RNS Number:4664J
Leyshon Resources Limited
26 September 2006



26 September, 2006


 Leyshon Resources intersects further high grade epithermal veins at its Zheng
                         Guang gold zinc project, China

*       Further High Grade intersections obtained including:
        - 14 metres at 3.48 g/t gold, 23 g/t silver and 4.12% zinc; and
        - 5 metres at 14.55 g/t gold, 36 g/t silver and 4.95% zinc.
*       Angled drilling provides a better understanding of the structural
        controls and more accurate estimations of the high grade gold and 
        zinc veins.
*       Additional results on the remaining 37 holes are expected to be
        released shortly.

Leyshon Resources Limited ("Leyshon") (ASX & AIM: LRL) today announces that it
has intersected further high grade epithermal veins during its drill programme
to extend the 1.2 million ounce Zheng Guang gold zinc project in Heilongjiang,
northeast China.

Results from holes ZGD109, 114, 115 and 116 located to the north west of the
Main Ore Zone include the following significant intersections:

ZGD115 14 metres at 3.48 g/t gold, 23 g/t silver and 4.12% zinc; and
ZGD116 5 metres at 14.55 g/t gold, 36 g/t silver and 4.95% zinc.

Hole ZGD109 intersected over 44 metres of epithermal veins within a 171 metre
zone, ZGD115 intersected 36 metres within in a 103 metre zone and ZGD 116
intersected 23 metres within in an 86 metre zone.

The drill programme is expected to be concluded late October, 2006 and to date,
assay results from 13 out of 49 holes drilled have been released including the
recent bonanza grade intersection from hole ZGD113 grading 600.75 g/t gold, 445
g/t silver and 5.34% zinc.

Further results on the remaining drill holes will be released shortly.

Angled drilling is providing a better understanding of the structural controls
and a more accurate estimate of the true width and grade of the steeply dipping
high grade gold and zinc veins that make up a large proportion of the Zheng
Guang resource.

Managing Director Paul Atherley commenting today said "This fourth set of
results from the 2006 drilling programme continues to show the significant
potential to be realized at the Zheng Guang gold zinc project. The density of
the epithermal veins are much higher than originally thought and we expect that
this will have a very positive impact on the new resource estimate."

For further information contact:

Paul Atherley - Managing Director 
Tel: +86 137 1800 1914 
Mob: +61 417 475 038 M

Leesa Peters Conduit PR
Tel: +44 (0) 20 7429 6600
ob: +44 (0) 781 215 9885

                        http://www.leyshonresources.com

Notes to editor -

Zheng Guang has been interpreted as carbonate base metal gold deposit. These
types of deposit represent some of the most prolific producers in the south west
Pacific Rim and elsewhere. High to bonanza gold grades, such as those recently
reported, can be expected to form part of this style of mineralisation.

This year's programme is the largest to be undertaken in Heilongjiang in recent
years and comprises 10,000 metres of diamond drilling and 20,000 metres of
reverse circulation drilling.

The programme is expected to increase the initial inferred resource estimate of
930,000 ounces gold, 64,000 tonnes zinc and 2.6 million ounces silver (1.2
million equivalent based on 1 g/t gold = 1% zinc) which was estimated on the
results from the 2005 programme.

Leyshon has recently entered into a 20 year joint venture agreement with the
Qiqiha'er Brigade for the financing development and mining of the Zheng Guang
Project. Leyshon remains one of the very few foreign resource companies with its
main operating office in Beijing.

The information in this report relating to Exploration Results, Mineral
Resources or Ore Reserves is based on information compiled by Mr Malcolm Wilson,
a full time employee of the Company, who is a member of the Australasian
Institute of Mining and Metallurgy.

Mr Wilson has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as a Competent Person as defined in the 2004
Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves'. Mr Wilson consents to the inclusion in the report
of the matters based on his information in the form and context in which it
appears.

Diamond Drilling Programme

To 24 September, 45 diamond drill holes have been completed with 4 currently
being drilled. Total metres drilled to date in 2006 is 11,832. Hole locations
are shown below.

Drill Hole No        Grid         Grid     Azim / Bearing*    Final Depth (m)
                   Co-Ord N     Co-Ord E

ZGD133                 49,400      9,590       -60/090                  363.25
ZGD134                 49,500      9,550       -60/090                  376.30
ZGD135                 49,150      9,980       -60/270                  129.90
ZGD136                 49,305      9,940       -60/270                  161.85
ZGD137                 49,000      9,825       -60/090                  172.35
ZGD138                 49,100      9,990       -60/090                   85.90
ZGD139                 49,550      9,470       -60/090                  382.75
ZGD140                 49,500      9,645       -85/090                  401.00
ZGD141                 49,100      9,910       -60/090                  151.25
ZGD142                 49,400      9,550       -60/090                  388.20
ZGD143                 49,350      9,650       -60/090                  341.00
ZGD144                 49,050      9,950       -60/090                  121.55
ZGD145                 49,450      9,605       -85/090                  396.00**
ZGD146                 49,000      9,885       -60/090                  217.05
ZGD147                 49,400      9,510       -60/090                  342.40**
ZGD148           Zheng Guang     North         -60/145                  202.75**
ZGD149           Zheng Guang     North         -60/145                   76.30**

* Bearings are all grid bearings **Currently being drilled as at 24 September.
                        Assays above 0.5g/t Gold Cutoff

Drill Hole Number   From    To      Metres        Au          Ag         Zn
                    (m)     (m)                 (g/t)*      (g/t)       (%)
ZGD109               107     109           2        1.41          9       0.81
                     125     126           1        0.53          4       0.02
                     136     140           4        0.41          3       0.21
                     158     159           1        1.40         10       0.71
                     174     175           1        1.53         11       1.37
                     179     180           1       66.81         44       3.50
                     185     186           1        1.46         11       2.19
                     212     218           6        0.80          5       0.45
                     222     226           4        0.82          4       0.72
                     229     235           6        0.69          4       0.33
                     241     255          14        3.48         23       4.12
Incl.                245     248           3        4.96         43       9.11
Incl.                252     253           1        9.73         52      10.71
                     258     259           1        1.57          4       0.05
                     266     267           1        1.53          5       0.34
                     277     278           1        3.51          3       0.09

ZGD114                61      62           1        0.69          2       0.01

ZGD115                45      47           2        0.74          2      0.02
                      60      61           1        0.78          4      0.96
                      77      80           3        0.94          5      0.92
                      95     101           6        3.14         17      1.60
Incl.                 96      98           2        7.29         42      3.20
                     104     108           4        1.80         10      1.05
                     111     121          10        3.48         14      1.01
Incl.                115     117           2        9.05         21      1.18
                     124     128           4        2.18          9      0.31
Incl.                127     128           1        5.77         26      0.91
                     139     141           2        3.20          5      0.30
                     147     148           1        5.55          3      0.02

ZGD116               101     103           2        1.57         10      0.64
                     117     118           1        1.52          9      0.87
                     134     143           9        1.14          5      0.32
Incl.                134     135           1        6.49         15      1.02
                     159     161           2        1.09          4      0.54
                     164     172           8        9.60         25      3.62
Incl.                164     169           5       14.55         36      4.95
                     186     187           1        2.44         13      0.85

Using 0.5g/t cut off and no more than 2 metres of internal waste.

* Preliminary Au results using aqua regia digest on AAS determination on 50gm
charge. Results are subject to confirmation by repeat assay from SGS laboratory
in Tianjin, China.



                      This information is provided by RNS
            The company news service from the London Stock Exchange

END
DRLAKAKPABKKPCB

Leyshon Resources (LSE:LRL)
Historical Stock Chart
From May 2024 to Jun 2024 Click Here for more Leyshon Resources Charts.
Leyshon Resources (LSE:LRL)
Historical Stock Chart
From Jun 2023 to Jun 2024 Click Here for more Leyshon Resources Charts.