TSX: JAG
TORONTO, Feb. 27, 2019 /PRNewswire/ -- Jaguar Mining Inc.
("Jaguar" or the "Company") (TSX: JAG) today announced drilling
results from 19 holes over 4,523m as
part of its growth exploration drill program on Orebody C, and 46
holes over 4,708m from infill
drilling (39 holes at C-SE and 7 holes at C-Central) completed
since June 2018 (Refer News Release
February 26 and June 18, 2018) at Turmalina Gold Mine
("Turmalina"). The growth drilling focused on targeting Orebody C
extensions down plunge and laterally along strike, and to upgrade
mineral resources to mineral reserves.
Turmalina Exploration Highlights
- Drill results confirm the structure hosting Orebody C extends
to depth beyond mine level 8,500m
down plunge (400m vertically) from
current operations and remains open at depth
- Drill results confirm changes in the plunge direction of the
higher-grade ore shoot as mapped structurally in mine development
on levels 3 and 4 in Q3 2018
- 4 growth exploration holes intersected grade x thickness of
> 10 GM including an intercept of 7.08 g/t Au over
3.85m (ETW 3.2m)
- Completed infill drilling on Orebody C to upgrade and covert
mineral resources to mineral reserves between levels 3 and 5
- Key infill drilling intersections on Orebody C-SE include
5.76 g/t Au over 29.63m (ETW
22.69m), 6.40 g/t Au over
14.80m (ETW 12.56m) and 5.65 g/t Au over 26.54m (ETW 19.09m)
- Infill drilling continued to define wide; high-grade intercepts
in 19 intersections with a grade x thickness of > 10 GM
including 15 intersections with grade x thickness > 25 GM, 5
intersections with grade x thickness > 50 GM and 3 intersections
with grade x thickness > 100 GM
- 8 infill holes targeting Orebody C-Central based on the new
plunge interpretation include two higher grade intersections from
the drilling in this area completed to date of 18.35 g/t Au over
8.76m (ETW 8.23m) and 9.95g/t Au over 2.29m (ETW 2.0m). Intersections appear to define a
high-grade plunging mineralized shoot, which extends over a strike
length of approximately 50m
Definitions: ETW – estimated true width, g/t Au – grams per
tonne gold, m – metres, Grade (g/t Au) x Thickness (m) = GM (gram –
meters)
Ben Guenther Interim CEO, Jaguar Mining commented: "We continue
to improve our geological understanding of Orebody C through
structural mapping, targeted growth drilling and prioritized infill
drilling. This strategic approach enables us to plan and develop
shallow mineralization that will provide Turmalina with additional
ore faces and operational flexibility. Development of C Central
will also provide exploration platforms for C NW and extend the
orebody laterally to increase longer term production capability.
We look forward to reporting our update Mineral Resources and
Mineral Reserves during March
2019."
Jon Hill, Expert Advisor, Geology
and Exploration, Jaguar Mining Management Committee commented:
"During 2018 exploration programs focused on upgrading mineral
resources to mineral reserves on both principle orebodies at
Turmalina. Concurrently, the Company has significantly advanced the
understanding of the structural and related geological controls on
Orebody C mineralization through detailed geological mapping of
current and ongoing underground development. The recognition of a
new plunge control to the distribution of the higher grade and
wider mineralized zones clearly broadens the potential to find
additional higher-grade mineralized "pay shoots" at shallower
depths along the strike of the host structure and, more
significantly, depth extensions, down plunge from the C-Central and
C-NW historically mined open pits."
"The recent high-grade intercept on orebody C-Central with a
grade x thickness value > 150 GM is encouraging as we begin to
evaluate previously under-tested areas assuming the newly
identified plunge control. This work is being prioritized as any
increase in grade, tonnes and ounces per vertical meter added in
shallow areas of the mine may leverage access from existing
infrastructure and provide more flexibility in the mine plan and
ultimately potential for higher production".
Turmalina Orebody C Growth Exploration and Infill Drilling
Results
Growth exploration drilling, targeting down dip extensions from
level 4, continues to confirm the structure hosting Orebody C
extends to depth beyond mine level 8 approximately 500m down plunge and 400m vertically from current operations.
Importantly, this drilling successfully tested and confirmed the
changes in the plunge direction of the higher-grade ore shoot
highlighted by earlier drilling and subsequently geologically –
structurally mapped in the mine development on levels 3 and 4 in
Q3-2018 (Refer June 18, 2018 news
release).
The new plunge direction assumed is N75/48 (azimuth / dip)
(previous N45/55). This high-grade plunge direction approximates
the observed Orebody A high-grade zone plunge of N65/48.
Further drilling is planned for Q2 and Q3 2019 to fully test
this ore-shoot between level 4 and level 8 once a new drilling
platform has been prepared for this purpose from the C-ramp on
level 5. (Refer figure 2).
Infill drilling on Orebody C focusing on upgrading mineral
resources to mineral reserves between levels 3 and 5 was
prioritized in Q3 and Q4 to inform the Mineral Resources and
Mineral Reserves update during March
2019.
This infill drilling continued to define wide; high-grade
intercepts consistent with those previously reported (Refer news
releases dated June18, 2018 and February 26,
2018). In the results released today 19 intersections with a
grade x thickness of > 10 GM including 15 intersections with
grade x thickness > 25 GM, 5 intersections with grade x
thickness > 50 GM and 3 intersections with grade x thickness
> 100 GM. (Refer figure 3, table 2).
The observed change in the plunge control of the higher grade
and wider parts of the Orebody Host Structure has positive
implications for interpreting and targeting additional shallow
mineralization further along the strike of the Orebody C structure
where clear potential exists for the identification and delineation
of additional high grade shoots below the C-Central and C-NW open
pits.
Results are reported from 8 infill holes targeting Orebody
C-Central along strike from Orebody C-SE (using the mine drill rig)
drilled as part of an ongoing drilling programme testing the
potential for additional shallow, structurally controlled
"payshoots" associated with the new plunge interpretation. Two
higher grade intersections are reported from this drilling
completed to date; 18.35 g/t Au over 8.76m (ETW 8.23m)
and 9.95g/t Au over 2.29m (ETW
2.0m). These two holes define a
high-grade plunging mineralized shoot, which extends over a strike
length currently estimated to be of the order of 50m in this area.
Further drilling and evaluation work targeting Orebodies C -
Central and C-NW is in progress with the aim of identifying and
delineating mineable material close to existing development that is
currently within 150m on Orebody C-SE
level 4. (Refer figure 4 and table 2).
Of Note, results and data from 18 infill drill holes out of the
46 infill drill hole results included in this report were drilled
after the database closed for the estimation at the end of 2018
Mineral Resources and Mineral Reserves. The hole numbers and
coordinate data for these 18 holes are included in Appendix 2.
Turmalina Gold Mine Drill Results and Intercepts
Table 1. Growth Exploration Drilling Results Orebody C.
(OREBODY – CSE)
Turmalina Gold
Mine
Growth Exploration Drill Results Ore Body C
|
Hole
ID
|
From
|
To
|
Down
Hole
Interval
(m)
|
Estimated True
Width (m)
|
Gold
Grade
(g/t)
|
GT
(ETW)
|
FTS1489
|
183.00
|
186.15
|
3.15
|
2.34
|
4.66
|
10.90
|
FTS1553
|
93.95
|
95.05
|
1.10
|
0.90
|
1.79
|
1.61
|
FTS1555
|
176.00
|
177.90
|
1.90
|
1.70
|
1.27
|
2.16
|
FTS1558
|
256.80
|
257.70
|
0.90
|
0.87
|
3.32
|
2.89
|
335.30
|
336.30
|
1.00
|
0.97
|
2.73
|
2.65
|
FTS1559
|
191.00
|
193.05
|
2.05
|
1.98
|
2.90
|
5.74
|
FTS1560
|
154.30
|
155.30
|
1.00
|
0.85
|
1.82
|
1.55
|
FTS1561
|
222.35
|
224.35
|
2.00
|
1.90
|
5.24
|
9.96
|
FTS1562
|
186.45
|
187.45
|
1.00
|
0.89
|
1.50
|
1.34
|
FTS1563
|
120.45
|
121.45
|
1.00
|
0.90
|
1.23
|
1.11
|
FTS1564
|
208.35
|
209.35
|
1.00
|
0.90
|
1.29
|
1.16
|
FTS1565
|
109.30
|
110.45
|
1.15
|
0.95
|
1.12
|
1.06
|
FTS1566
|
No impact
|
FTS1567
|
138.50
|
139.50
|
1.00
|
0.92
|
3.68
|
3.39
|
FTS1568
|
148.85
|
151.75
|
2.90
|
2.68
|
4.17
|
11.18
|
FTS1569
|
101.10
|
103.05
|
1.95
|
1.83
|
1.94
|
3.55
|
165.60
|
169.65
|
4.05
|
3.78
|
2.44
|
9.22
|
FTS1646
|
184.95
|
188.80
|
3.85
|
3.20
|
7.08
|
22.66
|
FTS1647
|
195.85
|
198.15
|
2.30
|
1.88
|
1.55
|
2.91
|
FTS1668
|
174.40
|
180.60
|
6.20
|
5.82
|
2.76
|
16.06
|
FTS1678
|
186.90
|
189.95
|
3.05
|
2.86
|
1.55
|
4.43
|
Table 2. Infill Drilling Results Orebody C –
Turmalina
Please note assay results reported in the tabulation below
were analyzed at Jaguar's Caeté Laboratory.
Turmalina Gold
Mine Infill Drill Results Ore Body C
|
Hole
ID
|
From
|
To
|
Down
hole
Interval
(m)
|
Estimated True
Width (m)
|
Gold
Grade
(g/t)
|
GT
(ETW)
|
Drilling
Company
|
FTS1537
|
No impact
|
JAGUAR
|
FTS1544*
|
65.20
|
72.38
|
7.18
|
6.99
|
2.78
|
19.43
|
JAGUAR
|
FTS1545*
|
74.95
|
79.10
|
4.15
|
3.75
|
7.57
|
28.39
|
JAGUAR
|
FTS1546*
|
67.70
|
69.80
|
2.10
|
1.80
|
4.44
|
7.99
|
JAGUAR
|
FTS1547A*
|
80.41
|
83.60
|
3.19
|
2.76
|
2.96
|
8.17
|
JAGUAR
|
FTS1574
|
82.54
|
85.44
|
2.90
|
2.58
|
2.80
|
7.22
|
JAGUAR
|
107.67
|
114.48
|
6.81
|
6.06
|
2.62
|
15.88
|
JAGUAR
|
FTS1627
|
77.79
|
80.42
|
2.63
|
2.58
|
3.55
|
9.16
|
JAGUAR
|
102.91
|
105.06
|
2.15
|
2.11
|
3.45
|
7.28
|
JAGUAR
|
FTS1628A
|
57.00
|
59.00
|
2.00
|
1.73
|
9.23
|
15.97
|
JAGUAR
|
73.00
|
75.00
|
2.00
|
1.63
|
5.13
|
8.36
|
JAGUAR
|
78.00
|
89.85
|
11.85
|
9.70
|
2.07
|
20.08
|
JAGUAR
|
94.60
|
96.00
|
1.40
|
1.23
|
4.73
|
5.82
|
JAGUAR
|
FTS1629
|
66.00
|
76.00
|
10.00
|
7.00
|
3.78
|
26.46
|
JAGUAR
|
82.00
|
88.00
|
6.00
|
4.24
|
8.41
|
35.66
|
JAGUAR
|
FTS1630
|
66.30
|
84.77
|
18.47
|
17.50
|
3.81
|
66.68
|
JAGUAR
|
FTS1631
|
56.73
|
73.00
|
16.27
|
14.95
|
3.82
|
57.11
|
JAGUAR
|
FTS1632
|
69.22
|
70.22
|
1.00
|
0.90
|
3.07
|
2.76
|
JAGUAR
|
FTS1649
|
21.80
|
35.03
|
13.23
|
11.45
|
1.72
|
19.69
|
JAGUAR
|
FTS1650
|
20.00
|
22.10
|
2.10
|
1.43
|
1.43
|
2.04
|
JAGUAR
|
27.35
|
29.39
|
2.04
|
1.76
|
2.50
|
4.40
|
JAGUAR
|
FTS1651
|
22.10
|
45.09
|
22.99
|
18.83
|
2.35
|
44.25
|
JAGUAR
|
FTS1652
|
29.34
|
58.97
|
29.63
|
22.69
|
5.76
|
130.69
|
JAGUAR
|
FTS1659
|
37.13
|
39.15
|
2.02
|
1.98
|
3.13
|
6.20
|
JAGUAR
|
42.23
|
43.27
|
1.04
|
1.02
|
4.68
|
4.77
|
JAGUAR
|
FTS1660
|
26.30
|
40.67
|
14.37
|
9.98
|
4.63
|
46.21
|
JAGUAR
|
FTS1661
|
20.70
|
33.67
|
12.97
|
9.17
|
1.61
|
14.76
|
JAGUAR
|
44.70
|
47.99
|
3.29
|
2.52
|
3.39
|
8.54
|
JAGUAR
|
FTS1662
|
32.82
|
50.72
|
17.90
|
15.65
|
5.03
|
78.72
|
JAGUAR
|
FTS1663
|
39.22
|
54.02
|
14.80
|
12.56
|
6.40
|
80.38
|
JAGUAR
|
59.68
|
68.07
|
8.39
|
7.03
|
2.72
|
19.12
|
JAGUAR
|
FTS1664
|
49.91
|
58.59
|
8.68
|
6.24
|
5.32
|
33.20
|
JAGUAR
|
63.22
|
76.45
|
13.23
|
9.51
|
7.79
|
74.08
|
JAGUAR
|
49.91
|
76.45
|
26.54
|
19.09
|
5.65
|
107.86
|
JAGUAR
|
FTS1682
|
48.28
|
52.08
|
3.80
|
2.95
|
1.23
|
3.63
|
JAGUAR
|
FTS1683
|
56.88
|
72.00
|
15.12
|
11.91
|
2.49
|
29.66
|
JAGUAR
|
78.94
|
79.63
|
0.69
|
0.54
|
20.35
|
10.99
|
JAGUAR
|
FTS1684
|
46.85
|
60.41
|
13.56
|
10.97
|
3.75
|
41.14
|
JAGUAR
|
65.83
|
68.61
|
2.78
|
2.19
|
8.42
|
18.44
|
JAGUAR
|
FTS1685
|
49.32
|
64.34
|
15.02
|
13.26
|
2.42
|
32.09
|
JAGUAR
|
FTS1686
|
54.10
|
58.01
|
3.91
|
3.51
|
4.56
|
16.01
|
JAGUAR
|
FTS1687
|
No impact
|
JAGUAR
|
FTS1688
|
43.32
|
46.17
|
2.85
|
2.77
|
2.09
|
5.79
|
JAGUAR
|
FTS1690*
|
66.90
|
74.85
|
7.95
|
7.20
|
2.00
|
14.40
|
JAGUAR
|
105.70
|
114.46
|
8.76
|
8.23
|
18.35
|
151.02
|
JAGUAR
|
FTS1691*
|
60.81
|
61.67
|
0.86
|
0.79
|
1.66
|
1.31
|
JAGUAR
|
81.38
|
82.36
|
0.98
|
0.83
|
1.51
|
1.25
|
JAGUAR
|
99.65
|
100.60
|
0.95
|
0.86
|
1.09
|
0.94
|
JAGUAR
|
FTS1692*
|
137.00
|
139.29
|
2.29
|
2.00
|
9.95
|
19.90
|
JAGUAR
|
FTS1693*
|
123.44
|
124.31
|
0.87
|
0.71
|
4.13
|
2.93
|
JAGUAR
|
FTS1717
|
100.18
|
102.20
|
2.02
|
1.90
|
6.20
|
11.78
|
JAGUAR
|
FTS1671
|
101.00
|
108.30
|
7.30
|
6.32
|
4.07
|
25.72
|
MAJOR
|
FTS1672
|
49.91
|
58.59
|
8.68
|
6.24
|
5.32
|
33.20
|
MAJOR
|
FTS1673
|
80.60
|
88.85
|
8.25
|
8.00
|
5.25
|
42.00
|
MAJOR
|
FTS1674
|
62.50
|
65.00
|
2.50
|
1.05
|
10.95
|
11.50
|
MAJOR
|
88.45
|
92.50
|
4.05
|
2.02
|
3.60
|
7.27
|
MAJOR
|
FTS1675
|
112.00
|
113.00
|
1.00
|
0.76
|
10.01
|
7.61
|
MAJOR
|
FTS1676
|
88.00
|
98.00
|
10.00
|
9.06
|
1.63
|
14.77
|
MAJOR
|
104.60
|
110.50
|
5.90
|
5.34
|
3.34
|
17.84
|
MAJOR
|
FTS1677
|
82.67
|
88.14
|
5.47
|
4.91
|
2.81
|
13.80
|
MAJOR
|
95.70
|
98.59
|
2.89
|
2.45
|
6.31
|
15.46
|
MAJOR
|
FTS1706
|
78.00
|
91.00
|
13.00
|
12.05
|
3.94
|
47.48
|
MAJOR
|
FTS1707
|
62.75
|
65.00
|
2.25
|
2.11
|
2.22
|
4.68
|
MAJOR
|
89.30
|
91.60
|
2.30
|
2.16
|
13.13
|
28.36
|
MAJOR
|
FTS1708
|
95.65
|
96.65
|
1.00
|
0.85
|
7.76
|
6.59
|
MAJOR
|
FTS1709
|
109.60
|
111.75
|
2.15
|
1.90
|
8.70
|
16.53
|
MAJOR
|
FTS1711
|
84.00
|
94.80
|
10.80
|
8.50
|
5.73
|
48.71
|
MAJOR
|
* Infill Drilling Results Orebody C - CENTRAL
Qualified Person
Scientific and technical information contained in this press
release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic
Geology - UCT), FAUSIMM, Senior Expert Advisor Geology and
Exploration to the Jaguar Mining Management Committee, who is also
an employee of Jaguar Mining Inc., and is a "qualified person" as
defined by National Instrument 43-101 - Standards of Disclosure
for Mineral Projects ("NI 43-101").
Quality Control
Jaguar continues to use a quality-control program that includes
insertion of blanks and commercial standards in order to ensure
best practice in sampling and analysis.
HQ, NQ, and BQ size drill core is sawn in half with a diamond
saw. Samples are selected for analysis in standard intervals
according to geological characteristics such as lithology and
hydrothermal alteration. All diamond drill hole collars are
accurately surveyed using a Total Station instrument and down-hole
deviations are surveyed using non-magnetic equipment (SPT Stockholm
Precision Tools with GyroMaster™ Solid State North Seeker) and
a Reflex Gyrosmart 642.
Mean grades are calculated using a variable lower grade cut-off
(generally 0.5g/t Au). No upper gold grade cut has been applied to
the data. However, the requirement for assay top cutting will be
assessed during future resource work.
Half of the sawed sample is forwarded to the analytical
laboratory for analysis while the remaining half of the core is
stored in a secure location. The drill core samples from growth
exploration drillholes are transported in securely sealed bags and
sent for physical preparation to the independent ALS Brazil
(subsidiary of ALS Global) laboratory located in Vespasiano, Minas
Gerais, Brazil. The analysis is
conducted at ALS Global's respective facilities (fire assay are
conducted by ALS Global in Lima,
Peru, and multi-elementary analysis are conducted by ALS
Global in Vancouver, Canada). ALS
has accreditation in a global management system that meets all
requirements of international standards ISO/IEC 17025:2005 and ISO
9001:2015. All major ALS geochemistry analytical laboratories are
accredited to ISO/IEC 17025:2005 for specific analytical
procedures.
The infill drilling results presented on this news release are
from drill holes completed by both Major
Drilling on contract and Jaguar Mining Inc´s own drilling
machines. The infill samples are transported for physical
preparation and analysis in securely sealed bags to the Jaguar
in-house laboratory located at the Roça Grande Mine, Caeté, Minas
Gerais.
For a complete description of Jaguar's sample preparation,
analytical methods and QA/QC procedures, please refer to the
"Technical Report on the Roça Grande and Pilar Operations, Minas
Gerais State, Brazil", a copy
of which is available on the Company's SEDAR profile at
www.sedar.com.
The Iron Quadrangle
The Iron Quadrangle has been an area of mineral exploration
dating back to the 16th century. The discovery in 1699–1701 of gold
contaminated with iron and platinum-group metals in the
southeastern corner of the Iron Quadrangle gave rise to the name of
the town Ouro Preto (Black Gold).
The Iron Quadrangle contains world-class multi-million-ounce gold
deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds
the second largest gold land position of a gold producer in the
Iron Quadrangle with just over 25,000 hectares.
About Jaguar Mining Inc.
Jaguar Mining Inc. is a Canadian-listed junior gold mining,
development, and exploration company operating in Brazil with three gold mining complexes and a
large land package with significant upside exploration potential
from mineral claims covering an area of approximately 64,000
hectares. The Company's principal operating assets are located in
the Iron Quadrangle, a prolific greenstone belt in the state of
Minas Gerais and include the Turmalina Gold Mine Complex and Caeté
Mining Complex (Pilar and Roça Grande
Mines, and Caeté Plant). The Company also owns the Paciência
Gold Mine Complex, which has been on care and maintenance since
2012. The Roça Grande Mine has been on temporary care and
maintenance since April 2018.
Additional information is available on the Company's website at
www.jaguarmining.com.
Forward-Looking Statements
Certain statements in this news release constitute
"forward-looking information" within the meaning of applicable
Canadian securities legislation. Forward-looking statements and
information are provided for the purpose of providing information
about management's expectations and plans relating to the future.
All of the forward-looking information set forth in this news
release is qualified by the cautionary statements below and those
made in our other filings with the securities regulators in
Canada. Forward-looking
information contained in forward-looking statements can be
identified by the use of words such as "are expected", "is
forecast", "is targeted," "approximately," "plans," "anticipates,"
"projects," "continue," "estimate," "believe," or variations of
such words and phrases or statements that certain actions, events
or results "may," "could," "would," "might," or "will" be taken,
occur or be achieved. All statements, other than statements of
historical fact, may be considered to be or include forward-looking
information. These forward-looking statements are made as of the
date of this news release and the dates of technical reports, as
applicable. This news release contains forward-looking information
regarding potential and, among other things, expected future
mineral resources, potential mineral production opportunities,
geological and mineral exploration statistics, ore grades, current
and expected future assay results, and
definition/delineation/exploration drilling at the Pilar Gold Mine
and the Turmalina Gold Mine in Brazil, as well as forward-looking information
regarding costs of production, capital expenditures, costs and
timing of the development of projects and new deposits, success of
exploration, development and mining activities, capital
requirements, project studies, mine life extensions, and continuous
improvement initiatives. The Company has made numerous assumptions
with respect to forward-looking information contained herein,
including, among other things, assumptions about the estimated
timeline and for the development of the drill program at the Pilar
Gold Mine (and its expanded exploration footprint) and the
Turmalina Gold Mine; its mineral properties; the supply and demand
for, and the level and volatility of the price of, gold; the
accuracy of reserve and resource estimates and the assumptions on
which the reserve and resource estimates are based; the receipt of
necessary permits; market competition; ongoing relations with
employees and impacted communities; and political and legal
developments in any jurisdiction in which the Company operates
being consistent with its current expectations including, without
limitation, the impact of any potential power rationing, tailings
facility regulation, exploration and mine operating licenses and
permits being obtained and renewed and/or there being adverse
amendments to mining or other laws in Brazil and any changes to general business and
economic conditions. Forward-looking information involves a number
of known and unknown risks and uncertainties, including among
others: the risk of Jaguar not meeting its plans regarding its
operations and financial performance; uncertainties with respect to
the price of gold, labor disruptions, mechanical failures, increase
in costs, environmental compliance and change in environmental
legislation and regulation, weather delays and increased costs or
production delays due to natural disasters, power disruptions,
procurement and delivery of parts and supplies to the operations;
uncertainties inherent to capital markets in general (including the
sometimes volatile valuation of securities and an uncertain ability
to raise new capital) and other risks inherent to the gold
exploration, development and production industry, which, if
incorrect, may cause actual results to differ materially from those
anticipated by the Company and described herein. In addition, there
are risks and hazards associated with the business of gold
exploration, development, mining and production, including without
limitation environmental hazards, tailings dam failures, industrial
accidents and workplace safety problems, unusual or unexpected
geological formations, pressures, cave-ins, flooding, chemical
spills, and gold bullion thefts and losses (and the risk of
inadequate insurance, or the inability to obtain insurance, to
cover these risks). Although we have attempted to identify
important factors that could cause actual actions, events or
results to differ materially from those described in
forward-looking statements, there may be other factors that cause
actions, events or results not to be as anticipated, estimated or
intended. There can be no assurance that forward-looking statements
will prove to be accurate, as actual results and future events
could differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on
forward-looking information.
Appendix 1
Drill Hole location data for holes reported in this
Press-Release - Orebody C Growth Exploration Drilling.
Hole
ID
|
Easting
(m)
|
Northing
(m)
|
Elevation
(m)
|
Total
Depth
(m)
|
Collar
Azimuth
(°)
|
Collar
Dip (°)
|
Date
|
Orebody
|
Drilling
Company
|
Technical
Report-
2019
|
FTS1489
|
513131.08
|
7817115.40
|
340.1
|
230.65
|
247.92
|
-51.17
|
9/5/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1553
|
513300.41
|
7817178.30
|
64.35
|
180.10
|
229.35
|
-34.32
|
7/3/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1555
|
513131.92
|
7817115.11
|
340.26
|
248.75
|
224.94
|
-70.27
|
17/05/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1558
|
513299.24
|
7817179.45
|
65.62
|
337.30
|
261.19
|
11.57
|
25/06/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1559
|
513301.02
|
7817180.56
|
63.59
|
271.50
|
295.06
|
-76.84
|
31/07/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1560
|
513300.02
|
7817179.61
|
63.53
|
201.65
|
265.86
|
-45.48
|
7/8/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1561
|
513299.76
|
7817179.92
|
64.62
|
253.95
|
270.98
|
-10.51
|
29/06/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1562
|
513300.49
|
7817180.39
|
63.72
|
284.90
|
285.17
|
-64.49
|
18/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1563
|
513301.00
|
7817180.76
|
63.69
|
263.80
|
301.44
|
-67.50
|
18/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1564
|
513301.57
|
7817181.16
|
63.48
|
330.15
|
324.08
|
-78.53
|
24/08/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1565
|
513300.45
|
7817180.19
|
63.64
|
227.55
|
278.64
|
-54.83
|
17/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1566
|
513300.72
|
7817180.64
|
63.74
|
270.00
|
293.83
|
-56.44
|
19/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1567
|
513300.79
|
7817177.40
|
64.17
|
164.85
|
214.09
|
-20.79
|
5/9/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1568
|
513301.27
|
7817176.97
|
64.15
|
171.10
|
201.08
|
-18.82
|
6/9/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1569
|
513301.85
|
7817176.12
|
63.97
|
195.20
|
188.00
|
-17.82
|
13/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1646
|
513301.71
|
7817176.12
|
64.14
|
204.90
|
180.02
|
-16.42
|
26/09/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1647
|
513302.35
|
7817175.89
|
64.14
|
247.05
|
172.71
|
-12.36
|
17/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1668
|
513302.38
|
7817176.71
|
63.52
|
207.50
|
168.87
|
-36.20
|
23/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1678
|
513301.15
|
7817176.61
|
64.84
|
232.35
|
192.36
|
-2.13
|
25/10/2018
|
Corpo CSE
|
MAJOR
|
YES
|
Appendix 2
Drill Hole location data for holes reported in this
Press-Release Infill Drilling Orebody C (C-SE and
C-CENTRAL).
Hole
ID
|
Easting
(m)
|
Northing
(m)
|
Elevation
(m)
|
Total
Depth
(m)
|
Collar
Azimuth
(°)
|
Collar
Dip (°)
|
Date
|
Orebody
|
Drilling
Company
|
Technical
Report-
2019
|
FTS1537
|
512761.01
|
7817072.58
|
487.80
|
72.86
|
188.86
|
-34.63
|
16/01/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1544
|
512741.90
|
7816981.58
|
481.28
|
83.70
|
84.29
|
-16.43
|
28/05/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1545
|
512742.43
|
7816981.30
|
481.19
|
125.24
|
6.38
|
-29.07
|
18/05/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1546
|
512741.59
|
7816981.65
|
481.21
|
77.88
|
41.02
|
-33.95
|
18/05/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1547A
|
512741.75
|
7816981.59
|
481.25
|
111.59
|
18.31
|
-34.18
|
25/06/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1574
|
512929.31
|
7816980.17
|
494.69
|
131.22
|
286.01
|
-64.67
|
29/05/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1627
|
513050.38
|
7817004.04
|
342.60
|
111.85
|
225.00
|
18.29
|
9/7/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1628A
|
513049.91
|
7816986.66
|
341.73
|
120.98
|
262.15
|
3.24
|
20/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1629
|
513050.14
|
7816986.40
|
341.67
|
110.19
|
254.78
|
3.08
|
19/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1630
|
513049.65
|
7816986.92
|
341.54
|
96.85
|
250.19
|
4.96
|
10/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1631
|
513049.89
|
7816986.62
|
341.53
|
91.10
|
235.71
|
4.84
|
10/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1632
|
513050.19
|
7816986.39
|
341.53
|
84.95
|
224.80
|
4.38
|
9/11/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1649
|
512946.20
|
7816896.99
|
415.32
|
46.35
|
2.46
|
30.58
|
12/9/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1650
|
512946.78
|
7816896.76
|
415.35
|
45.45
|
26.76
|
30.00
|
12/9/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1651
|
512949.31
|
7816896.09
|
414.86
|
61.09
|
340.14
|
18.42
|
5/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1652
|
512948.89
|
7816896.25
|
414.85
|
79.95
|
329.38
|
13.22
|
5/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1659
|
512949.22
|
7816895.77
|
413.24
|
65.44
|
55.08
|
-12.71
|
24/09/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1660
|
512949.82
|
7816895.92
|
413.97
|
65.25
|
31.69
|
-14.16
|
5/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1661
|
512949.46
|
7816896.13
|
414.07
|
69.03
|
10.20
|
-11.00
|
4/12/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1662
|
512946.40
|
7816897.05
|
413.69
|
75.20
|
353.58
|
-13.57
|
16/10/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1663
|
512945.87
|
7816897.25
|
413.76
|
85.81
|
342.69
|
-10.79
|
15/10/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1664
|
512945.46
|
7816897.41
|
413.82
|
96.63
|
335.16
|
-8.57
|
17/10/2018
|
Corpo CSE
|
JAGUAR
|
YES
|
FTS1682
|
513051.17
|
7816985.58
|
341.83
|
71.51
|
207.79
|
4.68
|
27/11/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1683
|
513049.74
|
7816986.74
|
341.00
|
92.95
|
263.72
|
-12.82
|
6/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1684
|
513050.62
|
7816985.94
|
341.27
|
84.35
|
255.01
|
-17.08
|
6/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1685
|
513051.00
|
7816985.85
|
341.31
|
77.59
|
244.84
|
-16.88
|
7/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1686
|
513051.33
|
7816985.77
|
341.32
|
82.87
|
231.49
|
-20.97
|
11/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1687
|
513051.30
|
7816985.20
|
341.10
|
66.99
|
210.47
|
-22.11
|
11/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1688
|
513051.75
|
7816984.84
|
341.12
|
75.79
|
186.22
|
-22.64
|
11/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1690
|
512781.32
|
7817136.22
|
495.03
|
137.48
|
254.76
|
-45.08
|
9/11/2018
|
Corpo CCE
|
JAGUAR
|
YES
|
FTS1691
|
512781.30
|
7817135.65
|
495.14
|
121.00
|
232.62
|
-47.85
|
17/01/2019
|
Corpo CCE
|
JAGUAR
|
NO
|
FTS1692
|
512781.26
|
7817136.57
|
495.26
|
148.35
|
272.70
|
-39.78
|
22/01/2019
|
Corpo CCE
|
JAGUAR
|
NO
|
FTS1693
|
512781.27
|
7817136.80
|
495.36
|
175.81
|
282.49
|
-34.30
|
22/01/2019
|
Corpo CCE
|
JAGUAR
|
NO
|
FTS1717
|
513020.74
|
7817055.05
|
345.09
|
132.55
|
266.11
|
-16.66
|
12/12/2018
|
Corpo CSE
|
JAGUAR
|
NO
|
FTS1671
|
513024.73
|
7817051.82
|
344.79
|
154.75
|
177.71
|
-22.34
|
5/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1672
|
513024.00
|
7817053.23
|
345.14
|
131.90
|
196.30
|
-27.58
|
6/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1673
|
513023.23
|
7817053.59
|
345.11
|
119.75
|
215.24
|
-31.15
|
12/8/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1674
|
513022.47
|
7817054.16
|
344.91
|
118.40
|
241.44
|
-28.76
|
11/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1675
|
513021.44
|
7817055.10
|
345.06
|
133.50
|
262.68
|
-20.39
|
12/12/2018
|
Corpo CSE
|
MAJOR
|
YES
|
FTS1676
|
513025.11
|
7817052.90
|
344.95
|
145.80
|
168.32
|
-29.78
|
29/11/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1677
|
513024.43
|
7817052.77
|
344.79
|
125.65
|
183.16
|
-34.14
|
29/11/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1706
|
513023.67
|
7817053.47
|
344.90
|
112.80
|
202.84
|
-39.76
|
1/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1707
|
513022.37
|
7817054.27
|
344.80
|
126.00
|
240.13
|
-39.76
|
28/11/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1708
|
513021.89
|
7817054.53
|
344.80
|
114.50
|
252.27
|
-35.83
|
1/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1709
|
513021.16
|
7817055.22
|
344.85
|
126.40
|
266.23
|
-27.86
|
13/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
FTS1711
|
513024.23
|
7817053.32
|
344.77
|
123.55
|
188.29
|
-46.70
|
13/12/2018
|
Corpo CSE
|
MAJOR
|
NO
|
Ben Guenther, Interim Chief
Executive Officer, Jaguar Mining Inc., bguenther@jaguarmining.com,
416-847-1854; Hashim Ahmed, Chief
Financial Officer, Jaguar Mining Inc.,
hashim.ahmed@jaguarmining.com, 416-847-1854