| Federal Communications Commission
Washington, D.C. 20554
September 29, 2023
VIA E-MAIL
Jeffrey Blum
Executive Vice President
External and Legislative Affairs
1110 Vermont Avenue NW
Suite 750
Washington, DC 20005
Re: DISH’s Buildout Submission and Proposed Testing Methodology; Monitoring DISH’s
Compliance with Conditions Granting an Extension of Time to Complete Construction of
Facilities and Buildout Commitments, WT Docket No. 22-212
Dear Mr. Blum:
As part of DISH’s involvement in the T-Mobile-Sprint transaction, and in connection with
DISH’s related applications for an extension of time to complete construction of its facilities for its AWS-4, Lower 700 MHz E Block, and AWS H Block licenses, DISH committed to construct a nationwide 5G
broadband network.1
The DISH Commitments, which were imposed as license conditions, required
DISH to meet certain “concrete milestones,” including a set of “Band-Specific 5G Deployment
Commitments” and “Nationwide 5G Commitments.”2
On July 14, 2023, DISH submitted its status report
with detailed information on its compliance with these obligations as of June 14, 2023,3
and on September
25, 2023, DISH submitted a White Paper describing its proposed methodology for demonstrating
compliance with one of the nationwide 5G commitments that must be verified by drive tests.
As detailed below, and based on our review of your submission, the Wireless
Telecommunications Bureau (Bureau) finds that DISH has met its band-specific 5G commitments and
two of its three nationwide 5G commitments, and the Bureau accepts DISH’s proposed drive test
methodology for verifying compliance with the remaining nationwide 5G commitment. The Bureau will
evaluate compliance with the remaining commitment once DISH submits its drive test results consistent
1
Letter from Jeffrey H. Blum, Senior Vice President, Public Policy and Government Affairs, DISH, to Donald
Stockdale, Chief, Wireless Telecommunications Bureau, WT Docket No. 18-197, Attach. A (filed July 26, 2019)
(DISH Commitments); see also Applications of T-Mobile US, Inc., and Sprint Corporation for Consent to Transfer
Control of Licenses and Authorizations, and Applications of American H Block Wireless L.L.C., DBSD
Corporation, Gamma Acquisition L.L.C., and Manifest Wireless L.L.C. for Extension of Time, WT Docket No. 18-
197, Memorandum Opinion and Order, Declaratory Ruling, and Order of Proposed Modification, 34 FCC Rcd
10579, 10747, 10829, paras. 394–98 and Appx. H (T-Mobile-Sprint Order); Applications of American H Block
Wireless L.L.C., DBSD Corporation, Gamma Acquisition L.L.C., and Manifest Wireless L.L.C. for Extension of
Time, ULS File Nos. 0008741236, 0008741420, 0008741603, and 0008741789 et al., Order of Modification and
Extension of Time to Construct, 35 FCC Rcd 9580, 9587–88, 9598–9605, para. 13 and Appx. B, Attach. A (WTB
2020) (DISH License Modification Order).
2 T-Mobile-Sprint Order, 34 FCC Rcd at 10747, 10834–35, paras. 394–98 and Appx. H, Attach. A; DISH License
Modification Order, 35 FCC Rcd at 9587–88, 9598–99, para. 13 and Appx. B.
3
DISH Network Corporation 5G Buildout Status Report, WT Docket No. 22-212 (filed July 14, 2023). |