Item 1. Business.
General
The Goldfield Corporation, incorporated in Wyoming in 1906 and subsequently reincorporated in Delaware in 1968, is primarily engaged in the construction of electrical infrastructure for the utility industry and industrial customers, primarily in the Southeast and mid-Atlantic regions of the United States and Texas. Unless the context otherwise requires, the terms “Goldfield,” the “Company,” “we,” “our” and “us” as used herein mean The Goldfield Corporation and its consolidated subsidiaries.
Our Internet website address is www.goldfieldcorp.com. Within the “Investor Relations” section, under the “Investors” tab of our website, we make available, free of charge, our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended, as soon as reasonably practicable after we electronically file such material with, or furnish it to, the U.S. Securities and Exchange Commission (“SEC”). The information on our website is not incorporated by reference into this Annual Report on Form 10-K. You may also access our reports at the SEC’s website at www.sec.gov. You may also read and copy any document we file with the SEC at the SEC’s public reference facilities located at 100 F Street, NE, Washington, DC 20549. Please call the SEC at 1-800-SEC-0330 for further information on the public reference facilities.
Financial Information About Geographic Areas
During the years ended
December 31, 2017
and
2016
, our operations were exclusively in the United States.
Employees
As of
March 4, 2018
, we had a total of
373
employees, which included
363
full-time and
ten
part-time employees. These employees included
82
unionized employees at our subsidiary, C and C Power Line, Inc. (“C&C”). The total number of employees includes
323
hourly-rate employees. The number of hourly-rate employees fluctuates depending upon the number and size of projects under construction at any particular time. We believe that our relationship with our employees is good.
Electrical Construction Operations
Through our subsidiaries, Power Corporation of America (“PCA”), Southeast Power Corporation (“Southeast Power”) and C&C, we are engaged in the construction of electrical infrastructure for the utility industry and industrial customers. Southeast Power and C&C operate under Power Corporation of America, headquartered in Port Orange, Florida. Southeast Power is headquartered in Titusville, Florida, and has additional offices in Bastrop, Texas and Spartanburg, South Carolina. C&C, headquartered in Jacksonville, Florida, is a full service electrical contractor that provides similar services as Southeast Power with a unionized work force.
Our electrical construction business includes the construction of transmission lines, distribution systems, substations, drilled pier foundations and other electrical services.
Representative customers include:
|
|
|
|
Santee Cooper (South Carolina Public Service Authority)
|
|
Central Electric Power Cooperative, Inc.
|
Florida Power & Light Company
|
|
Duke Energy Corporation
|
CPS Energy
|
|
Orlando Utilities Commission
|
Lower Colorado River Authority
|
|
Lee County Electric Cooperative
|
Historically, a significant portion of our revenue has come from several different customers each year. Our largest customers may change from year to year. For the year ended
December 31, 2017
, our top three customers accounted for approximately
58.7%
of our consolidated revenue. Since the contribution of a customer may vary from year to year, we cannot predict the future effect of the loss of any given customer.
It is our policy to commit ourselves only to the amount of work we believe we can properly supervise, equip and complete to the customer’s satisfaction and timetable. As a result of this policy and the magnitude of some of the construction projects undertaken by us, a substantial portion of our annual revenue is derived from a relatively small number of customers. See note 11 to the consolidated financial statements for detail on sales to major customers that exceed
10%
of total sales.
Construction is customarily performed pursuant to plans and specifications of customers. We generally supply the management, labor, equipment and tools, while customers generally supply most of the required materials, except we generally supply most of the required materials for the construction of concrete foundations. We are not presently experiencing, nor do we anticipate experiencing, any difficulties in procuring an adequate supply of materials.
Revenue and results of operations in our electrical construction business can be subject to seasonal variations. These variations are influenced by weather, customer spending patterns and system loads. Project duration varies based on project type, complexity and customer requirements.
We enter into contracts on the basis of either competitive bidding, direct negotiations or pursuant to master service agreements (“MSAs”). Competitively bid contracts and MSAs account for a majority of our electrical construction revenue. Although there is considerable variation in the terms of the contracts undertaken, such contracts are typically lump sum (fixed-price) or unit price contracts. Most of our contracts do not require our clients to purchase a minimum amount of services, and some of our contracts are cancelable on short notice.
In certain circumstances, we are required to provide performance and payment bonds issued by a surety to secure our contractual commitments. These bonds provide a guarantee to the customer that we will perform under the terms of a contract and that we will pay subcontractors and vendors. If we fail to perform under a contract or to pay subcontractors and vendors, the customer may demand the surety make payments or provide services under the bond. Management is not aware of any performance bonds issued for us that have ever been called by a customer. We currently believe that we will not have to fund any claims under our surety arrangements in the foreseeable future. We believe that we have adequate bonding availability for our operations. As of
December 31, 2017
, outstanding performance bonds issued on behalf of our electrical construction subsidiaries amounted to
$58.2 million
.
Contracts may include retention provisions. From 5% to 10% is withheld by the customer from progress payments as retainage until the contract work has been completed and approved.
Backlog
Our backlog represents future services to be performed under existing project-specific fixed-price and maintenance contracts and the estimated value of future services that we expect to provide under our existing MSAs.
The following table presents our total backlog
as of December 31, 2017 and 2016
along with an estimate of the backlog amounts expected to be realized within 12 months and during the life of each of the MSAs. The existing MSAs have remaining renewals ranging from one to three years at the option of the customer. The calculation assumes exercise of the renewal options by the customer. Revenue from assumed exercise of renewal options represents
$131.2 million
(
70.1%
) of our total estimated MSA backlog as of
December 31, 2017
.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Backlog as of
|
|
Backlog as of
|
|
|
December 31, 2017
|
|
December 31, 2016
|
Electrical Construction Operations
|
|
12-Month
|
|
Total
|
|
12-Month
|
|
Total
|
Project-Specific Firm Contracts
(1)
|
|
$
|
27,110,793
|
|
|
$
|
27,110,793
|
|
|
$
|
27,094,081
|
|
|
$
|
27,094,081
|
|
Estimated MSAs
|
|
83,124,471
|
|
|
187,047,802
|
|
|
70,464,180
|
|
|
162,923,289
|
|
Total
|
|
$
|
110,235,264
|
|
|
$
|
214,158,595
|
|
|
$
|
97,558,261
|
|
|
$
|
190,017,370
|
|
|
|
|
|
|
|
|
|
|
(1)
Amount includes firm contract awards under MSA agreements.
|
Our 12-month backlog as of
December 31, 2017
,
increased
$12.7 million
(
13.0%
) to
$110.2 million
, due to the successful renewal of an MSA agreement and adjustments to existing MSA backlog estimates, partially offset by existing MSA backlog run off.
Our total backlog as of
December 31, 2017
,
increased
$24.1 million
(
12.7%
) to
$214.2 million
, compared to
$190.0 million
as of
December 31, 2016
. The
increase
in total backlog is primarily due to the aforementioned successful renewal of an MSA agreement and adjustments to existing MSA backlog estimates, partially offset by existing MSA backlog run off.
Of our total backlog as of
December 31, 2017
, we expect approximately
$110.2 million
(
51.5%
) to be completed during
2018
.
Backlog is estimated at a particular point in time and is not determinative of total revenue in any particular period. It does not reflect future revenue from a significant number of short-term projects undertaken and completed between the estimated dates. Our electrical construction revenue in
2017
exceeded our 12-month backlog as of
December 31, 2016
by
11.9%
.
The estimated amount of backlog for work under MSAs is calculated by using recurring historical trends inherent in current MSAs and projected customer needs based upon ongoing communications with the customer. Our estimated backlog also assumes exercise of existing customer renewal options. Certain MSAs are not exclusive to the Company and, therefore, the size and amount of projects we may be awarded cannot be determined with certainty. Accordingly, the amount of future revenue from MSA contracts may vary substantially from reported backlog. Even if we realize all of the revenue from the projects in our backlog, there is no guarantee of profit from the projects awarded under MSAs.
As of
December 31, 2017
and
2016
, MSAs accounted for approximately
87.3%
and
85.7%
of total backlog, respectively. We plan to continue our efforts to grow MSA business. MSA contracts are generally multi-year and should provide improved operating efficiencies.
Backlog is not a term recognized under U.S. generally accepted accounting principles, but is a common measurement used in our industry. While we believe that our methodology of calculation is appropriate, such methodology may not be comparable to that employed by some other companies. Given the duration of our contracts and MSAs and our method of calculating backlog, our backlog at any point in time may not accurately represent the revenue that we expect to realize during any period, and our backlog as of the end of the year may not be indicative of the revenue we expect to earn in the following year and should not be viewed or relied upon as a stand-alone indicator. Consequently, we cannot provide assurance as to our customers’ requirements or our estimates of backlog.
Revenue estimates included in our backlog may be subject to change as a result of project accelerations, additions, cancellations or delays due to various factors, including but not limited to: commercial issues, material deficiencies, permitting, regulatory requirements and adverse weather. Our customers are not contractually committed to a specific level of services under our MSAs (other than project-specific firm contracts under MSAs). While we did not experience any material cancellations during the current period, most of our contracts may be terminated, even if we are not in default under the contract.
For further information regarding the factors that affect the realizability of profits from our business backlog, please refer to the information set forth in “Item 1A. Risk Factors.”
Competition and Regulation
The electrical construction business is highly competitive. We compete with other independent contractors, including larger regional and national firms that may have financial, operational, technical and marketing resources that exceed our own. Competitive factors include: level of technical expertise and experience, industry reputation, quality of work, price, geographic presence, dependability, availability of skilled personnel, worker safety and financial stability. Our management believes that we compete favorably with our competitors on the basis of these factors. There can be no assurance that our competitors will not develop the expertise, experience and resources to provide services that are superior in both price and quality to our services, or that we will be able to maintain or enhance our competitive position.
We are subject to various federal, state and local statutes and rules regarding, among other things, contractor licensing, electrical codes, worker safety and environmental protection. We believe that we are in substantial compliance with all applicable regulatory requirements.
Properties
The Company and its subsidiaries operate with owned or leased offices and facilities located in Florida, South Carolina and Texas. Individually, none of the properties are financially significant to the Company. We believe that such properties are currently in good condition and properly maintained. See note 8 to the consolidated financial statements for additional detail on properties.
Other Operations - Real Estate Development
Our real estate development operations are not significant for reporting purposes and, accordingly, results of the ongoing real estate development operations are included in the income statement under the caption “Other.” Revenue from real estate development under the caption “Other” was
$4.8 million
and
$4.7 million
for
the years ended December 31, 2017 and 2016
, respectively, representing approximately
4%
of our total revenue for both years. Our current real estate development activity is the construction of single and multi-family residential projects in Brevard County, Florida.
Item 1A. Risk Factors.
Our business involves various risks associated with the operations of our Company. To provide a framework to understand our operating environment, we are providing a brief explanation of the significant risks associated with our business. Although we have tried to identify and discuss key risk factors, others could emerge in the future. Each of the following risks could affect our performance.
Changes in Tax Laws
Changes in tax laws or tax rates may have a material impact on our future cash expended for taxes, effective tax rate or deferred tax assets and liabilities. These conditions are beyond our control and may have a significant impact on our business, results of operations, liquidity, and financial position. See “Item 7 Management’s Discussion and Analysis of Financial Condition and Results of Operations” and note 3 to the consolidated financial statements for additional information on the impact of the Tax Cuts and Jobs Act (the “Tax Act”) enacted in December 2017.
Our variable rate indebtedness subjects us to interest rate risk, which could cause our debt service obligations to increase significantly.
Borrowings under our credit facility are at variable rates of interest and expose us to interest rate risk. If interest rates increase, our debt service obligations on the variable rate indebtedness will increase even though the amount borrowed remains the same, and net income and cash flows, including cash available for servicing our indebtedness, will correspondingly decrease.
We derive a significant portion of our revenue from a small group of customers. The loss of one or more of these customers could negatively impact our revenue and results of operations.
Our electrical construction customer base is highly concentrated. For the year ended
December 31, 2017
, our top three customers accounted for approximately
58.7%
of our consolidated revenue, as discussed in note 11 to our consolidated financial statements herein. Our revenue could materially decline if one or more of our significant customers terminated our business relationship. Revenue under our contracts with significant customers may vary substantially from period-to-period. Reduced demand for our services or the loss of one or more of these customers, if not replaced by other business, would result in a decrease in revenue and profits, and could have a material impact on our results of operations.
The electrical construction industry is highly competitive.
The electrical construction business is highly competitive. We compete with other independent contractors, including larger regional and national firms that may have financial, operational, technical and marketing resources that exceed our own. We also face competition from existing and prospective customers establishing or augmenting in-house service and organizations that employ personnel who perform some of the same types of services as those provided by us. Some of our competitors may have lower cost structures and may, therefore, be able to provide their services at lower rates than we can provide. Many of our current and potential competitors, especially our competitors with national scope, also may have significantly greater financial, technical and marketing resources than we do. If we fail to compete favorably with new or existing competitors, our results of operations and financial condition could be adversely affected.
Our business is affected by the spending patterns of our customers, exposing us to variable quarterly results.
Our revenues are primarily driven by the spending patterns of our customers, which can vary significantly from period-to-period, as well as seasonal variations. These variations are influenced by available system outages from utilities, bidding seasons, customers’ budgetary constraints, holidays, weather and hours of daylight, which can have a significant impact on our gross margins.
An adverse change in economic conditions in the electric utility industry might reduce the demand for our services.
Because a substantial portion of our electrical construction work is performed for customers in the electric utility industry, an adverse change in economic conditions in the electric utility industry could impair the financial condition of many of our customers, which may cause them to reduce their capital expenditures and demand for our services.
Skilled labor shortages and increased labor costs may negatively affect our ability to compete for new projects.
In our electrical construction business, we have from time to time experienced shortages of certain types of qualified personnel. The commencement of new, large-scale infrastructure projects, increased demand for infrastructure improvements, a departure of workers to storm devastated locations and the aging utility workforce reduce the pool of skilled labor available to us, even if we are not awarded such projects. As a result of these factors, the supply of experienced linemen and supervisors may not be sufficient to meet our expected demand and we may not be able to allocate or hire a sufficient number of project managers for new electrical construction projects. We may also spend considerable resources training employees who may then be hired by our competitors, forcing us to spend additional funds to attract personnel to fill those positions. If we were unable to retain sufficient qualified personnel at a reasonable cost, or at all, we would be unable to staff new and existing projects, which would reduce our revenue and profits.
Our use of percentage-of-completion accounting may result in a reduction or elimination of previously reported profits.
As discussed in Critical Accounting Estimates and in the notes to our consolidated financial statements included herein, a significant portion of our revenue in our electrical construction operations is recognized on a percentage-of-completion method of accounting, using the cost-to-cost method, which is standard for fixed-price contracts. For the percentage-of-completion accounting practice, we recognize contract revenue and earnings ratably over the contract term in proportion to our incurrence of contract costs. The earnings or losses recognized on individual contracts are based on estimates of contract revenue, costs and profitability. The cost of labor and materials, however, may vary from the costs we originally estimated. These variations, along with other risks inherent in performing fixed-price contracts, may cause actual revenue and gross profit for a project to differ from those we originally estimated and may result in reduced profitability or losses on projects. Depending upon the size of a particular project, variations from the estimated contract costs may have a significant impact on our operating results for any quarter or year.
We possess a significant amount of accounts receivable and costs and estimated earnings in excess of billings assets.
We extend credit to our customers as a result of performing work under contract prior to billing our customers for that work. These customers mainly include electric utilities. As of
December 31, 2017
, we had net accounts receivable of
$21.6 million
and costs and estimated earnings in excess of billings of
$6.1 million
. We periodically assess the credit risk of our customers and continuously monitor the timeliness of payments. Slowdowns in the industries we serve may impair the financial condition of one or more of our customers and hinder their ability to pay us on a timely basis or at all. The failure or delay in payment by our customers may reduce our cash flows and adversely impact our liquidity and profitability.
Amounts included in our backlog may not result in revenue or translate into profits.
Backlog for our electrical construction operations as of
December 31, 2017
was
$214.2 million
, which represents the estimated amount of revenue that we expect to realize from work to be performed on uncompleted contracts, including new contractual agreements on which work has not begun. Of the total backlog,
$187.0 million
is attributable to MSAs (other than project-specific firm contracts under MSAs). We determine the estimated amount of backlog for work under MSAs by using recurring historical trends in current MSAs and projected customer needs based upon ongoing communications with the customer. These service agreements do not require our customers to award a minimum amount of contracts and are cancelable on short notice. To the extent that our customers cancel their contracts with us or reduce their requirements during a particular period for any reason, we will not realize revenue or profit from the associated backlog. Furthermore, contracts included in our backlog may not be profitable. We may experience variances in the realization of backlog revenue because of project delays or cancellations, external market factors and economic factors beyond our control. Even if we realize all of the revenue from the projects in our backlog, there is no guarantee of profit from the projects awarded under MSAs. Given these factors and our method of calculating backlog, our backlog at any point in time may not accurately represent the revenue that we expect to realize during any period, and our backlog as of the end of the year may not be indicative of the revenue we expect to earn in the following year and should not be viewed or relied upon as a stand-alone indicator. Consequently, we cannot provide assurance as to our customers’ requirements or our estimates of backlog and should we receive less revenue than expected, our results of operations and financial condition may be adversely affected. For further discussion on how we calculate backlog for our business, please refer to the information set forth in “Item 1. Business” under the caption “Backlog.”
Our projects are subject to numerous hazards. If we do not maintain an adequate safety record, we may be ineligible to bid on certain projects, may be terminated from existing projects and may have difficulty procuring adequate insurance.
Hazards experienced as a result of our electrical construction operations include electrocutions, fires, mechanical failure and transportation accidents. These hazards can cause and have caused personal injury and loss of life, severe damage to or destruction of property and equipment, and other consequential damages, including blackouts, and may result in suspension of our operations on a project, large damage claims, and, in extreme cases, criminal liability. At any given time, we are subject to workers’ compensation claims and claims by employees, customers and third parties for property damage, loss of life and personal injuries resulting from such hazards or other workplace accidents. Further, regulatory changes implemented by the Occupational Safety and Health Administration may impose additional costs on us. Notwithstanding our investment of substantial resources in occupational health and safety programs, our industry involves a high degree of operational risk and we may be unable to avoid accidents resulting from the hazards described above and the associated liability exposure, which may be significant. Furthermore, if serious accidents or fatalities were to occur or if our safety record were to deteriorate, we may become ineligible to bid on certain projects and may be terminated from existing projects, our reputation and our prospects for future projects may be negatively affected, and we may be required to expend additional resources on health and safety programs. In addition, if our safety record were to significantly deteriorate, it would become more difficult and expensive for us to procure adequate insurance.
An inability to obtain bonding would have a negative impact on our operations and results.
On many of our projects we are required to provide performance bonds to secure our contractual commitments.
We have not experienced difficulty in obtaining bonding. However, if we were unable to obtain surety bonds in the future, or were required to post collateral in order to obtain surety bonds, our ability to obtain new contracts would be adversely affected. This may have a material adverse effect on our results of operations and financial condition.
Our capital expenditures may fluctuate as a result of changes in business requirements.
Our anticipated capital expenditure requirements may vary from time to time as a result of changes in our business. Increased capital expenditures will use cash flow and may increase our borrowing costs if cash for capital expenditures is not available from operations.
We may be unable to secure sufficient independent subcontractors to fulfill our obligations, or our independent subcontractors may fail to satisfy their obligations.
We utilize independent subcontractors to complete work on a portion of our projects. If we are unable to secure independent subcontractors at a reasonable cost or at all, we may be delayed in completing work under a contract or the cost of completing the work may increase. In addition, we may have disputes with these independent subcontractors arising from, among other things, the quality and timeliness of the work they performed. Any of these factors may adversely affect the quality of our service, our ability to perform under certain contracts and the relationship with our customers, which could have an adverse effect on our results of operations, cash flows and liquidity.
Our failure to properly manage projects, or project delays, may result in additional costs or claims, which could have a material adverse effect on our operating results, cash flows and liquidity.
Certain of our engagements involve large-scale, complex projects. The quality of our performance on such a project depends in large part upon our ability to manage our client relationship and the project itself and to timely deploy appropriate resources, including third-party contractors and our own personnel. Our results of operations, cash flows and liquidity could be adversely affected if we miscalculate the resources or time needed to complete a project with capped or fixed fees, or the resources or time needed to meet contractual milestones. Additionally, delays on a particular project, including permitting, material and weather delays, may cause us to incur costs for standby pay, and may lead to personnel shortages on other projects scheduled to commence at a later date. In addition, some of our agreements require that we share in cost overages or pay liquidated damages if we do not meet project deadlines; therefore, any failure to properly estimate or manage costs, or delays in completion of projects, could subject us to penalties, which could adversely affect our results of operations, cash flows and liquidity. Further, any defects or errors, or failures to meet our customers’ expectations could result in large damage claims against us, and because of the substantial cost of, and potentially long lead-times necessary to acquire certain of the materials and equipment used in our more complex projects, damage claims may substantially exceed the amount we can charge for our associated services.
Our business may be affected by difficult work sites and environments, which could cause delays and increase our costs.
We perform work under a variety of conditions, including, but not limited to, difficult and hard to reach terrain and difficult site conditions. Weather changes can materially change work site conditions after initial inspection and bid submittal. Performing work under such conditions can result in project delays or cancellations, potentially causing us to incur additional unanticipated costs, reductions in revenues or the payment of liquidated damages. In addition, most of our contracts require that we assume the risk should actual site conditions vary from those expected.
Our unionized workforce and related obligations could adversely affect our operations.
Certain of our employees are represented by labor unions and collective bargaining agreements. Although all such collective bargaining agreements prohibit strikes and work stoppages, we cannot be certain that strikes or work stoppages will not occur despite the terms of these agreements. Strikes or work stoppages would adversely impact relationships with our customers and could cause us to lose business and decrease our revenue. Additionally, as current agreements expire, the labor unions may not be able to negotiate extensions or replacements on terms favorable to their members, or at all, or avoid strikes, lockouts or other labor actions from time to time that may affect their members. Therefore, it cannot be assured that new agreements will be reached with employee labor unions as existing contracts expire, or on terms that we find desirable. Any labor action against us relating to failure to reach an agreement with employee labor unions could have a material adverse effect on our liquidity, cash flows and results of operations.
We may be required to contribute cash to meet our underfunded obligations in certain multi-employer pension plans.
Our collective bargaining agreements generally require us to participate with other companies in multi-employer pension plans. To the extent those plans are underfunded, the Employee Retirement Income Security Act of 1974, as amended by the Multi-Employer Pension Plan Amendments Act of 1980, may subject us to substantial liabilities under those plans if we withdraw from them or they are terminated or experience a mass withdrawal.
In addition, the Pension Protection Act of 2006 added special funding and operational rules generally applicable to plan years beginning after 2007 for multi-employer plans that are classified as “endangered,” “seriously endangered,” or “critical” status. Plans in these classifications must adopt measures to improve their funded status through a funding improvement or rehabilitation plan, which may require additional contributions from employers (which may take the form of a surcharge on benefit contributions) and/or modifications to retiree benefits. A number of multi-employer plans to which we contribute or may contribute in the future could have “endangered,” “seriously endangered” or “critical” status. The amount of additional funds we may be obligated to contribute to these plans in the future cannot be estimated, as such amounts will likely be based on future work that requires the specific use of union employees covered by these plans, and the amount of that future work and the number of employees that may be affected cannot reasonably be estimated. Our performance of a significant amount of future services in areas that require us to utilize unionized employees covered by these affected plans, or a deterioration in the
funding status of any of the plans to which our operating units contribute, could require significant additional contributions, which could detrimentally affect our results of operations, financial condition or cash flows if we are not able to adequately mitigate these costs.
Adverse weather conditions and climate change risk expose us to variable quarterly results.
Most of our work is performed outdoors and as a result, our results of operations can be adversely impacted by extended periods of inclement weather. Any weather related delays in the completion of, or which increase the cost of, our projects could adversely affect our revenue and results of operations in any one or more of our reporting periods. We cannot predict with certainty whether climate change is occurring and, if so, at what rate. However, the physical effects of climate change could have a material adverse effect on our properties, operations and business. The potential physical impacts of climate change on our operations are highly uncertain. Climate change may result in, among other things, changing rainfall patterns, changing storm patterns and intensities and changing temperature levels. Because our operating results are significantly influenced by weather, substantial changes in historical weather patterns could significantly impact our future operating results. For example, if climate change results in a greater amount of rainfall, snow, ice, flooding or other less accommodating weather over a greater period of time in a given period, we could experience reduced productivity, which could negatively impact our revenue and gross margins.
Environmental risks.
We are subject to numerous federal, state, local and environmental laws and regulations governing our operations, including the handling, transportation and disposal of non-hazardous and hazardous substances and wastes, as well as emissions and discharges into the environment, including discharges to air, surface water and groundwater and soil. We also are subject to laws and regulations that impose liability and cleanup responsibility for releases of hazardous substances into the environment. Under some of these laws and regulations, such liabilities can be imposed for cleanup of previously operated properties regardless of whether we directly caused the contamination or violated any law at the time. The presence of any contamination from substances or wastes could interfere with ongoing operations. In addition, we could be held liable for significant penalties and damages under certain environmental laws and regulations and also could be subject to a revocation of our permits, which could materially and adversely affect our business and results of operations.
From time to time, we may incur costs and obligations for correcting environmental noncompliance matters and for remediation at or relating to our operations. We believe that we are currently in compliance with our environmental obligations and that any such obligations should not have a material adverse effect on our business or financial performance.
Climate change issues may result in the adoption of new environmental regulations that may unfavorably impact us, our suppliers, our customers, and subsequently effect how we conduct our businesses. This could also cause us to incur additional direct costs in complying with any new environmental regulations, as well as increased indirect costs resulting from our customers, suppliers, or both, incurring additional compliance costs that are passed on to us. These costs may adversely impact our operations and financial condition. In addition, developments in federal and state legislation and regulation on climate change could result in increased capital expenditures to improve the energy efficiency of our existing properties, equipment and our processes without a corresponding increase in revenue.
We could be adversely affected by environmental liabilities associated with our former mining business.
The Company was previously engaged in mining activities and disposed of our last mining property over 15 years ago. Although we are not aware of any current environmental investigations relating to previously owned sites, we could still be liable for previous activities at such sites. For example, in 2015 we completed remediation activities at a mining site which we sold over 50 years ago, as discussed in note 4 to the consolidated financial statements.
Our operating results may vary significantly from period-to-period.
Our periodic results may be materially and adversely affected by:
•
the timing and volume of work under contract;
•
changes in national, regional, local and general economic conditions;
•
the budgetary spending patterns of customers;
•
variations in margins of projects performed during any particular quarter;
•
a change in the demand for our services;
•
increased costs of performance of our services caused by severe weather conditions;
•
increases in design and construction costs that we are unable to pass through to our customers;
•
the termination of existing agreements;
•
losses experienced in our operations that are not covered by insurance;
•
a change in the mix of our customers, contracts and business;
•
availability of qualified labor hired for specific projects; and
•
changes in bonding requirements applicable to existing and new agreements.
Our actual costs may be greater than expected in performing our fixed-price and unit-price contracts.
We currently generate, and expect to continue to generate, a significant portion of our revenues and profits under fixed-price and unit-price contracts. We must estimate the costs of completing a particular project when we bid for these types of contracts or when they are awarded under our current MSAs. The actual cost of labor and materials, however, may vary from the costs we originally estimated and we may not be successful in recouping additional costs from our customers. These variations, along with other risks inherent in performing fixed-price and unit-price contracts, may cause actual revenue and gross profits for a project to differ from those we originally estimated and could result in reduced profitability or losses on projects due to changes in a variety of factors such as:
•
failure to properly estimate costs of engineering, material, equipment or labor;
|
|
•
|
unanticipated technical problems with the materials or services being supplied by us, which may require us to incur additional costs to remedy the problem;
|
•
project modifications that create unanticipated costs;
•
changes in costs of equipment, materials, labor or subcontractors;
•
the failure of our suppliers or subcontractors to perform;
•
difficulties in our customers obtaining required governmental permits or approvals;
•
site conditions that differ from those assumed in the original bid (to the extent contract remedies are unavailable);
•
the availability and skill level of workers in the geographic location of the project;
•
an increase in the cost of fuel or other resources;
•
changes in local laws and regulations;
•
delays caused by local weather conditions, third parties or customers; and
•
quality issues requiring rework.
We could be adversely affected by the loss of key management personnel.
Our future success depends, to a significant degree, on the efforts of our executive officers and senior management, including those of our subsidiaries
.
Other than with respect to our Chief Executive Officer, we do not have employment agreements with any of our employees. We believe that key members of our senior management possess valuable industry knowledge, relationships and experience that are important to the successful operation of our business. The relationships between our executive officers and senior management and our customers are important to our being retained as a service provider. We are also dependent upon our project managers and field supervisors who are responsible for managing and drawing employees to our projects. There can be no assurance that any individual will continue in his or her capacity for any particular period of time. Industry-wide competition for managerial talent in electrical construction has increased and the loss of one or more of our key employees could negatively impact our ability to manage our business and relationships with our customers. The loss of any of our executive officers or senior management could adversely affect our financial condition and results of operations.
The violation of our debt covenants imposed by our credit facility could impact our access to that credit facility and therefore our cash flows.
Our debt arrangements contain various financial and other covenants including, but not limited to: minimum tangible net worth, outside debt limitation, maximum debt to tangible net worth ratio and fixed charge coverage ratio. Our loans also have cross-default provisions whereby any default under any loans of the Company (or its subsidiaries) with the lender will constitute a default under all of the other loans of the Company (and its subsidiaries) with the lender. Although we are in compliance with all covenants, if we were to experience substantial losses, absent a modification of the loan agreement or a waiver, this could result in a violation of the financial covenants. A violation of our financial covenants will give the right to our lender to accelerate our loans. Under these circumstances, there can be no assurance that we could obtain a modification or waiver. The acceleration of all of our loans would adversely affect our cash flows and consequently our results of operations.
Due to our market capitalization, we will be unable to continue to rely on the exemption from the requirement to provide an attestation by our independent registered public accounting firm on the effectiveness of our internal control over financial reporting. If we fail to maintain effective internal control, investors could lose confidence and the market value of our common stock could decrease.
The Sarbanes-Oxley Act of 2002 has many requirements applicable to us regarding corporate governance and financial reporting, including the requirement that management report on our internal control over financial reporting. As of
December 31, 2017
, our internal control over financial reporting was effective. Refer to “Item 9A. Controls and Procedures.” However, there can be no assurance that our internal control over financial reporting will continue to be effective in the future. Pursuant to rules of the SEC, we will no longer be exempt from the requirement that our independent registered public accounting firm express an opinion on the effectiveness of our internal control over financial reporting. Therefore, we engaged our independent registered public accounting firm to perform an audit of our internal control over financial reporting. Refer to “Item 9A. Controls and Procedures.”
Our aggregate market value of the voting and non-voting common equity held by non-affiliates of the Company increased to
$127.6 million
on
June 30, 2017
, which rendered us ineligible to rely on this exemption. Furthermore, as of this year, we are in year one of compliance with Section 404(b) of the Sarbanes-Oxley Act of 2002, which requires our registered public accounting firm, who prepares and issues the audit report for us, to attest to, and report on, the assessment made by management regarding our internal controls over financial reporting. Refer to “Item 9A. Controls and Procedures.” As we grow our business, our internal controls will become more complex, and we will require significantly more resources to ensure our internal controls remain effective. As a result, we may incur significant additional cost. If we or our independent registered public accounting firm discover a material weakness, the disclosure of that fact, even if quickly remedied, could result in a loss of investor confidence and reduce the market value of our common stock. Additionally, the existence of any material weakness or significant deficiency may require management to devote significant time and incur significant expense to remediate any such material weakness or significant deficiency and management may not be able to remediate any such material weakness or significant deficiency in a timely manner. Failure to maintain effective internal controls or the identification of significant internal control deficiencies could also impair our ability to obtain financing and result in the loss of customers. In addition, such failure could result in investigations and penalties.
Item 1B. Unresolved Staff Comments.
None.
Item 2. Properties.
For information with respect to the principal properties utilized in the Company’s operations, see “Item 1. Business - Properties.”
Item 3. Legal Proceedings.
The Company is not currently involved in any material legal proceedings, having substantially completed the Environmental Protection Agency remediation matter described in note 4 to the consolidated financial statements in this Form 10-K.
The Company is involved in various legal claims arising in the ordinary course of business. The Company has concluded that the ultimate disposition of these matters should not have a material adverse effect on the Company’s consolidated financial position, results of operations, or liquidity.