Current Report Filing (8-k)
October 19 2016 - 3:47PM
Edgar (US Regulatory)
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
Form
8-K
CURRENT
REPORT
Pursuant
to Section 13 or 15(d) of
The
Securities Exchange Act of 1934
October
19, 2016
Date
of Report (Date of earliest event reported)
Zion
Oil & Gas, Inc.
(Exact
name of registrant as specified in its charter)
Delaware
(State
or other jurisdiction of incorporation)
001-33228
|
|
20-0065053
|
(Commission
File Number)
|
|
(IRS
Employer Identification No.)
|
12655
North Central Expressway, Suite 1000, Dallas, TX 75243
(Address
of Principal Executive Offices)
Registrant's
telephone number, including area code: 214-221-4610
Check
the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant
under any of the following provisions:
☐
|
Written
communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
|
|
|
☐
|
Soliciting
material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
|
|
|
☐
|
Pre-commencement
communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
|
|
|
☐
|
Pre-commencement
communications pursuant to 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
|
On
October 13. 2016, Zion Oil & Gas, Inc. (the “Company”) timely complied with two key Special Conditions of our
existing license terms established by the Israel Petroleum Commissioner, by providing the fully executed drilling contract with
S.A. Daflog, S.R.L. (dated 6 October 2016) and a Detailed Drilling Engineering Plan for the Megiddo-Jezreel #1 well (dated 13
October 2016). Zion entered into a drilling contract with S.A. DAFLOG S.R.L., an Israeli-registered related party entity to DAFORA
S.A. DAFORA is the largest drilling company in Romania and has drilled over 1,000 wells in Romania, Eastern Europe and East Africa.
Zion will use DAFORA’s F-400 drilling rig which has a 3,000 HP capacity drawworks capable of drilling to over 7,000 meters.
This provides more than sufficient horsepower and safety factor to drill our planned well with a target depth of up to 4,500 meters.
The DAFORA rig is currently stored in Israel, at Givot Olam’s Meged-8 drill site.
The
drill site plan is being prepared by an outside engineering firm to accommodate DAFORA’s F-400 Rig. We intend to award the
drill site construction contract as soon as the engineering firm completes the site plan. The final step in the process is for
Zion to submit the drill site plan along with our Application to Drill for final drilling program approval. We plan to begin drill
site construction in November which should take approximately 45-60 days to complete. Upon completion of the access road
and drill site, we hope to commence rig mobilization to the MJ#1 location to begin rig-up and acceptance testing.
The
Company is dedicated to exploring for oil and gas onshore Israel. We are 100% focused on our Megiddo-Jezreel License, a large
area south of the Sea of Galilee that includes the Jezreel and Megiddo valleys. This license gives Zion the exclusive right to
explore in an area of approximately 99,000 acres that appears to possess the key geologic ingredients of an active petroleum system
with significant onshore exploration potential. We intend to start drilling our deep exploratory well, the Megiddo-Jezreel #1,
as soon as possible, assuming sufficient capital is raised.
Item 9.01
|
Financial
Statements and Exhibits.
|
(d)
Exhibits
|
99.1
|
– Press release dated October 19, 2016
|
SIGNATURES
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf
by the undersigned hereto duly authorized.
|
Zion
Oil and Gas, Inc.
|
|
|
Date: October
19, 2016
|
By:
|
/s/ Victor
G. Carrillo
|
|
|
Victor
G. Carrillo
|
|
|
Chief
Executive Officer
|
3
Zion Oil and Gas (QB) (USOTC:ZNOG)
Historical Stock Chart
From Aug 2024 to Sep 2024
Zion Oil and Gas (QB) (USOTC:ZNOG)
Historical Stock Chart
From Sep 2023 to Sep 2024