TIDMEOG 
 
Europa Oil & Gas (Holdings) plc 
 
17th November 2010 
 
West Firsby 9 Drilling Plans 
 
The Directors of Europa Oil & Gas (Holdings) plc are pleased to provide details 
of the timing for the forthcoming West Firsby-9 development well. 
 
A letter of intent has been signed for Geometric to use their HH102 rig for a 
new development well on the field. Well cellar construction will commence on 
the 18th November and the tophole section is expected to be pre-drilled ahead 
of the arrival of the HH102 rig in December. 
 
West Firsby-9 will be engineered as a 2,000 ft long near-horizontal producer 
with the reservoir expected to be encountered in a structurally high position 
on the field. The reservoir will be completed openhole to minimise formation 
damage and with packers to give zonal production flexibility. 
 
Paul Barrett, Managing Director, said `We are looking forward very much to the 
drilling of this crestal well and the decision to drill a new well instead of a 
sidetrack greatly reduces technical risk and allows much more operational 
flexibility with respect to completion strategy. According to the expected 
timetable, the well should be on production early in the New Year.' 
 
Further information: 
 
Europa Oil & Gas 
 
Paul Barrett / Phil Greenhalgh Tel: +44 1235 553 266 
 
finnCap 
 
Sarah Wharry / Henrik Persson, Corporate Finance Tel: +44 207 220 0567 
Joanna Weaving, Corporate Broking Tel: +44 207 600 1658 
 
The contents of this news release have been reviewed and approved by Paul 
Barrett, MSc., a geologist with over 30 years oil and gas experience. 
 
 
 
END 
 

Europa Oil & Gas (holdin... (LSE:EOG)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Europa Oil & Gas (holdin... Charts.
Europa Oil & Gas (holdin... (LSE:EOG)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Europa Oil & Gas (holdin... Charts.