co. said. 
                              Expansion project announced on 
                              March 16 to increase crude oil 
                              throughput by 25,000 b/d to 
                              195,000 b/d. 
 
Valero   Norco, LA     250.0  Turnaround maintenance at FCCU      mid-May 
                              and alkylation unit seen ending 
                              by mid-May, the co. said on 
                              April 26. Work began on 3/7. 
 
                              Hydrocracker project will pro- 2013 
                              ceed and be completed in late 
                              2013, the co. said on 7/27/10. 
 
                              Upgrade project to build            2012 
                              a new diesel hydrotreater 
                              unit moved from 2010 to 
                              4Q 2012. 
 
Valero   Port Arthur   325.0  Six coker drums will be re- 
         TX                   placed in 2011. 
 
                              Hydrocracker project will pro-    2012 
                              ceed and be completed in late 
                              2012. 
 
MIDWEST 
 
BP       Whiting, IN   405.0  Turnaround will start at the      End-May 
                              end of March at Reformer No. 4 
                              and alkylation unit for 60 days, 
                              source said on Mar 25. 
 
                              Turnaround at Pipestill 12 de- 
                              layed by 3 months; it was sup- 
                              posed to begin in November, a 
                              source said on Mar 25. 
 
Marathon Canton, OH     78.0  Unspecified processing units re-    Apr 27 
                              turning to service, the Co. said 
                              on Apr 27 following turnaround 
                              maintenance underway since early 
                              March. 
 
 
 
CVR      Coffeyville   115.7  Periodic turnaround will take place 
         KS                   in two phases beginning in Fall 2011 
                              and completed in Spring 2012. 
 
Valero   Ardmore, OK    90.0  Refinery in restart the co. said    Apr 25 
                              on Apr. 25 following plant wide 
                              turnaround under way since early 
                              March. 
 
Suncor   Commerce       93.0  Planned turnaround maintenance    Apr 26 
Energy   City, CO             completed and refinery resumed 
                              normal operations, the company 
                              said on April 26. The work started 
                              on March 19. 
 
Tesoro   Mandan, ND     58.0  Total crude-oil processing capa-    2nd Q 
                              city to increase by 17% to 68,000   2012 
                              b/d by 2nd quarter 2012. 
 
WEST COAST 
 
Conoco   Carson, CA   139.0   Planned maintenance under way at 
Phillips                      unspecified units the co. said 
                              on April 25. Traders said work 
                              is being performed at a crude 
                              an coker unit. 
 
BP      Carson, CA     265.0  Flaring may occur on April 18-26, 
                              Co. reported April 15. 
 
 
 
 
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Imperial Oil Charts.
Imperial Oil (AMEX:IMO)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Imperial Oil Charts.