VANCOUVER, BC, Sept. 11, 2024 /CNW/ - OceanaGold Corporation (TSX: OGC) (OTCQX: OCANF) ("OceanaGold" or the "Company") is pleased to provide results from exploration and resource conversion drilling at the Haile Gold Mine ("Haile") in the United States.

Gerard Bond, President & CEO of OceanaGold, said "Today's outstanding resource conversion and definition drill results support our goal of delineating 2 million ounces underground at Haile by the end of this year. Infill drill results at Ledbetter Phase 4 are exceptional in width and grade and inform the work evaluating whether to mine the last phase of Ledbetter from underground. Additionally, new resource conversion results announced today improve our confidence in Horseshoe mineralization at depth, and results from Horseshoe Extension have intersected new mineralization proximal to existing infrastructure."

Drill highlights include (core length):

  • 82.0 m @ 35.07 g/t Au Ledbetter Phase 4 (DDH1218 – conversion)
  • 4.6 m @ 398.12 g/t Au, Ledbetter Phase 4 (DDH1228 – conversion)
  • 71.0 m @ 16.80 g/t Au Ledbetter Phase 4 (DDH1220 – conversion)
  • 45.3 m @ 21.29 g/t Au, Ledbetter Phase 4 (DDH1226 – conversion)
  • 29.0 m @ 33.11 g/t Au, Ledbetter Phase 4 (DDH1230 – conversion)
  • 54.4 m @ 14.82 g/t Au, Ledbetter Phase 4 (DDH1237 – conversion)
  • 42.7 m @ 15.55 g/t Au, Ledbetter Phase 4 (DDH1246 – conversion)
  • 48.5 m @ 8.30 g/t Au, Ledbetter Phase 4 (DDH1232 – conversion)
  • 40.5 m @ 13.30 g/t Au, Horseshoe (UGD0029 - conversion)
  • 16.6 m @ 9.00 g/t Au and 8.4 m @ 5.06 g/t Au, Horseshoe (UGD0030 - conversion)
  • 11.6 m @ 4.05 g/t Au, Horseshoe Extension (UGD0055 – definition)

Results announced today can be viewed in 3D using VRIFY at the following link1: https://vrify.com/meetings/recordings/f7d13714-449f-4cd1-a6c0-935c31100911 

Ledbetter Phase 4

Ledbetter Phase 4 mineralization sits within the open pit reserve (Figure 1) and is currently in the mine plan as the final Ledbetter open pit phase. With a higher-grade resource at Ledbetter Phase 4 potentially sufficient to support an underground mine with improved economics, trade-off study work is underway to confirm the future preferred mining option. To support this study work, a resource conversion drill program is underway to improve confidence and provide drill core for metallurgical testing (Figure 1). A total of 9,053 metres and 24 holes have been completed, with highlights including 82.0 m @ 35.07 g/t Au from DDH1218, 4.6 m @ 398.12 g/t Au from DDH1228, and 71.0 m @ 16.80 g/t Au from DDH1220. These drill results have exceeded expectations compared to previous drilling outcomes.

An additional ~2,850 metres and 5 holes are being drilled in the remaining months of 2024 to test mineralization, approximately 50 to 250 metres to the northwest of the current Ledbetter Phase 4 resource (Figure 1).

Figure 1: Ledbetter Phase 4 mineralization and recent drill holes annotated. (CNW Group/OceanaGold Corporation)

Horseshoe and Horseshoe Extension (HEX)

Resource conversion and definition drilling undertaken from the Horseshoe Underground mine continues with 6,956 metres completed of a planned 10,605 metres this year. The results from 15 new drill holes have been received, with 3 holes supporting resource conversion of Inferred resources and 12 holes supporting resource definition of the HEX target. HEX is not currently a resource, however drilling is ongoing to test its potential as it is adjacent to the current Horseshoe Underground mine and within 150 metres of the planned decline to access Palomino Underground.

The latest drilling of Horseshoe has targeted Inferred resources in the lower zone with 3 holes all intersecting mineralization and delivering results in line with expectations based on the resource model. Highlights from Horseshoe include 40.5 m @ 13.30 g/t Au including 9.7 m @ 46.79 g/t Au (UGD0029) and 16.6 m @ 9.00 g/t Au (UGD0030) and 21.1 m @ 2.74 g/t Au (UGD0027).

Following the significant drill results reported in our April 3, 2024 press release, the latest drilling at HEX has targeted 3 zones of mineralization: upper, middle, and lower HEX. Drilling has (i) further defined continuity in the upper zone with 3 holes (UGD0046, 52, 54), (ii) defined continuity of the middle zone with 4 holes (UGD0053, 55, 56, 57), and (iii) stepped out on the lower mineralized zone to test extensions with 5 holes (UGD0037, 48, 49, 50, 51). Significantly, hole UGD0050 has intercepted mineralization of 24.2 m @ 2.47 g/t Au ~30 metres below the currently defined lower zone of mineralization (Figure 2). In addition, significant results were returned from UGD0046 with 13.7 m @ 3.42 g/t Au in the upper zone, and from UGD0055 with 11.6 m @ 4.05 g/t and UGD0056 with 27.2 m @ 1.45 g/t Au from the middle zone.

Drilling is ongoing at HEX for the remainder of 2024 with the goal to define an initial resource estimate in Q1 2025.   

Figure 2: Schematic long section (looking north-west) showing Horseshoe and Horseshoe Extension mineralization and recent drill holes annotated. (CNW Group/OceanaGold Corporation)

Table 1: Haile drill intersections.

Hole ID

From

(m)

To

(m)

 Interval

 (m)

Au

(g/t)

Target

Category

DDH1217

258.7

264.8

6.1

2.58

Ledbetter 04

Conversion

DDH1218

206.6

247.4

39.3

2.53

Ledbetter 04

Conversion

And

284.7

366.6

82.0

35.07

Ledbetter 04

Conversion

Including

295.0

299.5

4.5

521.79

Ledbetter 04

Conversion

And including

337.7

340.7

3.1

74.08

Ledbetter 04

Conversion

DDH1219

197.5

219.4

22.0

2.45

Ledbetter 04

Conversion

And

304.2

309.9

5.7

43.16

Ledbetter 04

Conversion

Including

304.2

306.6

2.4

95.10

Ledbetter 04

Conversion

And

344.4

364.1

19.7

14.17

Ledbetter 04

Conversion

Including

348.7

350.5

1.8

113.00

Ledbetter 04

Conversion

DDH1220

201.2

240.9

39.7

2.99

Ledbetter 04

Conversion

And

291.6

362.6

71.0

16.80

Ledbetter 04

Conversion

Including

301.6

309.3

7.6

106.28

Ledbetter 04

Conversion

DDH1221

258.0

271.0

13.0

1.56

Ledbetter 04

Conversion

DDH1224

217.6

223.9

6.3

2.97

Ledbetter 04

Conversion

And

235.2

238.2

3.0

7.62

Ledbetter 04

Conversion

And

324.4

344.5

19.7

7.47

Ledbetter 04

Conversion

Including

327.0

329.0

2.0

41.13

Ledbetter 04

Conversion

DDH1225

299.7

306.5

6.8

2.29

Ledbetter 04

Conversion

And

315.0

368.8

53.8

6.35

Ledbetter 04

Conversion

Including

321.4

325.4

4.0

43.12

Ledbetter 04

Conversion

DDH1226

197.1

207.5

10.4

5.25

Ledbetter 04

Conversion

And

290.5

304.5

14.0

4.15

Ledbetter 04

Conversion

And

314.9

360.2

45.3

21.29

Ledbetter 04

Conversion

Including

316.4

319.4

3.1

275.08

Ledbetter 04

Conversion

DDH1228

239.0

246.3

7.3

4.99

Ledbetter 04

Conversion

Including

239.0

240.2

1.2

20.90

Ledbetter 04

Conversion

And

299.7

304.2

4.6

398.12

Ledbetter 04

Conversion

Including

299.7

301.2

1.5

1120.00

Ledbetter 04

Conversion

And

318.6

331.4

12.8

3.78

Ledbetter 04

Conversion

And

338.9

362.8

23.8

5.76

Ledbetter 04

Conversion

DDH1229

353.3

360.5

7.2

2.02

Ledbetter 04

Conversion

DDH1230

193.3

195.7

2.4

12.27

Ledbetter 04

Conversion

And

202.3

231.3

29.0

33.11

Ledbetter 04

Conversion

Including

222.4

227.8

5.5

141.99

Ledbetter 04

Conversion

And

291.9

295.5

3.6

5.54

Ledbetter 04

Conversion

And

306.4

309.3

2.9

6.71

Ledbetter 04

Conversion

And

347.5

365.4

17.9

5.85

Ledbetter 04

Conversion

DDH1231


NSR



Ledbetter 04

Conversion

DDH1232

357.4

405.9

48.5

8.30

Ledbetter 04

Conversion

DDH1233

342.6

350.2

7.6

2.45

Ledbetter 04

Conversion

DDH1234

185.3

203.9

18.6

6.09

Ledbetter 04

Conversion

And

211.9

217.2

5.3

20.17

Ledbetter 04

Conversion

And

284.1

286.3

2.2

24.80

Ledbetter 04

Conversion

And

307.0

322.9

15.8

6.96

Ledbetter 04

Conversion

And

336.3

358.5

22.2

5.89

Ledbetter 04

Conversion

DDH1235

343.3

357.4

14.1

2.40

Ledbetter 04

Conversion

DDH1236

343.4

353.3

9.9

1.89

Ledbetter 04

Conversion

DDH1237

189.3

193.6

4.3

22.42

Ledbetter 04

Conversion

And

202.2

210.1

7.9

20.78

Ledbetter 04

Conversion

Including

204.1

207.0

2.9

49.36

Ledbetter 04

Conversion

And

217.0

220.7

3.8

3.55

Ledbetter 04

Conversion

And

283.2

292.4

9.1

10.69

Ledbetter 04

Conversion

And

301.5

355.9

54.4

14.82

Ledbetter 04

Conversion

Including

310.7

312.2

1.5

331.00

Ledbetter 04

Conversion

Including

318.0

319.2

1.2

26.40

Ledbetter 04

Conversion

DDH1238

363.7

398.4

34.7

2.90

Ledbetter 04

Conversion

DDH1239

320.2

327.0

6.8

3.93

Ledbetter 04

Conversion

DDH1240

270.4

278.7

8.3

2.06

Ledbetter 04

Conversion

DDH1241

224.8

226.6

1.8

7.99

Ledbetter 04

Conversion

And

312.2

327.5

15.3

3.09

Ledbetter 04

Conversion

DDH1243

320.7

328.4

7.7

9.92

Ledbetter 04

Conversion

DDH1244

346.5

364.5

18.1

1.91

Ledbetter 04

Conversion

And

374.1

377.9

3.8

5.46

Ledbetter 04

Conversion

DDH1246

328.5

346.3

17.8

11.86

Ledbetter 04

Conversion

And

357.5

400.2

42.7

15.55

Ledbetter 04

Conversion

Including

360.5

363.6

3.1

145.25

Ledbetter 04

Conversion

Including

373.4

383.1

9.7

13.33

Ledbetter 04

Conversion

UGD0027

338.0

359.1

21.1

2.74

Horseshoe Lower

Conversion

UGD0029

300.3

340.8

40.5

13.30

Horseshoe Lower

Conversion

Including

300.3

310.0

9.7

46.79

Horseshoe Lower

Conversion

UGD0030

337.9

354.4

16.6

9.00

Horseshoe Lower

Conversion

And

399.6

408.0

8.4

5.06

Horseshoe Lower

Conversion

UGD0037


NSR



Horseshoe Extension

Definition

UGD0046

182.3

196.0

13.7

3.42

Horseshoe Extension

Definition

UGD0048


NSR



Horseshoe Extension

Definition

UGD0049


NSR



Horseshoe Extension

Definition

UGD0050

403.3

427.5

24.2

2.47

Horseshoe Extension

Definition

UGD0051


NSR



Horseshoe Extension

Definition

UGD0052


NSR



Horseshoe Extension

Definition

UGD0053


NSR



Horseshoe Extension

Definition

UGD0054


NSR



Horseshoe Extension

Definition

UGD0055

240.6

252.3

11.6

4.05

Horseshoe Extension

Definition

UGD0056

236.0

263.3

27.2

1.45

Horseshoe Extension

Definition

UGD0057


NSR



Horseshoe Extension

Definition

Note: Intervals are core length, not true width. "Conversion" intercept is within the current resource model shell directed at converting Inferred to Indicated resource category, while "Definition" are intercepts outside the current resource model shell directed at converting mineralization to an Inferred resource category. NSR = No Significant Result.

For further information relating to drill hole data please refer to the Company's website at https://investors.oceanagold.com/additional-drillhole-data.

About OceanaGold

OceanaGold is a growing intermediate gold and copper producer committed to safely and responsibly maximizing the generation of Free Cash Flow from our operations and delivering strong returns for our shareholders. We have a portfolio of four operating mines: the Haile Gold Mine in the United States of America; Didipio Mine in the Philippines; and the Macraes and Waihi operations in New Zealand.

Qualified Person Statement

The scientific and technical information contained in this press release has been reviewed and approved by Craig Feebrey, a Member of the Australasian Institute of Mining and Metallurgy and a qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"). Mr. Feebrey is the Executive Vice President and Chief Exploration Officer of OceanaGold. 

QA/QC at Haile Gold Mine

From July 2017 to 2022 almost all Haile exploration core samples have been prepared at the ALS lab in Tucson, Arizona, and analyzed at the ALS lab in Reno, Nevada, each of which is independent from OceanaGold. Select resource conversion core samples were also prepared and analyzed at the SGS lab in Kershaw, South Carolina, which is also independent from OceanaGold, with confirmation pulp duplicates sent to ALS lab in Reno, Nevada. Samples are pulverized from a 250g (ALS) or 450g (SGS) sample to 85% passing 75 mesh. Approximately 225g of pulp sample is used for fire assay. Assays are based on a 30g fire assay aliquot for gold with Atomic Absorption finish. If the gold value from Atomic Absorption is >10g/t, an additional 30g of pulp sample is fire assayed for gold using a gravimetric finish. Some holes are composited and analyzed for carbon, sulphur and multi-elements using LECO and ICP-OES methods. Both ALS and SGS labs used for Haile OceanaGold samples are ISO 17025 certified. In 2023, select resource conversion core samples were prepared and analyzed at the SGS lab in Kershaw, South Carolina, with confirmation pulp duplicates sent to ALS lab in Reno, Nevada.

Blanks and standards are each inserted every 20th sample.. Precision and accuracy of certified reference materials ("CRMs") compared to expected values have been consistently within 5% RSD and often within 3%. Barren marble and sand are inserted as blanks every 20th sample. CRMs from RockLabs are inserted every 20th sample (5%). CRMs from RockLabs and OREAS are inserted every 20th sample (5%). All blanks and CRMs are handled by the Geology Team and are stored in the locked OceanaGold office.

All drill hole samples are handled and transported from the drill rigs to the secured Haile Exploration warehouse by OceanaGold personnel. Access to the property is controlled by locked doors and cameras monitored by OceanaGold security. The main gate requires an electronic employee badge to enter. Samples are packaged at the Haile Exploration warehouse by OceanaGold geologists and geotechnicians. Samples are trucked in sealed plastic barrels by certified couriers with submittal forms that are verified during sample pick-up and delivery to ALS. No sample shipments have been recorded as missing or tampered with.

Technical Report

For further information, please refer to the following NI 43-101 technical report available on the SEDAR+ website at www.sedarplus.com under the Company's profile or on our website at www.oceanagold.com: "NI 43-101 Technical Report Haile Gold Mine Lancaster County, South Carolina" dated March 28, 2024 with an effective date of December 31, 2023, prepared by D. Carr, D, Londoño, J. Moore and B. Drury (OceanaGold); L. Standridge and R. Cook (Call & Nicholas, Inc.); J.N. Janney-Moore and W.L. Kingston (NewFields Mining & Technical Services LLC); and M. Sullivan and B. Miller Clarkson (SRK Consulting (U.S.), Inc.).

Cautionary Statement for Public Release

This press release contains certain "forward-looking statements" and "forward-looking information" (collectively, "forward-looking statements") within the meaning of applicable Canadian securities laws which may include, but is not limited to, statements with respect to the estimation of Mineral Reserves and Mineral Resources, the realization of Mineral Reserve and Mineral Resource estimates, costs and timing of the development of new deposits, costs and timing of future exploration and drilling programs and timing of filing of updated technical information. Forward-looking statements and information relate to future performance and reflect the Company's expectations regarding the generation of free cash flow, execution of business strategy, future growth, future production, estimated costs, results of operations, business prospects and opportunities of OceanaGold and its related subsidiaries. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those expressed in the forward-looking statements and information. They include, among others, the accuracy of Mineral Reserve and Mineral Resource estimates and related assumptions, inherent operating risks and those risk factors identified in the Company's most recent Annual Information Form prepared and filed with securities regulators which is available on SEDAR+ at www.sedarplus.com under the Company's name. There are no assurances the Company can fulfil forward-looking statements. Such forward-looking statements are only predictions based on current information available to management as of the date that such predictions are made; actual events or results may differ materially as a result of risks facing the Company, some of which are beyond the Company's control.  Although the Company believes that any forward-looking statements contained in this press release is based on reasonable assumptions, readers cannot be assured that actual outcomes or results will be consistent with such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, events or otherwise, except as required by applicable securities laws.   

www.oceanagold.com

____________________________

1Note: Drill results reflect those set forth in OceanaGold's press release dated September 11, 2024 and do not include all historical drill results. For further information relating to drill holes highlighted, please see the press release.

OceanaGold Logo (CNW Group/OceanaGold Corporation)

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/oceanagold-continues-to-delineate-high-grade-mineralization-in-the-haile-underground-302245699.html

SOURCE OceanaGold Corporation

Copyright 2024 Canada NewsWire

OceanaGold (TSX:OGC)
Historical Stock Chart
From Oct 2024 to Nov 2024 Click Here for more OceanaGold Charts.
OceanaGold (TSX:OGC)
Historical Stock Chart
From Nov 2023 to Nov 2024 Click Here for more OceanaGold Charts.