Pretium Resources Inc. (TSX:PVG)(NYSE:PVG) ("Pretivm") is pleased
to report the remaining assays for hole SU-452, which includes the
highest-grading gold intersection encountered to date at the
Brucejack project, and additional bonanza-grade results from
drilling in Valley of the Kings. (See Table 1 below for
assays.)
The bonanza-grade interval from hole SU-452 now extends over 10
meters, from a downhole depth of 198.79 meters, with an average
grade of:
-- 2,393 grams of gold and 1,605 grams of silver per tonne uncut over 10.71
meters (70.3 ounces gold and 46.8 ounces silver per ton over 35.1 feet).
The high-grade interval noted above includes the
previously-reported record intercept of 41,582 grams of gold and
27,725 grams of silver per tonne uncut over 0.5 meters (see news
release dated July 25, 2012). Hole SU-452 also intersected 1,130
grams of gold per tonne uncut over 0.65 meters from a downhole
depth of 150.79 meters.
A total of seven separate intervals grading over 20 grams of
gold per tonne were intersected in hole SU-452. To view hole SU-452
on the updated cross section through the Valley of the Kings at
section 426625E please visit the following link:
http://media3.marketwire.com/docs/pvg731-F1.pdf.
Other results from the Valley of the Kings include:
-- Hole SU-445 intersected 5,242 grams of gold per tonne uncut over 0.57
meters (152.9 ounces of gold per ton over 1.9 feet); and
-- Hole SU-447 intersected 3,660 grams of gold per tonne uncut over 0.54
meters (106.7 ounces of gold per ton over 1.8 feet); and
-- Hole SU-434 intersected 2,400 grams of gold per tonne uncut over 0.50
meters (70.0 ounces of gold per ton over 1.6 feet); and
-- Hole SU-440 intersected 1,140 grams of gold per tonne uncut over 0.50
meters (33.3 ounces of gold per ton over 1.6 feet).
The holes noted above were collared from the far western margin
of the Valley of the Kings to the far eastern margin, respectively,
with holes SU-434 and SU-440 drilled from the same pad. Also of
note is hole SU-458, a 50-meter eastern step-out hole which
intersected 433 grams of gold per tonne over 0.5 meters. The Valley
of the Kings now extends over 550 meters in length, and remains
open along strike and at depth.
Table 1: Selected Brucejack Project Drill Results, July 2012 (SU-431 to SU-
460) (1,4)
----------------------------------------------------------------------------
Hole Collar Dip/ From To Interval Gold Silver Capping
No. Coords. Azimuth (meters) (meters) (meters) (g/t) (g/t) (2)
----------------------------------------------------------------------------
VALLEY OF THE KINGS
----------------------------------------------------------------------------
SU- 6257996N -45/178
431 426438E 29.60 30.10 0.50 180.50 79.60
----------------------------------------------------------------------------
SU- 6257870N -50/358
432 426625E 180.97 182.13 1.16 41.00 78.70
----------------------------------------------------------------------------
284.59 285.09 0.50 128.50 77.70
----------------------------------------------------------------------------
SU- 6257920N -65/358
433 426325E 178.00 179.50 1.50 19.65 23.40
----------------------------------------------------------------------------
SU- 6257850N -70/178
434 426663E 97.00 98.50 1.50 49.6 46.6
----------------------------------------------------------------------------
203.80 205.59 1.79 37.30 2,600
----------------------------------------------------------------------------
290.83 291.33 0.50 2,400 1,610
----------------------------------------------------------------------------
335.77 336.77 1.00 244.50 157.00
----------------------------------------------------------------------------
SU- 6258015N -50/178
435 426388E 280.00 281.00 1.00 85.70 36.80
----------------------------------------------------------------------------
SU- 6257995N -60/358
438 426338E 261.00 262.50 1.50 22.00 18.40
----------------------------------------------------------------------------
SU- 6257850N -55/178
440 426663E 222.28 222.78 0.50 1,140 665.00
----------------------------------------------------------------------------
275.50 277.39 1.89 32.53 16.69
----------------------------------------------------------------------------
incl 276.89 277.39 0.50 64.60 21.10
----------------------------------------------------------------------------
SU- 6258040N -50/178
441 426475E 205.07 205.57 0.50 64.70 33.10
----------------------------------------------------------------------------
SU- -60/358 1 Gold
445 6257965N sample
426337E 66.26 79.00 12.74 28.49 108.72 cut
----------------------------------------------------------------------------
66.26 79.00 12.74 240.66 108.72 Uncut
----------------------------------------------------------------------------
incl 66.26 66.83 0.57 5,242 2,120
----------------------------------------------------------------------------
incl 77.50 79.00 1.50 42.30 48.90
----------------------------------------------------------------------------
SU- 6257935N -60/358
446 426338E 162.50 165.50 3.00 7.96 18.55
----------------------------------------------------------------------------
SU- -50/178 1 Gold
447 6258020N sample
426450E 109.74 112.00 2.26 125.73 427.12 cut
----------------------------------------------------------------------------
109.74 112.00 2.26 880.78 427.12 Uncut
----------------------------------------------------------------------------
incl 109.74 110.28 0.54 3,660 1,750
----------------------------------------------------------------------------
SU- 6257850N -60/178
448 426663E 175.69 176.19 0.50 21.70 11.60
----------------------------------------------------------------------------
SU- 6257950N -60/358
451 426338E 99.79 100.29 0.50 536.00 112.00
----------------------------------------------------------------------------
SU- -55/358
452 6257869N
(3) 426624E 26.14 26.64 0.50 22.30 47.70
----------------------------------------------------------------------------
57.50 59.00 1.50 142.00 127.00
----------------------------------------------------------------------------
131.10 132.00 0.90 63.70 38.20
----------------------------------------------------------------------------
150.79 151.44 0.65 1,130 480.00
----------------------------------------------------------------------------
5
samples
cut to
500 ppm
Au/2
samples
cut to
2,500
198.79 209.50 10.71 161.69 390.54 ppm Ag
----------------------------------------------------------------------------
or 198.79 209.50 10.71 2,393 1,605 Uncut
----------------------------------------------------------------------------
incl 198.79 199.29 0.50 733 273.00
----------------------------------------------------------------------------
incl 200.97 201.47 0.50 412.42 313
----------------------------------------------------------------------------
incl 201.47 201.97 0.50 41,582 27,725
----------------------------------------------------------------------------
incl 201.97 202.47 0.50 2,251 1,770
----------------------------------------------------------------------------
incl 202.47 202.97 0.50 9.97 12.00
----------------------------------------------------------------------------
incl 202.97 203.47 0.50 4,902 3,290
----------------------------------------------------------------------------
incl 203.47 203.97 0.50 820.00 660.00
----------------------------------------------------------------------------
incl 203.97 204.97 1.00 121 45.30
----------------------------------------------------------------------------
incl 208.00 209.50 1.50 79.30 46.40
----------------------------------------------------------------------------
292.00 293.50 1.50 20.10 280.00
----------------------------------------------------------------------------
307.00 308.44 1.44 30.20 35.00
----------------------------------------------------------------------------
SU- -60/358 1 Gold
454 6257920N sample
426338E 175.06 186.00 10.94 26.31 30.70 cut
----------------------------------------------------------------------------
or 175.06 186.00 10.94 43.36 30.70 Uncut
----------------------------------------------------------------------------
incl 175.06 175.56 0.50 873.00 474.00
----------------------------------------------------------------------------
286.23 286.73 0.50 90.1 22.00
----------------------------------------------------------------------------
SU- 6258130N -45/178
455 426525E 227.37 227.87 0.50 232.00 48.00
----------------------------------------------------------------------------
SU- 6258083N -50/178
456 426475E 156.90 157.41 0.51 529 277.00
----------------------------------------------------------------------------
321.91 322.41 0.50 34.80 13.40
----------------------------------------------------------------------------
SU- 6257938N -45/178
457 426575E 142.47 142.97 0.50 100.50 46.20
----------------------------------------------------------------------------
SU- 6257899N -70/358
458 426800E 243.63 244.13 0.50 433.00 223.00
----------------------------------------------------------------------------
SU- 6257870N -60/358
459 426625E 240.45 248.5 8.05 8.33 18.88
----------------------------------------------------------------------------
incl 245.50 247.00 1.50 28.70 51.80
----------------------------------------------------------------------------
282.94 291.00 8.06 14.89 14.04
----------------------------------------------------------------------------
incl 282.94 283.54 0.60 134.50 72.60
----------------------------------------------------------------------------
incl 289.50 291.00 1.50 20.70 17.50
----------------------------------------------------------------------------
SU- 6258051N -55/358
460 426375E 111.66 126.00 14.34 17.84 29.25
----------------------------------------------------------------------------
incl 111.66 112.23 0.57 68.40 19.30
----------------------------------------------------------------------------
incl 120.79 121.29 0.50 276.00 338.00
----------------------------------------------------------------------------
incl 123.84 124.34 0.50 46.70 19.30
----------------------------------------------------------------------------
incl 124.34 126.00 1.66 25.20 54.80
----------------------------------------------------------------------------
GOSSAN HILL
----------------------------------------------------------------------------
SU- 6258818N -47/360
442 426600E 166.53 167.03 0.50 15.95 10.2
----------------------------------------------------------------------------
228.50 230.00 1.50 14.40 102.00
----------------------------------------------------------------------------
SU- 6258818N -62/360
450 426600E 251.00 259.00 8.00 24.06 102.82
----------------------------------------------------------------------------
incl 255.42 256.00 0.58 243.00 475.00
----------------------------------------------------------------------------
incl 256.64 257.15 0.51 31.10 340.00
----------------------------------------------------------------------------
(1)True thickness to be determined.
(2)Unless otherwise indicated as uncut, all gold assays over 500 g/t were
cut to 500 g/t.
(3)SU-452 intervals previously reported: 200.97 to 203.97.
(4)All samples were submitted for preparation and analysis by ALS Chemex at
its facilities in Terrace, B.C. All samples were analyzed using multi-
digestion with ICP finish. Samples over 100 ppm silver were reanalyzed
using four acid digestion with an ore grade AA finish. Samples over 1,000
ppm silver were fire assayed with a gravimetric finish. Samples with over
10 ppm gold were fire assayed with a gravimetric finish. One in 10 samples
was blank, one in 20 was a standard sample, and differing one in 20 samples
was a field duplicate one-quarter split core assayed at ALS Chemex in
Vancouver, B.C.
Assay results for completed drilling will be reported as they
are received over the course of the 2012 drilling season.
Kenneth C. McNaughton, M.A.Sc., P.Eng., Chief Exploration
Officer, Pretium Resources Inc. is the Qualified Person (QP)
responsible for the Brucejack Project exploration program.
About Pretivm
Pretivm is creating value through gold at its advanced-staged
exploration projects Brucejack and Snowfield, located in northern
British Columbia. Pretivm is advancing the high-grade, underground
gold opportunity at Brucejack, which hosts a significant
undeveloped high-grade gold resource.
Forward-Looking Statements
This Press Release contains "forward-looking information" and
"forward-looking statements" within the meaning of applicable
Canadian and United States securities legislation. Forward-looking
information may include, but is not limited to, risks related to
unsatisfactory results of due diligence, the ability to satisfy the
conditions of closing of Offering and general economic conditions,
our planned exploration and development activities, the adequacy of
Pretivm's financial resources, the estimation of mineral resources,
realization of mineral resource estimates, timing of development of
Pretivm's Brucejack Project, costs and timing of future
exploration, results of future exploration and drilling, production
and processing estimates, capital and operating cost estimates,
timelines and similar statements relating to the economic viability
of the Brucejack Project, timing and receipt of approvals, consents
and permits under applicable legislation, Pretivm's executive
compensation approach and practice, and adequacy of financial
resources. Wherever possible, words such as "plans", "expects",
"projects", "assumes", "budget", "strategy", "scheduled",
"estimates", "forecasts", "anticipates", "believes", "intends" and
similar expressions or statements that certain actions, events or
results "may", "could", "would", "might" or "will" be taken, occur
or be achieved, or the negative forms of any of these terms and
similar expressions, have been used to identify forward-looking
statements and information.
Statements concerning mineral resource estimates may also be
deemed to constitute forward-looking information to the extent that
they involve estimates of the mineralization that will be
encountered if the property is developed. Any statements that
express or involve discussions with respect to predictions,
expectations, beliefs, plans, projections, objectives, assumptions
or future events or performance are not statements of historical
fact and may be forward-looking information. Forward-looking
information is subject to a variety of known and unknown risks,
uncertainties and other factors that could cause actual events or
results to differ from those expressed or implied by the
forward-looking information, including, without limitation, those
risks identified in Pretivm's prospectus supplement to the short
form base shelf prospectus dated March 19, 2012 filed on SEDAR at
www.sedar.com and in the United States through EDGAR at the SEC's
website at www.sec.gov. Forward-looking information is based on the
expectations and opinions of Pretivm's management on the date the
statements are made. The assumptions used in the preparation of
such statements, although considered reasonable at the time of
preparation, may prove to be imprecise. We do not assume any
obligation to update forward-looking information, whether as a
result of new information, future events or otherwise, other than
as required by applicable law. For the reasons set forth above,
prospective investors should not place undue reliance on
forward-looking information.
Neither the TSX nor the NYSE has approved or disapproved of the
information contained herein.
Contacts: Pretium Resources Inc. Robert Quartermain President
and Chief Executive Officer (604) 558-1784 Pretium Resources Inc.
Michelle Romero Corporate Relations Director (604)
558-1784invest@pretivm.com www.pretivm.com
Pretium Resources (TSX:PVG)
Historical Stock Chart
From Jun 2024 to Jul 2024
Pretium Resources (TSX:PVG)
Historical Stock Chart
From Jul 2023 to Jul 2024