Exxon Mobil Corp. (XOM) on Jan. 10 said unplanned flaring at its
oil refinery in Torrance, Calif., was caused by two temporary
external power interruptions the day before. The impact of the
outages is being assessed.
ConocoPhillips (COP) on Jan. 10 said planned maintenance is
under way at its Lake Charles refinery in Westlake, La., but didn't
disclose the specific units involved or the duration of the
work.
Valero Energy Corp. (VLO) on Jan. 9 said crude oil throughput
rates at its oil refinery on the island country of Aruba have been
reduced by an unspecified amount for the past several weeks due to
economics. The company is evaluating its options for the refinery
on an ongoing basis.
Valero Energy Corp. on Jan. 9 said the FCCU at its oil refinery
in Meraux, La., will be shut while planned turnaround maintenance
is performed at the plant's alkylation unit. The alkylation unit
turnaround started last week.
Routine maintenance at an alkylation unit is on going at BP
PLC's (BP, BP.LN) oil refinery in Texas City, Texas, a person
familiar with operations at the plant said on Jan. 9. The work got
under way earlier this month, according to traders doing business
with BP, but it isn't clear when the unit will be returned to
service.
For more detailed information, search Dow Jones Newswires using
the code N/REF.
Operator Refinery Capacity Description Restart
(in 000s
bbl/day)
UNPLANNED
CANADA
CARIBBEAN
Valero Aruba 235.0 Crude throughput rates cut by an
unspecified amount for the past
several weeks due to economics
co. said on Jan 9.
EAST COAST
Sunoco Philadelphia 330.0 Hydrotreater shut Dec 15 for
PA maintenance; restart timing not
known. Traders say unit remains
shuttered on Jan 10.
GULF COAST
Pasadena Pasadena TX 100.0 Coker unit shut on Dec 10 due to N/A
Refining fire. One man injured. Fire con-
tained; cause under investigation.
MIDWEST
Conoco Roxana, IL 356.0 Coke drum fire and process unit N/A
Phillips upset on Dec 9, a filing to
regulators said. Impact to pro-
duction unclear.
ROCKIES
Sinclair Sinclair 74.0 Refinery at reduced rates fol-
WY lowing fires at CDU on Sept. 3
and Sept. 4. Repairs underway.
Plant continues to operate at re-
duced rates, sources said Nov. 11.
WEST COAST
Exxon Torrance 155.0 Two temporary external power out-
Mobil CA ages on Jan 9 caused flaring. Im-
pact on production being assessed
the co. said on Jan 10.
PLANNED
CANADA
CARIBBEAN
EAST COAST
Conoco Trainer, PA 185.0 Crude processing halted;
operations winding down,
the company said on Sept. 30.
The refinery will be
shuttered in six months if
not sold.
Sunoco Philadelphia 335.0 Refineries up for sale on July
Marcus Hook 190.0 Sept. 6; Marcus Hook shut 2012
Dec. 1 ahead of schedule
due to poor refining econo-
mics. Phila. to shut in July.
GULF COAST
BP Texas City 406.6 Alkylation unit routine main-
TX tenance that began earlier in
Jan continues, a person familiar
with the refinery said on Jan 9.
Restart estimate not available.
Conoco Belle Chasse 247.0 Refinery up for sale a
Phillips LA Nov. 29 Bloomberg News
report said.
Conoco Westlake, LA 239.4 Planned maintenance currently
Phillips under way at unspecified unit(s)
the co. said on Jan 10; no other
details provided.
CVR Wynnewood 54.0 Maintenance turnaround for up 4Q
Energy OK to 40 days starting in 3Q 2013. 2012
Holly Artesia, NM 100.0 Crude runs will be reduced by Early
Frontier 50% during 30 days of major turn- 2012
maintenance in early 2012, the Co.
said on Aug. 5.
Motiva Port Arthur 285.0 Expansion project to increase 1Q
TX throughput capacity by 325,000 2012
b/d, to 610,000-b/d, slowed.
Completion now seen 1Q
2012, from 2010.
Valero McKee TX 170.0 Vacuum unit turnaround planned for
first half of 2012, company said.
Expansion project announced
March 2011 to increase crude oil
throughput by 25,000 b/d to
195,000 b/d.
Valero Meraux, LA 135.0 FCCU will be shuttered during
alkylation unit turnaround main-
tenance that began wk of Jan 2
the co. said on Jan 9.
Valero Houston,TX 88.0 Seven weeks of FCCU maintnance end-March
starting in Feb. 2012 the Co.
said on Nov. 1, 2011.
Valero Norco, LA 185.0 Ten weeks of work planned for mid-April
the crude and coker units start- 2012
ing Feb. 2012, co said on Nov. 1,
2011.
Valero Norco, LA 185.0 Hydrocracker project will pro- 2013
ceed and be completed in late
2013, the co. said on 7/27/10.
Upgrade project to build 2012
a new diesel hydrotreater
unit moved from 2010 to
4Q 2012.
Valero Port Arthur 325.0 Hydrocracker project will pro- 2012
TX ceed and be completed in late
2012.
MIDWEST
CVR Coffeyville 115.7 Second phase of turnaround work Q1
KS planned for Feb. 2012; first 2012
phase concluded in Nov. 2011.
CVR Wynnewood 54.0 30-40 days maintenance planned Q3
OK in 3rd Q 2013, the co. said on 2013
Nov. 3, 2011.
Holly Tulsa, OK 125.0 The entire refinery will be shut Late
Frontier while West Plant section under- 2012
goes major turnaround maintenance
in late 2012, the Co. said on
Aug. 5, 2011.
Husky Lima, OH 160.0 15-days of maintenance planned at
Energy at aromatics unit in the fall
of 2012.
Husky Toledo, OH 140.0 Two turnarounds planned in 4Q 4thQ
Energy 2011; one for two weeks, one for 2011
25 days. The plant will run at
90% of capacity during work,
the co. said on Nov. 3, 2011.
Tesoro Mandan, ND 58.0 Total crude-oil processing capa- 2nd Q
city to increase by 17% to 68,000 2012
b/d by 2nd quarter 2012.
Valero Memphis, TN 180.0 Five weeks of maintenance on early-April
crude unit starting in March. 2012
2012, co. said on Nov. 1, 2011.
WEST COAST
Tesoro West Coast N/A Q4 2011 maintenance at West
Coast refineries delayed until
2012. Further details not pro
vided.
Valero Wilmington, 78.0 Four weeks of maintenance for Feb. 2012
CA crude and coker units starting
in January 2012, Co. said on
Nov. 1, 2011.