Significant Channel Sampling Results at New Departure Silver Mine

Black Mountain Resources Limited (ASX | AIM: BMZ) ("Black Mountain" or the
"Company", the silver focused development company with interests in the US, is
pleased to announce that high grade silver results have been returned from
channel sampling at its New Departure Silver Mine in Montana.

Highlights

  * Extremely high grade sampling results surpass expectations with up to 422
    oz/t of silver (`Ag') returned over 1.9m - grades never before seen with
    historical results

  * 25% of samples taken from Blue Dot Level showed mineralisation of Ag 3oz/t
    or above

  * 111 channel samples were taken in total from the Main Drive and Blue Dot
    Level in line with the Company's strategy to complete its 3-D mine model
    ahead of production upon securing financing

  * Results highlight that the Blue Dot level has the greatest potential for
    hosting a mineral resource in the downward and northwest plunging remainder
    of the ore body as well as confirming existing historical results

  * A second round of underground sampling is planned in August to expand the
    known high grade zones and move into production

Black Mountain Chairman, Pete Landau, said:

"We are focussed on delivering high grade silver ounces for production and
these excellent results, including a significant number of samples that
returned over Ag 20oz/t, provide encouraging support for this model. With this
in mind, as we finalise funding to enable us to meet our production goal at New
Departure, we are strengthening our understanding of the historic mine and
further sampling will be undertaken in the coming six weeks which will
contribute to our 3-D mine model and ultimately the commencement of mining."

Sampling Process

111 samples were shipped to Elko, Nevada for sample preparation and assayed in
Reno, Nevada and Vancouver, BC. 40 samples were taken from the main drive
incline (not a targeted production area) as a follow up sampling programme to
ensure mineralised zones that may have been crossed had not been missed.
Although generally these results showed little or no mineralisation, several
samples showed sufficient mineralisation that deserves follow-up.

48 samples were taken from the Blue Dot Level which is the lowest level of the
mine and 25% (12) of these samples showed mineralization of Ag 3oz/t or
greater. The Blue Dot level has the greatest potential for hosting a mineral
resource in the downward and northwest plunging remainder of the ore body. The
balance of the samples was taken from the upper historic workings area where
remnant mineralisation and extensions of mineralization from older stoped
workings remains. On these levels 14 samples were greater than Ag 3oz/t silver.

Highlights of the results are listed below. Note that silver results are given
in ounces per ton ("opt") and length in meters. Full details of the sampling
results are provided in Annexure A.

Table 1

     Area          SampleID         Ag opt          Au ppm        Length - m

Silver Springs       14614           422.6           1.295            1.9

Silver Springs       14618           137.9           1.52             0.5

Stinker Decline      14601           132.1           0.482            1.4

Stinker Decline      14609           117.0           0.155            0.9

Blue Dot Level       14521           98.7            0.392            0.9

Blue Dot Level       14503           63.7            0.388            0.3

Stinker Decline      14605           34.1            0.409            1.9

Silver Springs       14615           33.1            0.475            1.9

Blue Dot Level       14542           25.0            0.284            0.9

Stinker Decline      14610           19.0            0.333            2.5

Silver Springs       14621           18.7            0.253            0.3

Stinker Decline      14608           17.0            0.559            0.6

Blue Dot Level       14541           15.7            0.33             0.9

Blue Dot Level       14547           14.3            0.313            1.6

Stinker Decline      14613           11.2             0.3             1.3

Blue Dot Level       14543           10.9            0.261            0.9

Silver Springs       14616           10.1            12.25            0.9

Blue Dot Level       14538            8.5            0.35             1.3

Blue Dot Level       14504            6.2            0.131            0.9

Silver Springs       14617            4.5            0.156            0.9

Blue Dot Level       14506            3.9            0.033            1.3

Blue Dot Level       14511            3.7            0.313            1.3

Stinker Decline      14604            3.5            0.08             1.0

Blue Dot Level       14548            3.1            0.162            0.9

Stinker Decline      14602            3.0            0.071            1.1

Blue Dot Level       14516            3.0            0.297            0.9

These samples continue to confirm the high grade nature of the New Departure
silver mineralisation (see map below). The map also shows potential resource
areas that warrant additional sampling on the Blue Dot Level. A second round of
underground sampling is planned in early August to expand the known high grade
zones. On the next sampling programme a XRF instrument will be utilized to map
the high grade beds (mantos) at New Departure in addition to taking further
channel samples for assay.

Corporate

The Company also advises that Ms Shannon Robinson has resigned as a director
and joint company secretary of the Company and Ms Rebecca Sandford has resigned
as joint company secretary of the Company effective 21 July 2014. Ms Jane Flegg
has been appointed as Company Secretary effective 21 July 2014.

The Board thanks Ms Robinson and Ms Sandford for their contributions to the
Company and wishes them well with their future endeavours.

A full PDF version of the announcement including images is available from the
Company's website.

For and on behalf of the Board


Peter Landau

Executive Director

For further information please visit www.blackmountainresources.com.au or
contact:

Black Mountain Resources Limited        Nominated Advisor
Peter Landau                            RFC Ambrian Limited
Executive Director                      Oliver Morse and Trinity McIntyre
T: +61 (8) 9488 5220                    T: +61 (8) 9480 2500

Media (Australia)                       Media (UK)
PPR                                     St Brides Media & Finance Limited
David Tasker                            Elisabeth Cowell
T: +61 (8) 9388 0944                    T: +44 (0) 207 236 1177

Joint Broker (UK)                       Joint Broker (UK)
Westhouse Securities Limited            Hume Capital Securities plc
Martin Davison                          Jon Belliss
T: +44 (0) 207 601 6100                 T: +44 (0) 203 693 1493


About Black Mountain Resources Limited

Black Mountain Resources Limited is a dual listed (ASX | AIM: BMZ) silver and
gold focused development company focussed on the advancement of three highly
prospective previously operating assets located in two of the world's most
developed and proven silver and gold mining regions of Idaho and Montana, USA.

The Company holds a 70% interest in the New Departure Silver Project, the
Conjecture Silver Project and the Tabor Gold and Silver Project pursuant to 45
year leases from Chester Mining Company, Lucky Friday Extension Mining Company
and Brush Prairie Minerals respectively. Black Mountain plans to implement low
cost production and development programmes across all three assets. It is also
implementing exploration programmes to capitalise on the exploration upside
potential apparent across its portfolio.

Black Mountain Resources Limited was incorporated on 29 October 2010 and is
listed on the Australian Securities Exchange (ASX) and London's AIM Market -
trading codes BMZ and BMZO.

Competent Persons Statement

The information included in this release that relates to historical mining data
and exploration results is based on information compiled by Mr. James Baughman,
a technical consultant to the Company. Mr. Baughman is a qualified geologist
and has sufficient experience in exploration and mine development which is
relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2004 Edition of the `Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves'. Mr. Baughman has
reviewed this release and consents to the inclusion in the release of the
matters based on his information in the form and context in which it appears.

Forward Looking Statement

Certain statements made during or in connection with this communication,
including, without limitation, those concerning the economic outlook for the
silver market, expectations regarding silver ore prices, production, cash costs
and other operating results growth prospects and the outlook of the Company's
operations including the likely commencement of commercial operations of the
New Departure and Conjecture Silver Projects, its liquidity and the capital
resources and expenditure, contain or comprise certain forward-looking
statements regarding the Company's development and exploration operations
economic performance and financial condition. Although the Company believes
that the expectations reflected in such forward-looking statements are
reasonable, no assurance can be given that such expectations will prove to have
been correct. Accordingly, results could differ materially from those set out
in the forward-looking statements as a result of, among other factors, changes
in economic and market conditions, success of business and operating
initiatives, changes in the regulatory environment and other government
actions, fluctuations in silver ore prices and exchange rates and business and
operational risk management. For a discussion of such factors refer to the
Company's most recent annual report and half year report. The Company
undertakes no obligation to update publicly or release any revisions to these
forward-looking statements to reflect events or circumstances after today's
date or to reflect the occurrence of unanticipated events.

Annexure A: Sampling Process - New Departure Mine

111 rock channel samples were collected from the New Departure Mine on June 21
& 22, 2014. 48 samples were taken from the Blue Dot Level, 40 samples from the
Laczay tunnel and 23 from the Stinker Incline & Silver Springs levels.

Samples were predominantly vertical channel samples on the Blue Dot level
following up previous grab sampling completed in 2013. Each sample location was
photographed and located on a plan map. The samples were kept under lock and
key and shipped directly from Dillon, Montana to ALS Chemex in Elko, Nevada for
sample preparation. The average weight of each sample was 2 kilograms.

 Area   Sampled Sample  Ag    Cu    Pb    Zn    Au   X -UTMN- Y -UTMN-   Z M   Sample  Type   Sample   Orien-    Descr-
                Wt Kg   opt   ppm   ppm   ppm   ppm  AD83Z12   AD83Z12          Date          length   tation    iption
                                                                                               - cm

Blue      14501   2     0.0   12     3    247  0.017 348905.5 5006754.9 2004.5 21/06/ Channel 121.92 Horizontal Pillar
Dot                                                                              2014
Level

Blue      14502  2.28   0.0    5     2    74   0.003 348907.3 5006733.9 2002.0 21/06/ Channel 91.44  Horizontal Manto
Dot                                                                              2014
Level

Blue      14503  1.95  63.7  3280  10000 10000 0.388 348900.0 5006749.6 2003.5 21/06/ Channel 30.48   Vertical  320°
Dot                                                                              2014                           Strike
Level

Blue      14504  2.15   6.2   309  3220  6450  0.131 348883.6 5006775.3 2003.0 21/06/ Channel 91.44   Vertical
Dot                                                                              2014
Level

Blue      14505  1.78   1.3   64    282   627  0.024 348882.5 5006777.5 2002.1 21/06/ Channel 91.44   Vertical  10'
Dot                                                                              2014                           North of
Level                                                                                                           14504

Blue      14506  2.65   3.9   197  1005  1510  0.033 348881.3 5006779.4 2002.0 21/06/ Channel 121.92  Vertical  10'
Dot                                                                              2014                           North of
Level                                                                                                           14505

Blue      14507  1.86   0.3   14    284   702  0.083 348877.5 5006789.2 2002.0 21/06/ Channel 121.92  Vertical  Upper
Dot                                                                              2014                           Sample
Level

Blue      14508  1.99   0.2    9    108   293  0.030 348877.9 5006789.6 2002.0 21/06/ Channel 243.84  Vertical  Lower
Dot                                                                              2014                           Sample
Level

Blue      14509  2.19   0.6   36    223   919  0.022 348874.5 5006794.7 2002.0 21/06/ Channel 243.84  Vertical  Pillar
Dot                                                                              2014
Level

Blue      14510  2.01   0.1   26    22    78   0.005 348870.0 5006794.7 2002.0 21/06/ Channel 182.88  Vertical  Pillar
Dot                                                                              2014
Level

Blue      14511  3.32   3.7   176  1485  4560  0.313 348869.8 5006801.8 2002.0 21/06/ Channel 121.92  Vertical  Pillar
Dot                                                                              2014
Level

Blue      14512  2.27   0.4   17    98    489  0.015 348863.5 5006803.6 2002.0 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014
Level

Blue      14513  2.47   0.0    2     4    76   0.019 348867.5 5006808.5 2002.0 21/06/ Channel 91.44   Vertical  East Rib
Dot                                                                              2014
Level

Blue      14514  1.71   0.0    3    24    83   0.008 348867.3 5006804.7 2002.0 21/06/ Channel 243.84  Vertical  East Rib
Dot                                                                              2014
Level

Blue      14515  2.19   0.2    7    44    125  0.011 348864.8 5006808.5 2002.0 21/06/ Channel 304.80  Vertical  Pillar
Dot                                                                              2014
Level

Blue      14516  2.1    3.0   103  2940  5100  0.297 348866.5 5006812.3 2002.0 21/06/ Channel 91.44   Vertical  East
Dot                                                                              2014                           Side
Level                                                                                                           above
                                                                                                                incline

Blue      14517  2.09   0.2   12    54    234  0.012 348858.6 5006818.6 2002.0 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014                           sample
Level

Blue      14518  1.62   0.0    6    68    61   0.011 348864.5 5006838.9 2004.3 21/06/ Channel 121.92  Vertical  Orem
Dot                                                                              2014                           Winze
Level

Blue      14519  1.47   0.1   11    70    408  0.005 348856.2 5006832.5 2002.1 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014
Level

Blue      14520  2.09   0.2   56    130   900  0.018 348855.2 5006838.5 2004.0 21/06/ Channel 152.40  Vertical  210XCW -
Dot                                                                              2014                           West Rib
Level

Blue      14521  2.34  98.7  5740  10000 10000 0.392 348852.6 5006838.5 2004.5 21/06/ Channel 91.44   Vertical  210XCW -
Dot                                                                              2014                           South
Level                                                                                                           Rib

Blue      14522  2.34   0.2   25    118   428  0.007 348853.2 5006848.9 2002.2 21/06/ Channel 91.44   Vertical  10'
Dot                                                                              2014                           North of
Level                                                                                                           432662

Blue      14523  2.74   0.1    6    28    150  0.002 348852.8 5006851.7 2003.7 21/06/ Channel 60.96   Vertical  West Rib
Dot                                                                              2014
Level

Blue      14524  2.23   0.5   30    111   354  0.004 348855.5 5006857.6 2004.5 21/06/ Channel 60.96  Horizontal North
Dot                                                                              2014                           Rib -
Level                                                                                                           Strong
                                                                                                                Lim

Blue      14525  2.46   0.0    1     3    23   0.002 348851.8 5006856.9 2004.5 21/06/ Channel 121.92  Vertical  East Rib
Dot                                                                              2014
Level

Blue      14526  2.28   0.0    3    11    22   0.002 348843.4 5006863.9 2004.5 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014                           & Back
Level

Blue      14527  2.35   0.1    6    22    55   0.004 348839.2 5006863.5 2004.5 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014
Level

Blue      14528  2.03   0.0    3     5    30   0.003 348836.8 5006864.9 2004.5 21/06/ Channel 60.96   Vertical  East Rib
Dot                                                                              2014
Level

Blue      14529  2.08   0.0    2    19    16   0.003 348838.0 5006866.9 2004.5 21/06/ Channel 60.96   Vertical  West Rib
Dot                                                                              2014                           - Across
Level                                                                                                           from
                                                                                                                14528

Blue      14530  2.45   0.0    6    12    94   0.004 348835.9 5006867.8 2004.5 21/06/ Channel 152.40  Vertical  East Rib
Dot                                                                              2014
Level

Blue      14531  2.34   0.1    9    21    121  0.005 348835.2 5006868.8 2004.5 21/06/ Channel 91.44   Vertical  East Rib
Dot                                                                              2014                           - 2 m
Level                                                                                                           north
                                                                                                                14530

Blue      14532  2.24   0.1    5    12    86   0.005 348834.2 5006869.1 2004.5 21/06/ Channel 121.92  Vertical  East Rib
Dot                                                                              2014                           - 2 m
Level                                                                                                           north
                                                                                                                14531

Blue      14533  2.01   0.1   14    181   197  0.009 348833.2 5006869.0 2004.5 21/06/ Channel 121.92  Vertical  East Rib
Dot                                                                              2014                           - 2 m
Level                                                                                                           north
                                                                                                                14532

Blue      14534  2.46   0.1   20    131   167  0.011 348831.9 5006868.8 2004.5 21/06/ Channel 91.44   Vertical  East Rib
Dot                                                                              2014                           - 2 m
Level                                                                                                           north
                                                                                                                14533

Blue      14535  1.97   2.9   599  4040  2460  0.043 348829.8 5006868.9 2004.5 21/06/ Channel 91.44   Vertical  East Rib
Dot                                                                              2014
Level

Blue      14536  1.92   1.8   518  1650  1690  0.088 348821.5 5006871.3 2004.5 21/06/ Channel 152.40  Vertical  West Rib
Dot                                                                              2014
Level

Blue      14537  2.24   0.5   32    221   682  0.076 348820.7 5006873.4 2004.5 21/06/ Channel 121.92  Vertical
Dot                                                                              2014
Level

Blue      14538  2.22   8.5  1580  8850  1740  0.350 348819.8 5006875.2 2004.5 21/06/ Channel 121.92  Vertical  East Rib
Dot                                                                              2014
Level

Blue      14539  2.18   0.1   14    66    175  0.011 348818.1 5006876.7 2004.5 21/06/ Channel 152.40  Vertical  East Rib
Dot                                                                              2014
Level

Blue      14540  2.42   1.7   90    784  1190  0.072 348815.9 5006879.0 2004.5 21/06/ Channel 121.92  Vertical  North
Dot                                                                              2014                           Rib
Level

Blue      14541  1.76  15.7   455  4940  1600  0.330 348813.9 5006880.7 2004.5 21/06/ Channel 91.44   Vertical  East Rib
Dot                                                                              2014
Level

Blue      14542  2.47  25.0   989  6500  10000 0.284 348813.2 5006882.7 2004.5 21/06/ Channel 91.44   Vertical  East Rib
Dot                                                                              2014
Level

Blue      14543  1.88  10.9   699  5330  5060  0.261 348819.2 5006873.0 2004.5 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014                           - Repeat
Level                                                                                                           of 565/
                                                                                                                564

Blue      14544  2.19   0.1    9    82    100  0.016 348813.6 5006884.2 2004.5 21/06/ Channel 91.44   Vertical  North
Dot                                                                              2014                           Rib on
Level                                                                                                           Xcut

Blue      14545  1.8    0.1    6    73    119  0.005 348816.4 5006883.9 2004.5 21/06/ Channel 91.44   Vertical  10 m in
Dot                                                                              2014                           Xcut
Level

Blue      14546  2.28   0.4   38    498   433  0.050 348813.6 5006885.7 2004.5 21/06/ Channel 152.40  Vertical  East Rib
Dot                                                                              2014
Level

Blue      14547  1.85  14.3   838  7120  4830  0.313 348811.1 5006884.5 2004.5 21/06/ Channel 152.40  Vertical  East Rib
Dot                                                                              2014                           - 20'
Level                                                                                                           North of
                                                                                                                546

Blue      14548  1.94   3.1   315  2110  3500  0.162 348811.0 5006881.4 2004.5 21/06/ Channel 91.44   Vertical  West Rib
Dot                                                                              2014
Level

Laczay    14549  1.82   0.0    7    68    135  0.138 349058.6 5006816.8 2008.0 21/06/ Channel  0.00     Grab    Vein
Tunnel                                                                           2014                           sample
                                                                                                                from
                                                                                                                cave

Laczay    14550  2.12   0.0    5    20    197  0.003 349054.8 5006810.2 2009.0 21/06/ Channel 91.44   Vertical  South
Tunnel                                                                           2014                           Rib

Laczay    14551  2.02   0.0    9    20    67   0.012 349051.1 5006808.6 2009.0 21/06/ Channel  0.00     Grab    Sample
Tunnel                                                                           2014                           from
                                                                                                                Cave in
                                                                                                                decline

Laczay    14552  2.32   0.0    3    16    22   0.002 349047.8 5006806.5 2009.0 22/06/ Channel 60.96   Vertical  South
Tunnel                                                                           2014                           Rib -
                                                                                                                25'
                                                                                                                North of
                                                                                                                Cave

Laczay    14553  2.07   0.0    5    16    41   0.003 349048.6 5006812.4 2009.0 22/06/ Channel 91.44   Vertical  N Rib -
Tunnel                                                                           2014                           Across
                                                                                                                from
                                                                                                                14552

Laczay    14554  2.3    0.0    6    19    92   0.004 349045.2 5006804.7 2009.0 22/06/ Channel 91.44   Vertical  South
Tunnel                                                                           2014                           Rib -
                                                                                                                Choppin
                                                                                                                Vein

Laczay    14555  2.36   0.0    5    27    178  0.042 349044.5 5006809.4 2009.0 22/06/ Channel 121.92  Vertical  North
Tunnel                                                                           2014                           Rib -
                                                                                                                Across
                                                                                                                from 554

Laczay    14556  2.27   0.0    6    16    38   0.006 349040.7 5006808.2 2010.0 22/06/ Channel 121.92  Vertical  North
Tunnel                                                                           2014                           Rib

Laczay    14557  2.37   0.0   11    12    58   0.003 349042.5 5006803.4 2010.0 22/06/ Channel 91.44   Vertical  South
Tunnel                                                                           2014                           Rib

Laczay    14558  1.9    0.0    8    17    20   0.002 349039.5 5006799.4 2010.0 22/06/ Channel 45.72   Vertical  South
Decline                                                                          2014                           Rib

Laczay    14559  2.43   0.0    6    11    23   0.004 349034.2 5006792.0 2010.0 22/06/ Channel 121.92  Vertical  South
Decline                                                                          2014                           Rib

Laczay    14560  2.38   0.0    4    11    37   0.005 349030.1 5006790.8 2011.0 22/06/ Channel  0.00     Grab    Rib Cave
Decline                                                                          2014                           in
                                                                                                                decline
                                                                                                                - blk
                                                                                                                rock

Laczay    14561  2.19   0.0   10    11    33   0.006 349028.9 5006784.4 2009.0 22/06/ Channel 91.44   Vertical  South
Decline                                                                          2014                           Rib

Laczay    14562  2.05   0.0   10     8    25   0.004 349025.8 5006786.3 2009.0 22/06/ Channel 152.40  Vertical  North
Tunnel                                                                           2014                           Rib

Laczay    14563  1.92   0.0    7    43    30   0.023 349028.0 5006808.2 2014.0 22/06/ Channel 152.40  Vertical  South
Tunnel                                                                           2014                           Rib

Laczay    14564  1.94   0.0   12    37    77   0.113 349028.4 5006813.3 2014.0 22/06/ Channel 76.20  Horizontal North
Tunnel                                                                           2014                           Rib
                                                                                                                across
                                                                                                                from
                                                                                                                14563

Laczay    14565  2.11   0.0    5     7    25   0.006 349023.4 5006810.2 2014.0 22/06/ Channel 121.92  Vertical  S Rib -
Tunnel                                                                           2014                           below
                                                                                                                Silver
                                                                                                                Spring
                                                                                                                adit

Laczay    14566  1.82   0.0    9    10    34   0.030 349024.9 5006814.5 2014.0 22/06/ Channel 121.92  Vertical  N Rib -
Tunnel                                                                           2014                           Across
                                                                                                                from
                                                                                                                14565

Laczay    14567  2.16   0.0   14    24    64   0.072 349009.9 5006820.8 2016.5 22/06/ Channel 91.44   Vertical  N Rib -
Tunnel                                                                           2014                           Resample
                                                                                                                432547

Laczay    14568  2.06   0.0    6     9    121  0.040 349007.5 5006823.2 2019.0 22/06/ Channel 121.92  Vertical  N Rib -
Tunnel                                                                           2014                           Silver
                                                                                                                Spring N
                                                                                                                door

Laczay    14569  2.02   0.6   31    86    305  0.029 349005.6 5006824.1 2019.0 22/06/ Channel 91.44   Vertical  W side
Tunnel                                                                           2014                           Silver
                                                                                                                Spring N
                                                                                                                door

Laczay    14570  2.1    0.3   10    140   452  0.472 349004.3 5006818.8 2017.0 22/06/ Channel 60.96   Vertical  S Rib -
Tunnel                                                                           2014                           Resample
                                                                                                                432546

Laczay    14571  2.01   0.2    7    51    240  0.559 349000.6 5006817.9 2018.0 22/06/ Channel 60.96   Vertical  East
Tunnel                                                                           2014                           side -
                                                                                                                resample
                                                                                                                432541

Laczay    14572  2.08   0.0    7    28    133  0.025 348998.6 5006817.7 2018.0 22/06/ Channel 91.44  Horizontal W side -
Tunnel                                                                           2014                           resample
                                                                                                                432542

Laczay    14573  2.06   0.0   18    41    208  0.021 348999.2 5006819.0 2018.0 22/06/ Channel 91.44  Horizontal W side -
Tunnel                                                                           2014                           resample
                                                                                                                432540

Laczay    14574  2.16   0.0    7     2    22   0.006 348999.6 5006820.6 2017.0 22/06/ Channel 91.44   Vertical  W side -
Tunnel                                                                           2014                           S Silver
                                                                                                                Spring
                                                                                                                Door

Laczay    14575  1.59   0.1    6    21    90   0.008 348971.2 5006816.4 2020.0 22/06/ Channel 60.96   Vertical  S Side
Tunnel                                                                           2014                           Jumbo
                                                                                                                muck bay

Laczay    14576  2.41   0.1    9    100   72   0.297 348978.6 5006822.4 2020.0 22/06/ Channel 106.68  Vertical  W side
Tunnel                                                                           2014                           Jumbo
                                                                                                                muck bay

Laczay    14577  2.39   0.0   13    31    334  0.013 348983.0 5006826.8 2018.0 22/06/ Channel 30.48   Vertical
Tunnel                                                                           2014

Laczay    14578  1.98   0.0   20    16    340  0.017 348982.0 5006824.7 2018.0 22/06/ Channel 45.72  Horizontal
Tunnel                                                                           2014

Laczay    14579  1.67   0.0    4     5    59   0.026 348949.6 5006842.8 2025.0 22/06/ Channel 30.48   Vertical  S Rib -
Tunnel                                                                           2014                           E side
                                                                                                                Silver
                                                                                                                Spring
                                                                                                                adit

Laczay    14580  1.67   0.0   11     8    73   0.014 348952.7 5006841.2 2025.0 22/06/ Channel 91.44   Vertical  Adjacent
Tunnel                                                                           2014                           to 14579

Laczay    14581  1.98   0.0    8     8    90   0.005 348951.8 5006846.3 2025.0 22/06/ Channel 45.72  Horizontal N Rib -
Tunnel                                                                           2014                           across
                                                                                                                from
                                                                                                                14580

Laczay    14582  1.85   0.0    1     2    33   0.010 348953.9 5006845.1 2025.0 22/06/ Channel 91.44  Horizontal N Rib -
Tunnel                                                                           2014                           adjacent
                                                                                                                to 14581

Laczay    14583  1.88   0.0   10    13    206  0.042 348929.5 5006856.1 2030.0 22/06/ Channel 91.44   Vertical  N Rib
Tunnel                                                                           2014

Laczay    14584  2.04   0.7   259  1580  4460  0.032 348915.0 5006865.7 2033.0 22/06/ Channel 30.48   Vertical  SW Rib
Tunnel                                                                           2014

Laczay    14585  1.77   0.0   22    84    420  0.005 348906.9 5006882.2 2031.0 22/06/ Channel 121.92  Vertical  S Rib
Tunnel                                                                           2014

Laczay    14586  1.83   0.1    8    55    456  0.018 348910.3 5006884.3 2031.0 22/06/ Channel 152.40  Vertical  E Rib
Tunnel                                                                           2014                           across
                                                                                                                from
                                                                                                                14585

Laczay    14587  1.84   0.0    2    19    59   0.005 348885.6 5006910.1 2033.0 22/06/ Channel 76.20   Vertical  W Rib
Tunnel                                                                           2014

Laczay    14588  2.05   0.0    1    13    24   0.008 348888.9 5006912.0 2033.0 22/06/ Channel 60.96   Vertical  E Rib
Tunnel                                                                           2014                           across
                                                                                                                from
                                                                                                                14587

Stinker   14601  1.8   132.1 6110  10000 10000 0.482 348847.7 5006872.1 2004.5 22/06/ Channel 137.16  Vertical  Back -
Decline                                                                          2014                           5' from
                                                                                                                432658

Stinker   14602  1.78   3.0   224   506  3200  0.071 348864.2 5006862.1 2004.5 22/06/ Channel 106.68  Vertical  Rib
Decline                                                                          2014

Stinker   14603  1.82   1.0   56    283   324  0.102 348865.5 5006864.6 2004.5 22/06/ Channel 91.44   Vertical  Rib
Decline                                                                          2014

Stinker   14604  1.82   3.5   185  7410  5180  0.080 348869.5 5006868.9 2004.5 22/06/ Channel 97.54   Vertical
Decline                                                                          2014

Stinker   14605  1.53  34.1  1590  10000 10000 0.409 348877.8 5006873.7 2004.5 22/06/ Channel 182.88  Vertical
Decline                                                                          2014

Stinker   14606  1.81   0.5   23   1580  6110  0.032 348883.3 5006872.7 2004.5 22/06/ Channel 60.96   Vertical  Back -
Decline                                                                          2014                           Good
                                                                                                                looking
                                                                                                                vein

Stinker   14607  1.73   1.8   73   1160  1090  0.056 348884.5 5006876.4 2004.5 22/06/ Channel 30.48   Vertical  Back
Decline                                                                          2014

Stinker   14608  1.8   17.0   575  5310  10000 0.559 348891.1 5006878.5 2004.5 22/06/ Channel 60.96   Vertical  Rib
Decline                                                                          2014

Stinker   14609  2.33  117.0 7360  7410  6850  0.155 348896.2 5006885.4 2004.5 22/06/ Channel 91.44   Vertical  Rib
Decline                                                                          2014

Stinker   14610  1.81  19.0  1010  7780  10000 0.333 348903.7 5006884.1 2004.5 22/06/ Channel 243.84 Horizontal Rib -
Decline                                                                          2014                           Good
                                                                                                                Copper
                                                                                                                Oxide

Stinker   14611  2.14   1.0   77    375  1050  0.040 348906.5 5006887.0 2004.5 22/06/ Channel 152.40 Horizontal Rib -
Decline                                                                          2014                           Resample
                                                                                                                432578

Stinker   14612  1.85   1.0   70    652  1510  0.125 348892.9 5006890.9 2004.5 22/06/ Channel 152.40  Vertical
Decline                                                                          2014

Stinker   14613  2.14  11.2  1040  10000 10000 0.300 348912.2 5006885.0 2004.5 22/06/ Channel 121.92  Vertical  Back
Decline                                                                          2014

Silver    14614  1.25  422.6 10000 10000 10000 1.295 349007.5 5006828.6 2004.5 22/06/ Channel 182.88  Vertical  Back
Springs                                                                          2014                           from
                                                                                                                ballroom

Silver    14615  1.9   33.1  2090  10000 4360  0.475 349009.3 5006822.3 2004.5 22/06/ Channel 182.88  Vertical  Pillar
Springs                                                                          2014                           in
                                                                                                                Valley
                                                                                                                of Moon

Silver    14616  1.67  10.1   215  1510   497  >10.0 349024.7 5006818.1 2004.5 22/06/ Channel 91.44   Vertical
Springs                                                                          2014

Silver    14617  1.78   4.5   303  1490  2120  0.156 348940.2 5006696.8 2004.5 22/06/ Channel 91.44   Vertical  Back
Springs                                                                          2014

Silver    14618  1.66  137.9 3330  10000 7280  1.520 348939.8 5006690.3 2004.5 22/06/ Channel 45.72   Vertical  Rib Near
Springs                                                                          2014                           432526 &
                                                                                                                514

Silver    14619  2.02   1.4   71    675   351  0.033 348881.9 5006646.6 2004.5 22/06/    Grab  0.00     Grab    Chute
Springs                                                                          2014                           Muck

Silver    14620  2.16   0.1    9    36    67   0.006 348922.8 5006670.8 2025.0 22/06/ Channel 121.92  Vertical  Back
Springs                                                                          2014

Silver    14621  1.74  18.7  1550  5790  10000 0.253 348950.6 5006698.8 2004.5 22/06/ Channel 30.48   Vertical  Pillar
Springs                                                                          2014

Silver    14622  2.12   1.0   143   932  1740  0.077 348942.7 5006714.3 2004.5 22/06/ Channel 76.20   Vertical  Rib
Springs                                                                          2014

Silver    14623  1.96   0.3   18    70    220  0.169 348946.6 5006762.7 2004.5 22/06/ Channel 152.40 Horizontal Back -
Springs                                                                          2014                           Black
                                                                                                                Vein
                                                                                                                area

Copyright y 22 PR Newswire

Black Mountain Resources (LSE:BMZ)
Historical Stock Chart
From Apr 2024 to May 2024 Click Here for more Black Mountain Resources Charts.
Black Mountain Resources (LSE:BMZ)
Historical Stock Chart
From May 2023 to May 2024 Click Here for more Black Mountain Resources Charts.