Drilling Report
October 20 2004 - 3:01AM
UK Regulatory
First Calgary Petroleums Ltd. announces gas and condensate success at
MZLN-1
TSX: FCP LSE: FPL
CALGARY, Oct. 19 /CNW/ - First Calgary Petroleums Ltd. ("FCP" or the
"Company") today announces production testing of the MZLN-1 well has resulted
in a successful test of gas and condensate of 45,596 barrels oil equivalent
per day (boe/d), comprised of 214 million cubic feet of gas per day and
9,863 barrels of condensate per day, normalized to a flowing wellhead pressure
of 2000 psi. Rates were as follows:
------------------------------------------------------------
MZLN-1 well: Test Conditions Normalized Rates (xx)
-------------------------------------------------------------------------
FWHP Gas Condensate Gas Condensate TOTAL
Interval Psi(x) Choke Mmcf/d Bbls/d Mmcf/d Bbls/d Boe/d(xxx)
-------------------------------------------------------------------------
Siegenian
F6-2 Lower 4,753 36/64 29.1 1,332 159.8 7,350 33,979
-------------------------------------------------------------------------
Siegenian
F6-2 Upper 4,158 40/64 26.9 1,278 54.6 2,513 11,617
-------------------------------------------------------------------------
TOTALS 56.0 2,610 214.4 9,863 45,596
----------------------------------------------------
(x) FWHP - Flowing Wellhead Pressure per square inch
(xx) rate normalized to a FWHP of 2000 psi
(xxx)using a conversion ratio of 6 thousand cubic feet of gas to 1 barrel
of oil equivalent
The MZLN-1 well on Block 405b is located 5.4 km west of the recently
tested LEC-1 well and 13 km west of the MLE Field. The MZLN-1 well and the
LEC-1 well have each tested separate structures from the MLE Field.
Richard Anderson, President and CEO stated, "We are extremely pleased
with our drilling results on Ledjmet Block 405b. With each well completed, we
continue to confirm the extension of the prolific Lower Devonian reservoirs on
the Block. The MZLN-1 well has resulted in the best production test so far on
Block 405b, exceeding the tremendous results from FCP's MLE-2 well last year.
To date, we have five cased gas wells in the MLE Field with a cumulative
production test rate, normalized to a FWHP of 2000 psi, of approximately
90,000 boe/d, our recently cased well at LEC-1 with a production test rate of
20,000 boe/d, and today's production test rate from the MZLN-1 well exceeding
45,000 boe/d. In total, the seven wells have production tested in excess of
155,000 boe/d."
FCP also advised that testing is continuing on the cased LES-1 well,
located 10 km southwest of the LEC-1 well and logging results are expected
shortly on the MZLS-1 well, located 6.3 km southwest of MZLN-1.
The Company also advises that it intends to purchase the 5% net profits
interests associated with each of the 405b and 406a Blocks that are
outstanding in exchange for 10,150,000 Common Shares. The vendor of the NPIs
has agreed to a 12 month hold period for the shares received.
First Calgary Petroleums Ltd. is an oil and gas exploration company
actively engaged in exploration and development activities in Algeria. The
Company's common shares trade on the Toronto Stock Exchange in Canada (FCP)
and on the AIM market of the London Stock Exchange in the UK (FPL).
This news release includes statements about expected future events and
financial results that are forward looking in nature and subject to risks and
uncertainties. FCP cautions that actual performance may be affected by a
number of factors, many of which are beyond its control. Future events and
results may vary substantially from what First Calgary Petroleums Ltd.
currently foresees.
For further information: Richard G. Anderson, President and CEO, First
Calgary Petroleums Ltd., Tel: (403) 264-6697, Website: www.fcpl.ca; European
contacts: Jim Joseph, College Hill, Tel: +44 (0) 207 457 2020; Carina Corbett,
4C Communications Ltd., Tel: +44 (0) 207 907 4761
(FPL)
END
First Calgary Petroleums (LSE:FPL)
Historical Stock Chart
From Jun 2024 to Jul 2024
First Calgary Petroleums (LSE:FPL)
Historical Stock Chart
From Jul 2023 to Jul 2024