RNS Number : 8890C
  Global Energy Development PLC
  08 September 2008
   

    Immediate Release                                                                                            8 September 2008


    GLOBAL ENERGY DEVELOPMENT PLC

    COMBINED TEST RESULT FOR TILODIRAN 3 WELL

    SIGNIFICANT UPLIFT IN PRODUCTION

    Global Energy Development PLC (the "Company"), the Latin America focused petroleum exploration and production company (LSE-AIM: "GED"),
which operates in Colombia through its wholly-owned subsidiary Harken de Colombia Limited, is pleased to announce a combined test result for
the Tilodiran 3 well within the Colombian Rio Verde contract. Previous testing had already proved four productive zones within three
different formations in the well.

    An electric submersible pump was installed in the Tilodiran 3 well at a depth of 7,198 feet to increase the pressure drawdown and thus
facilitate the clean up of the perforations in the Mirador (11,652 to 11,662 feet), Ubaque (12,836 to 12,842 feet), Lower Gacheta (12,744 to
12,748) / (12,806 to 12,814 feet) and Middle/Upper Gacheta (12,672 to 12,680 feet) / (12,690 to 12,694).

    The production test of all the zones within the three formations is continuing and the well continues to clean up. The well is currently
producing at a rate of approximately 1,280 barrels of oil per day ("BOPD") with 9% basic sediment and water ("BS&W") that analysis shows as
having a significant content of completion fluid and is expected to further reduce as the well continues to clean up. The combined gravity
is 17.8 degrees API and the current gas/oil ratio ("GOR") is 245 scf per barrel.

    Application has now been made to the Colombian Ministry of Mines and Energy ("the Ministry") to allow the Company to produce the
formations on a commingled basis. Based upon detailed analysis of the well data obtained to date, and the provisions of the Colombian
Petroleum Code, management believes appropriate conditions exist for such approval to be forthcoming.  

    The Company averaged gross production of 1,169 BOPD for the first seven months of 2008 so the addition of the Tilodiran 3 well will
provide a significant uplift to the Company's overall production volumes. 

    For further information:

    Global Energy Development PLC
    Catherine Miles, Company Secretary            +44 (0) 20 7763 7177
    www.globalenergyplc.com                             +44 (0) 7909918034

    Landsbanki Securities (UK) Limited         +44 (0) 20 7426 9000
    Fred Walsh / Sebastian Jones        

    Notes to Editors:

    The Company's shares have been traded on AIM, a market operated by the London Stock Exchange, since March 2002 (LSE-AIM: "GED"). The
Company's balanced portfolio covers the countries of Colombia, Peru and Panama and comprises a base of production, developmental drilling
and workover opportunities and several high-potential exploration projects.  

    The information contained within this announcement has been reviewed by Mr. Stephen Voss and Mr. Stephen Newton, both Directors of the
Company. Mr. Voss is a Registered Professional Engineer in Texas and has been a Member of SPE for 25 years. Mr. Newton holds a
Mining/Petroleum Engineering degree from the University of Queensland, Brisbane and a Master of Science Petroleum Engineering degree from
Imperial College London. He has been a Member of SPE for 35 years.


This information is provided by RNS
The company news service from the London Stock Exchange
 
  END 
 
MSCILFEEAVIEIIT

Global Energy Development (LSE:GED)
Historical Stock Chart
From May 2024 to Jun 2024 Click Here for more Global Energy Development Charts.
Global Energy Development (LSE:GED)
Historical Stock Chart
From Jun 2023 to Jun 2024 Click Here for more Global Energy Development Charts.