Highlights:
- High grade diamond drill result1,2 confirms
interpreted high grade gold plunging shoot thesis by extending
plunging shoot to over 300m
down-plunge. The shoot remains open down-plunge.
-
- SPDD0003: 6.1 g/t over 14.0 metres, including 8.6 g/t over
5.7 metres
- This drill intersection supports the plunging shoot
interpretation associated with previously announced (see Karora
news release, November 18, 2020),
near-surface high grade intersections at the south end of the
deposit which included:
-
- SPRC0012: 27.3 g/t over 15.0 metres, including 168.0 g/t
over 1.3 metres
- SPRC0019: 8.0 g/t over 19.0 metres, including 20.6 g/t over
2.0 metres
- SPRC0026: 29.8 g/t over 19.0
m, including 99.5 g/t over 5.0 metres
- All outstanding (new) drill results from the infill
drilling1,2 program designed to support resource
modelling and mine design for open-pit evaluation have been
received. Significant gold results include:
-
- SPDD0001: 14.0 g/t over 6.3 metres
- SPDD0002: 12.7 g/t over 4.0 metres, and 22.3 g/t over 1.7
metres
- SPRC0069: 11.0 g/t over 5.0 metres
- SPRC0065: 9.0 g/t over 12.0 metres
- SPRC0054: 8.1 g/t over 5.0 metres
- SPRC0062: 10.2 g/t over 5.0 metres
1.
|
Downhole
intervals. Estimated true widths are approximately
70% of the downhole interval
|
2.
|
Tables showing
complete drill results and drill hole locations can be found at the
end of this news release.
|
- A new Spargos resource is expected to be published in the
second quarter of 2021.
TORONTO, March 1, 2021 /CNW/ - Karora Resources Inc.
(TSX: KRR) ("Karora" or the "Corporation") is pleased to announce
completion of its 12,000 metre drill program at Spargos Reward Gold
Project ("Spargos"). The drilling has delineated high grade gold
mineralization within approximately 100 metres of surface along an
approximate 400 metre strike length which will support the
commencement of mining operations at Spargos around mid-year.
Paul Andre Huet, Chairman &
CEO, commented: "I am extremely pleased with the outcome of our
maiden drilling program at Spargos. In mid-November, we announced
some of the best drill results in Karora's history and today we
have confirmed a major extension of the high grade plunging shoot
thesis we originally outlined with our first pass results. This is
a new shoot, not previously recognized by previous owners and
highlights both near surface high grade mineralization as well as
the underground opportunity that exists at Spargos.
Now that our extended Resource Definition drilling program is
complete, I am looking forward to our upcoming Mineral Resource
estimate and the initiation of mining activities for Spargos in the
second quarter. Spargos is expected to provide high grade gold feed
for the Higginsville plant in the second half of 2021, contributing
to our expectation that gold grades will increase as we progress
through the year."
Infill RC/Geotechnical Diamond Drilling
The Infill RC drill program designed to upgrade the Historical
Mineral Resource and support resource modelling for open pit
evaluation has been completed. Drilling totalled 107 holes for
9,590 metres. In addition, two geotechnical diamond holes were
completed to support open pit mine design assumptions. Drilling
targeted mineralization over 400 metres of strike to a depth of
approximating 100 metres below surface – in line with expectations
for open-pit mine depths. All assay results from this drilling have
now been received, noting that turnaround on assay results was
delayed due to backlogs at laboratories in the region reflecting a
rapid increase in exploration and new mining projects in the region
and COVID-19 related issues. Assay highlights from this program are
listed below, including some previously released drill
intersections.
Highlighted gold intersections from the drilling3,4
are listed in order below:
New results
- SPDD00015: 14.0 g/t over 6.3 metres
- SPDD00025: 12.7 g/t over 4.0 metres, and 22.3 g/t
over 1.7 metres
- SPDD0003: 6.1 g/t over 14.0 metres; including 8.6 g/t over 5.7
metres
- SPRC0069: 11.0 g/t over 5.0 metres
- SPRC0065: 9.0 g/t over 12.0 metres
- SPRC0054: 8.1 g/t over 5.0 metres
- SPRC0062: 10.2 g/t over 5.0 metres
Previously released (Karora news release, November 18, 2020)
- SPRC0012: 27.3 g/t over 15.0 metres, including 168.0 g/t over
1.3 metres
- SPRC0013: 5.7 g/t over 8.0 metres
- SPRC0019: 8.0 g/t over 19.0 metres, including 20.6 g/t over 2.0
metres
- SPRC0026: 29.8 g/t over 19.0 m,
including 99.5 g/t over 5.0 metres
- SPRC0028: 29.8 g/t over 3.0 metres
- SPRC0030: 6.9 g/t over 8.0 metres
- SPRC0032: 8.7g/t over 16.0 metres
3.
|
Downhole
intervals. Estimated true widths are approximately 70% of the
downhole interval
|
4.
|
Tables showing
complete drill results and drill hole locations can be found at the
end of this news release.
|
5.
|
Geotechnical
diamond holes
|
An updated Spargos gold Mineral Resource is planned for release
in the second quarter of 2021 and remains in line with the
commencement of mining at Spargos.
High Grade Gold Plunging Shoot Target
Four diamond holes totalling 1,102 metres were drilled to test
the interpretation and extent of high grade gold mineralization
controlled by north plunging shoots within the Spargos Reward
mineralized system. These shoots were first identified from
interpreting historical drill results and underground mine data.
Current interpretation is of four parallel high-grade shoots
(Figure 1), with the Stage 1 diamond drilling targeted to extend
and/or test the interpreted position of three shoots.
Results to date were received for SPDD003 which targeted the
down-plunge extension of the very high gold grades previously
intersected at the southern end of the deposit from the initial
infill drill holes (Karora news release, November 18, 2020). The new results confirm the
current interpretation which shows high grade gold mineralization
extending over a down-plunge distance of over 300 metres. The
down-plunge extension of this shoot remains open at depth and
highlights the underground growth opportunity remaining to be
tested. Results for the remaining three diamond holes are
pending.
Spargos Project – Background
The Spargos Reward project tenements cover 33 square kilometres,
located in the Eastern Goldfields of Western Australia, just 65 kilometres north of
Karora's Higginsville mill by road. The project contains an
existing historical (JORC (2012) gold Mineral Resource
Estimate6 of 112,000 oz (785,800 tonnes @ 4.4 g/t)
indicated resource and 19,000 oz (151,000 tonnes @ 4.0 g/t)
inferred resource, There are also a number of historic workings
within the project, most notable of which is the historic Spargos
Reward Gold Mine which produced 105,397 tonnes at an average grade
of 8.56 g/t Au in the 1930s and 1940s, with limited gold extraction
since that time. Karora acquired the Spargos Reward project in
August 2020 (see Karora news release
dated August 7, 2020)
The Spargos gold mineralized system is positioned on the contact
between meta-greywackes to the east and strongly altered sodic
felsic volcaniclastics to the west along a major north trending
shear zone which dips steeply to the east. Gold mineralization is
hosted in a number of positions with the bulk of the identified
mineralization occurring as disseminations and stringer zones of
quartz-biotite-amphibole-pyrite-arsenopyrite alteration. The
deposit is characterized by the absence of quartz veining.
The gold mineralized zones can be broken down into two key zones
- Main Lode and a second West Zone. A review of the historical mine
mapping and data indicate high grade mineralization is associated
with shallow, north plunging shoots controlled by drag folds
recognized along the meta-greywackes and western
meta-volcaniclastics contact. The interpreted down-plunge position
of high grade mineralization is virtually untested by drilling and
represents significant exploration potential to grow the existing
historical mineral resource.
6.
|
See
www.coronaresources.com.au, Feb 26, 2020. A qualified
person has not done sufficient work on behalf of Karora to classify
the historical estimate as current mineral resources or mineral
reserves, and Karora is not treating the historical estimates as
current mineral resources or mineral reserves.
|
Spargos Reward – Resource Update
A revised gold Mineral Resource statement is expected in the
second quarter of 2021 which remains in line with the Corporation's
targeted date for commencement of mining at Spargos. Initial open
pit design, flora and fauna surveys, waste characterization and
infrastructure location have all been completed and will form part
of the final mine plan submitted for mining approval with the
appropriate authorities.
Compliance Statement (JORC 2012 and NI 43-101)
The disclosure of scientific and technical information contained
in this news release has been reviewed and approved by Stephen Devlin, FAusIMM, Group Geologist, Karora
Resources Inc., a Qualified Person for the purposes of NI
43-101.
Higginsville: All RC and diamond drill sampling is conducted by
Karora personnel. Samples for gold analysis are shipped to Bureau
Veritas Laboratories of Kalgoorlie and Perth for preparation and assaying by 40 gram
fire assay analytical method. All RC drill samples submitted
for assay include Certified Reference Material ("CRM") and coarse
blank every 25th down hole metre. Duplicate samples are
taken every 50th metre. All diamond drill samples
submitted for assay include Certified Reference Material ("CRM") or
coarse blank approximately every 10th sample down hole,
equating to 10 in every 100 samples. The diamond drill
samples contained no duplicate samples.The lab is also required to
undertake a minimum of 1 in 45 wet screens on pulverised samples to
ensure a minimum 90% passing at -75µm.
Where problems have been identified in QA/QC checks, Karora
personnel and the Bureau Veritas laboratory staff have actively
pursued and corrected the issues as standard procedure.
About Karora Resources
Karora is focused on growing gold production and reducing costs
at its integrated Beta Hunt Gold Mine and Higginsville Gold
Operations ("HGO") in Western
Australia. The Higginsville treatment facility is a low-cost
1.4 Mtpa processing plant which is fed at capacity from Karora's
underground Beta Hunt mine and open pit Higginsville mine. At Beta
Hunt, a robust gold Mineral Resource and Reserve is hosted in
multiple gold shears, with gold intersections along a 4 km strike
length remaining open in multiple directions. HGO has a substantial
gold Mineral Resource and Reserve and prospective land package
totaling approximately 1,900 square kilometers. The Company also
owns the high grade Spargos Reward project which is anticipated to
begin mining in 2021. Karora has a strong Board and management team
focused on delivering shareholder value. Karora's common shares
trade on the TSX under the symbol KRR. Karora shares also trade on
the OTCQX market under the symbol KRRGF.
Cautionary Statement Concerning Forward-Looking
Statements
This news release contains "forward-looking information"
including without limitation statements relating to the potential
of the Beta Hunt Mine, Higginsville Gold Operation, the Aquarius
Project and the Spargos Gold Project, the commencement of mining at
the Spargos Gold Project and the completion of the resource
estimate.
Forward-looking statements involve known and unknown risks,
uncertainties and other factors which may cause the actual results,
performance or achievements of Karora to be materially different
from any future results, performance or achievements expressed or
implied by the forward-looking statements. Factors that could
affect the outcome include, among others: future prices and the
supply of metals; the results of drilling; inability to raise the
money necessary to incur the expenditures required to retain and
advance the properties; environmental liabilities (known and
unknown); general business, economic, competitive, political and
social uncertainties; results of exploration programs; accidents,
labour disputes and other risks of the mining industry; political
instability, terrorism, insurrection or war; or delays in obtaining
governmental approvals, projected cash operating costs, failure to
obtain regulatory or shareholder approvals. For a more detailed
discussion of such risks and other factors that could cause actual
results to differ materially from those expressed or implied by
such forward-looking statements, refer to Karora 's filings with
Canadian securities regulators, including the most recent Annual
Information Form, available on SEDAR at www.sedar.com.
Although Karora has attempted to identify important factors
that could cause actual actions, events or results to differ
materially from those described in forward-looking statements,
there may be other factors that cause actions, events or results to
differ from those anticipated, estimated or intended.
Forward-looking statements contained herein are made as of the date
of this news release and Karora disclaims any obligation to update
any forward-looking statements, whether as a result of new
information, future events or results or otherwise, except as
required by applicable securities laws.
Cautionary Statement Regarding the Higginsville Mining
Operations
A production decision at the Higginsville gold
operations was made by previous operators of the mine, prior to the
completion of the acquisition of the Higginsville gold operations
by Karora and Karora made a decision to continue production
subsequent to the acquisition. This decision by Karora to continue
production and, to the knowledge of Karora, the prior production
decision were not based on a feasibility study of mineral reserves,
demonstrating economic and technical viability, and, as a result,
there may be an increased uncertainty of achieving any particular
level of recovery of minerals or the cost of such recovery, which
include increased risks associated with developing a commercially
mineable deposit. Historically, such projects have a much higher
risk of economic and technical failure. There is no guarantee that
anticipated production costs will be achieved. Failure to achieve
the anticipated production costs would have a material adverse
impact on the Corporation's cash flow and future profitability.
Readers are cautioned that there is increased uncertainty and
higher risk of economic and technical failure associated with such
production decisions.
Table 1: Spargos Reward Drilling, November -
December 2020 - Significant
Results
Hole ID
|
Sub
interval
|
From
(m)
|
To
(m)
|
Downhole
Interval
(m)
|
Au
(g/t)1,2
|
SPDD0001
|
|
2
|
3
|
1.0
|
2.37
|
|
140.5
|
149
|
8.5
|
11.01
|
Including
|
142.75
|
149
|
6.3
|
14.0
|
|
160
|
160.41
|
0
|
1.1
|
|
165.25
|
165.58
|
0.3
|
1.11
|
|
168.6
|
168.9
|
0.3
|
2.45
|
SPDD0002
|
|
140
|
140.5
|
0.5
|
3.37
|
|
144.1
|
144.5
|
0.4
|
1.6
|
|
153.9
|
155.6
|
1.7
|
22.25
|
|
161
|
165
|
4.0
|
12.68
|
|
177
|
177.4
|
0.4
|
1.00
|
SPDD0003
|
|
172.8
|
173.5
|
0.7
|
1.35
|
|
188
|
202
|
14.0
|
6.06
|
including
|
196.3
|
202
|
5.7
|
8.6
|
SPRC0033
|
|
104
|
108
|
4.0
|
4.8
|
|
111
|
112
|
1.0
|
1.03
|
|
120
|
121
|
1.0
|
8.33
|
SPRC0034
|
|
7
|
11
|
4.0
|
2.48
|
|
29
|
36
|
7.0
|
2.21
|
SPRC0035
|
|
43
|
53
|
10.0
|
3.49
|
SPRC0036
|
|
71
|
75
|
4.0
|
1.2
|
|
80
|
81
|
1.0
|
1.75
|
|
84
|
88
|
4.0
|
1.94
|
SPRC0037
|
|
72
|
75
|
3.0
|
1.32
|
|
82
|
83
|
1.0
|
3.58
|
|
96
|
97
|
1.0
|
1.92
|
|
103
|
104
|
1.0
|
1.46
|
SPRC0037b
|
|
54
|
55
|
1.0
|
1.77
|
|
59
|
62
|
3.0
|
0.86
|
|
81
|
84
|
3.0
|
1.23
|
|
92
|
95
|
3.0
|
3.11
|
SPRC0038b
|
|
105
|
106
|
1.0
|
1.58
|
|
109
|
110
|
1.0
|
2.96
|
|
116
|
118
|
2.0
|
2.29
|
SPRC0039b
|
|
0
|
1
|
1.0
|
1.22
|
|
122
|
123
|
1.0
|
1.06
|
|
126
|
129
|
3.0
|
4.76
|
SPRC0041
|
|
13
|
14
|
1.0
|
1.19
|
|
27
|
28
|
1.0
|
1.09
|
|
38
|
42
|
4.0
|
2.73
|
SPRC0042
|
|
1
|
2
|
1.0
|
1.33
|
|
51
|
56
|
5.0
|
4.65
|
SPRC0044
|
|
37
|
38
|
1.0
|
2.47
|
|
83
|
84
|
1.0
|
4.72
|
SPRC0046
|
|
29
|
30
|
1.0
|
1.43
|
SPRC0047
|
|
28
|
29
|
1.0
|
1.19
|
|
32
|
33
|
1.0
|
1.28
|
|
36
|
39
|
3.0
|
2.84
|
|
48
|
49
|
1.0
|
1.21
|
SPRC0048
|
|
29
|
30
|
1.0
|
1.05
|
SPRC0050
|
|
68
|
75
|
7.0
|
2.41
|
|
79
|
83
|
4.0
|
3.82
|
SPRC0051
|
|
0
|
1
|
1.0
|
1.83
|
|
30
|
31
|
1.0
|
1.29
|
|
99
|
103
|
4.0
|
3.82
|
SPRC0052
|
|
120
|
122
|
2.0
|
1.97
|
|
136
|
138
|
2.0
|
4.48
|
SPRC0054
|
|
43
|
48
|
5.0
|
8.08
|
SPRC0055
|
|
0
|
1
|
1.0
|
1.3
|
SPRC0056
|
|
27
|
28
|
1.0
|
1.04
|
|
70
|
72
|
2.0
|
1.43
|
SPRC0057
|
|
81
|
83
|
2.0
|
6.04
|
SPRC0058
|
|
93
|
94
|
1.0
|
1.3
|
SPRC0060
|
|
39
|
47
|
8.0
|
1.4
|
SPRC0061
|
|
0
|
3
|
3.0
|
8.48
|
|
50
|
54
|
4.0
|
8.07
|
|
60
|
61
|
1.0
|
1.04
|
|
73
|
74
|
1.0
|
1.00
|
SPRC0062
|
|
0
|
1
|
1.0
|
3.51
|
|
39
|
40
|
1.0
|
1.01
|
|
58
|
62
|
4.0
|
1.35
|
|
68
|
73
|
5.0
|
10.17
|
SPRC0063
|
|
12
|
13
|
1.0
|
1.98
|
|
68
|
69
|
1.0
|
1.44
|
SPRC0064
|
|
92
|
93
|
1.0
|
2.28
|
SPRC0065
|
|
113
|
125
|
12.0
|
8.96
|
|
128
|
129
|
1.0
|
1.26
|
|
134
|
135
|
1.0
|
3.88
|
SPRC0067
|
|
38
|
41
|
3.0
|
2.38
|
|
48
|
56
|
8.0
|
3.25
|
SPRC0068
|
|
0
|
1
|
1.0
|
1.19
|
|
34
|
38
|
4.0
|
1.05
|
|
41
|
61
|
20.0
|
3.11
|
SPRC0069
|
|
52
|
57
|
5.0
|
10.98
|
SPRC0070
|
|
84
|
85
|
1.0
|
1.16
|
SPRC0074
|
|
33
|
34
|
1.0
|
1.02
|
SPRC0075
|
|
36
|
54
|
18.0
|
2.08
|
|
65
|
66
|
1.0
|
2.26
|
|
79
|
80
|
1.0
|
1.24
|
|
84
|
85
|
1.0
|
2.26
|
SPRC0076
|
|
67
|
68
|
1.0
|
7.09
|
SPRC0077
|
|
92
|
93
|
1.0
|
1.9
|
SPRC0078
|
|
17
|
19
|
2.0
|
1.71
|
|
24
|
25
|
1.0
|
1.18
|
|
31
|
37
|
6.0
|
4.82
|
SPRC0079
|
|
43
|
45
|
2.0
|
3.01
|
|
54
|
58
|
4.0
|
0.94
|
SPRC0080
|
|
18
|
21
|
3.0
|
2.18
|
|
26
|
27
|
1.0
|
1.08
|
|
37
|
38
|
1.0
|
1.58
|
|
46
|
47
|
1.0
|
1.77
|
|
62
|
63
|
1.0
|
1.82
|
|
73
|
75
|
2.0
|
1.71
|
SPRC0081
|
|
69
|
75
|
6.0
|
3.79
|
SPRC0082
|
|
90
|
92
|
2.0
|
5.61
|
SPRC0084
|
|
48
|
49
|
1.0
|
1.33
|
SPRC0085
|
|
35
|
36
|
1.0
|
1.1
|
|
48
|
49
|
1.0
|
1.13
|
|
74
|
75
|
1.0
|
1.44
|
|
85
|
86
|
1.0
|
1.64
|
SPRC0087
|
|
83
|
84
|
1.0
|
1.92
|
|
121
|
122
|
1.0
|
1.25
|
|
127
|
128
|
1.0
|
2.79
|
SPRC0088
|
|
90
|
91
|
1.0
|
1.2
|
|
112
|
120
|
8.0
|
2.73
|
|
124
|
127
|
3.0
|
1.02
|
SPRC0089
|
|
8
|
9
|
1.0
|
1.16
|
SPRC0090
|
|
38
|
39
|
1.0
|
1.01
|
SPRC0091
|
|
81
|
82
|
1.0
|
3.26
|
SPRC0092
|
|
61
|
62
|
1.0
|
1.68
|
|
65
|
66
|
1.0
|
1.35
|
|
73
|
74
|
1.0
|
1.11
|
|
84
|
85
|
1.0
|
1.11
|
|
104
|
105
|
1.0
|
1.36
|
|
113
|
114
|
1.0
|
1.58
|
SPRC0095
|
|
14
|
16
|
2.0
|
1.15
|
SPRC0096
|
|
0
|
1
|
1.0
|
1.87
|
SPRC0097
|
|
69
|
70
|
1.0
|
1.09
|
|
82
|
83
|
1.0
|
2.08
|
SPRC0098
|
|
92
|
93
|
1.0
|
1.9
|
|
100
|
101
|
1.0
|
3.59
|
SPRC0100
|
|
79
|
80
|
1.0
|
1.06
|
SPRC0101
|
|
85
|
86
|
1.0
|
1.05
|
SPRC0102
|
|
23
|
25
|
2.0
|
2.22
|
|
33
|
35
|
2.0
|
4.04
|
SPRC0103
|
|
44
|
45
|
1.0
|
1.48
|
SPRC0104
|
|
10
|
13
|
3.0
|
1.49
|
|
16
|
17
|
1.0
|
5.08
|
|
46
|
47
|
1.0
|
2.55
|
SPRC0106
|
|
57
|
58
|
1.0
|
2.99
|
SPRC0107
|
|
31
|
35
|
4.0
|
1.64
|
|
47
|
48
|
1.0
|
2.7
|
SPRC0111
|
|
39
|
40
|
1.0
|
1.33
|
|
45
|
46
|
1.0
|
1.26
|
SPRC0112
|
|
42
|
43
|
1.0
|
8.74
|
SPRC0113
|
|
76
|
79
|
3.0
|
1.93
|
SPRC0122
|
|
80
|
84
|
4.0
|
1.47
|
SPRC0123
|
|
41
|
42
|
1.0
|
2.29
|
SPRC0124
|
|
57
|
58
|
1.0
|
1.14
|
SPRC0125
|
|
25
|
26
|
1.0
|
2.67
|
|
|
1.
|
Downhole
intervals. Estimated true widths are approximately 70% of the
downhole interval.
|
2.
|
Significant
results reported as >1.0g/t Au over 1.0 metres
|
Table 2: Spargos Reward Drilling, November –
December 2020
Hole
ID
|
Northing
|
Easting
|
mRL
|
AZ
|
DIP
|
Total
Length (m)
|
SPDD0001
|
6543202.465
|
354267.1
|
424.071
|
272.356
|
-59.91
|
195.44
|
SPDD0002
|
6543215.111
|
354104.4
|
426.471
|
91.356
|
-60.05
|
177.4
|
SPDD0003
|
6543200.3
|
354071.8
|
425.945
|
89.416
|
-55.48
|
240.07
|
SPRC0033
|
6543100.201
|
354238.5
|
421.429
|
269.176
|
-53.91
|
146
|
SPRC0034
|
6543120.136
|
354146.2
|
423.562
|
88.256
|
-45.75
|
36
|
SPRC0035
|
6543124.607
|
354204.7
|
424.813
|
264.056
|
-42.53
|
72
|
SPRC0036
|
6543106.845
|
354209.5
|
421.951
|
269.106
|
-57.09
|
94
|
SPRC0037
|
6543110.198
|
354222.6
|
421.952
|
243.926
|
-55.32
|
107
|
SPRC0037b
|
6543108.819
|
354221.2
|
421.947
|
270.426
|
-54.07
|
108
|
SPRC0038b
|
6543114.25
|
354235.2
|
422.192
|
271.286
|
-56.07
|
130
|
SPRC0039b
|
6543120.267
|
354248
|
422.559
|
268.626
|
-55.75
|
148
|
SPRC0041
|
6543140.009
|
354144.2
|
424.708
|
96.956
|
-47.4
|
44
|
SPRC0042
|
6543140.179
|
354206.4
|
424.865
|
271.026
|
-51.19
|
116
|
SPRC0044
|
6543140.118
|
354227.2
|
424.776
|
270.246
|
-55.44
|
130
|
SPRC0046
|
6543159.9
|
354141.9
|
425.378
|
95.136
|
-45.53
|
30
|
SPRC0047
|
6543159.795
|
354198.9
|
424.221
|
270.986
|
-46.37
|
60
|
SPRC0048
|
6543160.298
|
354201.6
|
424.071
|
270.146
|
-55.48
|
45
|
SPRC0050
|
6543160.029
|
354223.3
|
424.817
|
267.536
|
-55.41
|
120
|
SPRC0051
|
6543159.988
|
354235.8
|
424.961
|
268.076
|
-56.08
|
138
|
SPRC0052
|
6543160.199
|
354249.3
|
424.014
|
268.586
|
-55.94
|
150
|
SPRC0054
|
6543179.901
|
354211.2
|
424.644
|
266.916
|
-42.31
|
80
|
SPRC0055
|
6543180.05
|
354214.2
|
424.684
|
267.906
|
-50.43
|
55
|
SPRC0056
|
6543179.86
|
354222.2
|
424.962
|
268.156
|
-55.41
|
72
|
SPRC0057
|
6543179.788
|
354233.4
|
424.806
|
268.496
|
-56.24
|
83
|
SPRC0058
|
6543179.453
|
354245.2
|
424.475
|
269.926
|
-55.95
|
94
|
SPRC0060
|
6543200.058
|
354132.3
|
426.305
|
94.686
|
-38.8
|
54
|
SPRC0061
|
6543200.031
|
354217.4
|
425.637
|
272.446
|
-47.94
|
74
|
SPRC0062
|
6543200.615
|
354224.8
|
424.868
|
273.366
|
-55.75
|
73
|
SPRC0063
|
6543200.313
|
354231
|
424.952
|
274.426
|
-55.73
|
69
|
SPRC0064
|
6543199.358
|
354244.5
|
424.937
|
274.816
|
-56.09
|
93
|
SPRC0065
|
6543197.959
|
354259.7
|
423.955
|
271.816
|
-55.74
|
135
|
SPRC0067
|
6543220.184
|
354218.4
|
425.467
|
270.436
|
-44.79
|
56
|
SPRC0068
|
6543220.276
|
354222.1
|
425.426
|
270.346
|
-50.31
|
61
|
SPRC0069
|
6543220.079
|
354230.9
|
425.179
|
271.936
|
-55.59
|
57
|
SPRC0070
|
6543225.262
|
354250.3
|
424.358
|
267.486
|
-56.07
|
85
|
SPRC0074
|
6543241.192
|
354185
|
426.323
|
269.976
|
-55.22
|
48
|
SPRC0075
|
6543240.018
|
354214
|
426.077
|
271.396
|
-57.5
|
90
|
SPRC0076
|
6543240.839
|
354241.2
|
425.192
|
271.106
|
-56.14
|
68
|
SPRC0077
|
6543240.369
|
354259.8
|
424.747
|
272.826
|
-56.26
|
93
|
SPRC0078
|
6543259.97
|
354177.6
|
426.389
|
270.946
|
-54.77
|
48
|
SPRC0079
|
6543259.761
|
354191.1
|
426.55
|
271.336
|
-54.91
|
60
|
SPRC0080
|
6543259.329
|
354211.2
|
426.551
|
272.056
|
-54.74
|
100
|
SPRC0081
|
6543260.213
|
354241.6
|
425.668
|
270.766
|
-56.09
|
75
|
SPRC0082
|
6543259.889
|
354260
|
425.455
|
271.386
|
-55.5
|
92
|
SPRC0084
|
6543279.416
|
354196.4
|
427.045
|
270.186
|
-55.31
|
56
|
SPRC0085
|
6543279.574
|
354213
|
427.226
|
270.546
|
-53.87
|
90
|
SPRC0087
|
6543279.875
|
354249.1
|
426.356
|
269.826
|
-60.27
|
148
|
SPRC0088
|
6543280.138
|
354267.4
|
425.638
|
270.466
|
-60.15
|
148
|
SPRC0089
|
6543299.757
|
354172.2
|
428.046
|
268.586
|
-54.69
|
24
|
SPRC0090
|
6543300.054
|
354192.4
|
427.682
|
272.226
|
-55.06
|
54
|
SPRC0091
|
6543299.834
|
354221.5
|
427.901
|
271.016
|
-54.53
|
100
|
SPRC0092
|
6543300.058
|
354245
|
426.897
|
272.786
|
-56.56
|
152
|
SPRC0095
|
6543319.749
|
354182.1
|
428.558
|
270.406
|
-55.03
|
38
|
SPRC0096
|
6543319.671
|
354191.5
|
428.26
|
268.176
|
-54.91
|
54
|
SPRC0097
|
6543319.969
|
354221.7
|
428.398
|
267.986
|
-55.48
|
96
|
SPRC0098
|
6543329.681
|
354241.5
|
428.394
|
261.52
|
-54.24
|
156
|
SPRC0100
|
6543340.201
|
354113.8
|
431.774
|
90
|
-60
|
150
|
SPRC0101
|
6543340.143
|
354132.8
|
432.214
|
90
|
-60
|
150
|
SPRC0102
|
6543339.902
|
354152
|
431.398
|
92.216
|
-59.35
|
135
|
SPRC0103
|
6543340.005
|
354175.1
|
430.175
|
89.386
|
-59.47
|
90
|
SPRC0104
|
6543339.684
|
354193.6
|
429.086
|
90.176
|
-59.94
|
50
|
SPRC0106
|
6543360.172
|
354130.8
|
433.286
|
90.363
|
-54.106
|
160
|
SPRC0107
|
6543360.653
|
354149.6
|
433.843
|
90
|
-55
|
130
|
SPRC0111
|
6543379.604
|
354195
|
431.215
|
271.006
|
-55.9
|
54
|
SPRC0112
|
6543379.44
|
354214.1
|
430.648
|
270.176
|
-55.59
|
80
|
SPRC0113
|
6543379.151
|
354244.7
|
429.907
|
268.436
|
-56.21
|
126
|
SPRC0122
|
6543009.789
|
354098.8
|
420.487
|
91.186
|
-60.92
|
139
|
SPRC0123
|
6543010.096
|
354118
|
420.391
|
92.066
|
-60.6
|
130
|
SPRC0124
|
6543009.646
|
354129.6
|
420.059
|
93.916
|
-61.92
|
110
|
SPRC0125
|
6543009.739
|
354139.1
|
419.941
|
89.826
|
-62.31
|
90
|
SOURCE Karora Resources Inc.