Aurizon Mines Ltd. (TSX:ARZ)(NYSE Amex:AZK) is pleased to report on the final drill results of the first phase program on the Marban Block property, located in the Malartic gold camp, Abitibi region of Quebec. A $5 million second phase program has been initiated, as reported in the news release dated November 1, 2011.

Results from the last 31 drill holes of the first phase program are included in this release, of which 14 of the holes are on the Marban deposit and 17 are step out holes that tested the area between the Marban and Norlartic deposits. Drill results are tabled on the following pages.

"These remaining results from the first phase of the program on the Marban Block are encouraging, and overall there is a high degree of consistency throughout the first phase drilling data," said George Paspalas, President and CEO of Aurizon. "Our original assumptions going into this joint venture are being realized, and we look forward to a successful second phase of the program."

Drilling highlights include:


--  An additional important near surface mineralised interval of 9.8 grams
    of gold per tonne over 5.8 metres (MB-11-224) was obtained in the newly
    recognised Marban 'High Grade Western Zone' (see news release dated
    September 19, 2011). 
    
    
--  Drilling within the Marban deposit continues to confirm the continuity
    of the mineralised zones near surface as well as their extensions below
    the Marban mine. Six (6) of the fourteen (14) holes returned thick lower
    grade gold mineralised intervals with metal factors above 20 as well as
    higher grade intercepts, including 8.3 grams of gold per tonne over 4.6
    metres (MB-11-200) intersected at a vertical depth of 275 metres. 
    
    
--  An interval of 5.9 grams of gold per tonne over 3.6 metres (MB-08-
    056ext) was obtained at a vertical depth of 350 metres in the newly
    recognised Marban 'Eastern Down Dip Zone'. 
    
    
--  Shallow exploration fence drilling between the Norlartic and Marban
    deposits intersected mineralised gold intervals up to 600 metres east
    and along the strike extent of the Norlartic deposit/Norbenite shear
    zone and within a newly recognised altered and mineralised felsic
    intrusive. Values of up to 10 grams of gold per tonne were returned over
    0.5 metres. 

Marban Deposit:

The last series of drill holes on the Marban deposit were designed with the objective of extending the mineralized areas previously identified during this first phase program. The drill grid covered a lateral extension of 1.4 kilometres along 50 metre-wide sections.

The Marban mineralized system has a funnel shape corresponding to a 400 to 700 metre wide folded structure in the upper part and a more steeply dipping root at depth, with thicknesses in the range of 100 to 200 metres. Mineralised zones and structures are developed in a strongly chloritized and schistosed basalt. Gold grades typically correlate with an increasing density of quartz veining associated with disseminated pyrite. The hanging wall and footwall are composed mainly of ultramafic units.

Drilling from surface down to 250 metres:


--  The gold bearing parallel structures forming the deposit hanging wall
    have been intersected by holes MB-11-200, 214, 240, 246 and 247 with
    hole MB-11-200 having the best result of 1.8 grams per tonne over 15.4
    metres.  The mineralized lense identified is included inside a corridor
    extending 100 metres along strike and approximately 100 metres from
    previous mine workings. 
    
    
--  Drilling within the central part of the Marban deposit continues to
    confirm extensions of the main mineralized areas. The three holes (MB-
    11-200, 214 and 222) tested the Marban deposit at a vertical depth of
    approximately 250 metres. The holes intersected mineralization at
    distances varying from 25 metres to 120 metres from the previous mine
    workings. 
    
    
--  Hole (MB-11-224) filled a gap and confirmed the grade and thickness of
    one section in the Western High Grade Zone, returning values of 9.8
    grams of gold per tonne over 5.8 metres and 6.6 grams of gold per tonne
    over 3.5 metres.  

Drilling below 250 metres:


--  The Eastern Down Dip Zone was tested on a wide spacing with the
    extension of two holes and two new holes. The results obtained show
    consistent gold values with a possible connection 200 metres westward
    with the Marban deposit itself (see long section on sketch). The
    orientation and plunge of the structure will be analysed with a view to
    target possible mineralized extensions. 

Step out drilling:

Three 300-metre spaced NE-SW oriented exploration drill hole fences were completed between the Norlartic and Marban deposits. The fences consist of 18 shallow drill holes, for a total of 4,664 metres. Results were previously released for hole NL-11-046.

Highlight from the westernmost fence:


--  Hole NL-11-046 cut a mineralised interval that returned values averaging
    1.23 grams of gold per tonne over 21.2 metres on strike at a vertical
    depth of 70 metres and 30 metres to the east of the Norlartic resources.

Highlights of the central fence:


--  Hole MB-11-208 collared into a wide mineralised zone interpreted to
    represent the southeast extension of Norlartic deposit/Norbenite shear
    zone. The best result includes a value of 10 grams of gold per tonne
    over 0.5 metres.  
    
    
--  Further south, holes MB-11-206 and 207 intersected a thick felsic
    intrusive containing sulphide mineralisation over 23 and 26 metres,
    respectively. The best results returned from Hole 207 include gold
    values averaging 0.7 grams of gold per tonne over 25.9 metres, including
    7.4 grams of gold per tonne over 2.1 metres. 

Highlights of the easternmost fence:


--  Holes MB-11-212 and 213 collared into a wide mineralised zone
    interpreted to represent the southeast extension of Norbenite shear
    zone. The best result returned an interval of 7.5 grams of gold per
    tonne over 1.5 metres. 
    
    
--  Hole MB-11-210 intersected a thick mineralised felsic intrusive possibly
    correlating with the one cut in holes MB-11-206 and 207 of the central
    fence. The intrusive returned gold values averaging 1.0 grams of gold
    per tonne over 13.1 metres. 

These results are located at distances that vary from 200 to 800 metres from the Marban resource outline, along parallel, continuous shear zones, trending north-west and moderately dipping to the north-east. In contrast to Marban, where mineralization is primarily parallel to structures developed in volcanic rocks, several of these new intervals come from intrusions hosting a stockwork controlled, disseminated mineralization.

"Preliminary results confirm the gold potential of the area surrounding the Marban deposit. Until now, the possibility to extend the Marban deposit influence was unknown due to a lack of sampling on scattered historical drill information. Specific geological aspects such as the presence of mineralized intrusions and steep strike variations of structures reinforce our view on this part of the mineralized system," said Martin Demers, P. Geo., General Manager, Exploration.

First phase program:

The first phase program commenced on August 30, 2010, and was completed on August 9, 2011. The program consisted of 50,253 metres of diamond drilling (170 holes, 8 extensions) at a total cost of $6 million. Drilling was distributed between the Marban (41,270 metres) and Norlartic (4,319 metres) deposits and exploration drill hole fences between the two deposits (4,664 metres). Highlights include the identification of two new gold zones surrounding the former Marban mine named the 'High Grade Western Zone' and 'Eastern Down Dip Zone'. Results have been released for all the holes drilled to date (see news release dated September 19, 2011).

Second phase program:

As reported on November 1, 2011, the $5-million second phase program will include 34,000 metres of diamond drilling on the Marban deposit, updated resource estimates and basic technical studies. Drilling and technical work are expected to commence in November 2011 and will continue through to the second quarter of 2012.

Aurizon Option:

Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option agreement dated July 5, 2010 between NioGold and Aurizon. The initial 50% interest can be earned by incurring expenditures of C$20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold is the project operator during the initial earn-in period (see news release dated July 6, 2010).

Drill Results - Marban Deposit


----------------------------------------------------------------------------
                                  Length     From       To   Length    Grade
Hole                       Line      (m)      (m)      (m)      (m) (g/t Au)
----------------------------------------------------------------------------
MB-08-056ext             2+50 E      474    348.0    370.0     22.0      1.5
                                    incl    348.6    360.7     12.1      1.8
                                    incl    367.9    369.0      1.1      6.8
                                            402.2    405.8      3.6      5.9
----------------------------------------------------------------------------
MB-08-078ext             2+50 E      548    366.7    368.7      2.0      5.1
                                            401.3    402.5      1.2      7.1
                                            422.9    428.9      6.0      1.2
                                            452.3    453.0      0.7      4.0
----------------------------------------------------------------------------
MB-11-200                0+25 W    450.2    209.6    225.0     15.4      1.8
                                    incl    213.0    214.0      1.0      6.3
                                    incl    223.0    224.0      1.0     12.6
                                            277.0    281.0      4.0      3.4
                                            332.3    333.3      1.0      7.4
                                            361.4    378.0     16.6      1.8
                                    incl    372.4    375.4      3.0      6.1
                                            395.8    400.4      4.6      8.3
                                    incl    399.3    400.4      1.1     30.5
----------------------------------------------------------------------------
MB-11-214                0+50 E      555    294.0    303.4      9.4      1.6
                                            384.5    386.5      2.0      4.5
----------------------------------------------------------------------------
MB-11-218                6+00 W      200        No significant value        
----------------------------------------------------------------------------
MB-11-222                  0+00      522    319.6    355.6     36.0      1.0
                                    incl    337.2    339.3      2.1      5.0
                                    incl    349.6    350.8      1.2      5.0
                                            362.6    369.8      7.2      0.8
                                            375.8    387.8     12.0      0.6
                                            438.4    442.8      4.4      4.8
----------------------------------------------------------------------------
MB-11-224                4+00 W      192     29.6     35.4      5.8      9.8
                                             94.1     97.6      3.5      6.6
                                    incl     94.1     95.0      0.9     21.1
----------------------------------------------------------------------------
MB-11-227                4+50 E      345        No significant value        
----------------------------------------------------------------------------
MB-11-237                7+00 E      582    223.8    229.8      6.0      1.2
                                            416.4    422.4      6.0      2.0
                                            504.8    507.0      2.2      2.0
----------------------------------------------------------------------------
MB-11-238                7+00 E      359    256.4    260.0      3.6      2.0
                                    incl    257.6    258.8      1.2      4.3
----------------------------------------------------------------------------
MB-11-239                8+00 E      627    356.8    362.2      5.4      1.0
----------------------------------------------------------------------------
MB-11-241                4+50 E      528    249.9    261.0     11.1      0.9
----------------------------------------------------------------------------
                                            467.0    468.1      1.1     12.2
----------------------------------------------------------------------------
MB-11-246                  0+00      519     19.7     31.6     11.9      0.7
----------------------------------------------------------------------------
MB-11-247                1+00 E      150     85.1    101.8     16.7      1.8
----------------------------------------------------------------------------
                                    incl     87.8     90.2      2.4      7.7
----------------------------------------------------------------------------

Only mineralized intervals with a weight average above 0.5 grams per tonne corresponding to a metal factor above 5 are reported.

True thickness is evaluated at 90% of core length.

Step out Drilling Between Marban and Norlartic Deposits


----------------------------------------------------------------------------
           Length   From     To Length    Grade                             
Hole          (m)    (m)    (m)    (m) (g/t Au) Description                 
----------------------------------------------------------------------------
NL-11-050   204.0  167.4  168.6    1.2     1.91 Granodiorite Py             
----------------------------------------------------------------------------
                                                Int. dike/Granodiorite Py Qz
NL-11-051   201.0   96.2   97.8    1.6     0.99 veins                       
                   117.8  128.1   10.3     0.22 Granodiorite Py Qz veins    
----------------------------------------------------------------------------
                                                Sheared basalt Py Po Qz     
MB-11-201   204.0  108.9  111.0    2.1     0.45 veins                       
----------------------------------------------------------------------------
MB-11-202   201.0  104.7  107.6    2.9     0.28 Sheared basalt Py Qz veins  
----------------------------------------------------------------------------
MB-11-203   204.7   91.6   93.8    2.2     0.13 Granodiorite silicified Py  
----------------------------------------------------------------------------
MB-11-204   555.0   53.5   58.1    4.6     0.37 Granodioritic dike Py       
----------------------------------------------------------------------------
MB-11-205   368.0   29.9   35.0    5.1     0.47 Granodioritic dike Py       
----------------------------------------------------------------------------
MB-11-206   200.0   47.1   70.0   22.9     0.25 Felsic dike Py              
----------------------------------------------------------------------------
MB-11-207   200.0  152.1  178.0   25.9     0.72 Felsic dike Py              
             incl  174.9  177.0    2.1     7.37 Felsic dike Py Qz veins     
----------------------------------------------------------------------------
MB-11-208   200.0   28.6   29.1    0.5    10.05 Dioritic dikes Py Qz veins  
                    30.5   33.9    3.4     1.17 Dioritic dikes Py Qz veins  
----------------------------------------------------------------------------
                                                Ultramafic rocks            
MB-11-209   203.0  191.6  198.7    7.1     0.30 Py/Granodiorite Py          
----------------------------------------------------------------------------
MB-11-210   206.0   79.5   92.6   13.1     1.02 Granodioritic dike Py       
             incl   86.6   89.6    3.0     3.15 Granodioritic dike Py       
----------------------------------------------------------------------------
                                                Intermediate dike Py Qz     
MB-11-211   275.0  112.3  115.4    3.1     0.66 veins                       
----------------------------------------------------------------------------
MB-11-212   200.0  195.0  196.2    1.2     0.94 Granodiorite Py             
----------------------------------------------------------------------------
                                                Dioritic dikes Py Po Qz     
MB-11-213   263.0  167.5  169.0    1.5     7.54 veins                       
                   188.9  191.9    3.0     2.41 Dioritic dikes Py Qz veins  
----------------------------------------------------------------------------
                                                Intermediate dike Py Qz     
MB-11-243   395.0  315.3  320.0    4.7     0.75 veins                       
----------------------------------------------------------------------------
MB-11-244   380.0  157.8  158.3    0.5     4.60 Dioritic Dike Py Qz veins   
----------------------------------------------------------------------------

Technical Info, QA/QC and Qualified Persons

Reported intervals are in core lengths but are anticipated to approximate true width, except where structural complexities occur, as the holes were drilled nearly perpendicular to the principal local structural orientation.

Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for holes that traversed underground workings which were completed using BQ-size core. The core was sealed and delivered by the drilling contractor to NioGold's facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralised sections were sawed in half. Sample lengths vary between 0.5 to 1.5 metres. Half core samples were bagged, sealed and delivered to ALS Chemex in Val-d'Or, Quebec, an accredited laboratory. The remaining core is stored on site for reference. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split. A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and field duplicates in the sample batches sent to the laboratory and a systematic re-assaying of samples returning values above 2 g/t Au by the fire-assay method using a gravimetric finish. As well, pulps grading above 0.5 g/t Au are sent to Bourlamaque Assay Laboratories Ltd. in Val-d'Or for check assaying.

The drilling program is conducted under the supervision of Yan Ducharme, M.Sc., P.Geo. (OGQ), Niogold's Exploration Manager and a Qualified Person as defined by National Instrument 43-101. This news release was prepared under the supervision of Martin Demers, P.Geo., General Manager of Exploration of Aurizon and a Qualified Person under National Instrument 43-101, based on information made available by Niogold and verified by personnel of Aurizon.

Additional information

There are two sketches attached to this news release showing the Marban Block drill hole location and the Marban longitudinal figures.

To view the sketches associated with this news release, please visit the following links:

http://media3.marketwire.com/docs/aurizon-1116-map1.pdf

http://media3.marketwire.com/docs/aurizon-1116-map2.pdf

About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE Amex under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at www.aurizon.com.

Forward Looking Statements and Information

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities regulations in Canada and the United States (collectively, "forward-looking information"). The forward-looking information contained in this news release is made as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

Specifically, this news release contains forward-looking information with respect to future exploration work on the Marban Block property. Forward-looking information contained in this news release is based on certain assumptions that the Company believes are reasonable, that the current price of and demand for gold will be sustained or will improve. However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, the risk that actual results of exploration activities will be different than anticipated, that required supplies, equipment or personnel will not be available or will not be available on a timely basis or that the cost of labour, equipment or supplies will increase more than expected, that the future price of gold will decline, that the Canadian dollar will strengthen against the U.S. dollar, that mineral resources are not as estimated, that actual costs or actual results of reclamation activities are greater than expected; that changes in project parameters as plans continue to be refined may result in increased costs, of accidents, labour disputes and other risks generally associated with exploration, unanticipated delays in obtaining governmental approvals or financing or in the completion of exploration activities, as well as those factors and other risks more fully described in Aurizon's Annual Information Form filed with the securities commission of all of the provinces and territories of Canada and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission, which are available on Sedar at www.sedar.com and on Edgar at www.sec.gov/. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.

U.S. Registration: (File 001-31893)

Contacts: Aurizon Mines Ltd. George Paspalas President & CEO 604-687-6600 Aurizon Mines Ltd. Martin Bergeron VP Operations 819-874-4511 Aurizon Mines Ltd. Jennifer North Investor Relations 604-687-6600 or Toll Free: 1-800-411-GOLD (4653) 604-687-3932 (FAX)jennifer.north@aurizon.com; info@aurizon.comwww.aurizon.com

Aurizon Mines (AMEX:AZK)
Historical Stock Chart
From May 2024 to Jun 2024 Click Here for more Aurizon Mines Charts.
Aurizon Mines (AMEX:AZK)
Historical Stock Chart
From Jun 2023 to Jun 2024 Click Here for more Aurizon Mines Charts.