Aurizon Mines Ltd. (TSX:ARZ)(NYSE Amex:AZK) is pleased to release new drill results from the Phase Two program conducted under the terms of the Aurizon Mines Ltd. ("Aurizon") earn-in option on the Marban property, located in the Malartic gold camp, Abitibi region of Quebec.

Results from 22 new drill holes and six (6) extensions of previous holes completed on the Marban gold deposit are included in this release. Drill results are tabled on the following pages.

The new results highlight the potential to define high grade shoots within the Marban deposit, which include:


--  Hole MB-07-024 ext, drilled on section 4300E, was extended to
    investigate the Eastern Down Dip Zone and returned 196.5 grams of gold
    per tonne over 1.2 metres at a vertical depth of 415 metres 
--  Shallow in-fill drilling between sections 4300E and 4400E returned the
    following high grade intersections: 
    --  20.5 grams of gold per tonne over 2.0 metres at a vertical depth of
        180 metres (MB-11-248) 
    --  36.7 grams of gold per tonne over 1.1 metres at a vertical depth of
        155 metres (MB-07-019ext) 
    --  29.8 grams of gold per tonne over 1.0 metre at a vertical depth of
        65 metres (MB-12-252) 
--  Hole MB-12-295 drilled on section 3,575E and part of the in-fill
    drilling on the near surface Western High Grade Zone intersected 51.4
    grams of gold per tonne over 1.1 metres at a vertical depth of 95 metres

The new results show positive intercepts over a strike length of 1,050 metres on the deposit (from section 3550 to 4600) and from surface to a vertical depth of 500 metres. The deposit is developed inside a 200 to 500 metres wide deformation system controlled by a kilometric drag fold along the Marbenite shear zone. Mineralization is in the form of multiple lenses, each one having a thickness that varies between 5 to 80 metres. Mineralization is characterized by chlorite - carbonate - albite alteration associated with a variable amount of quartz veining and iron sulphides.

The Phase Two program will include 34,000 metres of diamond drilling, an updated mineral resource estimate and basic technical studies, including metallurgical testwork. Drilling commenced on December 13, 2011, and four drill rigs are currently in operation. Two are testing the extension at depth of the Marban deposit, one is following up on the fences drilled during first phase between the Norlartic and Marban deposits, and the fourth drill is investigating select exploration targets outlined on the Marban property. To date, 75 holes and nine (9) extensions of previous holes have been completed for a total of 26,380 metres. The Phase Two program and updated resource estimate are expected to be completed by the end of the second quarter of 2012.

Marban deposit drilling

The 2011 Phase One drill program demonstrated the continuity of the mineralisation between surface and a vertical depth of 250 metres, as well as the grade consistency, and led to the discovery of the Western High Grade Zone. This first phase also identified the Eastern Down Dip Extension Zone, which is located below a vertical depth of 250 metres and remains open at depth and laterally.

The objectives of the Phase Two drilling program are:


1.  Improve the quality of the Marban near surface resources
    
    The objective is to improve the quality of the known resources and to
    increase the potential to find more mineralised corridors within a pit
    shell to help decrease the stripping ratio, and will include drilling
    the Western High Grade Zone. 

2.  Develop a mineral inventory below a vertical depth of 250 metres:
    
    This objective targets the identification of new gold resources inside
    the Marban structural zone. Preliminary interpolation on the Eastern
    Down Dip Zone indicates a strong potential to identify gold resources
    between a vertical depth of 350 and 600 metres. The mineralised
    structure is considered open laterally and downdip.
    
    New holes and the extension of previous holes are planned at vertical
    depths of 300 metres to 1,000 metres to test the consistency and
    extension of the Eastern Down Dip Zone at an average drill hole spacing
    of 50 metres. 

Aurizon Option

Aurizon can earn up to a 65% interest the Marban property under the terms of an option and joint venture agreement dated July 5, 2010, between NioGold Mining Corporation ("NioGold") and Aurizon. The initial 50% interest can be earned by incurring expenditures of $20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold remains the project operator during the initial earn-in period.

The Phase One program commenced on August 30, 2010, and was completed on August 9, 2011. The program consisted of 50,253 metres of diamond drilling (170 holes, 8 extensions) at a total cost of $6 million. Drilling was distributed between the Marban (41,270m) and Norlartic (4,319m) deposits and exploration drill hole fences between the two deposits (4,664m). Highlights include the identification of two new gold zones surrounding the former Marban mine named the High Grade Western Zone and Eastern Down Dip Zone.


Drill results - Marban deposit                                            
                                                                          
----------------------------------------------------------------------------
           East- North-                  Hole              Len-  Grade
             ing    ing  Azi-          Length   From    To  gth   (g/t
Hole         (m)    (m)  muth   Dip       (m)    (m)   (m)  (m)    Au) Zones
----------------------------------------------------------------------------
MB-11-248   4400   4185  N180   -62     612.0  207.0 209.0  2.0  20.53
                         deg-  deg-            503.1 507.5  4.4   2.36     W
                         rees  rees            526.9 528.0  1.1   6.15
----------------------------------------------------------------------------
MB-12-252   4300   3855  N180   -45     284.0   61.0  62.1  1.1   8.67     2
                         deg-  deg-             84.5  86.1  1.6   4.50
                         rees  rees             88.0  89.0  1.0  29.80      
                                               175.3 180.8  5.5   2.64     A
----------------------------------------------------------------------------
MB-12-253   3700   3975  N180   -47     241.0  109.8 111.0  1.2   3.24      
                         deg-  deg-            132.6 133.6  1.0   3.17    D1
                         rees  rees             
----------------------------------------------------------------------------
MB-12-254   3675   4290  N180   -47     437.0  253.5 256.5  3.0   2.26     2
                         deg-  deg-            294.8 299.2  4.4   3.64     Z
                         rees  rees including  298.2 299.2  1.0   9.78     Z
                                               353.2 354.1  0.9   4.84     B
----------------------------------------------------------------------------
MB-12-258   4600   3862  N180   -55     440.0  223.2 229.4  6.2   3.29   V-M
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-259   4000   4165  N180   -51     425.0  197.8 201.2  3.4   3.40
                         deg-  deg-            239.7 240.8  1.1  12.05     E
                         rees  rees            282.2 283.2  1.0   7.31    D1
                                               329.5 332.0  2.5   6.96    C2
                                               337.5 340.0  2.5   6.00    C1
----------------------------------------------------------------------------
MB-12-260   3950   4110  N180   -45     359.0  192.5 193.5  1.0  19.65     Z
                         deg-  deg-            206.5 207.8  1.3   5.03     E
                         rees  rees            257.7 269.7 12.0   1.59     B
                                               274.9 276.9  2.0   7.14    C1
                                               282.2 284.8  2.6   4.35     A
----------------------------------------------------------------------------
MB-12-261   3550   4265  N180   -50     327.0   62.0  63.2  1.2   4.87    
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-265   4100   3830  N180   -55     239.0  117.8 119.0  1.2   2.27     T
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-268   3950   3955  N180   -47     360.0   63.0  64.2  1.2   4.92     2
                         deg-  deg-            104.0 104.8  0.8   3.72     E
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-273   4550   4110  N180   -61     603.0   65.4  66.3  0.9   5.99   
                         deg-  deg-            174.0 174.6  0.6   4.66
                         rees  rees                          
----------------------------------------------------------------------------
MB-12-276   4350   3750  N180   -45     285.0  162.1 163.3  1.2   2.53   
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-277   4050   4015  N180   -60     345.0  171.6 172.8  1.2  11.15   
                         deg-  deg-            202.8 218.6 15.8   1.71     B
                         rees  rees            227.0 233.9  6.9   3.58    C1
----------------------------------------------------------------------------
MB-12-280   3700   4287  N180   -50     428.0  255.3 257.3  2.0   2.23     2
                         deg-  deg-            321.2 322.4  1.2   6.29     Z
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-286   4050   4265  N180   -57     525.0   30.4  38.0  7.6   1.91  
                         deg-  deg-            152.3 153.3  1.0   3.60   
                         rees  rees            281.5 283.5  2.0   2.51     Y
                                               344.2 357.2 13.0   2.47    D1
                                    including  351.0 354.2  3.2   7.08    D1
                                               450.8 451.7  0.9   5.63   
                                               468.0 475.8  7.8   0.99     A
----------------------------------------------------------------------------
MB-12-288   3900   4145  N180   -55     420.0  227.0 228.0  1.0   6.72     E
                         deg-  deg-            309.1 316.1  7.0   3.07    C1
                        rees  rees             342.9 350.6  7.7   1.74     A
----------------------------------------------------------------------------
MB-12-291   3575   4260  N180   -51     381.0  202.2 203.4  1.2   1.58     2
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-292   3600   4335  N180   -51     429.0  358.6 359.8  1.2   5.98    
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-293   3625   4260  N180   -51     372.0  127.4 129.6  2.2   2.49  
                         deg-  deg-            231.2 246.2 15.0   1.48     2
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-295   3575   4130  N180   -51     300.0  121.3 122.4  1.1   51.4     2
                         deg-  deg-            234.0 242.2  8.2   1.01     T
                         rees  rees                                       
----------------------------------------------------------------------------
MB-12-296   3625   4130  N180   -51     305.0  216.6 218.1  1.5   1.74     Z
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-12-299   3550   4005  N180   -50     189.0   49.7  50.7  1.0  10.35     Y
                         deg-  deg-                                       
                         rees  rees                                        
----------------------------------------------------------------------------
MB-07-      4350   3880  N180   -45       189  204.3 205.4  1.1  36.70     A
 019ext                  deg-  deg-    to 345                             
                         rees  rees            324.8 326.0  1.2   7.36    
----------------------------------------------------------------------------
MB-07-      4300   4050  N180   -80       282  386.4 401.5 15.1   1.54     A
 024ext                  deg-  deg-    to 525                       
                         rees  rees            411.7 419.0  7.3   2.16
                                    including  412.8 413.7  0.9   8.10    
                                               432.4 433.6  1.2 196.50     P
----------------------------------------------------------------------------
MB-08-      4200   4200  N180   -65       360  460.6 468.6  8.0   0.87     A
 049ext                  deg-  deg-    to 561                              
                         rees  rees                                        
----------------------------------------------------------------------------
MB-08-      4200   4240  N180   -68       351  540.0 542.4  2.4   4.02     A
 071ext                  deg-  deg-    to 612                            
                        rees   rees                                        
----------------------------------------------------------------------------
MB-08-      4150   4235  N180   -56     296.3  313.0 316.6  3.6   3.05    D2
 074ext                  deg-  deg-    to 509                              
                         rees  rees            335.8 337.0  1.2   4.72      
                                               345.4 351.4  6.0   1.27    D1
                                               440.0 446.8  6.8   0.92     A
----------------------------------------------------------------------------
MB-08-      4300   4050  N180   -63       264  325.6 333.8  8.2   2.73    C1
 077ext                  deg-  deg-    to 484                           
                         rees  rees                                        
----------------------------------------------------------------------------

Technical Info, QA/QC and Qualified Persons

Reported intervals are in core lengths but are anticipated to approximate true width, except where structural complexities occur, as the holes were drilled nearly perpendicular to the principal local structural orientation.

Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for holes that traversed underground workings which were completed using BQ-size core. The core was sealed and delivered by the drilling contractor to NioGold's facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to ALS Chemex in Val-d'Or, Quebec, an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 2 g/t Au by the fire-assay method using a gravimetric finish. As well, pulps grading above 0.5 g/t Au are sent to Bourlamaque Assay Laboratories Ltd. in Val-d'Or for check assaying.

The drilling program is conducted under the supervision of Yan Ducharme, M.Sc., P.Geo. (OGQ), NioGold's Exploration Manager and a Qualified Person as defined by National Instrument 43-101. This news release was prepared under the supervision of Martin Demers, P.Geo., General Manager, Exploration of Aurizon and a Qualified Person under National Instrument 43-101, based on information made available by NioGold and verified by personnel of Aurizon.

Additional information

There is one sketch attached to this news release showing the Marban deposit drill hole locations and the longitudinal figures. To view sketch, visit the following link: http://media3.marketwire.com/docs/MarbanZone.pdf.

About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE Amex under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at www.aurizon.com.

FORWARD LOOKING STATEMENTS AND INFORMATION

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities regulations in Canada and the United States (collectively, "forward-looking information"). The forward-looking information contained in this news release is made as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

Specifically, this news release contains forward-looking information with respect to future exploration work and the expected timing of an updated resource estimate on the Marban property. Forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, including the assumption that the current price of and demand for gold will be sustained or will improve. However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, the risk that actual results of exploration activities will be different than anticipated, that required supplies, equipment or personnel will not be available or will not be available on a timely basis or that the cost of labour, equipment or supplies will increase more than expected, that the future price of gold will decline, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources are not as estimated, that actual costs or actual results of reclamation activities are greater than expected; that changes in project parameters as plans continue to be refined may result in increased costs, of accidents, labour disputes and other risks generally associated with exploration, unanticipated delays in obtaining governmental approvals or financing or in the completion of exploration activities, as well as those factors and other risks more fully described in Aurizon's Annual Information Form filed with the securities commission of all of the provinces and territories of Canada and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission, which are available on Sedar at www.sedar.com and on Edgar at www.sec.gov/. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

U.S. Registration (File 001-31893)

News Release Issue No. 10 - 2012

Contacts: Aurizon Mines Ltd. George Paspalas President & CEO 604-687-6600 Aurizon Mines Ltd. Martin Bergeron Vice President Operations 819-874-4511 Aurizon Mines Ltd. Investor Relations 604-687-6600 or Toll Free: 1-800-411-GOLD (4653) 604-687-3932 (FAX)jennifer.north@aurizon.com or info@aurizon.com www.aurizon.com

Aurizon Mines (AMEX:AZK)
Historical Stock Chart
From May 2024 to Jun 2024 Click Here for more Aurizon Mines Charts.
Aurizon Mines (AMEX:AZK)
Historical Stock Chart
From Jun 2023 to Jun 2024 Click Here for more Aurizon Mines Charts.