UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
 
Form 6-K
 
REPORT OF FOREIGN ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
 
 
For the month of: November 2015
Commission File Number: 001-35393
 
PRETIUM RESOURCES INC.

(Name of registrant)
 
570 Granville Street, Suite 1600
Vancouver, British Columbia
Canada V6C 3P1

(Address of Principal Executive Offices)
 
 
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:
 
Form 20-F o Form 40-F þ
 
 
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):
 

 
Exhibit Index
 
 
 
SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
 

 
Date: November 9, 2015
PRETIUM RESOURCES INC.
 
 
 
 
By:
/s/ Joseph J. Ovsenek
 
   
Name:
Joseph J. Ovsenek
 
   
Title:
President
 

 
 
 
1

 



EXHIBIT 99.1














PRETIUM RESOURCES INC.





CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2015 AND 2014

(Expressed in thousands of Canadian Dollars)
(Unaudited)












Suite 2300, Four Bentall Centre
1055 Dunsmuir Street, PO Box 49334
Vancouver, BC  V7X 1L4

Phone: 604-558-1784
Email: invest@pretivm.com
 
 

 
1

 

PRETIUM RESOURCES INC.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF FINANCIAL POSITION
(Unaudited – Expressed in thousands of Canadian Dollars)
 
   
Note
   
September 30,
2015
   
December 31,
 2014
 
                   
ASSETS
                 
                   
Current assets
                 
Cash and cash equivalents
        $ 453,233     $ 34,495  
Receivables and other
          17,019       12,552  
            470,252       47,047  
Non-current assets
                     
Restricted cash
    3       5,419       1,697  
Mineral properties, plant and equipment
    3       919,522       768,072  
Other assets
    4       38,099       -  
              963,040       769,769  
Total Assets
          $ 1,433,292     $ 816,816  
                         
LIABILITIES
                       
                         
Current liabilities
                       
Accounts payable and accrued liabilities
          $ 38,452     $ 13,277  
Flow-through share premium
            297       -  
              38,749       13,277  
Non-current liabilities
                       
Long-term debt
    4       434,911       -  
Decommissioning and restoration provision
            4,961       2,096  
Deferred income tax
            21,426       22,212  
Total liabilities
            500,047       37,585  
                         
EQUITY
                       
                         
Share capital
    5       951,731       795,034  
Contributed surplus
    5       66,578       59,970  
Deficit
            (85,064 )     (75,773 )
Total equity
            933,245       779,231  
Total Equity and Liabilities
          $ 1,433,292     $ 816,816  
                         
                         
Contingencies     7                  
Subsequent event     8                  

These condensed consolidated interim financial statements were authorized for issue by the Board of Directors on November 5, 2015.

On behalf of the Board:
 
     
“Ross A. Mitchell”
 
“George N. Paspalas”
 
Ross A. Mitchell
(Chairman of Audit Committee)
 
George N. Paspalas
(Director)
 

The accompanying notes are an integral part of these condensed consolidated interim financial statements.

 
2

 

PRETIUM RESOURCES INC.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF LOSS AND COMPREHENSIVE LOSS
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
       
Three months ended September 30,
   
Nine months ended September 30,
 
   
Note
   
2015
   
2014
   
2015
   
2014
 
                               
EXPENSES
                             
 
                             
Amortization
        $ 29     $ 19     $ 56     $ 53  
Consulting
          39       39       101       81  
Financing and interest costs
          148       -       148       -  
Insurance
          133       80       364       259  
Investor relations
          266       276       873       785  
Listing and filing fees
          11       21       323       260  
Office
          316       276       919       830  
Professional fees
          90       150       361       1,211  
Salaries
          665       405       2,192       1,158  
Share-based compensation
  5(b)       780       477       4,479       2,383  
Travel and accommodation
          88       82       328       136  
Gain on sale of equipment
          -       -       (47 )     -  
                                       
Operating loss
          2,565       1,825       10,097       7,156  
                                       
Interest income
          (134 )     (193 )     (647 )     (257 )
Accretion of decommissioning and restoration provision
          30       9       55       26  
Derivative (gain) loss
  4       2,853       -       2,853       -  
Foreign exchange (gain) loss
          (2,206 )     (400 )     (2,740 )     (178 )
                                       
Loss before taxes
          3,108       1,241       9,618       6,747  
                                       
Deferred income tax expense (recovery)
          227       3,427       (327 )     3,605  
                                       
Net loss and comprehensive loss for the period
        $ 3,335     $ 4,668     $ 9,291     $ 10,352  
                                       
Basic and diluted loss per common share
        $ 0.02     $ 0.04     $ 0.07     $ 0.09  
                                       
Weighted average number of common shares outstanding
          134,245,920       113,914,479       132,242,718       109,448,226  
 
 
 
 
 
 

 
The accompanying notes are an integral part of these condensed consolidated interim financial statements.
 
 

 
3

 

PRETIUM RESOURCES INC.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CASH FLOWS
(Unaudited – Expressed in thousands of Canadian Dollars)

         
Nine months ended September 30,
 
   
Note
   
2015
   
2014
 
                   
CASH FLOWS FROM OPERATING ACTIVITIES
                 
Loss for the period
        $ (9,291 )   $ (10,352 )
Items not affecting cash:
                     
Change in fair value of derivatives
          2,853       -  
Accretion of decommissioning and restoration provision
          55       26  
Amortization
          56       53  
Deferred income tax expense (recovery)
          (327 )     3,605  
Share-based compensation
  5       4,479       2,383  
Gain on sale of equipment
          (47 )     -  
Unrealized foreign exchange (gain) loss
          (2,836 )     -  
Change in non-cash working capital items:
                     
Receivables and other
          157       (183 )
Accounts payable and accrued liabilities
          (332 )     696  
                       
Net cash used in operating activities
          (5,233 )     (3,772 )
                       
CASH FLOWS FROM FINANCING ACTIVITIES
                     
Proceeds from credit facility, net
  4       192,291       -  
Proceeds from stream financing
  4       198,750       -  
Common shares issued
  5       159,126       93,784  
Share issue costs
  5       (4,591 )     (6,159 )
Proceeds from  exercise of stock options
  5       1,289       -  
                       
Net cash generated by financing activities
          546,865       87,625  
                       
CASH FLOWS FROM INVESTING ACTIVITIES
                     
Expenditures on mineral properties, plant & equipment
  3       (124,120 )     (40,152 )
Mineral recoveries
          210       9,154  
Proceeds from sale of equipment
          121       -  
Restricted cash
  3       (3,721 )     (449 )
                       
Net cash used in investing activities
          (127,510 )     (31,447 )
                       
Change in cash and cash equivalents for the period
          414,122       52,406  
 
                     
Cash and cash equivalents, beginning of period
          34,495       11,575  
Effect of foreign exchange rate changes on cash and cash equivalents
          4,616       -  
                       
Cash and cash equivalents, end of period
        $ 453,233     $ 63,981  

 
 

 
The accompanying notes are an integral part of these condensed consolidated interim financial statements.

 
4

 

PRETIUM RESOURCES INC.
CONDENSED CONSOLIDATED INTERIM STATEMENTS OF CHANGES IN EQUITY
(Unaudited – Expressed in thousands of Canadian Dollars)
 
   
Note
   
Number of shares
   
Share capital
   
Contributed surplus
   
Deficit
   
Total
 
                                               
Balance – December 31, 2013
          105,051,050     $ 707,547     $ 53,820     $ (63,328 )   $ 698,039  
                                               
Shares issued under flow-through agreement
          3,425,327       26,307       -       -       26,307  
                                               
Shares issued under marketed offering
          7,855,650       61,868       -       -       61,868  
                                               
Shares issued under private placement
          496,054       3,916       -       -       3,916  
                                               
Share issue costs
          -       (6,159 )     -       -       (6,159 )
                                               
Deferred income tax on share issuance costs
          -       1,599       -       -       1,599  
                                               
Value assigned to options vested
          -       -       4,673       -       4,673  
                                               
Loss for the period
          -       -       -       (10,352 )     (10,352 )
                                               
Balance – September 30, 2014
          116,828,081     $ 795,078     $ 58,493     $ (73,680 )   $ 779,891  
                                               
Balance – December 31, 2014
          116,828,081     $ 795,034     $ 59,970     $ (75,773 )   $ 779,231  
                                               
Shares issued under private placement
  5       23,430,324       152,126       -       -       152,126  
                                               
Shares issued under flow-through agreement
  5       800,000       5,968       -       -       5,968  
                                               
Share issue costs
  5       -       (4,591 )     -       -       (4,591 )
                                               
Shares issued upon exercise of options
  5       216,250       2,000       (711 )     -       1,289  
                                               
Deferred income tax on share issuance costs
          -       1,194       -       -       1,194  
                                               
Value assigned to options vested
  5       -       -       7,319       -       7,319  
                                               
Loss for the period
          -       -       -       (9,291 )     (9,291 )
                                               
Balance – September 30, 2015
          141,274,655     $ 951,731     $ 66,578     $ (85,064 )   $ 933,245  
                                               
 
 
 
 
 
 
 
 
 
 
 
 
The accompanying notes are an integral part of these condensed consolidated interim financial statements.

 
5

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
1. 
NATURE OF OPERATIONS

Pretium Resources Inc. (the "Company") was incorporated under the laws of the Province of British Columbia, Canada on October 22, 2010.  The address of the Company’s registered office is Suite 2300, Four Bentall Centre, 1055 Dunsmuir Street, PO Box 49334, Vancouver, BC, V7X 1L4.

The Company is in the business of acquiring, owning, evaluating and developing gold/silver/copper mineral interests and owns the Brucejack and Snowfield Projects (the “Projects”) located in Northwest British Columbia, Canada.  The Company is in the process of developing the Brucejack Project and exploring the Snowfield Project.

The Company’s continuing operations and the underlying value and recoverability of the amount shown for the mineral interests are entirely dependent upon the existence of economically recoverable mineral reserves and resources, the ability of the Company to obtain the necessary financing to complete the exploration and development of the Projects, the ability to obtain the necessary permits to mine, and on future profitable production or proceeds from the disposition of the Projects.

2. 
SIGNIFICANT ACCOUNTING POLICIES

 
a)
Statement of Compliance

These condensed consolidated interim financial statements have been prepared in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”) applicable to the preparation of interim financial statements, including IAS 34, Interim Financial Reporting. Accordingly, these financial statements do not include all of the information and footnotes required by IFRS for complete financial statements for year-end reporting purposes. These financial statements should be read in conjunction with the Company’s financial statements for the year ended December 31, 2014, which have been prepared in accordance with IFRS as issued by the IASB.

These condensed consolidated interim financial statements are expressed in thousands of Canadian dollars (unless otherwise stated).  The accounting policies applied by the Company in these financial statements are the same as those applied by the Company in its most recent annual consolidated financial statements for the year ended December 31, 2014.  As a result of the transition of the Brucejack Project from exploration and evaluation to property, plant and equipment in the period, the Company has also applied the accounting policies described below.

 
b)
Mineral property development costs

Mineral properties consists of the Brucejack Project carried at cost, less accumulated depletion.  Costs of project development including gaining access to underground resources are capitalized to mineral properties.  Once the mineral property is in production, it will be depleted using the units-of-production method.  Depletion is determined each period using gold equivalent ounces mined over the asset’s estimated recoverable reserves.

 
6

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
2.
SIGNIFICANT ACCOUNTING POLICIES (Cont’d)

 
c)
Construction in Progress

Costs recorded for assets under construction are capitalized as construction in progress.  On completion, the cost of construction is transferred to the appropriate category of property, plant and equipment.  No depreciation is recorded until assets are substantially complete and available for their intended use.

 
d)
Borrowing Costs

Borrowing costs that are directly attributable to the acquisition, construction or production of an asset that takes a substantial period of time to prepare for its intended use are capitalized as part of the cost of the asset.  Capitalization of borrowing costs begins when there are borrowings and activities commence to prepare an asset for its intended use.  Capitalization of borrowing costs ends when substantially all activity necessary to prepare a qualifying asset for its intended use are complete.  When proceeds of project specific borrowings are invested on a temporary basis, borrowing costs are capitalized net of any investment income.

 
e)
Impairment of non-financial assets

The carrying amounts of assets included in mineral properties, plant and equipment are reviewed for impairment whenever facts and circumstances suggest that the carrying amounts may not be recoverable.  If there are indicators of impairment, the recoverable amount of the asset is estimated in order to determine the extent of any impairment.  Where the asset does not generate cash flows that are independent from other assets, the recoverable amount of the cash generating unit to which the asset belongs is determined.  The recoverable amount of an asset or cash generating unit is determined as the higher of its fair value less costs of disposal and its value in use.  An impairment loss exists if the asset’s carrying amount exceeds the recoverable amount, and is recorded as an expense immediately.

Value in use is determined as the present value of the future cash flows expected to be derived from continuing use of an asset or cash generating unit in its present form.  These estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset or cash generating unit for which estimates of future cash flows have not been adjusted.  Fair value is the price that would be received from selling an asset in an orderly transaction between market participants at the measurement date.  Costs of disposal are incremental costs directly attributable to the disposal of an asset.  Estimated future cash flows are calculated using estimated future prices, mineral reserves and resources and operating and capital costs.  All inputs used are those that an independent market participant would consider appropriate.



 
7

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
2.
SIGNIFICANT ACCOUNTING POLICIES (Cont’d)

 
e)
Impairment of non-financial assets (Cont’d)

Tangible assets that have been impaired in prior periods are tested for possible reversal of impairment whenever events or changes in circumstances indicate that the impairment has reversed.  If the impairment has reversed, the carrying amount of the asset is increased to its recoverable amount, but not beyond the carrying amount that would have been determined had no impairment loss been recognized for the asset in the prior periods.  A reversal of an impairment loss is recognized into profit or loss immediately.

 
f)
Critical accounting estimates and judgments

The preparation of financial statements requires management to use judgment in applying its accounting policies and estimates and assumptions about the future.  Estimates and other judgments are regularly evaluated and are based on management’s experience and other factors, including expectations about future events that are believed to be reasonable under the circumstances.  The following discusses the most significant accounting judgments and estimates that the Company has made in the preparation of the financial statements that could result in a material effect in the next financial year on the carrying amounts of assets and liabilities:

 
·
Impairment of exploration and evaluation assets

The application of the Company’s accounting policy for impairment of exploration and evaluation assets requires judgment to determine whether indicators of impairment exist including factors such as, the period for which the Company has the right to explore, expected renewals of exploration rights, whether substantive expenditures on further exploration and evaluation of resource properties are budgeted and results of exploration and evaluation activities up to the reporting date.  Management has assessed impairment indicators on the Company’s exploration and evaluation assets and has concluded that no impairment indicators existed as of September 30, 2015.

 
·
Determination of commercial viability and technical feasibility of the Brucejack Project

The application of the Company’s accounting policy for exploration and evaluation expenditures requires judgment to determine whether technical feasibility and commercial viability of the Brucejack Project is demonstrable.  The Company considered the positive National Instrument 43-101 compliant Feasibility Study, the receipt of key environmental permits and completed construction financing and concluded that commercial viability and technical feasibility of the Brucejack Project had been confirmed in the period ended September 30, 2015.  At this point, the asset is reclassified to mineral properties, plant and equipment and tested for impairment.


 
8

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
3. 
MINERAL PROPERTIES, PLANT AND EQUIPMENT
 
   
Nine months ended September 30, 2015
 
   
Mineral properties
   
 
Construction in progress
   
Plant and equipment
   
Exploration and evaluation assets
   
Total
 
Cost
                             
Balance, beginning of period
  $ -     $ -     $ 13,436     $ 759,238     $ 772,674  
Additions in the period
    -       -       731       155,924       156,655  
Recoveries
    (3,677 )     -       -       -       (3,677 )
Transfer to mineral properties
      515,369         83,811         -       (599,180 )       -  
    $ 511,692     $ 83,811     $ 14,167     $ 315,982     $ 925,652  
                                         
Accumulated depreciation and depletion
                                       
Balance, beginning of period
  $ -     $ -     $ 4,602     $ -     $ 4,602  
Additions
    -       -       1,762       -       1,762  
Disposals
    -       -       (234 )     -       (234 )
    $ -     $ -     $ 6,130     $ -     $ 6,130  
Balance, September 30, 2015
  $   511,692     $   83,811     $   8,037     $   315,982     $   919,522  

Exploration and evaluation assets

Exploration and evaluation assets consists primarily of the Snowfield Project as well as additional regional drilling.

Mineral properties

Mineral properties consists solely of the Brucejack Project.  The Company and the Nisga’a Nation have entered into a comprehensive Cooperation and Benefits Agreement in respect of the Brucejack Project.  Under the terms of the Agreement, the Nisga’a Nation will provide ongoing support for the development and operation of Brucejack with participation in its economic benefits.

In relation to the Brucejack Project, the Company has $5,419 of restricted cash which includes $5,036 in the form of Guaranteed Investment Certificates and Letters of Credit as security deposits with various government agencies in relation to close down and restoration provisions.

The Brucejack Project is subject to a 1.2% net smelter returns royalty on production in excess of 503,386 ounces of gold and 17,907,080 ounces of silver.

 
9

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
3.
MINERAL PROPERTIES, PLANT AND EQUIPMENT (Cont’d)

On July 31, 2015, the Company received an Environmental Assessment Decision Statement from the Federal Minister of the Environment which found that the Brucejack Project was not likely to cause significant adverse environmental effects.  Subsequent to this, the British Columbia Minister of Energy and Mines issued a Mines Act Permit approving the mine plan and reclamation program allowing commercial production at the Brucejack Project.  With receipt of the permits, the development decision from the Board of Directors and the completion of the construction financing package, the Brucejack Project has transitioned from an exploration and evaluation asset under IFRS 6 to property, plant and equipment under IAS 16.

At the time of the transition from exploration and evaluation to property, plant and equipment, the company completed an impairment test as required by IFRS 6.  The impairment test compared the carrying amount of the Brucejack Project to its recoverable amount.  The recoverable amount is the higher of the value in use and the fair value less costs of disposal.  The Company estimated the recoverable amount based on the fair value less costs of disposal using a discounted cash flow model with feasibility study economics.  The significant assumptions that impact the resulting fair value include future gold and silver prices, exchange rates, capital cost estimates, operating cost estimates, estimated reserves and resources and the discount rate.  Upon completion of the impairment test, the Company concluded there was no impairment.

4.
CONSTRUCTION FINANCING

On September 21, 2015, the Company closed a construction financing package comprised of a credit facility for US$350 million, an offtake agreement, a US$150 million callable gold and silver stream agreement and a private placement of common shares for US$40 million.  The Company received credit facility proceeds of US$150 million, before an arrangement fee of US$4.5 million, gold and silver stream proceeds of US$150 million and common share proceeds of US$40 million upon closing.

The Company recorded the following at closing:

 
Assets
     
Loan commitment under senior secured term facility (US$23,589)
  $ 31,530  
Embedded derivatives in senior secured term facility (US$5,152)
    6,826  
Total
  $ 38,356  
         
Liabilities
       
Senior secured term facility (a):
  $    
Principal drawn (US$150,000)
    198,750  
Adjustment to carrying amount
    (35,230 )
Total
  $ 163,520  
Offtake obligation (US$50,662) (b)
  $ 67,127  
Stream obligation (US$150,000) (c)
  $ 198,750  
Equity
       
Common shares (US$40,000)
  $ 53,000  
 
 
 
 
10

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
4.
CONSTRUCTION FINANCING (Cont’d)

Transaction costs associated with the loan facility and common shares have been recorded as part of the associated financing.  Transaction costs attributable to the offtake and stream obligations have been expensed as incurred.

Pursuant to the construction financing agreements, the Company is subject to a number of non-financial covenants, including restrictions on future financings while amounts remain outstanding under the senior secured term credit facility.

 
(a)
Senior secured term facility

Pursuant to the terms of the senior secured term credit facility, the Company can borrow up to US$350 million, which bears interest at a stated rate of 7.5%, compounded quarterly and payable upon maturity.   The credit facility is secured by substantially all of the assets of the Company and its subsidiaries.

On September 21, 2015, the Company received an initial advance of US$150 million.  Subsequent advances will be available starting 6 months following the closing date and ending 18 months following the closing date.  Each subsequent advance shall be for a minimum of US$5 million and a maximum of US$50 million and is subject to a 3% arrangement fee at the time of draw.

The credit facility matures December 31, 2018 and is subject to an extension for one year, at the Company’s option, upon payment of an extension fee of 2.5% of the principal amount, including accumulated interest.  The Company has the right to repay at par plus accrued interest after the second anniversary of closing and upon payment of 2.5% of principal prior to the second anniversary.

The Company has determined the prepayment and extension options in the credit facility are embedded derivatives that are required to be separated from the credit facility obligations and recorded at fair value initially and at each balance sheet date, with changes in fair value recorded in profit or loss.  From inception to September 30, 2015, the change in fair value of the embedded payment options was a fair value loss of $257.

In conjunction with the credit facility, the Company entered into an agreement to sell the gold produced at the Brucejack Project (the “Offtake obligation”).  The Offtake obligation (discussed below), compensates for a lower stated interest rate on the credit facility and is presented as a reduction to the carrying amount of the drawn portion of the credit facility and an asset representing the initial fair value of the undrawn loan commitment.  As the balance of the credit facility is drawn, the loan commitment will be reclassified as a reduction of the resulting loan and amortized over the life of the associated liability on an effective interest rate basis.

As a result of impact of both the Offtake obligation and the arrangement fees, the effective interest rate on the drawn portion of the credit facility is 13.7%.  From inception to September 30, 2015, the Company capitalized $556 of interest on the credit facility to mineral property, plant and equipment.

 
11

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
4.
CONSTRUCTION FINANCING (Cont’d)

As at September 30, 2015, the carrying value of the credit facility obligation is as follows:

Balance, beginning of period
  $ -  
Credit facility advances, net of discounts (US$123,579)
    163,520  
Accrued interest during the period (US$417)
    556  
Foreign currency loss
    1,780  
Balance, end of period
  $ 165,856  

 
(b)
Offtake obligation

The Company has entered into an agreement pursuant to which it will sell 100% of refined gold (in excess of any delivered ounces pursuant to the stream obligation) up to 7,067,000 ounces.  The final purchase price to be paid by the purchaser will be, at the purchaser’s option, a market referenced gold price in US dollars per ounce during a defined pricing period before and after the date of each sale.

The Company has the option to reduce the Offtake obligation by up to 75% by paying (a) US$11 per remaining ounce effective December 31, 2018 or (b) US$13 per ounce effective December 31, 2019 on the then remaining undelivered gold ounces.

The Company has determined the offtake obligation represents a derivative liability.  Accordingly, the offtake obligation, which is primarily a function of the purchaser’s gold price option feature, is remeasured at fair value at each balance sheet date, with changes in fair value being recorded in profit or loss.  From inception to September 30, 2015, the change in fair value of the Offtake obligation was a fair value loss of $294.

 
(c)
Stream obligation

The Company has entered into a stream arrangement from which it received a US$150 million deposit on September 21, 2015.  Pursuant to the stream, the Company is obligated to deliver, subject to prepayment options, 8% of up to 7,067,000 ounces of refined gold and 8% of up to 26,297,000 ounces of refined silver commencing on January 1, 2020 (less gold and silver sold to date) and a payment of US$20 million.   Upon delivery, the Company is entitled to (a) for gold, the lesser of US$400 and the gold market price and (b) for silver, the lesser of US$4 per ounce and the silver market price.  Any excess of market over the fixed prices above are credited against the deposit.  Any remaining uncredited balance of the deposit is repayable, without interest, upon the earlier of the date (i) the aggregate stated gold and silver quantities have been delivered and (ii) 40 years.

The Company has the option to repurchase the stream obligation for US$237 million on December 31, 2018 or US$272 million on December 31, 2019.  Alternatively, the Company may reduce the stream obligation to (a) 3% on December 31, 2018 (and accelerate deliveries under the stream to January 1, 2019) or (b) 4% on December 31, 2019 (in which case deliveries will commence on January 1, 2020) on payment of US$150 million.

 
12

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 

4.
CONSTRUCTION FINANCING (Cont’d)

In the event of certain change of control events prior to January 1, 2020 (or the date the deposit is reduced to nil, if earlier), the Company and the counterparty each have an option pursuant to which the Company would repurchase the stream obligation in exchange equal to the greater of (a) 13.6% of consideration received as a result of the triggering event and (b) an amount that will result in the counterparty receiving a 15% annualized return on the stream obligation.

The Company has determined that the stream obligation is in substance a debt instrument with embedded derivatives linked to gold and silver commodity prices.   The Company has elected to measure the stream obligation in its entirety at fair value through profit and loss.  The stream obligation will be remeasured at fair value at each balance sheet date, with changes in the fair value being recorded in profit or loss.  From inception to September 30, 2015, the stream obligation increased by $2,884.  As the stream is in substance a debt instrument, the effective interest on the debt host is capitalized.  From inception to September 30, 2015, the Company capitalized $582 of interest on the stream debt to mineral properties, plant and equipment.  The capitalized interest was deducted from the derivative loss recorded in the statement of loss.
 
 
(d)
Fair Value of Financial Liabilities Under the Construction Financing Arrangements

International Financial Reporting Standards establish a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value.  The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities and the lowest priority to unobservable inputs. The three levels of the fair value hierarchy are as follows:

 
Level 1:
Quoted prices in active markets for identical assets or liabilities that the reporting entity has the ability to access at the measurement date.
 
 
Level 2:
Inputs that are observable, either directly or indirectly, for substantially the full term of the asset or liability.
 
 
Level 3:
Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable.
 
The following table sets forth the Company’s assets and liabilities measured at fair value on a recurring basis by level within the fair value hierarchy.  Each of these financial instruments are classified as Level 3 as their valuation includes significant unobservable inputs.

As at and for the period ended September 30, 2015
   
Fair value
Asset / (Liability)
 
Embedded derivatives under the senior secured term facility
  $ 6,570  
Offtake obligation
  $ (67,421 )
Stream obligation
  $ (201,635 )


 
13

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
4.
CONSTRUCTION FINANCING (Cont’d)

The embedded derivative assets were valued using the Monte Carlo simulation valuation models with principal inputs related to the credit facility including the risk-free interest rate, the Company’s credit spread and foreign exchange rates.

The offtake and stream obligations were valued using Monte Carlo simulation valuation models.  The key inputs used by the Monte Carlo simulation in valuing both the stream and the offtake include: the gold forward curve based on Comex futures, the Company’s expectation about long-term gold yields, gold volatility, call option exercise prices, risk-free rate of return, non-performance risk, production expectations and spot USD/CAD foreign exchange rates.  In addition, in valuing the stream obligation, the silver forward curve based on Comex futures, silver volatility and the gold/silver correlation were used.

5. 
CAPITAL AND RESERVES

 
a)
Authorized Share Capital

On January 15, 2015, the Company completed a private placement of 12,836,826 common shares at $6.30 per share for gross proceeds of $80.9 million resulting in the acquirer owing approximately 9.9% of the Company’s issued and outstanding shares.  As a result of this agreement, the Company entered into additional subscription agreements with holders who wished to maintain their respective pro rata interest in the Company.  Thus, on January 21, 2015, the Company issued an additional 2,897,490 common shares at $6.30 per share for gross proceeds of $18.3 million.  The combined gross proceeds of these two offerings was $99.1 million (before share issue costs of $3.5 million).

On June 8, 2015, the Company completed a private placement of 800,000 flow-through shares at a price of $8.75 per flow-through share for gross proceeds of $7.0 million.  The Company bifurcated the gross proceeds between share capital of $6.0 million (before share issue costs of $0.1 million) and flow-through share premium of $1.0 million.

On September 21, 2015, as part of the construction financing package, the Company completed a private placement of 7,696,008 common shares at US$5.1975 per share for gross proceeds of US$40 million (before share issue costs of US$0.6 million).

 
b)
Share Option Plan

The following table summarizes the changes in stock options for the nine months ended September 30:
 
   
2015
   
2014
 
   
Number of options
   
Weighted average exercise price
   
Number of options
   
Weighted average exercise price
 
Outstanding, January 1
    10,810,950     $ 8.48       9,841,950     $ 8.63  
Granted
    1,556,000       8.23       510,000       7.44  
Exercised
    (216,250 )     5.96       (22,500 )     13.06  
Forfeited
    (135,750 )     12.12                  
Outstanding, September 30
    12,014,950     $ 8.44       10,329,450     $ 8.56  
 
 
 
 
14

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
5.
CAPITAL AND RESERVES (Cont’d)

The following table summarizes information about stock options outstanding and exercisable at September 30, 2015:
 
       Stock options outstanding     Stock options exercisable  
Exercise prices
   
Number of options outstanding
   
Weighted average years to expiry
   
Number of options exercisable
   
Weighted average exercise price
 
$5.85 – $7.99       6,866,500       1.64       6,375,750     $ 6.17  
$8.00 - $9.99       1,632,750       3.33       1,080,750       9.04  
$10.00 - $11.99       2,015,700       0.97       2,015,700       11.53  
$12.00 - $13.99       1,355,000       2.17       1,355,000       13.69  
$14.00 - $15.99       20,000       1.52       20,000       14.67  
$16.00 - $17.99       125,000       1.33       125,000       16.48  
Outstanding, September 30, 2015
      12,014,950       1.81       10,972,200     $ 8.50  

The total share option compensation for the nine month period ended September 30, 2015 is $7,319 (2014 - $4,673) of which $4,181 (2014 - $2,383) has been recorded to share-based compensation in the statement of loss and $3,138 (2014 - $2,290) has been capitalized to mineral interests.

The following are the weighted average assumptions employed to estimate the fair value of options granted for the nine month periods ended September 30, 2015 and September 30, 2014 using the Black-Scholes option pricing model:

  Nine months ended September 30   
   
2015
   
2014
 
Risk-free interest rate
    1.02 %     1.37 %
Expected volatility
    66.80 %     68.28 %
Expected life
 
5 years
   
5 years
 
Expected dividend yield
 
Nil
   
Nil
 

Option pricing models require the input of subjective assumptions including the expected price volatility, and expected option life. Changes in these assumptions may have a significant impact on the initial fair value.

 
15

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
5.
CAPITAL AND RESERVES (Cont’d)

 
c)
Restricted Share Unit (“RSU”) Plan

The following table summarizes the changes in RSU’s for the nine months ended September 30, 2015:
 
   
Number of RSU’s
   
Weighted average fair value
 
Outstanding, January 1
    330,992     $ 6.84  
Granted
    -          
Settled
    (1,433 )     8.24  
Forfeited/expired
    (6,023 )     8.24  
Outstanding, September 30
    323,536     $ 6.84  

The Company’s RSU’s are cash settled share based awards.  At September 30, 2015, a liability of $723 (2014 - $Nil) was outstanding and included in accounts payable and accrued liabilities.  For the period ended September 30, 2015, $298 (2014 - $Nil) of RSU compensation has been recorded to share-based compensation expense and $375 (2014 - $Nil) has been capitalized to mineral interests.

6.
RELATED PARTIES

 
Transactions with directors and key management personnel

Nine months ended September 30  
   
2015
   
2014
 
Salaries and management fees
  $ 1,710     $ 1,213  
Share based compensation
    5,312       3,548  
Total management compensation
  $ 7,022     $ 4,761  

Subsidiaries

The Company has two wholly owned subsidiaries: Pretium Exploration Inc., which holds interest in the Brucejack and Snowfield Projects, and 0890696 BC Ltd., which holds real estate in Stewart, BC.
 
7. 
CONTINGENCIES
 
 
a)
Canadian Class Actions

On October 29, 2013, David Wong, a shareholder of the company, filed a proposed class action against the Company, Robert Quartermain (a director, the President and the CEO of the Company), and Snowden Mining Industry Consultants Ltd. (the “Wong Action”). 

A similar proposed class action was filed by Roksana Tahzibi, a shareholder of the Company, on November 1, 2013 (the “Tahzibi Action”).  The defendants in the Tahzibi Action are the Company, Mr. Quartermain, Joseph Ovsenek (an officer and director of the Company), Kenneth McNaughton (an officer of the Company), Ian Chang (an officer of the Company) and Snowden Mining Industry Consultants Ltd.    

 
16

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
7.
CONTINGENCIES (Cont’d)

The Wong Action and Tahzibi Action (together, the “Ontario Actions”) were filed in the Ontario Superior Court of Justice.

The plaintiffs in the Ontario Actions seek certification of a class action on behalf of a class of persons, wherever they reside, who acquired the Company’s securities.  In the Wong Action, the class period is between November 22, 2012 and October 22, 2013.  In the Tahzibi Action, the class period is between July 23, 2013 and October 22, 2013.  

The plaintiffs in the Ontario Actions allege that certain of the Company’s disclosures contained material misrepresentations or omissions regarding Brucejack, including statements with respect to probable mineral reserves and future gold production at Brucejack.  The plaintiffs further allege that until October 22, 2013 the Company failed to disclose alleged reasons provided by Strathcona Mineral Services Ltd. for its resignation as an independent qualified person overseeing the bulk sample program.  According to the plaintiffs in the Ontario Actions, these misrepresentations and omissions are actionable under Ontario’s Securities Act, other provincial securities legislation and the common law.  

The Wong Action claims $60 million in general damages.  The Tahzibi Action claims $250 million in general damages. The plaintiffs in the Ontario Actions have asked for the appointment of a case management judge.  There have been no further steps in the Ontario Actions. 
 
 
b)
United States Class Actions

Between October 25, 2013 and November 18, 2013, five putative class action complaints were filed in the United States against the Company and certain of its officers and directors, alleging that defendants violated the United States securities laws by misrepresenting or failing to disclose material information concerning the Brucejack Project. All five actions were filed in the United States District Court for the Southern District of New York.

In January 2014, the Court ordered that these actions be consolidated into a single action, styled In re Pretium Resources Inc. Securities Litigation, Case No. 13-CV-7552. The Court has appointed as lead plaintiffs in the consolidated action three individuals who are suing on behalf of a putative class of shareholders who purchased the Company’s common shares between June 11, 2013 and October 22, 2013.

In March 2014, the plaintiffs filed a consolidated amended class action complaint, which the Company moved to dismiss in May 2014. In July 2014, the plaintiffs filed a second consolidated amended class action complaint (“Second Amended Complaint”). The Company moved to dismiss the Second Amended Complaint on September 5, 2014.  Plaintiffs filed their Opposition to the Company’s Motion to Dismiss on October 20, 2014, and the Company filed a reply brief on November 19, 2014.  The Court has not yet issued a decision on the motion.

 
17

 
 
PRETIUM RESOURCES INC.
NOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
For the nine months ended September 30, 2015 and 2014
(Unaudited – Expressed in thousands of Canadian Dollars)
 
 
7.
CONTINGENCIES (Cont’d)

The Company believes that the allegations made against it in these actions are meritless and will vigorously defend these matters, although no assurance can be given with respect to the ultimate outcome of such proceedings.  No liability amounts have been recorded in connection with these cases.

8. 
SUBSEQUENT EVENT

Subsequent to the period end, 3,316,450 employee stock options were exercised at an exercise price between $5.85 and $6.10 per share for total gross proceeds of $20,026.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
18





EXHIBIT 99.2


 
PRETIUM RESOURCES INC.
 
MANAGEMENT’S DISCUSSION AND ANALYSIS
FOR THE QUARTER ENDED SEPTEMBER 30, 2015
 
This Management’s Discussion and Analysis (“MD&A”) should be read in conjunction with the condensed consolidated interim financial statements of Pretium Resources Inc. (“Pretivm”, the “Company”, “we” or “us”) for the quarter ended September 30, 2015 as publicly filed on the System for Electronic Document Analysis and Retrieval (SEDAR) website.
 
We have prepared the condensed consolidated interim financial statements in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”) applicable to the preparation of interim financial statements, including IAS 34, Interim Financial Reporting.  This MD&A is prepared as of November 5, 2015 and includes certain statements that may be deemed “forward-looking statements”. We direct investors to the section “Risks and Uncertainties” and “Statement on forward-looking information” included within this MD&A.  Additional information relating to us, including our Annual Information Form and Form 40-F, is available on the SEDAR website at www.sedar.com and on the SEC website at www.sec.gov.
 
Our Business
 
Pretivm was incorporated on October 22, 2010 under the laws of the Province of British Columbia.  We are an exploration and development company that was formed for the acquisition, exploration and development of precious metal resource properties in the Americas.
 
We have a 100% interest in the Brucejack Project and Snowfield Project, both of which are located in northwestern British Columbia.
 
The Brucejack Project is our material mineral project.  Our focus is on advancing the Brucejack Project to production as a high-grade gold underground mine, with engineering and construction underway.
 
The mineral claims for the Snowfield Project are in good standing until 2026 and we continue to conduct baseline environmental studies for potential future development.
 
3rd Quarter Highlights
 
·
On July 15, 2015, we reported the second set of results from the underground infill drill program in the Valley of the Kings targeting stope areas in years 1 through 3 of the current mine plan.  Drilling continued to confirm the style and grade distribution of the gold mineralization in the area being tested, including the intersection of high-grade and visible gold.

 
1

 
 
·
On July 30, 2015, we announced that a positive Environmental Assessment Decision Statement was received from the Federal Minister of the Environment.
 
·
On August 19, 2015 we reported the third set of results from the underground infill drill program in the Brucejack Project’s Valley of the Kings underway in the 1320 drill bay and the 1310 drill bay.
 
·
On September 1, 2015, we announced that we had been issued all of the major regulatory permits required to begin development work towards commercial production at the Brucejack Project.  A Mines Act Permit was issued by the British Columbia Minister of Energy and Mines approving our mine plan and reclamation program allowing for the construction of a 2,700 tonnes per day doré and flotation plant, development of an underground mine and associated facilities and other infrastructure.  We were also issued an Environmental Management Act permit for the Brucejack Project by the British Columbia Ministry of Environment, which governs effluent discharge during construction and operation.
 
·
On September 15, 2015, we announced a US$540 million construction financing package (the “Financing”) with Orion Mine Finance Group and Blackstone Tactical Opportunities (“Orion and Blackstone”). The Financing provided for immediate access to US$340 million at closing and will fund a substantial portion of the costs to develop an underground mine at our Brucejack Project.  The Financing was comprised of a credit facility and offtake agreement, a prepayment under a callable gold and silver stream agreement and a private placement of our common shares. We also announced that our Board of Directors approved a production decision for the Brucejack Project.  On September 21, 2015, we announced that we had closed the Financing.
 
·
On September 21, 2015, we announced initial results from the grass-roots exploration drill program underway in the Flow Dome Zone east of the Brucejack Project.  High-grade intersections along with long intervals of low-grade mineralization suggest a new stockwork zone or an extension of the Valley of the Kings deposit.
 
·
On September 30, 2015, we reported a fourth set of drill results from the underground infill drill program.  Results continue to confirm the style and grade distribution of the gold mineralization in the area currently being tested, which includes the intersection of high grade and visible gold.
 
·
Subsequent to the end of the quarter, on October 1, 2015 we announced the appointment of Dr. Nicole Adshead-Bell to our Board of Directors.
 
·
On October 8, 2015, we announced a second set of drill results from the regional grass-roots exploration drill program underway on the property surrounding the Brucejack Project. High-grade gold intersections encountered in the Flow Dome Zone east of the Brucejack Project supported results previously reported confirming the presence of either a new stockwork zone or an extension of the Valley of the Kings deposit.

 
2

 

Operations
 
Brucejack Project
 
The Brucejack Project is located approximately 950 km northwest of Vancouver, British Columbia and 65 km north-northwest of Stewart, British Columbia and is comprised of 4 mining leases and 6 mineral claims totaling 3,054 hectares in area.  The Brucejack Project forms part of our contiguous claims package that comprises over 111,000 hectares.
 
Project Permitting
 
During the third quarter, we received the remaining major regulatory permits from the federal and provincial governments required to begin development work towards commercial production at the Brucejack Project.
 
On July 22, 2015, the British Columbia Minister of Energy and Mines issued a Mines Act Permit approving our mine plan and reclamation program allowing commercial production at the Brucejack Project.  The Mines Act Permit allows for the construction of a 2,700 tonnes per day doré and flotation plant, development of an underground mine and associated facilities and infrastructure.
 
On July 30, 2015, we received a positive Environmental Assessment Decision Statement from the Federal Minister of the Environment.  The Decision Statement found that the Brucejack Project is not likely to cause significant adverse environmental effects. In reaching the Decision, the Minister considered the Project Recommendation and the Canadian Environmental Assessment Agency (CEAA) Environmental Assessment Report.  The Report includes CEAA’s conclusions and recommendations on the potential environmental effects of the project, the proposed mitigation measures, the significance of any remaining adverse environmental effects and the follow-up program.
 
On August 31, 2015, we were issued an Environmental Management Act Permit by the British Columbia Ministry of Environment for our Brucejack Project which governs effluent discharge during construction and operation.
 
On March 27, 2015, we were issued an Environmental Assessment Certificate for the Brucejack Project by the British Columbia Minister of the Environment and Minister of Energy and Mines.  The Ministers issued the certificate with conditions that have given them the confidence to conclude that the project will be constructed, operated and decommissioned in a way that ensures no significant adverse effects are likely to occur.  We addressed these conditions in advance of the start of mine construction.
 
Construction Financing
 
On September 21, 2015, we completed a US$540 million construction financing with Orion and Blackstone. The Financing provided immediate access to US$340 million and will fund a substantial portion of the costs to develop an underground mine at the Brucejack Project.  The Financing was comprised of a credit facility for US$350 million, a US$150 million prepayment under a callable gold and silver stream agreement and a private placement of our common shares for US$40 million (see “Liquidity and Capital Resources” below).

 
3

 

Project Engineering
 
Basic and detailed engineering activities have been ongoing following the completion in June 2014 of the updated National Instrument 43-101-compliant feasibility study for the Brucejack Project (see “Updated Feasibility Study” below).  All long lead items have been ordered, including the ball mill, SAG mill, and transformers. Construction power generators have been delivered to site and commissioned. Detailed project engineering continues along with an evaluation and review of the capital cost budget. An updated capital cost estimate is expected in the fourth quarter of 2015.
 
Construction Progress
 
Construction at the Brucejack Project commenced on September 5, 2015.  Activities are currently focused on bulk earth works, including the pads for the permanent camp and mill building, in preparation for facilities construction in the spring of 2016. Additional construction activities at site have included the excavation of diversion ditches and contact water pond and the widening of the haul road to accommodate construction traffic.  The permanent camp has been fabricated offsite and is expected to be assembled on site in the first half of 2016.
 
During the quarter, transmission line right-of-way clearing commenced and the contract for the transmission line towers was issued.
 
Underground development was ongoing throughout the third quarter, with an initial focus on underground exploration development.  With the receipt of final mine development permits, the focus switched to the development of mine infrastructure.  Prior to the end of the quarter, the pre-production underground development contract was awarded to Cementation Canada Inc.
 
June 2014 Feasibility Study
 
On June 19, 2014, we announced an updated National Instrument 43-101-compliant Feasibility Study for the Brucejack Project (see our news release dated June 19, 2014).  The Feasibility Study and Technical Report Update on the Brucejack Project, Stewart BC, dated June 19, 2014 was completed by Tetra Tech and was filed on SEDAR on June 30, 2014 (the “2014 Feasibility Study”).
 
The Valley of the Kings Proven and Probable Mineral Reserves are 6.9 million ounces of gold (13.6 million tonnes grading 15.7 grams of gold per tonne) and West Zone Proven and Probable Mineral Reserves are 600,000 ounces of gold (2.9 million tonnes grading 6.9 grams of gold per tonne).
 
The Base Case (US$1,100/ounce gold, US$17/ounce silver and exchange rate of 0.92 C$/US$) estimated pre-tax Net Present Value (5% discount) is US$2.25 billion, with an internal rate of return of 34.7%.
 
The 2014 Feasibility Study contemplates average annual production for the first eight years of 504,000 ounces of gold and for the 18 year life of mine 404,000 ounces of gold, an estimated capital cost, including contingencies, of US$746.9 million and an average processing rate of 2,700 tonnes/day with operating costs of C$163.05 per tonne milled.

 
4

 

Economic Evaluation
 
A summary of financial outcomes using three metal price scenarios is presented below:
 
Table 1: Summary of Brucejack High-Grade Economic Results by Metal Price
 
 
Low Case
Base Case
High Case
Gold Price (US$/ounce)
$800
$1,100
$1,400
Silver Price (US$/ounce)
$15.00
$17.00
$21.00
Net Cash Flow (US$)
$2.02 billion (pre-tax)
$1.34 billion (post-tax)
$4.16 billion (pre-tax)
$2.72 billion (post-tax)
$6.35 billion (pre-tax)
$4.13 billion (post-tax)
Net Present Value(1)
(5.0% discount) (US$)
$985 million (pre-tax)
$620 million (post-tax)
$2.25 billion (pre-tax)
$1.45 billion (post-tax)
$3.54 billion (pre-tax)
$2.28 billion (post-tax)
Internal Rate of Return
20.3% (pre-tax)
16.5% (post-tax)
34.7% (pre-tax)
28.5% (post-tax)
47%(pre-tax)
38.7% (post-tax)
Payback(from start of production period)
4.4 years (pre-tax)
4.5 years (post-tax)
2.7 years (pre-tax)
2.8 years (post-tax)
2.0 years (pre-tax)
2.1 years (post-tax)
Exchange Rate (US$:C$)
0.92
0.92
0.92
 (1) NPV is discounted to July 2014.
 
Project Mineral Reserves
 
The Mineral Reserves resulting from the 2014 Feasibility Study for the Brucejack Project are based on the 2013 Mineral Resource estimates for the Valley of the Kings and the West Zone (see “Resource Estimate” below).  The Mineral Reserve estimates by zone and Reserve category are summarized below.
 
Table 2: Valley of the Kings Mineral Reserve Estimate(2)(3)  – June 2014
 
Category
Tonnes
(millions)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(million oz)
Silver
(million oz)
Proven
2.1
15.6
12
1.1
0.8
Probable
11.5
15.7
10
5.8
3.9
Total P&P
13.6
15.7
11
6.9
4.6
(2) Rounding of some figures may lead to minor discrepancies in totals
(3) Based on C$180/t cutoff grade, US$1,100/oz Au price, US$17/oz Ag price, C$/US$ exchange rate = 0.92
 
Table 3: West Zone Mineral Reserve Estimate(4)  – June 2014
 
Category
Tonnes
(millions)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(million oz)
Silver
(million oz)
Proven
1.4
7.2
383
0.3
17.4
Probable
1.5
6.5
181
0.3
8.6
Total P&P
2.9
6.9
279
0.6
26.0
(4) See notes (2) and (3) to Table 2 above

 
5

 
 
Mining and Processing
 
The Brucejack Project is planned as a high-grade underground mining operation using a long-hole stoping mining method and cemented paste backfill.  The Valley of the Kings, the higher-grade, primary targeted deposit, will be developed first; the lower-grade West Zone will be developed in the second half of the Project’s 18-year mine life.  The mine is planned to operate with a processing rate of 2,700 tonnes per day and mine a total of 16.5 million tonnes of ore for the 18 years at an average mill feed grade of 14.1 grams gold per tonne.
 
Mineral processing will involve conventional sulphide flotation and gravity concentration, producing gold-silver doré and gold-silver flotation concentrate.  Metallurgical recoveries for the Valley of the Kings are projected to be 96.9% for gold and 84.7% for silver, and for the West Zone 95.1% for gold and 91.0% for silver.  A total of 7.27 million ounces of gold and 27.63 million ounces of silver is estimated to be produced over the life of the Brucejack Project, including the gold and silver recovered into the flotation concentrate.  The Brucejack Project’s projected production and processing is summarized in Table 4 below.
 
Table 4: Brucejack Project Total Mine Projected Production and Processing Summary(5)
 
Year
Tonnage
(t)
Gold grade
(g/t)
Silver grade
(g/t)
Gold Production
(‘000 ounces)
Silver
Production
(‘000 ounces)
1
839,000(6)
15.4
11.7
403
268
2
995,000
15.2
11.7
470
318
3
995,000
16.7
12.8
519
349
4
984,000
15.9
9.9
488
263
5
988,000
16.9
11.0
521
296
6
999,000
17.5
10.6
545
287
7
986,000
17.8
11.8
547
319
8
996,000
17.5
11.7
542
319
9
994,000
14.9
10.2
461
276
10
987,000
15.5
11.2
476
302
Years 11-18
6,788,000
11.0
124.5
2,303
24,630
Life of Mine (Years 1-18)
16,550,000
14.1
57.7
7,274
27,626
(5) Rounding of some figures may lead to minor discrepancies in totals.
(6) Tonnage includes pre-production ore.
 
Capital and Operating Costs
 
The capital cost for the Brucejack Project is estimated at US$746.9 million, including a contingency of US$69 million.  Capital costs are summarized in Table 5 below.
 
Table 5: Capital Costs Summary
 
 
(US$ million)
Mine underground
179.5
Mine site(7)
210.8
Offsite Infrastructure
89.1
Total Direct Costs
479.4
Indirect Costs
127.5
Owner’s Costs
71.0
Contingency
69.0
Total Capital Cost
746.9
 (7) Includes mine site, mine site process, mine site utilities, mine site facilities, tailings facilities, mine site temporary facilities and surface mobile equipment.
 
 
 
 
6

 
 
Average operating cost is estimated at C$163.05 per tonne milled.  Operating costs are summarized in Table 6 below.
 
Table 6: Operating Costs Summary
 
 
(C$/tonne)
Mining
91.34(8)
Processing
19.69
General & Administrative
30.87
Surface Services and Others
21.15
Total Operating Cost
163.05
 (8) LOM ore milled; if excluding the ore mined during preproduction, the estimated cost is C$91.78/t.
 
All-In sustaining cash costs, which include by-product cash costs, sustaining capital, exploration expense, and reclamation cost accretion are summarized in Table 7 below.
 
Table 7: All-In Sustaining Cash Costs Life of Mine
 
 
(US$ million)
Total Cash Costs(9)
2,814.5
Reclamation Cost Accretion
27.5
Sustaining Capital Expenditure
320.6
All-in Sustaining Cash Costs
3,162.6
Gold Sales (ounces)
7,067
All-in Sustaining Cash Costs per Ounce
US$448/ounce
 (9) Net of silver credits at Base Case silver price of $US17/ounce.
 
Mineral Resource Estimate
 
The 2014 Feasibility Study for the Brucejack Project is based on an updated high-grade Mineral Resource estimate which we announced on December 19, 2013 (see our news release dated December 19, 2013).  The resource estimate, which incorporated all drilling completed to December 2013 at the Valley of the Kings, was completed by Snowden Mining Industry Consultants.  The Brucejack Project Mineral Resources Update Technical Report dated December 19, 2013 was filed on SEDAR on February 2, 2014.
 
High-grade gold resources in the Valley of the Kings (5.0 g/t gold-equivalent cut-off) total:
 
 
·
1.2 million ounces of gold in the Measured Mineral Resource category
(2.0 million tonnes grading 19.3 grams of gold per tonne);
 
 
 
7

 
 
 
·
7.5 million ounces of gold in the Indicated Mineral Resource category
 (13.4 million tonnes grading 17.4 grams of gold per tonne); and
 
 
·
4.9 million ounces of gold in the Inferred Mineral Resource category
(5.9 million tonnes grading 25.6 grams of gold per tonne).
 
2015 Underground Infill Drill Program
 
A 40,000-meter infill drill program continued in the third quarter in the Valley of the Kings.  The program currently comprises 32 drill fans from three underground drill stations and has been planned to target stope areas in years 1 through 3 of the current mine plan (1320-meter level to 1200-meter level). The primary purpose of the drilling is grade control, with the additional benefit of infill drilling inferred and non-stope indicated resources in the same area. Results from the program continue to confirm the style and grade distribution of the gold mineralization in the area being tested, which includes the intersection of high grade and visible gold. The program is anticipated to be completed in the first quarter of next year.
 
2015 Regional Exploration Program
 
A grass-roots exploration program targeting geophysical anomalies surrounding the Brucejack Project is also underway, comprising additional airborne geophysical surveying and a surface drill program of 10,000 to 15,000 meters targeting porphyry/epithermal-style mineralization.  The Flow Dome Zone and Kitchenview Zone northeast of the Brucejack Project were identified through extensive regional exploration as potential porphyry/epithermal-style mineralized zones similar to the Valley of the Kings.
 
Initial results from the Flow Dome Zone east of the Brucejack Project reported high-grade gold intersections along with long intervals of low-grade gold mineralization, which suggests a new stockwork zone or an extension of the Valley of the Kings deposit.   High grade intersections along a broader corridor of mineralization were encountered in holes SU-666 and SU-668 up to 1,000 meters east of the Valley of the Kings. Additional drilling will be required to adequately define the zone.
 
In the Kitchen View Zone, hole SU-659 collared approximately 3.5 kilometers northeast of the Valley of the Kings, intersected a narrow zone with low grade gold, silver and anomalous copper hosted in a sheared massive sulphide unit. A ground geophysical survey of the sulphide unit is planned for next year.
 
In the Hanging Glacier Zone, approximately 3 kilometers northwest of the Valley of the Kings, holes SU-665 and SU-667 intersected narrow zones with anomalous gold and copper values. Hole SU-669 intersected a single high grade value over 1.2 meters as well as low to medium grade gold values over intervals up to 20 meters thick.
 
Drilling in the Lookout Zone was focused on testing surface geochemical anomalies located 500 to 700 meters west of the Brucejack Fault. Holes SU-662, SU-663, and SU-664 intersected broad zones, up to 49 meters long, with low-grade gold values. The Hanging Glacier and Lookout Zones are not currently considered priority targets for follow-up testing.
 
 
 

 
8

 

Snowfield Project
 
The Snowfield Project borders the Brucejack Project to the north and is comprised of one mineral claim with an area of 1,267.43 hectares.  Since we acquired the Snowfield Project in October 2010, we have continued to carry out environmental studies in conjunction with the Brucejack Project.  Our previous efforts focused on completing an updated mineral resource estimate for the project, examining alternatives for advancing the project and negotiating cooperation agreements with Seabridge Gold Inc. (“Seabridge”).
 
Joint Snowfield/ KSM Engineering Studies
 
We have entered into a confidentiality and cooperation agreement with Seabridge that, amongst other things, provided for the completion of an engineering study examining the economics of combining our Snowfield Project and Seabridge’s KSM Project as a single operation.  The internal engineering study was finalized during the first quarter of 2012 and indicated that developing the KSM and Snowfield deposits together could produce better economics than developing KSM as a stand-alone project, although no property acquisition costs or allocation of initial KSM capital were considered.
 
We have also entered into a mutual access agreement with Seabridge that (a) gives Seabridge access to our Snowfield Project and us access to Seabridge’s KSM Project for the stripping of overburden and (b) provides us with road access to the Brucejack and Snowfield Projects over Seabridge’s KSM Project lands.
 
Snowfield represents a longer term gold opportunity for our shareholders.
 
Additional Claims
 
Our contiguous claims, including the claims comprising the Brucejack and Snowfield Projects, total over 111,000 hectares, providing further exploration potential to supplement the value we are creating at Brucejack.  A claim boundary map is available on our website.
 
Results of Operations
 
Our operations and business are not driven by seasonal trends, but rather the achievement of project milestones such as the achievement of various technical, environmental, socio-economic and legal objectives, including obtaining the necessary permits, completion of final feasibility studies, preparation of engineering designs, as well as receipt of financings to fund these objectives.
 
Selected Financial Information

Basis of Presentation

The following financial data has been extracted from the Company’s unaudited interim financial statements, which have been prepared in accordance with International Financial Reporting Standards (“IFRS”), as issued by the International Accounting Standards Board (“IASB”) applicable to the preparation of interim financial statements and interpretations of the International Financial Reporting Interpretation Committee (“IFRIC”) and are expressed in thousands of Canadian dollars unless otherwise stated.  Our significant accounting policies are outlined in the notes to our audited consolidated financial statements for the year ended December 31, 2014 and, as applicable to Brucejack Project development activities, in the notes to our interim consolidated financial statements for the period ended September 30, 2015.

 
9

 

Quarterly information
 
Selected consolidated financial information for this quarter and the preceding seven quarters is as follows:
 
(in $000’s)
    2015 Q3       2015 Q2       2015 Q1       2014 Q4       2014 Q3       2014 Q2       2014 Q1       2013 Q4  
Revenue
  $ Nil     $ Nil     $ Nil     $ Nil     $ Nil     $ Nil     $ Nil     $ Nil  
Loss per share
    – basic and diluted
  $ 0.02     $ 0.02     $ 0.03     $ 0.02     $ 0.04     $ 0.03     $ 0.02     $ 0.04  
Loss and
comprehensive loss
  $ 3,335     $ 2,426     $ 3,530     $ 2,094     $ 4,668     $ 3,306     $ 2,377     $ 5,006  
Total assets
  $ 1,433,292     $ 931,111     $ 915,153     $ 816,816     $ 811,896     $ 749,142     $ 746,736     $ 726,261  
Long-term liabilities
  $ 461,298     $ 24,336     $ 23,252     $ 24,308     $ 23,379     $ 20,303     $ 19,228     $ 19,836  
Cash dividends
  $ Nil     $ Nil     $ Nil     $ Nil     $ Nil     $ Nil     $ Nil     $ Nil  
Cash and cash equivalents
  $ 453,233     $ 68,871     $ 103,412     $ 34,495     $ 63,981     $ 19,739     $ 24,706     $ 11,575  
Mineral properties, plant and equipment
  $ 919,522     $ 841,691     $ 793,349     $ 768,072     $ 736,526     $ 717,247     $ 712,275     $ 705,448  
 
Net loss and comprehensive loss for the quarter ended September 30, 2015 was $3,335 compared to a loss of $4,668 during the quarter ended September 30, 2014.  The decrease is largely attributed to deferred income tax which changed from an expense of $3,427 for the quarter ended September 30, 2014 to an expense of $327 for the quarter ended September 30, 2015.  The higher expense in 2014 is related primarily to the Company’s non-capital losses and the transfer of the tax base of mineral exploration expenditures to flow-through share investors.
 
During the third quarter, share-based compensation increased to $780 as compared to $477 in the third quarter of 2014. This is due to the increased number of options granted in 2015 and by the timing of stock option grants.  We hire individuals with the required skills to advance our business and stock options may be granted to employees and consultants as part of their overall compensation.  Depending on the nature of the awarded recipient’s role, we expense or capitalize to project development costs the fair value of these stock option issuances over the vesting period.
 
Investor relations and shareholder communication costs for the quarter ended September 30, 2015 was $266 as compared to $276 incurred for the quarter ended September 30, 2014.  Investor relations and shareholder communication costs were mainly due to marketing and communication activities conducted within the investment community.
 
 

 
10

 

Professional fees were $90 for the quarter ended September 30, 2015 compared to $150 for the quarter ended September 30, 2014.  We are currently engaged in two class action lawsuits filed against us in the Ontario Superior Court of Justice and the United States District Court for the Southern District of New York.  For details on the class action lawsuits, please see “Commitments, Contingencies and Off-Balance Sheet Arrangements” below.  Because we had reached our deductible limit with our insurers in the second quarter of 2014, future legal expenses associated with the class action lawsuits will be provided for in accordance with our insurance policy.
 
Salaries expense for the quarter ended September 30, 2015 was $665 as compared to $405 for the quarter ended September 30, 2014.  We hired additional personnel in this quarter as compared to the quarter ended 2014 as we are heading into project construction.
 
Travel and accommodation for the quarter ended September 30, 2015 was $88 as compared to $82 for the quarter ended September 30, 2014.  Travel and accommodation remained consistent with the prior comparable period and is a result of attendance at conventions and trade shows as well as investor and marketing efforts.
 
Interest income for the quarter ended September 30, 2015 was $134 compared to $193 for the quarter ended September 30, 2014 reflecting interest on the funds received from the closing of the non-brokered private placements in January 2015 and June 2015 and the limited amount of interest on the proceeds of the construction financing package which was drawn in late September.
 
During the third quarter, we completed a construction financing package comprised of a credit facility, an offtake agreement, a callable gold and silver stream agreement and a private placement.  At every period end, embedded derivatives in the credit facility, the offtake agreement and the gold and silver stream, which are accounted for at fair value, will be marked-to-market through the statement of loss.  The derivative loss for the quarter ended September 30, 2015 totaled $2,853 (2014 - $Nil).  The loss was largely attributable to the change in foreign exchange rates and valuation assumptions such as forward gold and silver curves, spot gold and silver prices and interest rates over the period from closing of the financing to September 30, 2015.  Interest on the credit facility and the debt aspect of the gold and silver stream totaled $1,138 (2014 - $Nil) and is capitalized as part of the Brucejack Project development costs.
 
During the quarter ended September 30, 2015, we recorded a foreign exchange gain of $2,206 as compared to a gain of $400 for the quarter ended September 30, 2014.  The majority of the foreign exchange is a result of the translation of the US dollar cash proceeds of the construction financing net the US dollar denominated credit facility to Canadian dollars.
 
Liquidity and Capital Resources
 
Our cash and cash equivalents as at September 30, 2015 totaled $453,233 increasing $418,738 from $34,495 at December 31, 2014.  Of the cash and cash equivalents at September 30, 2015, approximately $3,000 of the flow-through funds raised remain unspent.  The increase in cash is largely attributable to the construction financing that was completed on September 21, 2015.
 
 

 
11

 

Our working capital as at September 30, 2015 was $431,503 as compared to $33,770 as at December 31, 2014.  Working capital items other than cash and cash equivalents consisted of receivables and other of $17,019, accounts payable and accrued liabilities of $38,452 and flow-through share premium of $297. Receivables and other is comprised primarily of $3,504 of Goods and Services Tax refunds, and $13,207 accrued for BC Mineral Exploration Tax Credits receivable from the Province of BC.
 
On January 16, 2015, we completed a private placement of 12,836,826 common shares at a price of $6.30 per share with Zijin Mining Group., Ltd. (“Zijin”) for gross proceeds of $80,872 and on January 21, 2015, we completed a private placement with certain shareholders who wished to maintain their respective pro rata interests in the Company in connection with the strategic investment by Zijin.  A total of 2,897,490 common shares were issued to subscribers at a price of $6.30 per share for gross proceeds of $18,254.
 
On June 8, 2015, we completed a private placement of 800,000 flow-through shares at a price of $8.75 per flow-through share for gross proceeds of $7,000.
 
On September 21, 2015, we completed the US$540 million construction financing package with Orion and Blackstone. The Financing was comprised of a credit facility for US$350 million, a US$150 million prepayment under a callable gold and silver stream agreement and a private placement of our common shares for US$40 million.  Upon closing, we received proceeds of US$340 million that will fund a substantial portion of the costs to develop an underground mine at the Brucejack Project.
 
Credit Facility
 
 
·
Credit Agreement:
 
o
Senior Secured Loan facility of US$350 million;
 
o
US$150 million was advanced at closing;
 
o
Remaining US$200 million available to be drawn in up to $50 million tranches over 18 months with;
 
o
Each draw subject to an arrangement fee of 3%;
 
o
Fixed interest rate of 7.5%;
 
o
Principal and accrued interest compounded quarterly is due at maturity on December 31, 2018, or we can exercise an option to extend maturity to December 31, 2019 on payment of 2.5% of the principal amount outstanding.
 
 
·
Offtake Agreement:
 
o
Applies to sales from first 7.067 million ounces of refined gold;
 
o
Orion and Blackstone will pay us for refined gold (in excess of any delivered ounces pursuant to the stream obligation) based on a market referenced gold price in US dollars per ounce during a defined pricing period before and after the date of each sale;
 
o
We have the option to reduce the Offtake obligation by up to 75% by paying:
 
(a)
US$11 per remaining ounce effective December 31, 2018 or
 
(b)
US$13 per ounce effective December 31, 2019 on the remaining undelivered gold ounces.
 
 
 

 
12

 
 
Stream Agreement
 
 
·
US$150 million in cash was advanced at closing as prepayment in consideration of a callable stream that applies to 8% of the total precious metals production of 7.067 million ounces of refined gold and 26.279 million ounces of refined silver (the “Refined Precious Metals”).  The applicable gold ounces from the Brucejack Project under the Offtake Agreement and Refined Precious Metals under the Stream Agreement are the 7.067 million ounces of refined gold and 26.297 million ounces of refined silver which were estimated to be available for sale in the June 2014 Feasibility Study for the Brucejack Project.  The gold ounces subject to the Offtake Agreement will be reduced by the amount of refined gold ounces that is subject to the Stream Agreement.
 
 
·
We may elect to repurchase all or a portion of the Refined Precious Metals stream by one of the following options:
 
 
o
On December 31, 2018, we can elect to repurchase the entire 8% stream by paying US$237 million or can elect to reduce the stream to 3% of Refined Precious Metals by paying US$150 million, in which case the stream deliveries would commence January 1, 2019; and
 
 
o
On December 31, 2019, we can elect to repurchase the entire 8% stream by paying US$272 million or can elect to reduce the stream to 4% of Refined Precious Metals by paying US$150 million, in which case the stream deliveries would commence January 1, 2020.
 
 
·
If we do not exercise the right to reduce or repurchase the Refined Precious Metals stream by December 31, 2019, US$20 million will be payable and an 8% stream will apply to the Refined Precious Metals beginning January 1, 2020, with payment of US$400 per ounce of gold and US$4.00 per ounce of silver.  If the market price of gold is greater than US$400 per ounce, the excess will decrease the stream obligation until it has been reduced to Nil.
 
 
·
In the event of a change of control or the sale of the Brucejack Project by us prior to the earlier of (a) our reduction or repurchase of the Refined Precious Metals stream or (b) January 1, 2020, we have the right to repurchase the stream for consideration equal to the greater of: (i) 13.6% of the consideration received by our shareholders or us in such a transaction, or (ii) an amount of cash that generates a 15% rate of return on the US$150 million stream advance.
 
Private Placement
 
 
·
Each of Orion and Blackstone subscribed for 3,848,004 of our common shares at US$5.1975 per common share for aggregate proceeds at closing of US$40 million, based on the 20-day volume weighted average price of our common shares at the close on September 21, 2015.
 
During the nine months-ended September 30, 2015, an increase in the trading price of our common shares contributed to the exercise of share options awards, which provided us with additional liquidity.  With our current working capital as at September 30, 2015, we believe we will have sufficient capital to fund a significant portion of the construction of the Brucejack Project. 
 
Cash used in investing activities in the quarter ended September 30, 2015 was $127,510 (2014 - $31,447).  For the quarter ended September 30, 2015, much of the expenditure increase is due to the commencement of project construction and the increased costs for engineering and mine development.  In the prior quarter ended September 30, 2014, costs were incurred mainly in respect of exploration and evaluation activities at the Projects.
 

 
13

 
 
Development of any of our mineral properties will require additional equity and/or debt financing. We are a development stage company and as such, we do not generate revenues from operations, except for periodic proceeds from our exploration program gold sales.  We rely on equity and/or debt funding for our continuing financial liquidity. Our access to financing is always uncertain. There can be no assurance of continued access to significant equity and/or debt funding.
 
Commitments, Contingencies and Off-Balance Sheet Arrangements
 
Class Action Lawsuits
 
Following the announcement on October 9, 2013 of the resignation of Strathcona Mineral Services Ltd. (“Strathcona”), the consultant responsible for overseeing and reporting on the 10,000-tonne bulk sample, and the announcement of Strathcona’s reasons for resigning on October 22, 2013, the price of our shares on the TSX and the NYSE had a significant drop in value.
 
Canadian Class Actions
 
We are aware of two proposed class actions filed against us and certain of our officers and directors in the Ontario Superior Court of Justice: the first on October 29, 2013 by David Wong (the “Wong Action”) and the second on November 1, 2013 by Roksana Tahzibi (the “Tahzibi Action”) (collectively, the “Ontario Actions”).  The plaintiffs seek certification of a class action on behalf of a class of persons, wherever they reside, who acquired our securities.  In the Wong Action, the class period is between November 22, 2012 and October 22, 2013.  In the Tahzibi Action, the class period is between July 23, 2013 and October 22, 2013.
 
The plaintiffs allege that certain of our continuous disclosure documents filed in Canada contained material misrepresentations or omissions regarding our Brucejack Project, including statements with respect to probable mineral reserves and future gold production at Brucejack, and failed to communicate alleged information from Strathcona.  The plaintiffs allege these misrepresentations and omissions are actionable as negligent misrepresentations or misrepresentations under various provincial Securities Acts.  The plaintiffs seek general damages of $60 million in the Wong Action and $250 million in the Tahzibi Action as well as pre- and post-judgment interest and costs.
 
There have been no further steps in the Ontario Actions.  The Company believes that the allegations made against it in the Ontario Actions are meritless and will vigorously defend them, although no assurance can be given with respect to the ultimate outcome of the Ontario Actions.
 
United States of America Class Actions
 
Between October 25, 2013 and November 18, 2013, five putative class action complaints were filed in the United States against us and certain of our officers and directors, alleging that we violated the United States securities laws by misrepresenting or failing to disclose material information concerning the Brucejack Project.  All five actions were filed in the United States District Court for the Southern District of New York.
 
In January 2014, the Court ordered that these actions be consolidated into a single action, styled In re Pretium Resources Inc. Securities Litigation, Case No. 13-CV-7552.  The Court has appointed as lead plaintiffs in the consolidated action three individuals who are suing on behalf of a putative class of shareholders who purchased our shares between June 11, 2013 and October 22, 2013.
 
 
 
14

 
 
In March 2014, the plaintiffs filed a consolidated amended class action complaint, which we moved to dismiss in May 2014.  In July 2014, the plaintiffs filed a second consolidated amended class action complaint (“Second Amended Complaint”).  We moved to dismiss the Second Amended Complaint on September 5, 2014. The plaintiffs filed their Opposition to our Motion to Dismiss on October 20, 2014 and we filed our reply brief on November 19, 2014.  The Court has not yet issued a decision on the motion.
 
We believe the allegations made against us in these actions are meritless and will vigorously defend the matter, although no assurance can be given with respect to the ultimate outcome of such proceedings.
 
In general, litigation claims can be expensive and time consuming to bring or defend and could result in settlements or damages that could significantly affect our financial position.  We intend to contest any such litigation claims to the extent of any available defenses.  However, it is not possible to predict the final outcome of any current litigation or additional litigation to which we may become party to in the future, and the impact of any such litigation on our business, results of operations and financial condition, could be material.
 
Contractual Obligations
 
The following table provides our gross contractual obligations as of September 30, 2015(in $000’s):
 
   
Less than 1 year
   
1 – 3 years
   
3 – 5 years
   
More than 5 years
   
Total
 
Operating activities:
                             
Decommissioning provision
  $ -     $ -     $ -     $ 4,961     $ 4,961  
Rent
    173       1,592       -       -       1,765  
Financing activities:(1)(2)
                                       
Repayment of credit facility (US$192,029)
            257,204               -       257,204  
    $ 173     $ 258,796     $ -     $ 4,961     $ 263,930  
 
 
1)
Pursuant to the stream arrangement, we are obligated to deliver, subject to prepayment options, 8% of up to 7,067,000 ounces of refined gold and 8% of up to 26,297,000 ounces of refined silver commencing on January 1, 2020 and a payment of US$20,000.
 
 
2)
Under the Offtake agreement, we are obligated to sell 100% of refined gold (in excess of any delivered ounces pursuant to the stream obligation) up to 7,067,000 ounces.  The final purchase price to be paid by the purchaser will be, at the purchase’s option, a market referenced gold price in US dollars per ounce during a defined pricing period before and after the date of each sale.
 
Related Party Transactions
 
We have entered into employment agreements with each of our Chairman and CEO (our “CEO”), our President (our “President”), our Chief Operating Officer and Vice President (our “COO”), our Chief Financial Officer (our “CFO”), and our Chief Exploration Officer and Vice President (our “CExO”).
 
 
 
15

 
 
Under the employment agreements as of June 30, 2015, our CEO receives a base salary of $500,000 per year, benefits, and an annual performance bonus of 0.25% of the annual increase in our market capitalization, provided the increase in market capitalization is 10% or more.  Our President receives a base salary of $450,000 per year, our COO receives a base salary of $400,000 per year, our CFO receives a base salary of $375,000, and our CExO receives a base salary of $350,000 per year.  Each of the President, COO, CFO, and CExO are entitled to extended benefits and are eligible for an annual bonus determined at the discretion of our Board.  Our CEO, President, COO, CFO and CExO are also entitled, on termination without cause, to twenty-four months’ salary and twice the average annual performance bonus earned in the three years immediately preceding termination.
 
Critical Accounting Estimates and Judgments
 
Our significant accounting policies are presented in the notes to the consolidated financial statements for the year ended December 31, 2014. The preparation of the consolidated financial statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and reported amounts of expenses during the reporting period. Actual outcomes could differ from our estimates. The consolidated financial statements include estimates which, by their nature, are uncertain. The impacts of such estimates are pervasive throughout the consolidated financial statements, and may require accounting adjustments based on future occurrences. Revisions to accounting estimates are recognized in the period in which an estimate is revised and future periods if the revision affects both current and future periods.
 
Significant judgments about the future and other sources of estimation uncertainty at the financial position reporting date, that could result in a material adjustment to the carrying amounts of assets and liabilities, in the event that actual results differ from assumptions made include, but are not limited to, the following:
 
1) Impairment of exploration and evaluation assets

The application of our accounting policy for impairment of exploration and evaluation assets requires judgment to determine whether indicators of impairment exist including factors such as, the period for which we have the right to explore, expected renewals of exploration rights, whether substantive expenditures on further exploration and evaluation of resource properties are budgeted and results of exploration and evaluation activities up to the reporting date.  We have assessed impairment indicators on our exploration and evaluation assets and have concluded that no impairment indicators existed as of September 30, 2015.
 
2) Determination of commercial viability and technical feasibility of the Brucejack Project

The application of our accounting policy for exploration and evaluation expenditures requires judgment to determine whether technical feasibility and commercial viability of the Brucejack Project is demonstrable.  We considered the positive National Instrument 43-101 compliant Feasibility Study, the receipt of key environmental permits and completed construction financing and concluded that commercial viability and technical feasibility of the Brucejack Project had been attained as in the period ended September 30, 2015.  At this point, the asset is reclassified to mineral properties, plant and equipment and tested for impairment.
 
 
 
16

 
 
Outstanding Share Data
 
At November 5, 2015, we had the following common shares and share purchase options outstanding.
 
 
Number of securities
Exercise price
($)
Weighted Average
Remaining Life (years)
Common shares
144,591,105
   
Share purchase options
8,845,250
$5.85 - $17.46
2.34
Fully diluted
153,439,605
   
 
Risks and Uncertainties
 
Natural resources exploration and development involves a number of risks and uncertainties, many of which are beyond our control. These risks and uncertainties include, without limitation, the risks discussed elsewhere in this MD&A and those identified in our Annual Information Form dated March 31, 2015 and filed on SEDAR, which are incorporated by reference in this MD&A.
 
Internal Control over Financial Reporting and Disclosure Controls and Procedures
 
Internal Control over Financial Reporting
 
Management assessed the effectiveness of our internal control over financial reporting (“ICFR”) as of December 31, 2014.  In making this assessment, management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission in Internal Control – Integrated Framework (COSO 1992). During 2015, we will be transitioning to the updated standards set out in the COSO 2013 framework.
 
Management is responsible for establishing and maintaining adequate internal controls over financial reporting.  Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation.  There has been no change in our internal control over financial reporting during the quarter ended September 30, 2015 that has materially affected, or is reasonably likely to affect our internal control over financial reporting.
 
Disclosure Controls and Procedures
 
Management assessed the effectiveness of our disclosure controls and procedures as of September 30, 2015.  Based upon the results of that evaluation, management concluded that our disclosure controls and procedures were effective to provide reasonable assurance that the information disclosed by us in the reports that we file were appropriately recorded, processed, summarized and reported to allow timely decisions regarding required disclosure.

 
17

 

Statement Regarding Forward-Looking Information
 
This MD&A contains ‘‘forward-looking information’’ and ‘‘forward looking statements’’ within the meaning of applicable Canadian and United States securities legislation (collectively, “forward-looking information”).
 
In connection with the forward-looking information contained in this MD&A, we have made certain assumptions about our business, including about our planned exploration and development activities; the accuracy of our mineral resource estimates; capital and operating cost estimates; production and processing estimates; the results, costs and timing of future exploration and drilling; timelines and similar statements relating to the economic viability of the Brucejack Project; timing and receipt of approvals, consents and permits under applicable legislation; and the adequacy of our financial resources.  We have also assumed that no significant events occur outside of our normal course of business. Although we believe that the assumptions inherent in the forward-looking information are reasonable as of the date of this MD&A, forward-looking information is not a guarantee of future performance and, accordingly, undue reliance should not be put on such statements due to the inherent uncertainty therein.
 
Forward-looking information may include, but is not limited to, risks related to information with respect to our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral resources and reserves, realization of mineral resource and reserve estimates, timing of development of the Brucejack Project, costs and timing of future exploration, results of future exploration and drilling, production and processing estimates, capital and operating cost estimates, timelines and similar statements relating to the economic viability of the Brucejack Project, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, and adequacy of financial resources. Wherever possible, words such as ‘‘plans’’, ‘‘expects’’, ‘‘projects’’, ‘‘assumes’’, ‘‘budget’’, ‘‘strategy’’, ‘‘scheduled’’, ‘‘estimates’’, ‘‘forecasts’’, ‘‘anticipates’’, ‘‘believes’’, ‘‘intends’’ and similar expressions or statements that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, or the negative forms of any of these terms and similar expressions, have been used to identify forward-looking statements and information.
 
Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information, including, without limitation, risks related to:
 
 
·
uncertainty as to the outcome of legal proceedings including certain class action proceedings in the U.S. and Canada;
 
·
the exploration, development and operation of a mine or mine property, including the potential for undisclosed liabilities on our mineral projects;
 
·
the fact that we are a relatively new company with no mineral properties in production or development and no history of production or revenue;
 
 
 
18

 
 
 
 
·
our ability to obtain adequate financing for our planned exploration and development activities and to complete further exploration programs;
 
·
dependency on the Brucejack Project for our future operating revenue;
 
·
our mineral resource estimates, including accuracy thereof and our ability to upgrade such mineral resource estimates and establish mineral reserve estimates;
 
·
uncertainties relating to the interpretation of drill results and the geology, grade and continuity of our mineral deposits;
 
·
commodity price fluctuations, including gold price volatility;
 
·
our history of negative operating cash flow, incurred losses and accumulated deficit;
 
·
market events and general economic conditions;
 
·
the inherent risk in the mining industry;
 
·
the commercial viability of our current and any acquired mineral rights;
 
·
availability of suitable infrastructure or damage to existing infrastructure;
 
·
governmental regulations, including environmental regulations;
 
·
delay in obtaining or failure to obtain required permits, or non-compliance with permits that are obtained;
 
·
increased costs and restrictions on operations due to compliance with environmental laws and regulations;
 
·
compliance with emerging climate change regulation;
 
·
adequate internal control over financial reporting;
 
·
increased costs of complying with the Dodd-Frank Wall Street Reform and Consumer Protection Act;
 
·
potential opposition from non-governmental organizations;
 
·
uncertainty regarding unsettled First Nations rights and title in British Columbia;
 
·
uncertainties related to title to our mineral properties and surface rights;
 
·
land reclamation requirements;
 
·
our ability to identify and successfully integrate any material properties we acquire;
 
·
uncertainties related to title to our mineral properties and surface rights;
 
·
currency fluctuations;
 
·
increased costs affecting the mining industry;
 
·
increased competition in the mining industry for properties, qualified personnel and management;
 
·
our ability to attract and retain qualified management;
 
·
some of our directors’ and officers’ involvement with other natural resource companies;
 
·
potential inability to attract development partners or our ability to identify attractive acquisitions;
 
·
potential liabilities associated with our acquisition of material properties;
 
·
our ability to comply with foreign corrupt practices regulations and anti-bribery laws;
 
·
changes to relevant legislation, accounting practices or increasing insurance costs;
 
·
our anti-takeover provisions could discourage potentially beneficial third party takeover offers;
 
·
significant growth could place a strain on our management systems;
 
·
share ownership by our significant shareholders, their ability to influence our governance and possible market overhang;
 
·
there is no market for our securities other than our common shares;
 
 
19

 
 
 
·
the trading price of our common shares is subject to volatility due to market conditions;
 
·
future sales or issuance of our equity securities;
 
·
certain actions under U.S. federal securities laws may be unenforceable;
 
·
we do not intend to pay dividends in the near future; and
 
·
our being treated as a passive foreign investment company for U.S. federal income tax purposes.
 
This list is not exhaustive of the factors that may affect any of our forward-looking information. Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Forward-looking information involves statements about the future and is inherently uncertain, and our actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in our AIF dated March 31, 2015 which is filed on SEDAR and in the United States in our Form 40-F filed on the SEC’s website.
 
Our forward-looking information is based on the beliefs, expectations and opinions of management on the date the statements are made.  In connection with the forward-looking information contained in this MD&A, we have made certain assumptions about our business, including about our planned exploration and development activities; the accuracy of our mineral resource estimates; capital and operating cost estimates; production and processing estimates; the results, costs and timing of future exploration and drilling; timelines and similar statements relating to the economic viability of the Brucejack Project; timing and receipt of approvals, consents and permits under applicable legislation; and the adequacy of our financial resources.  We have also assumed that no significant events will occur outside of our normal course of business. Although we believe that the assumptions inherent in the forward-looking information are reasonable as of the date of this MD&A, forward-looking information is not a guarantee of future performance and, accordingly, undue reliance should not be put on such statements due to the inherent uncertainty therein.  We do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
20


Pretium Resources (NYSE:PVG)
Historical Stock Chart
From Apr 2024 to May 2024 Click Here for more Pretium Resources Charts.
Pretium Resources (NYSE:PVG)
Historical Stock Chart
From May 2023 to May 2024 Click Here for more Pretium Resources Charts.