AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”)
(TSX.V: AAZ, OTC: AZURF), is pleased to report
both drill rig and crew have been mobilized on site to begin the
2021 winter exploration program at the East Preston uranium
project, located in the western Athabasca Basin, Saskatchewan,
Canada.
The 2021 exploration program will be a minimum
10-12 hole, 2000-to-2500 meter diamond drill campaign. Drilling is
anticipated to begin this weekend. TerraLogic Exploration and
Bryson Drilling have been contracted to execute the drill program,
which is being conducted under the guidance and supervision of
Azincourt’s Exploration Manager, Trevor Perkins, P.Geo, and Jarrod
Brown, M.Sc., P.Geo, Chief Geologist and Project Manager with
TerraLogic Exploration.
As previously reported targeting for the 2021
drill program is the conductive corridor from the A-Zone through to
the G-Zone (Figures 1 and 2) and is based on a compilation of
results from the 2019 and 2020 drill programs, 2018 through 2020
ground based EM and gravity surveys, and property wide VTEM and
magnetic surveys.
The 2020 HLEM survey completed in December
indicates multiple prospective conductors and structural complexity
along the eastern edge of this corridor. Drilling in the A zone
suggests this structural corridor hosts significant graphitic
packages within strongly sheared and faulted host lithologies,
indicating an environment conducive to fluid movement and uranium
deposition. Drilling will start in the AB-Zone and continue
southwest along the G-Zone (see Figure 2).
“Naturally, we’re eager to get the drill program
underway,” said Alex Klenman, President and CEO. “The most exciting
part of what we do is drilling. We’re only 12 holes into East
Preston, and to date the data generated is suggesting we’re getting
closer to a potential discovery. The data is strong, and it is
reflected through multiple exploration activities that essentially
stack on top of one another. This coincidental layering creates
very strong targets. We have dozens of targets to test, we’re
really only scratching the surface,” continued Mr. Klenman.
Once drilling has commenced the Company will
issue a news release and will follow up with regular reports as the
program progresses.
Figure 1: Target corridors at the East Preston
Uranium Project, Western Athabasca Basin
Saskatchewan:https://www.globenewswire.com/NewsRoom/AttachmentNg/f1c8e9c5-1d12-4592-8b2b-00f1f5ca554c
Figure 2: 2021 Drill Target areas at the East
Preston Uranium
Project:https://www.globenewswire.com/NewsRoom/AttachmentNg/96987719-11c8-4950-99da-0f14629e1fd7
Figure 3: Project Location – Western Athabasca
Basin, Saskatchewan,
Canada:https://www.globenewswire.com/NewsRoom/AttachmentNg/b73eb9ee-dbe4-4e5c-a2e7-79ec086a0c22
About East Preston
Azincourt currently controls a 70% interest in
the 25,000+ hectare East Preston project as part of a joint venture
agreement with Skyharbour Resources (TSX.V: SYH), and Dixie Gold
Inc. (TSX.V: DG). Multiple prospective conductive, low magnetic
signature corridors have been discovered on the property. These
distinct corridors have a total strike length of over 25 km, each
with multiple EM conductor trends identified. Ground prospecting
and sampling work completed to date has identified outcrop, soil,
biogeochemical and radon anomalies, which are key pathfinder
elements for unconformity uranium deposit discovery.
The East Preston Project has multiple long
linear conductors with flexural changes in orientation and offset
breaks in the vicinity of interpreted fault lineaments – classic
targets for basement-hosted unconformity uranium deposits. These
are not just simple basement conductors; they are clearly
upgraded/enhanced prospectivity targets because of the structural
complexity.
The targets are basement-hosted unconformity
related uranium deposits similar to NexGen’s Arrow deposit and
Cameco’s Eagle Point mine. East Preston is near the southern edge
of the western Athabasca Basin, where targets are in a near surface
environment without Athabasca sandstone cover – therefore they are
relatively shallow targets but can have great depth extent when
discovered. The project ground is located along a parallel
conductive trend between the PLS-Arrow trend and Cameco’s
Centennial deposit (Virgin River-Dufferin Lake trend).
Qualified Person
The technical information in this news release
has been prepared in accordance with the Canadian regulatory
requirements set out in National Instrument 43-101 and reviewed on
behalf of the company by C. Trevor Perkins, P.Geo., Exploration
Manager of Azincourt Energy, and a Qualified Person as defined by
National Instrument 43-101.
About Azincourt Energy
Corp.
Azincourt Energy is a Canadian-based resource
company specializing in the strategic acquisition, exploration, and
development of alternative energy/fuel projects, including uranium,
lithium, and other critical clean energy elements. The Company is
currently active at its joint venture East Preston uranium project
in the Athabasca Basin, Saskatchewan, Canada, and the Escalera
Group uranium-lithium project located on the Picotani Plateau in
southeastern Peru.
ON BEHALF OF THE BOARD OF AZINCOURT
ENERGY CORP.
“Alex Klenman”Alex Klenman, President
& CEO
Neither the TSX Venture Exchange nor its
regulation services provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
This press release includes “forward-looking
statements”, including forecasts, estimates, expectations and
objectives for future operations that are subject to a number of
assumptions, risks and uncertainties, many of which are beyond the
control of Azincourt. Investors are cautioned that any such
statements are not guarantees of future performance and that actual
results or developments may differ materially from those projected
in the forward-looking statements. Such forward-looking information
represents management’s best judgment based on information
currently available. No forward-looking statement can be
guaranteed, and actual future results may vary materially.
For further information please
contact:
Alex Klenman, President & CEOTel:
604-638-8063info@azincourtenergy.com
Azincourt Energy Corp.1430 – 800 West Pender
StreetVancouver, BC V6C
2V6www.azincourtenergy.com
Dixie Gold (TSXV:DG)
Historical Stock Chart
From Nov 2024 to Dec 2024
Dixie Gold (TSXV:DG)
Historical Stock Chart
From Dec 2023 to Dec 2024