First Solar Inc (F3A)
TG
JP Energie Environnement choisit les modules solaires bas carbone de First Solar pour sa centrale de Labarde Construite sur un terrain industriel désaffecté, cette installation de 59MWp est...
Period | Change | Change % | Open | High | Low | Avg. Daily Vol | VWAP | |
---|---|---|---|---|---|---|---|---|
1 | -5.92 | -3.26999558109 | 181.04 | 190.02 | 172.12 | 1576 | 181.27222843 | DE |
4 | -1.84 | -1.03978300181 | 176.96 | 194.08 | 170.02 | 1574 | 182.64888677 | DE |
12 | 3.9 | 2.2777712884 | 171.22 | 202.65 | 162.34 | 2916 | 184.25524752 | DE |
26 | -25.13 | -12.5493133583 | 200.25 | 234.65 | 162.34 | 2550 | 192.68740782 | DE |
52 | 41.68 | 31.2350119904 | 133.44 | 282.5 | 126.3 | 3169 | 194.67121426 | DE |
156 | 106.94 | 156.849515987 | 68.18 | 282.5 | 53.4 | 2141 | 162.06680581 | DE |
260 | 128.42 | 274.989293362 | 46.7 | 282.5 | 27.2 | 1956 | 131.46561313 | DE |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.