Paul N. Wright, President & Chief Executive Officer of Eldorado Gold Corporation
("Eldorado" the "Company" or "we") (TSX:ELD)(NYSE:EGO) is pleased to provide an
update on the Efemcukuru project located in western Turkey.


"The Efemcukuru project continues to improve in quality and there remains
considerable scope for additional growth through continued exploration.
Construction on site is progressing in accordance with our projected start up in
Q4 2010," stated Paul Wright, President & Chief Executive Officer of Eldorado.


Mineral Resource Estimate

Following completion of the 2009 drill program on the Efemcukuru North Ore Shoot
the Company and its consultants have carried out a review of the mineral
resource and mineral reserves for the project. The measured and indicated
resource estimate previously reported in 2008 has been increased by
approximately 10%. This increase in ounces has resulted from minor changes in
the previously defined South Ore Shoot ("SOS") and Middle Ore Shoot ("MOS") and
further definition of a larger measured and indicated resource in the North Ore
Shoot ("NOS") area. The Company believes that there is considerable potential to
further expand the resource base, however due to the geometry of the deposit
further drilling will take place from underground. The mineral resource is as
follows:




EFEMCUKURU MINERAL RESOURCES, as of 29 October 2009

--------------------------------------------------------
Mineral Resource          Tonnes    Grade   In-situ Gold
Classification            (x1000) (Au g/t) ounces (x1000)
--------------------------------------------------------
South Ore Shoot
---------------
Measured                     427     10.4            142
Indicated                  2,126      9.0            615
Measured + Indicated       2,553      9.0            757
--------------------------------------------------------
Middle Ore Shoot
----------------
Measured                     808     14.7            381
Indicated                  1,234      7.8            310
Measured + Indicated       2,042     10.5            691
--------------------------------------------------------
North Ore Shoot
---------------
Measured                       -        -              -
Indicated                    944      8.3            252
Measured + Indicated         944      8.3            252
--------------------------------------------------------
Total Efemcukuru Project
------------------------
Measured                   1,235     13.2            523
Indicated                  4,304      8.5          1,177
Measured + Indicated       5,539      9.6          1,700
--------------------------------------------------------
--------------------------------------------------------
Inferred                   1,703      6.4            352
--------------------------------------------------------

Notes: 1) Cut-off grade is 3.0 g/t Au
       2) Stephen Juras, Ph.D., P.Geo., Director Technical
          Services for the Company, is the qualified person
          responsible for the Efemcukuru mineral resource
          estimate.



Reserve Estimate

Based on the updated resource model Wardrop Engineering has prepared a revised
mine plan which includes mining from the SOS and MOS during the initial years of
operation with the inclusion of the NOS in the later half of the mine life.
Based on a gold price of $825/ounce and a cut off grade of 4.0 g/t the mineral
reserves are stated as follows:




EFEMCUKURU MINERAL RESERVES, as of 29 October 2009

--------------------------------------------------------
Mineral Reserve           Tonnes    Grade   In-situ Gold
Classification            (x1000) (Au g/t) ounces (x1000)
--------------------------------------------------------
South Ore Shoot
---------------
Proven                       379      9.4            114
Probable                   2,160      8.8            608
Proven + Probable          2,539      8.8            722
--------------------------------------------------------
Middle Ore Shoot
----------------
Proven                       750     13.4            323
Probable                   1,028      7.5            248
Proven + Probable          1,778     10.0            571
--------------------------------------------------------
North Ore Shoot
---------------
Proven                         -        -              -
Probable                     819      8.1            213
Proven + Probable            819      8.1            213
--------------------------------------------------------
Total Efemcukuru Project
------------------------
Proven                     1,129     12.0            437
Probable                   4,007      8.3          1,069
Proven + Probable          5,136      9.1          1,506
--------------------------------------------------------

Notes: 1) Scott Cowie, B.Eng., MAusIMM, Senior Mining Engineer
          of Wardrop Engineering Inc. is the qualified person
          responsible for the Efemcukuru mineral reserve estimate.
       2) The Efemcukuru mineral reserves are inclusive to the
          mineral resources.



The 2009 reserve estimate which includes mining from NOS represents a 35%
increase in tonnage with a 23% increase in ounces to be mined based on an
overall dilution rate of 17%.


Operating Costs

Operating cost calculations have been based on updated labour rates and
consumable costs. Exchange rate benefits have been largely offset by increased
consumable costs particularly chemical reagents. The result has been a modest
decrease in forecast operating costs of approximately 2% from previous
disclosure. A breakdown of the operating costs including mining, processing and
treatment of concentrate at the Company's Kisladag operation are shown below.




---------------------------------------------------------
                                           $/Tonne   $/Oz
---------------------------------------------------------
Mining Operating Costs                       30.32 119.54
Process Operating Costs Efemcukuru           23.02  90.75
Process Operating Costs Kisladag              8.15  32.28
Transport & Insurance Costs                   3.83  15.11
General and Administration Operating Costs    5.65  22.27
Cash Operating Cost                          70.97 279.95
---------------------------------------------------------



Capital Costs

A definitive engineering cost estimate has been prepared by the project team
which is based on a level of engineering and procurement that is now 60%
complete. The estimate reflects changes in exchange rate, cost escalation,
design changes and the addition of an owner purchased mine fleet. The total
capital estimate has increased by $10 million or 7% to $152.1 million.
Construction expenditures (spent and committed) to the end of Q3 2009 were $50.1
million. A breakdown of the capital cost follows.




-------------------------------------------------
Direct Costs                           Area Total
-------------------------------------------------
Plantsite                             $14,445,000
Mining                                $32,316,000
Underground Crushing                   $2,402,000
Ore Storage                            $3,521,000
Process                               $17,564,000
Waste Handling                        $14,171,000
Water Treatment Facility               $4,330,000
Ancillary Buildings                    $2,958,000
Site Services                          $5,400,000
Site Fleet                             $2,256,000
Kisladag Concentrate Treatment Plant  $11,011,000
Miscellaneous                          $1,989,000
-------------------------------------------------

Direct Costs                         $112,363,000
Indirect Costs                        $39,758,000

Project Totals                       $152,121,000
-------------------------------------------------



Eldorado is a gold producing, exploration and development company actively
growing businesses in Brazil, Turkey, China, Greece and the surrounding regions.
With our international expertise in mining, finance and project development,
together with highly skilled and dedicated staff, we believe that Eldorado is
well positioned to grow in value as we create and pursue new opportunities.


ON BEHALF OF ELDORADO GOLD CORPORATION

Paul N. Wright, President & Chief Executive Officer

Forward-looking statements and forward-looking information by their nature are
based on assumptions and involve known and unknown risks, uncertainties and
other factors which may cause the actual results, performance or achievements of
the Company to be materially different from any future results, performance or
achievements expressed or implied by such forward-looking statements or
information. We have made certain assumptions about the forward-looking
statements and information and even though our management believes that the
assumptions made and the expectations represented by such statements or
information are reasonable, there can be no assurance that the forward-looking
statement or information will prove to be accurate. Furthermore, should one or
more of the risks, uncertainties or other factors materialize, or should
underlying assumptions prove incorrect, actual results may vary materially from
those described in forward-looking statements or information. These risks,
uncertainties and other factors include, among others, the following: the number
of shares issued is subject to certain adjustments; gold price volatility;
discrepancies between actual and estimated production, mineral reserves and
resources and metallurgical recoveries; mining operational and development risk;
litigation risks; regulatory restrictions, including environmental regulatory
restrictions and liability; risks of sovereign investment; currency
fluctuations; speculative nature of gold exploration; global economic climate;
dilution; share price volatility; competition; loss of key employees; additional
funding requirements; and defective title to mineral claims or property, as well
as those factors discussed in the sections entitled "Forward-Looking Statements"
and "Risk Factors" in the Company's Annual Information Form & Form 40-F dated
March 31, 2009.


There can be no assurance that forward-looking statements or information will
prove to be accurate, as actual results and future events could differ
materially from those anticipated in such statements. Accordingly, you should
not place undue reliance on the forward-looking statements or information
contained herein. Except as required by law, we do not expect to update
forward-looking statements and information continually as conditions change and
you are referred to the full discussion of the Company's business contained in
the Company's reports filed with the securities regulatory authorities in Canada
and the U.S.


Cautionary Note Regarding Mineral Reserves and Mineral Resources

The terms "Mineral Reserve", "Proven Mineral Reserve" and "Probable Mineral
Reserve" used in this release are Canadian mining terms as defined in accordance
with National Instrument 43-101 - Standards of Disclosure for Mineral Projects
under the guidelines set out in the Canadian Institute of Mining, Metallurgy and
Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves,
adopted by the CIM Council on August 20, 2000 as may be amended from time to
time by the CIM. These definitions differ from the definitions in the United
States Securities & Exchange Commission ("SEC") Guide 7. In the United States, a
mineral reserve is defined as a part of a mineral deposit which could be
economically and legally extracted or produced at the time the mineral reserve
determination is made.


The terms "Mineral Resource", "Measured Mineral Resource", "Indicated Mineral
Resource", "Inferred Mineral Resource" used in this release are Canadian mining
terms as defined in accordance with National Instruction 43-101 - Standards of
Disclosure for Mineral Projects under the guidelines set out in the CIM
Standards. Mineral Resources which are not Mineral Reserves do not have
demonstrated economic viability.

 
For a detailed discussion of resource and reserve estimates and related matters
see the Company's reports, including the Annual Information Form and Form 40-F
dated March 31, 2009 and technical reports filed under the Company's name at
www.sedar.com.


Estimates of mineral resources and mineral reserves prepared in accordance with
the JORC Code would not be materially different if prepared in accordance with
the Canadian Institute of Mining, Metallurgy and Petroleum Standards on Mineral
Resources and Reserves Definitions applicable under National Instrument 43-101.
There can be no assurance that those portions of such mineral resources that are
not mineral reserves will ultimately be converted into mineral reserves. Mineral
resources which are not mineral reserves do not have demonstrated economic
viability.


Cautionary Note to US Investors Concerning Estimates of Measured, Indicated and
Inferred Resources


Note to U.S. Investors. While the terms "mineral resource", "measured mineral
resource," "indicated mineral resource", and "inferred mineral resource" are
recognized and required by Canadian regulations, they are not defined terms
under standards in the United States and normally are not permitted to be used
in reports and registration statements filed with the SEC. As such, information
contained in this report concerning descriptions of mineralization and resources
under Canadian standards may not be comparable to similar information made
public by U.S companies in SEC filings. With respect to "indicated mineral
resource" and "inferred mineral resource" there is a great amount of uncertainty
as to their existence and a great uncertainty as to their economic and legal
feasibility. It can not be assumed that all or any part of an "indicated mineral
resource" or "inferred mineral resource" will ever be upgraded to a higher
category. Investors are cautioned not to assume that any part or all of mineral
deposits in these categories will ever be converted into reserves.


Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX:ELD)
and the New York Stock Exchange (NYSE:EGO). The TSX has neither approved nor
disapproved the form or content of this release.


Request for information packages: info@eldoradogold.com

Mobi724 Global Solutions (TSXV:MOS)
Historical Stock Chart
From Apr 2024 to May 2024 Click Here for more Mobi724 Global Solutions Charts.
Mobi724 Global Solutions (TSXV:MOS)
Historical Stock Chart
From May 2023 to May 2024 Click Here for more Mobi724 Global Solutions Charts.