Date of report (Date of earliest event
reported):
September 8, 2016
INTERNATIONAL TOWER HILL MINES LTD.
(Exact Name of Registrant as Specified
in Charter)
British Columbia, Canada
|
|
001-33638
|
|
N/A
|
(State or Other Jurisdiction
|
|
(Commission
|
|
(IRS Employer
|
of Incorporation)
|
|
File Number)
|
|
Identification No.)
|
2300-1177 West Hastings Street, Vancouver, British Columbia, Canada
|
|
V6E 2K3
|
(Address of Principal Executive Offices)
|
|
(Zip Code)
|
Registrant’s telephone number,
including area code:
(604) 683-6332
(Former Name or Former Address, if Changed
Since Last Report.)
Check the appropriate box below if the
Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions
(see General Instruction A.2. below):
o
Written
communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
o
Soliciting
material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
o
Pre-commencement
communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
o
Pre-commencement
communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Item 7.01 Regulation FD Disclosure.
On September 8, 2016, International Tower
Hill Mines Ltd. (the “Company”) issued a press release regarding the results of a pre-feasibility study on an optimized
configuration for the Company’s Livengood Gold Project located near Fairbanks, Alaska. A copy of the press release is furnished
with this report as Exhibit 99.1.
The information furnished under this Item
7.01, including the press release, shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange
Act of 1934, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, except as shall be
expressly set forth by reference to such filing.
Item 8.01 Other Events.
On September 8, 2016, the Company announced
the results of a pre-feasibility study on an optimized configuration for its Livengood Gold Project. The engineering optimization
studies incorporated in the pre-feasibility study evaluated several scenarios, ultimately selecting a project that would process
52,600 tons per day over 23 years, as compared to a project that would process 100,000 tons per day over 14 years as evaluated
in the Company’s September 2013 feasibility study. The improved configuration would reduce projected capital costs by 34%
or $950 million to $1.84 billion, the process operating cost by 28% or $2.97 per ton to $7.48 per ton, and the all-in sustaining
costs by 16% or $242 to $1,263 per ounce, all as compared to the September 2013 feasibility study.
The pre-feasibility study was prepared
by independent third party consultants and provides information on the optimized Livengood Gold Project with lower throughput,
updated resource estimate, and capital and operating cost estimates as compared to the project evaluated in the September 2013
feasibility study. The Company anticipates filing the final version of the Canadian National Instrument 43-101 technical report
containing the pre-feasibility study on SEDAR within the next 45 days and investors are urged to review this report in its entirety.
As a result of the changes to the Livengood
Gold Project as evaluated in the pre-feasibility study, the original project as evaluated in the September 2013 feasibility study
is no longer considered current and investors should no longer rely upon the September 2013 feasibility study. The Company cautions
that the pre-feasibility study is preliminary in nature, and is based on technical and economic assumptions which would be further
refined and evaluated in a full feasibility study. There can be no certainty that the results estimated in the pre-feasibility
study will be realized.
Item 9.01 Financial Statements and Exhibits.
(d) Exhibits.
Exhibit
No.
|
Description
|
99.1
|
Press release of the Company dated September 8, 2016.
|
SIGNATURE
Pursuant to the requirements of the Securities
Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.
|
International Tower Hill Mines Ltd.
|
|
(Registrant)
|
|
|
|
|
|
|
Dated: September 8, 2016
|
By:
|
/s/ Thomas Irwin
|
|
Name:
|
Thomas Irwin
|
|
Title:
|
President and Chief Executive Officer
|
Exhibit Index
Exhibit
No.
|
Description
|
99.1
|
Press release of the Company dated September 8, 2016.
|