TIDMOMI 
 
 

Orosur Mining Inc. ("Orosur" or "the Company") (TSX: OMI) (AIM: OMI) has filed a technical report prepared by Andes GMS SPA in accordance with National Instrument 43-101 Standards for Mineral Projects ("NI 43-101") on the Anzá gold exploration project ("Anzá") in Colombia (the "Report"). To view the full report, please visit www.orosur.ca/operations/technical-reports.

 

Anzá is an advanced exploration project and the Report includes a review of the regional geology, local geology, types and degree of the mineralization, exploration history, metallurgical testing and drilling results and represents an update from the technical report prepared in May 2010 by Bargmann & Platten of Snowden Mining Industry Consultants.

 

OVERVIEW

 
 
    -- Total project area of 105 km² (10,615 hectares) located 50km west of 

Medellin, Colombia with access via predominantly paved roads with a

shorter gravel road leading immediately into the project area. The

site has existing infrastructure including water, power, roads and a

camp.

 
    -- 100% owned with no option fees or commitments, and includes existing 

environmental and mining permits relating to two gypsum mines located

on the property and mined since 1991 by a thrid party.

 
    -- Located on the eastern side of the Cordillera Occidental of Colombia 

in the Metallogenic Belt of the Middle Cauca, which mainly hosts two

types of gold mineralization: a porphyry style and/or an epithermal

type with a strong relationship with the Cauca-Romeral fault zone,

which constitutes a suture zone associated with the collision of the

Choco Volcanic Arc. The most important gold mining districts of the

country are located in this region.

 
    -- Magnetometry, induced polarization, radiometry, soil and rock sampling 

surveys have all been completed leading to the identification of 5

initial targets within the property: APTA, Charrascala, Guaimarala,

Jesuitas and La Cejita. APTA has been drilled and initial drilling has

been conducted at Charrascala.

 
    -- Initial metallurgical and rock density test work completed in mid-2016 

provided average gold recoveries ranging from 95.9% - 96.1% utilising

a combination of gravity concentration, flotation and cyanidation

processing, which is comparable to the metallurgical recoveries of the

development projects and producing mines in the region.

 
    -- Historic diamond drilling of 17,409m consisting of 53 holes was 

completed during 2011 to 2012 by Waymar Resources, a company and

assets acquired by Orosur in mid-2014.

 
    -- This drilling confirmed that gold and sulphide mineralization are 

associated with a structurally controlled hydrothermal system (fault

and breccia zones). Drilling also identified three units as carriers

of gold mineralization: silicified matrix- supported breccia with

pyrite / sphalerite / chalcopyrite disseminated in the matrix and

veins; fault zones with similar sulphides; and laminated mudstone or

tuff cut by quartz-sulphide veins.

 
    -- Notable interscepts from the 2011 to 2012 drill campaign include: 
 
Hole        From   To     Intercept  Au      Ag      Zn 
#           m      m      m          g/t     g/t     % 
MAP-11      213.0  219.0  6.0        18.26   1.95    0.35 
including   217.5  219.0  1.5        72.30   6.90    0.93 
MAP-20      145.0  186.0  41.0       3.85    1.39    1.25 
including   171.3  177.0  5.7        19.84   3.94    1.66 
MAP-21      224.0  242.0  18.0       14.14   2.05    2.83 
including   225.0  229.4  4.4        45.62   5.47    10.59 
            252.0  253.0  1.0        10.85   1.80    0.67 
MAP-29      183.0  194.9  11.9       10.57   2.40    1.61 
including   185.0  187.0  2.1        40.25   4.85    4.64 
MAP-33      157.1  179.5  22.4       10.42   1.87    1.56 
including   165.0  170.8  5.8        29.49   3.37    2.81 
MAP-36      198.6  227.5  28.9       3.88    1.68    0.43 
including   205.5  217.5  12.0       8.83    2.65    0.59 
MAP-38      123.4  124.5  1.1        15.40   3.60    1.94 
            172.0  212.5  40.5       14.09   3.82    1.95 
including   179.5  186.0  6.5        70.99   6.34    0.12 
including   184.6  186.0  1.4        176.00  15.20   0.39 
including   202.0  205.4  3.4        20.89   9.71    4.75 
MAP-43      65.5   68.6   3.1        7.66    73.04   0.68 
            167.5  231.5  64.0       1.88    1.88    0.70 
including   209.0  214.0  5.0        9.07    3.40    0.70 
MAP-47      105.0  118.3  13.3       2.24    316.25  1.00 
including   106.0  110.5  4.5        4.69    768.89  2.34 
MAP-48      181.0  195.7  14.7       40.37   9.30    3.41 
including   185.5  195.7  10.2       58.03   13.16   4.85 
including   187.6  189.5  1.9        219.00  29.50   6.55 
 
 
 
    -- Orosur commenced its own diamond drilling programme in late 2017 
 
    -- Orosur completed 18 diamond drill holes totalling 6,314m at the APTA 

target, improving and validating the geological model. Drilling

extended the mineralized zone a further 95m down dip, to a total depth

of 400m.

 
    -- Drilling to date has encountered a number of notable intercepts over 

20 g/t Au, including:

 
Hole        From   To      Intercept  Au      Ag     Zn 
#           m      m       m          g/t     g/t    % 
MAP_11      217.5  219.0   1.5        72.30   6.90   0.93 
MAP_20      172.3  175.5   3.2        22.28   4.55   1.98 
Including   172.3  174.0   1.7        32.60   5.50   1.82 
MAP_21      225.0  231.6   6.6        35.24   5.00   6.97 
Including   226.3  228.0   1.7        61.40   8.20   4.03 
Including   228.0  229.4   1.4        51.50   5.10   1.80 
MAP_28      220.5  221.7   1.2        29.20   8.10   0.58 
MAP_29      185.0  187.0   2.0        40.25   4.85   4.64 
Including   186.0  187.0   1.0        54.20   6.00   3.03 
MAP_33      166.5  170.8   4.3        37.09   3.99   2.93 
Including   167.5  169.0   1.5        79.90   7.70   3.15 
MAP_36      213.2  214.5   1.3        23.00   4.40   0.63 
MAP_38      179.5  186.0   6.5        70.99   6.34   0.12 
Including   181.0  182.5   1.5        99.90   7.50   0.03 
Including   184.6  186.0   1.4        176.00  15.20  0.39 
            202.0  205.4   3.4        20.89   9.71   4.75 
Including   203.5  204.5   1.0        28.30   12.50  5.85 
MAP_48      187.6  194.0   6.4        91.62   20.28  7.52 
Including   187.6  189.5   1.9        219.00  29.50  6.55 
Including   190.5  191.5   1.0        89.10   15.20  16.25 
MAP_51      201.6  203.3   1.7        37.00   5.40   13.80 
            303.5  305.0   1.5        22.90   8.40   6.06 
MAP_054     145.7  148.9   3.2        24.92   1.40   2.40 
Including   145.7  146.7   1.0        37.96   1.30   0.70 
MAP_062     237.7  238.50  0.80       25.84   7.40   0.07 
MAP_070     183.0  184.0   1.0        23.66   3.60   0.04 
            257.0  259.0   2.0        22.04   4.65   4.23 
Including   257.0  258.0   1.0        28.93   5.30   3.59 
 
 
 
    -- As part of this programme 5 holes, comprising 3,045m of diamond 

drilling, were completed at Charrascala, which tested the strong gold

soil geochemical anomalies along an 800m north-south corridor.

Drilling results included intersections of 3.43 g/t Au and 30.60 g/t

Ag over 1.5m, and 2.62 g/t Au and 14.30 g/t Ag over 0.90m;

 
    -- Exploration Agreement in place with Newmont Mining announced in late 

2018.

 

Qualified Person

 

The Report has been prepared by or under the supervision of independent geologist Mauricio Rubio (AusIMM), a Qualified Person under NI 43-101.

 

Andes GMS SPA have conducted a site visit allowing it to audit the Company's field procedures, sample handling and preparation techniques, analytical procedures, results and Quality Assessment / Quality Control ("QAQC") systems (check assaying) that it implements. Andes confirms that Orosur has undertaken its exploration programmes using industry best practices.

 

About Orosur Mining Inc.

 

Orosur Mining Inc. (TSX: OMI; AIM: OMI) is a precious metals developer and explorer focused on identifying and advancing gold projects in South America. The Company operates in Colombia and Uruguay.

 

For further information, please contact:

 

Orosur Mining Inc

 

Ignacio Salazar, Chief Executive Officer

 

Ryan Cohen, VP Corporate Development & Interim CFO

 

info@orosur.ca

 

Tel: +1 (778) 373-0100

 

Cantor Fitzgerald Europe - Nomad & Joint Broker

 

David Porter/Keith Dowsing

 

Tel: +44 (0) 20 7894 7000

 

Numis Securities Limited - Joint Broker

 

John Prior / James Black / Paul Gillam

 

Tel: +44 (0) 20 7260 1000

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation ("MAR"). Upon the publication of this announcement via Regulatory Information Service, this inside information is now considered to be in the public domain. If you have any queries on this, then please contact Ryan Cohen, VP Corporate Development and Interim CFO of the Company (responsible for arranging release of this announcement on behalf of the Company) on: +1 (778) 373-0100.

 
 

View source version on businesswire.com: https://www.businesswire.com/news/home/20190110005487/en/

 
This information is provided by Business Wire 
 
 

(END) Dow Jones Newswires

January 10, 2019 10:59 ET (15:59 GMT)

Orosur Mining (LSE:OMI)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Orosur Mining Charts.
Orosur Mining (LSE:OMI)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Orosur Mining Charts.