RNS Number:6610Y
Investika Ltd
20 June 2007

                                 Investika Ltd
                         ("Investika" or the "Company")

              JORC Resource Estimate for the Berong Nickel Project

The Company is pleased to announce that a JORC compliant resource estimate has
been completed for part of the Berong Nickel Project, in which the Company has
an 18.7% interest. The resource estimate covers portions of the 288 hectare
project area under the recently granted Mineral Production Sharing Agreement
(MPSA Application No. APSA-IVB-047).  The resource estimate was calculated by
Snowden Mining Industry Consultants (Perth, Australia) following in-fill pitting
and drilling totalling approximately 13,901 metres for 1266 test pits and 435
drill holes. The JORC compliant Measured, Indicated and Inferred Resource is:

                      9.92 million tonnes at 1.55% nickel

                       154,000 tonnes of contained nickel

                            @ 1.0% Ni cut-off grade

The resource lies within 0.5m of the surface and averages approximately 8 metres
in thickness. A plan showing the portion of the MPSA area tested to date will be
available from tomorrow on the Company's website (www.investika.com).  The
categorisation of the resource is detailed below. The resource is predominantly
saprolite (earthy and rocky) with lesser quantities of limonite.

Drilling within the MPSA area is ongoing and is aimed at delineating additional
JORC compliant resources.

As previously reported, the Berong Nickel Project covering Berong, Moorsom and
Long Point, has an estimated resource of some 250 million tonnes at 1.3% nickel.
Drilling and test pitting of the surrounding MPSA areas is expected to
re-commence in the second half of 2007. The geographical location of the
surrounding MPSA areas and full details of the JORC resource estimates will be
available on the Company's website from tomorrow (www.investika.com).

The Berong Nickel Project is a Joint Venture between the Company ,Toledo Mining
Corporation plc and Atlas Consolidated Mining & Development Corporation.

Enquiries to:

Chrisilios Kyriakou, Chief Executive Officer

Investika Ltd

Telephone: 020 7514 1480

James Joyce

WH Ireland Limited

Telephone: 020 7220 1666


Notes to Editors:

Detailed JORC Resource Estimates


                    Berong Nickel Project JORC Resource Estimate at 1.0% Ni Cutoff Grade
JORC Category       Tonnes       Ni%      Ni Metal       Co%        Fe2 O3 %     MgO%    P2 O5%      SiO2 %
                  (Millions)              (Tonnes)                                          

Measured             4.84       1.58       76,472       0.10        41.55       14.00    
Investika Di (LSE:IVK)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Investika Di Charts.
Investika Di (LSE:IVK)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Investika Di Charts.