TORONTO, Nov. 14, 2019 /CNW/ - RNC Minerals (TSX: RNX)
("RNC" or the "Company") is pleased to announce consolidated gold
production of 7,769 ounces for the month of October 2019 from its Beta Hunt and Higginsville
mines in Western Australia.
Paul Andre Huet, Chairman &
CEO, commented: "Following a strong first full quarter of
production in Q3 from our combined Beta Hunt and Higginsville
operations, I am pleased to see a continuation of this positive
production trend. October production is in line with expectations
and sets the Company up for a strong finish to the year."
As previously stated in RNC's third quarter 2019 results news
release dated November 6, 2019, RNC
will be transitioning to quarterly reporting of production results
and will provide production and cost guidance on an annual basis,
as is industry standard.
About RNC Minerals
RNC is currently focused on the integration of its Beta Hunt
Gold Mine with its recently acquired Higginsville Gold Operation
("HGO") in Western Australia. The
robust Beta Hunt gold mineral resource is underpinned by multiple
gold shears with gold intersections along a 4 km strike length
which remains open in multiple directions. The gold mineral
resource is adjacent to an existing 5 km ramp network. RNC has a
100% interest in HGO, which is comprised of a low cost 1.4 Mtpa
gold mill and a substantial portfolio of gold tenements. In
addition, RNC has a 28% interest in a nickel joint venture that
owns the Dumont Nickel-Cobalt Project located in the Abitibi region
of Quebec. Dumont contains the
second largest nickel reserve and ninth largest cobalt reserve in
the world. RNC also owns a 24% interest in Orford Mining
Corporation, a mineral explorer focused on highly prospective and
underexplored areas of Northern
Quebec. RNC has a strong Board and management team focused
on delivering shareholder value. RNC's common shares trade on the
TSX under the symbol RNX. RNC shares also trade on the OTCQX market
under the symbol RNKLF.
Cautionary Statement Concerning Forward-Looking
Statements
This news release contains "forward-looking information"
including without limitation statements relating to the liquidity
and capital resources of RNC, production guidance and the potential
of the Beta Hunt Mine, Higginsville Gold Operation and Dumont
Nickel Project.
Forward-looking statements involve known and unknown risks,
uncertainties and other factors which may cause the actual results,
performance or achievements of RNC to be materially different from
any future results, performance or achievements expressed or
implied by the forward-looking statements. Factors that could
affect the outcome include, among others: future prices and the
supply of metals; the results of drilling; inability to raise the
money necessary to incur the expenditures required to retain and
advance the properties; environmental liabilities (known and
unknown); general business, economic, competitive, political and
social uncertainties; results of exploration programs; accidents,
labour disputes and other risks of the mining industry; political
instability, terrorism, insurrection or war; or delays in obtaining
governmental approvals, projected cash operating costs, failure to
obtain regulatory or shareholder approvals. For a more detailed
discussion of such risks and other factors that could cause actual
results to differ materially from those expressed or implied by
such forward-looking statements, refer to RNC's filings with
Canadian securities regulators, including the most recent Annual
Information Form, available on SEDAR at www.sedar.com.
Although RNC has attempted to identify important factors that
could cause actual actions, events or results to differ materially
from those described in forward-looking statements, there may be
other factors that cause actions, events or results to differ from
those anticipated, estimated or intended. Forward-looking
statements contained herein are made as of the date of this news
release and RNC disclaims any obligation to update any
forward-looking statements, whether as a result of new information,
future events or results or otherwise, except as required by
applicable securities laws.
Cautionary Statement Regarding the Beta Hunt Mine and
Higginsville
The decision to produce at the Beta Hunt
Mine was not based on a feasibility study of mineral reserves,
demonstrating economic and technical viability, and, as a result,
there may be an increased uncertainty of achieving any particular
level of recovery of minerals or the cost of such recovery, which
include increased risks associated with developing a commercially
mineable deposit. Historically, such projects have a much higher
risk of economic and technical failure. There is no guarantee that
anticipated production costs will be achieved. Failure to achieve
the anticipated production costs would have a material adverse
impact on SLM's cash flow and future profitability. Readers are
cautioned that there is increased uncertainty and higher risk of
economic and technical failure associated with such production
decisions. It is further cautioned that mineral resources are not
mineral reserves and do not have demonstrated economic
viability.
A production decision at the Higginsville gold operations was
made by previous operators of the mine, prior to the completion of
the acquisition of the Higginsville gold operations by RNC and RNC
made a decision to continue production subsequent to the
acquisition. This decision by RNC to continue production and, to
the knowledge of RNC, the prior production decision were not based
on a feasibility study of mineral reserves, demonstrating economic
and technical viability, and, as a result, there may be an
increased uncertainty of achieving any particular level of recovery
of minerals or the cost of such recovery, which include increased
risks associated with developing a commercially mineable deposit.
Historically, such projects have a much higher risk of economic and
technical failure. There is no guarantee that anticipated
production costs will be achieved. Failure to achieve the
anticipated production costs would have a material adverse impact
on the Corporation's cash flow and future profitability. Readers
are cautioned that there is increased uncertainty and higher risk
of economic and technical failure associated with such production
decisions.
SOURCE RNC Minerals