UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 6-K

 

Report of Foreign Private Issuer

Pursuant to Rule 13a-16 or 15d-16

UNDER the Securities Exchange Act of 1934

 

For the month of February 25, 2025

 

Commission File Number: 001-39766

 

ORLA MINING LTD.

(Translation of registrant's name into English)

 

1010-1075 West Georgia Street

Vancouver, BC

V6E 3C9

(Address of principal executive offices)

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

 

Form 20-F    ☐   Form 40-F    ☒

 

 

 

 

 
 

SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

    ORLA MINING LTD..
        
Date: February 25, 2025    /s/ Etienne Morin
 

Name: Etienne Morin

Title:   Chief Financial Officer



 

 

   

 

 
 

 

EXHIBIT INDEX

 

 

Exhibit   Description of Exhibit
     
99.1   Press Release dated February 25, 2025

Exhibit 99.1

 

News Release 

Orla Mining Intersects High Grade Oxide Gold at South Carlin Complex and Advances Permitting for South Railroad Project in Nevada

34.7 m at 2.68 g/t Au, incl. 13.6 m at 5.85 g/t (Oxide) – Dark Star
55.2 m at 1.04 g/t Au incl. 11.3 m at 2.86 g/t Au (Oxide) – Pinion
65.5 m at 1.16 g/t Au, Incl. 10.7m at 2.60 g/t Au (Oxide) – Bowl

VANCOUVER, BC, Feb. 25, 2025 /CNW/ - Orla Mining Ltd. (TSX: OLA) (NYSE: ORLA) ("Orla" or the "Company") is pleased to provide additional exploration results from the 2024 South Carlin Complex program along with permitting progress for the South Railroad Project (the "Project").

Highlights:

  • Dark Star and Pinion project targets (Central Area): Multiple high-grade intersections within and beyond the feasibility study open pits demonstrate clear potential to expand resources and reserves at Dark Star and Pinion.
  • Oxide targets (South Area): Shallow drilling along soil geochemistry anomalies has revealed extensive gold-bearing structural trends highlighting significant potential to expand oxide resources to support the future heap leach operation.
  • Sulphide targets (North Area): Drill holes testing the extension of the North Bullion deposit, as well as Skarn-type targets returned significant mineralization, setting the stage for high-priority follow up drilling.
  • Ambitious 2025 exploration program planned with $15 million investment to accelerate resource growth and new discoveries at South Carlin Complex.
  • Significant permitting advances and water rights secured for the South Railroad Project.
  • South Carlin Resource & Reserve estimate and Technical Report update expected to be completed in the second half of 2025.
  • Considerable project advancement with awarding of Engineering, Procurement, and Construction Management (EPCM) contract to M3 Engineering & Technology Corp., and commencement of basic engineering.

"The South Railroad Project has exceeded our expectations since its acquisition in 2022 and subsequent expansion in 2024, which formed the larger the South Carlin Complex. Each drilling campaign has not only validated our geological model but also uncovered new high-grade and near-surface oxide mineralization across multiple targets. These excellent results strengthen our confidence in the untapped potential of the South Carlin Complex, supporting long-term resource growth and positioning it as an emerging Nevada gold district with significant potential for sustainable value creation."

– Sylvain Guerard, Orla's Senior Vice President, Exploration

 

Figure 1: South Carlin Complex drill results, H2 2024. (CNW Group/Orla Mining Ltd.)

 

Figure 2: Dark Star and Pinon 2024 drill holes. (CNW Group/Orla Mining Ltd.)

Dark Star Deposit – Extending oxide gold mineralization 75m down dip and 85m along strike

Additional drilling near the Dark Star deposit returned significant oxide results. Drillhole DSC24-02 returned 2.68 g/t Au (Ox) over 34.7 m including 5.85 g/t Au over 13.6 m (Ox), confirming the continuity of significant oxide mineralization between the projected open pit an     d previously reported results of 0.67 g/t Au over 45.7 m (Ox) including 1.24 g/t Au over 12.2 m (Ox) located approximately 100 m to the NE (see October 31, 2024 news release; Figure 3, 4, and 5).

Drilling on the west side of the southern open pit intersected narrower, lower-grade oxide-hosted gold mineralization (e.g., 1.41 g/t Au over 7.1 m (Ox)), confirming that mineralization extends westward. In 2025, Orla intends to continue focusing on defining the continuity of wider, higher-grade gold mineralization below the northern Dark Star open pit.

Dark Star Extension Drilling Results (Drillhole and Assay Results)

DSC24-02

incl.

2.68 g/t Au over 34.7 m (Ox)

5.85 g/t Au over 13.6 m (Ox)

DSC24-03 1.41 g/t Au over 7.6 m (Ox)

 

 

Figure 3: Dark Star long section, looking west (CNW Group/Orla Mining Ltd.)

 

Figure 4: Dark Star North long section, looking west. (CNW Group/Orla Mining Ltd.)

 

Figure 5: Cross section along DSC24-02, looking north. (CNW Group/Orla Mining Ltd.)

Pinion Deposit – Enhancing oxide gold mineralization

Recent drilling at the Pinion Deposit focused on the southeast extension, yielding higher-grade results than adjacent historical holes, including 1.04 g/t Au over 55.2 m (Ox), with 2.86 g/t Au over 11.1 m (Figure 6). These results reinforce the mineral resource growth potential and enhance the continuity of oxide gold mineralization in the southeast extension. In addition to exploration drilling, water wells were drilled to support the permitting process, with assay samples collected during drilling. Two water holes completed within the known deposit returned significant in-pit results, including PRMW24-03A: 60.0 m at 1.68 g/t Au, including 4.6 m at 13.67 g/t Au. These assay results confirm and align with historical drill hole results while also underscoring the potential to define local controls on higher-grade mineralization within the Pinion Deposit.

Pinion Drilling Results (Drillhole and Assay Results)

PC24-02

incl.

1.04 g/t Au over 55.2 m (Ox)

2.86 g/t Au over 11.1 m (Ox)

PRMW24-03

incl.

0.81 g/t Au over 30.5 m (Ox)

1.83 g/t Au over 10.7 m (Ox)

PRMW24-03A

incl.

incl.

1.54 g/t Au over 74.7 m (Ox)

7.46 g/t Au over 9.1 m (Ox)

13.67 g/t Au over 4.6 m (Ox)

 

 

Figure 6: Pinion vertical cross section, looking northeast (CNW Group/Orla Mining Ltd.)

Shallow Oxide Mineralization (South Area):

Gold deposits across the broader Railroad District are controlled by northwest-southeast and north-south structures and their intersections. From Jasperoid Wash to the southern property boundary (the South Area), anomalous gold-in-soil geochemistry defines a network of these auriferous structures, with a cumulative strike length of 15 km (Figure 7). The 2024 exploration program drill tested these soil anomalies, returning shallow oxide intersections, in some cases starting from surface. These results confirm the association between gold-in-soil anomalies and auriferous structures while also suggesting significant potential for oxide resource growth in the South Area.

Jasperoid Wash Extension: A series of holes drilled east of the main north-south Jasperoid Wash deposit intersected positive shallow oxide mineralization, indicating potential for a pit extension. Notable drill highlights include 30.5m at 0.40 g/t Au (oxide) from 1.5 meters (Hole JW24-11) and 39.6m at 0.25 g/t Au (oxide) from 0.0 meters (Hole JW24-07) down holes.

New shallow oxide drill intersections from the Robinson, Stallion-Bowl Trend, Mustang, and Appaloosa targets reinforce the relationship between auriferous structures and gold-in soil anomalies. Orla is encouraged by these early exploration results which highlight further potential for oxide resource growth. Orla intends to continue testing the South Area in 2025.

 

Figure 7: South Area Drill Results and Au-in-Soil trends (CNW Group/Orla Mining Ltd.)

At the Bowl Zone, one hole (BW24-01) was drilled within the Bowl Deposit, located within the recently acquired Pony Creek property. The drilling was conducted to gain fresh insights into the geology, level of oxidation, and the control and style of mineralization. The results were highly positive, exceeding expectations, with an intersection of 65.5 m at 1.16 g/t Au, including 10.7 m at 2.60 g/t Au and 7.6 m at 2.13 g/t (Ox, Figure 8)). This new intersection has reinforced Orla's confidence in the quality of the deposit and the potential to add additional oxide resources by testing potential open extensions to the northwest and southeast. Follow-up drilling at the Bowl Zone is planned as part of the 2025 program.

 

Figure 8: Bowl Vertical Cross Section, Looking Northwest (CNW Group/Orla Mining Ltd.)

North Bullion Deposit Extension and Skarn Targets (North Area)

Three holes were completed at North Bullion to provide key information supporting the continuity of shallow sulphide mineralization Hole RR24-03 intersected 41.1 m at 1.89 g/t Au (Sx), including 21.3 m at 2.28 g/t Au, within the resource's open pit. This result enhances confidence in the extent and continuity of the shallow sulphide mineralization. Exploration drilling, consisting of step-outs along the northwest trend controlling high-grade sulphide gold mineralization, is planned for 2025. Positive results from the planned step-out holes hope to significantly expand the extent of the mineralized zone and confirm resource growth potential.

Approximately three kilometres southwest of North Bullion, polymetallic skarn mineralization was intersected in one of three holes completed in the Skarn target area. Field work – including geochemical rock sampling, geological mapping, and geophysical survey interpretation – led to the definition of a high-priority skarn target. This target is supported by multiple recent high-grade surface rock samples, with individual samples returning grades up to 24% copper, 790 g/t silver (one over limit assay >1,500 g/t Ag pending), 9.4% zinc and 5.8% lead (one over limit assay >20% Pb pending) over a well-defined 900 metre x 600 metre alteration zone with sulphide minerals (bornite, chalcocite, sphalerite and pyrrhotite) in outcrop, overlying a high magnetic anomaly (Figure 9). The coincident alteration footprint, sulphide minerals and magnetic anomaly suggest potential to define copper skarn mineralization. Drilling to further test this target is planned for 2025.

2025 Exploration Drill Programs

Orla's 2024 South Carlin exploration program totaled 19,009 metres of drilling. For 2025, the Company plans to maintain an active exploration program with a $15 million program to include the following activities:

  1. 10,000 metres of drilling focused on near-deposit targets (Dark Star and Pinion), aiming to expand resources and potentially extend the projected open pits.
  2. 8,000 metres of drilling targeting the northern (Pod-Sweet Hollow, North Bullion) and southern (Jasperoid Wash, Robinson, Bowl) areas to define new shallow oxide gold mineralization.

South Railroad Project Update

The South Railroad Project, situated on federal land, is currently advancing under the guidance of the US Bureau of Land Management (BLM) in accordance with the National Environmental Policy Act (NEPA) for permitting. The Environmental Impact Statement (EIS) contractor is finalizing the Supplemental Environmental Reports (SERs) required by the BLM prior to issuing the Notice of Intent (NOI).  The Company anticipates all SERs will be finalized in the first quarter 2025.

The NOI is expected to be published in the first half of 2025, with the Company targeting a Record of Decision (final permitting decision) by mid-2026. Following this approval, construction on the South Railroad Project would commence, with first gold production anticipated in 2027.

The Company has a comprehenisve water strategy and has begun securing consumptive water rights required for the Project.  The Company also has a strategy to meet the sage grouse mitigation requirements under the State of Nevada Sagebrush Ecosystem Program (SEP).

At the state level, the Company has received Class I and II Air Operating Permits. Applications have been prepared for the Water Pollution Control Permit and the National Pollutant Discharge Elimination System (NPDES) discharge permit, which will be submitted after the NOI in 2025.

The Engineering, Procurement, and Construction Management (EPCM) contract has been awarded to M3 Engineering & Technology Corp. Basic engineering has commenced and will proceed throughout 2025 and 2026 to support the start of construction following the Record of Decision. Long-lead equipment will be identified, with purchase orders potentially beginning in 2025.

Qualified Persons Statement

The scientific and technical information in this news release with respect to the 2024 drilling programs has been reviewed and approved by Mr. Sylvain Guerard, P Geo., SVP Exploration of the Company, and with respect to permitting matters has been reviewed and approved by Mr. Andrew Cormier, Chief Operating Officer of the Company, each of whom is a Qualified Person as defined under the definitions of National Instrument 43-101 ("NI 43-101").

To verify the information related to the 2024 drilling programs at the South Railroad property, Mr. Guerard has visited the property in the past year; discussed logging, sampling, and sample shipping processes with responsible site staff; discussed and reviewed assay and QA/QC results with responsible personnel; and reviewed supporting documentation, including drill hole location and orientation and significant assay interval calculations.

Quality Assurance / Quality Control –2024 Drill Program

Gold results from 2024 drillholes at the South Carlin Complex were obtained by fire assay fusion and absorption emission finish (FA430) at Bureau Veritas Mineral Laboratories in Sparks, Nevada, USA. Over limit gold assays were determined using fire assay fusion with gravimetric finish (FA530). Gold cyanide extraction was determined using a 1-hour cyanide leach (CN403) conducted in either Sparks, Nevada, or Hermosillo, Mexico. All other elements were determined by 4-acid dissolution with ICP-OES+MS method (MA200).

Quality Assurance/Quality Control and interpretation of results were performed by qualified persons employing a Quality Assurance/Quality Control program consistent with NI 43-101 and industry best practices. Certified reference material (standards), blank, or rig duplicate were inserted approximately every tenth sample for Quality Assurance/Quality Control purposes by the Company. Bureau Veritas Mineral Laboratories is independent of Orla. There are no known drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the drilling data at the South Carlin Complex.

True width of a composites depends on sufficient geological information to determine orientation of mineralization. The true width in Pinion ranges from 70 to 98% of core length. At Dark Star true width ranges from 54% to 66% of core length. True width in Jasperoid Wash ranges from 66 to 99%. The true width of the mineralization in Skarn, Pony Creek intercepts cannot be estimated based on current information.

For additional information on the Company's previously reported drill results, see the Company's press releases dated February 8, 2023 (Orla Mining Drills Significant Gold Intersections at Multiple Oxide Targets upon Reactivation of Exploration at South Railroad Project, Nevada), March 7, 2024 (Orla Mining Drills Oxide Mineralization Outside Projected Open Pits at South Railroad Project in Nevada), April 4, 2024 (Orla Confirms Strong Carlin-Type Gold Mineralization at North Bullion Deposit and Defines New Drill Targets across the South Railroad Project) and October 31, 2024 (Orla Provides Exploration and Permitting Update at South Railroad Project). For additional information on South Railroad, see the technical report entitled "South Railroad Project, Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada" dated March 23, 2022, which is available on Orla's website at www.orlamining.com, and on SEDAR+ and EDGAR under the Company's profile at www.sedarplus.ca and www.sec.gov, respectively. For additional information on the Pony Creek Project, or additional information, please see Contact Gold Corp.'s ("Contact") technical report for Pony Creek entitled "Technical Report and Maiden Mineral Resource Estimate, Pony Creek Property, Elko Country, Nevada, USA" with an effective date of February 24, 2022, available on Contact's profile on SEDAR+ at www.sedarplus.ca.

About Orla Mining Ltd.

Orla's corporate strategy is to acquire, develop, and operate mineral properties where the Company's expertise can substantially increase stakeholder value. The Company has two material gold projects: (1) Camino Rojo, located in Zacatecas State, Mexico and (2) South Railroad, located in Nevada, United States. Orla is operating the Camino Rojo Oxide Gold Mine, a gold and silver open-pit and heap leach mine. The property is 100% owned by Orla and covers over 139,000 hectares which contains a large oxide and sulphide mineral resource. Orla is also developing the South Railroad Project, a feasibility-stage, open pit, heap leach gold project located on the Carlin trend in Nevada. Orla has also entered into a definitive agreement with a subsidiary of Newmont Corporation to acquire the Musselwhite Mine, located in Ontario, Canada. This transaction is subject to certain conditions and is expected to close in the first quarter of 2025. The technical reports for the Company's material projects are available on Orla's website at www.orlamining.com, and on SEDAR+ and EDGAR under the Company's profile at www.sedarplus.ca and www.sec.gov, respectively.

Forward-looking Statements

This news release contains certain "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities legislation and within the meaning of Section 27A of the United States Securities Act of 1933, as amended, Section 21E of the United States Exchange Act of 1934, as amended, the United States Private Securities Litigation Reform Act of 1995, or in releases made by the United States Securities and Exchange Commission, all as may be amended from time to time, including, without limitation, statements regarding: the potential mineralization at the South Carlin Complex based on the 2024 drill program; the Company's 2025 drill program at the South Carlin Complex, including the cost, timing and results thereof; the timing of resource, reserve and technical report updates; and the Company's proposed transaction for the Musselwhite Mine and the closing thereof. Forward-looking statements are statements that are not historical facts which address events, results, outcomes or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve a number of risks and uncertainties. Certain material assumptions regarding such forward-looking statements were made, including without limitation, assumptions regarding: the future price of gold and silver; anticipated costs and the Company's ability to fund its programs; the Company's ability to carry on exploration, development, and mining activities; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; currency exchange rates remaining as estimated; prices for energy inputs, labour, materials, supplies and services remaining as estimated; the Company's ability to secure and to meet obligations under property agreements, including the layback agreement with Fresnillo plc; that all conditions of the Company's credit facility will be met; the timing and results of drilling programs; mineral reserve and mineral resource estimates and the assumptions on which they are based; the discovery of mineral resources and mineral reserves on the Company's mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide mineral resource at the Camino Rojo Project and develop the entire Camino Rojo Project mineral resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company's ability to operate in a safe, efficient, and effective manner; the Company's ability to obtain financing as and when required and on reasonable terms; that the Company's activities will be in accordance with the Company's public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: uncertainty and variations in the estimation of mineral resources and mineral reserves; the Company's dependence on the Camino Rojo oxide mine; risks related to the Company's indebtedness; risks related to exploration, development, and operation activities; foreign country and political risks, including risks relating to foreign operations; risks related to the Company's proposed transaction with Newmont Corporation for the Musselwhite Mine; risks related to the Cerro Quema Project; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; delays in or failures to enter into a subsequent agreement with Fresnillo plc with respect to accessing certain additional portions of the mineral resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the mineral resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold and silver; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company's securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company's limited operating history; litigation risks; the Company's ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company's foreign subsidiaries; risks related to the Company's accounting policies and internal controls; the Company's ability to satisfy the requirements of Sarbanes-Oxley Act of 2002; enforcement of civil liabilities; the Company's status as a passive foreign investment company for U.S. federal income tax purposes; information and cyber security; the Company's significant shareholders; gold industry concentration; shareholder activism; other risks associated with executing the Company's objectives and strategies; as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis, as well as its annual information form dated March 19, 2024, which are available on www.sedarplus.ca and www.sec.gov. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.

Cautionary Note to U.S. Readers

This news release has been prepared in accordance with Canadian standards for the reporting of mineral resource and mineral reserve estimates, which differ from the previous and current standards of the United States securities laws. In particular, and without limiting the generality of the foregoing, the terms "mineral reserve", "proven mineral reserve", "probable mineral reserve", "inferred mineral resources,", "indicated mineral resources," "measured mineral resources" and "mineral resources" used or referenced herein and the documents incorporated by reference herein, as applicable, are Canadian mineral disclosure terms as defined in accordance with Canadian National Instrument 43-101 — Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") — CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the "CIM Definition Standards").

For United States reporting purposes, the United States Securities and Exchange Commission (the "SEC") has adopted amendments to its disclosure rules (the "SEC Modernization Rules") to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the Exchange Act, which became effective February 25, 2019. The SEC Modernization Rules more closely align the SEC's disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7. Issuers were required to comply with the SEC Modernization Rules in their first fiscal year beginning on or after January 1, 2021. As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multi-jurisdictional disclosure system, the Corporation is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Definition Standards. Accordingly, mineral reserve and mineral resource information contained or incorporated by reference herein may not be comparable to similar information disclosed by United States companies subject to the United States federal securities laws and the rules and regulations thereunder.

As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources." In addition, the SEC has amended its definitions of "proven mineral reserves" and "probable mineral reserves" to be "substantially similar" to the corresponding CIM Definition Standards that are required under NI 43-101. While the SEC will now recognize "measured mineral resources", "indicated mineral resources" and "inferred mineral resources", U.S. investors should not assume that all or any part of the mineralization in these categories will be converted into a higher category of mineral resources or into mineral reserves without further work and analysis. Mineralization described using these terms has a greater amount of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, U.S. investors are cautioned not to assume that all or any measured mineral resources, indicated mineral resources, or inferred mineral resources that the Company reports are or will be economically or legally mineable without further work and analysis. Further, "inferred mineral resources" have a greater amount of uncertainty and as to whether they can be mined legally or economically. Therefore, U.S. investors are also cautioned not to assume that all or any part of inferred mineral resources will be upgraded to a higher category without further work and analysis. Under Canadian securities laws, estimates of "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies, except in rare cases. While the above terms are "substantially similar" to CIM Definitions, there are differences in the definitions under the SEC Modernization Rules and the CIM Definition Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules or under the prior standards of SEC Industry Guide 7.

Appendix: Drill Results

Table 1: Composite Drill Results (Composites Ox/Tr 0.17g/t Au cog & Sx 0.50g/t Au cog)

HOLE-ID From
(m)
To
(m)
Core
Length
(m)
True
Width
Au
(g/t)
CN
Rec
(%)
Au
GXM
Oxide
Domain
Including
0.5g/t Au COG
Including
1g/t Au COG
Including
2g/t Au COG
Including
10g/t Au HG
AP24-02 146.30 164.59 18.3 N/C 0.25 71.2 4.53 Oxide 1.52m @ 0.59g/t Au & 
91.2% CN Rec
     
AP24-02 195.07 196.60 1.5 N/C 0.21 81.7 0.32 Oxide        
AP24-02 201.17 202.69 1.5 N/C 0.18 79.5 0.27 Oxide        
AP24-02 205.74 207.26 1.5 N/C 0.18 90.4 0.27 Oxide        
AP24-04 19.81 21.34 1.5 N/C 0.17 80.9 0.26 Oxide        
AP24-04 150.88 153.92 3.0 N/C 1.59 1.3 4.85 Sulphide   1.52m @ 2.41g/t Au & 
0.6% CN Rec
1.52m @ 2.41g/t Au &
0.6% CN Rec
 
AP24-04 160.02 163.07 3.0 N/C 1.05 10.1 3.21 Sulphide   3.05m @ 1.05g/t Au &
10.1% CN Rec
   
AP24-04 175.26 176.78 1.5 N/C 0.23 57.8 0.34 Oxide        
AP24-04 178.31 179.83 1.5 N/C 0.17 40.7 0.26 Oxide        
AP24-04 188.98 192.02 3.0 N/C 0.35 60.7 1.07 Oxide 1.52m @ 0.52g/t Au & 
67.6% CN Rec
     
AP24-06 131.06 132.59 1.5 N/C 1.11 46.0 1.69 Oxide  1.52m @ 1.11g/t Au &
46% CN Rec
1.52m @ 1.11g/t Au &
46% CN Rec
   
AP24-06 132.59 137.16 4.6 N/C 0.58 13.7 2.67 Sulphide        
AP24-06 138.68 140.21 1.5 N/C 1.19 42.2 1.81 Oxide 1.52m @ 1.18g/t Au & 
42.2% CN Rec
1.52m @ 1.18g/t Au & 
42.2% CN Rec
   
BW24-01 103.63 105.16 1.5 N/C 0.23 99.1 0.35 Oxide        
BW24-01 112.78 178.31 65.5 N/C 1.16 96.0 76.07 Oxide 50.29m @ 1.46g/t Au & 
96% CN Rec
12.19m @ 2.41g/t Au &
97.2% CN Rec
24.38m @ 1.57g/t Au &
98.2% CN Rec
10.67m @ 2.6g/t Au &
97.8% CN Rec
7.62m @ 2.13g/t Au &
98.3% CN Rec
 
BW24-01 184.40 187.45 3.0 N/C 0.30 98.6 0.91 Oxide        
BW24-01 190.50 192.02 1.5 N/C 0.22 93.8 0.34 Oxide        
BW24-01 196.60 198.12 1.5 N/C 0.34 99.7 0.52 Oxide        
BW24-01 210.31 211.84 1.5 N/C 0.21 95.2 0.32 Oxide        
DS24-11 199.64 201.17 1.5 N/C 0.95 92.6 1.45 Oxide 1.52m @ 0.95g/t Au & 
92.6% CN Rec
     
DS24-12 201.17 210.31 9.1 N/C 1.08 9.7 9.86 Sulphide   9.14m @ 1.08g/t Au &
9.7% CN Rec
1.52m @ 2.14g/t Au &
10.3% CN Rec
 
DS24-12 240.79 243.84 3.0 N/C 1.89 35.0 5.77 Sulphide   3.05m @ 1.89g/t Au &
35% CN Rec
1.52m @ 2.27g/t Au &
39.6% CN Rec
 
DS24-12 252.98 254.51 1.5 N/C 4.16 24.5 6.34 Sulphide   1.52m @ 4.16g/t Au &
24.5% CN Rec
1.52m @ 4.16g/t Au &
24.5% CN Rec
 
DS24-12 254.51 256.03 1.5 N/C 0.40 82.9 0.61 Oxide        
DS24-12 257.56 262.13 4.6 N/C 0.61 24.0 2.79 Sulphide        
DS24-12 358.14 365.76 7.6 N/C 1.05 9.0 8.01 Sulphide   1.52m @ 2.37g/t Au &
5.5% CN Rec
1.52m @ 2.37g/t Au &
5.5% CN Rec
 
DSC24-02 160.63 195.38 34.7 18.62 2.68 92.8 92.99 Oxide  20.42m @ 4g/t Au &
86.6% CN Rec
13.56m @ 5.85g/t Au &
80.7% CN Rec
11.28m @ 6.85g/t Au &
77.4% CN Rec
2.74m @ 11.93g/t Au & 
93.9% CN Rec
DSC24-03 89.00 90.53 1.5 1.05 0.26 97.3 0.39 Oxide        
DSC24-03 207.26 215.49 8.2 5.47 0.24 77.0 1.94 Oxide        
DSC24-03 221.59 229.21 7.6 5.07 1.41 81.0 10.76 Oxide  6.1m @ 1.69g/t Au &
76.4% CN Rec
6.1m @ 1.69g/t Au & 
76.4% CN Rec
1.52m @ 3.52g/t Au &
100% CN Rec
 
DSC24-03 284.38 285.45 1.1 0.70 1.00 42.0 1.07 Oxide  1.07m @ 1g/t Au &
42% CN Rec
1.07m @ 1g/t Au &
42% CN Rec
   
DSC24-03 288.04 289.56 1.5 1.00 0.86 16.4 1.30 Sulphide        
DSC24-04 85.04 86.56 1.5 N/C 0.62 46.8 0.94 Oxide 1.52m @ 0.62g/t Au & 
46.8% CN Rec
     
DSC24-04 93.57 103.78 10.2 N/C 0.36 90.2 3.68 Oxide 2.59m @ 0.56g/t Au & 
97.7% CN Rec
     
DSC24-04 112.47 133.35 20.9 N/C 0.34 86.4 7.09 Oxide 1.68m @ 0.71g/t Au & 
77% CN Rec
1.68m @ 0.6g/t Au &
97.7% CN Rec
     
DSC24-04 192.94 194.46 1.5 N/C 0.54 46.6 0.82 Oxide 1.52m @ 0.54g/t Au &
46.6% CN Rec
     
DSC24-04 200.56 202.08 1.5 N/C 0.31 65.6 0.46 Oxide        
DSC24-04 208.18 209.70 1.5 N/C 0.25 52.6 0.38 Oxide        
DSC24-04 247.80 250.85 3.0 N/C 1.11 45.0 3.37 Oxide 3.05m @ 1.11g/t Au & 
45% CN Rec
1.52m @ 1.68g/t Au &
43.6% CN Rec
   
DSC24-04 258.47 259.99 1.5 N/C 0.62 24.3 0.94 Sulphide        
DSC24-04 270.66 272.19 1.5 N/C 0.68 13.3 1.03 Sulphide        
DSC24-04 279.81 284.38 4.6 N/C 0.61 12.1 2.81 Sulphide        
ELT24-01 118.87 120.40 1.5 N/C 0.26 76.9 0.40 Oxide        
ELT24-03 99.06 111.25 12.2 N/C 0.20 89.2 2.38 Oxide        
JW24-02 102.11 105.16 3.0 2.08 0.33 64.7 1.01 Oxide        
JW24-02 108.20 109.73 1.5 1.04 0.18 67.8 0.27 Oxide        
JW24-02 114.30 115.82 1.5 1.04 0.20 51.3 0.30 Oxide        
JW24-06 47.24 48.77 1.5 1.00 0.19 63.5 0.29 Oxide        
JW24-06 192.02 193.55 1.5 1.14 0.32 52.5 0.49 Oxide        
JW24-07 0.00 39.62 39.6 39.07 0.25 68.2 9.82 Oxide        
JW24-07 45.72 70.10 24.4 23.63 0.21 76.5 5.15 Oxide        
JW24-08 1.52 9.14 7.6 7.51 0.27 85.7 2.04 Oxide        
JW24-08 60.96 62.48 1.5 1.50 0.17 97.7 0.27 Oxide        
JW24-09 6.10 16.76 10.7 10.51 0.22 85.8 2.30 Oxide        
JW24-10 10.67 12.19 1.5 1.50 0.23 87.7 0.35 Oxide        
JW24-11 1.52 32.00 30.5 29.26 0.40 92.9 12.22 Oxide 12.19m @ 0.52g/t Au &
94% CN Rec
     
JW24-11 45.72 57.91 12.2 11.95 0.18 93.2 2.15 Oxide        
JW24-11 65.53 71.63 6.1 5.97 0.19 90.1 1.19 Oxide        
JW24-11 77.72 79.25 1.5 1.49 0.21 66.7 0.32 Oxide        
JW24-12 35.05 36.58 1.5 1.50 0.22 60.5 0.33 Oxide        
JW24-12 41.15 42.67 1.5 1.49 0.19 46.4 0.30 Oxide        
JW24-12 47.24 48.77 1.5 1.49 0.22 54.8 0.33 Oxide        
JW24-12 54.86 57.91 3.0 2.98 0.20 50.0 0.61 Oxide        
JW24-12 74.68 86.87 12.2 11.89 0.22 60.5 2.62 Oxide        
JW24-13 12.19 25.91 13.7 13.51 0.23 90.5 3.16 Oxide        
JW24-13 32.00 35.05 3.0 3.00 0.42 96.2 1.29 Oxide        
JW24-13 50.29 54.86 4.6 4.46 0.20 95.3 0.91 Oxide        
JW24-13 70.10 77.72 7.6 7.38 0.21 100.0 1.61 Oxide        
JW24-14 3.05 6.10 3.0 3.00 0.20 80.4 0.62 Oxide        
JW24-14 13.72 15.24 1.5 1.50 0.30 92.7 0.46 Oxide        
JW24-15 1.52 4.57 3.0 2.99 0.25 88.3 0.75 Oxide        
JW24-15 25.91 42.67 16.8 16.45 0.19 95.4 3.14 Oxide        
JW24-16 3.05 6.10 3.0 3.00 0.26 86.5 0.78 Oxide        
JW24-16 24.38 25.91 1.5 1.49 0.24 100.0 0.36 Oxide        
JW24-16 83.82 91.44 7.6 7.41 0.32 86.3 2.45 Oxide 1.52m @ 0.55g/t Au & 
96.7% CN Rec
     
JW24-17 62.48 64.01 1.5 1.49 0.17 46.0 0.27 Oxide        
JW24-17 71.63 73.15 1.5 1.49 0.18 93.4 0.28 Oxide        
JW24-17 89.92 91.44 1.5 1.50 0.23 100.0 0.35 Oxide        
JW24-18 9.14 12.19 3.0 2.99 0.21 96.3 0.65 Oxide        
JW24-18 30.48 51.82 21.3 20.87 0.20 81.8 4.25 Oxide        
JW24-18 60.96 68.58 7.6 7.41 0.40 78.9 3.03 Oxide 1.52m @ 1.15g/t Au & 
93.2% CN Rec
1.52m @ 1.15g/t Au &
93.2% CN Rec
   
JW24-19 35.05 41.15 6.1 5.99 0.24 95.0 1.45 Oxide        
JW24-19 73.15 74.68 1.5 1.49 0.20 83.3 0.31 Oxide        
JW24-19 86.87 88.39 1.5 1.48 0.24 78.8 0.37 Oxide        
MU24-03 59.44 73.15 13.7 N/C 0.28 73.5 3.79 Oxide 1.52m @ 0.58g/t Au &
78.8% CN Rec
     
PC24-02 130.15 185.32 55.2 38.56 1.04 75.2 57.10 Oxide 26.82m @ 0.77g/t Au &
75.3% CN Rec
12.04m @ 2.67g/t Au &
81.4% CN Rec
3.51m @ 1.53g/t Au & 
70.6% CN Rec
11.13m @ 2.86g/t Au & 
80.5% CN Rec
9.6`m @ 3.02g/t Au &
79.7% CN Rec
 
PRMW24-02 57.91 59.44 1.5 1.45 0.18 72.6 0.27 Oxide        
PRMW24-02 71.63 73.15 1.5 1.46 0.19 100.0 0.29 Oxide        
PRMW24-02 109.73 111.25 1.5 1.46 0.28 97.5 0.42 Oxide        
PRMW24-03 96.01 126.49 30.5 28.65 0.81 91.4 24.74 Oxide 12.19m @ 1.69g/t Au & 84.6% CN Rec
1.52m @ 0.51g/t Au & 100.0% CN Rec
10.67m @ 1.83g/t Au &
88.6% CN Rec
4.57m @ 2.93g/t Au &
87.6% CN Rec
 
PRMW24-03 146.30 172.21 25.9 24.35 0.31 79.9 7.93 Oxide 1.52m @ 0.52g/t Au & 93% CN Rec
3.05m @ 0.59g/t Au & 73.9% CN Rec
     
PRMW24-03A 83.82 89.92 6.1 5.96 0.21 61.3 1.25 Oxide        
PRMW24-03A 114.30 188.98 74.7 72.81 1.54 75.6 115.26 Oxide 25.91m @ 1.21g/t Au &
72.2% CN Rec
7.62m @ 0.64g/t Au &
67.4% CN Rec
9.14m @ 7.46g/t Au &
86.8% CN Rec
1.52m @ 1.21g/t Au &
63.6% CN Rec
7.62m @ 1.67g/t Au & 
76.8% CN Rec
7.62m @ 1.64g/t Au &
67% CN Rec
9.14m @ 7.46g/t Au &
86.8% CN Rec
1.52m @ 1.21g/t Au &
63.6% CN Rec
1.52m @ 2.18g/t Au &
87.1% CN Rec
1.52m @ 3.9g/t Au &
79.6% CN Rec
4.57m @ 13.67g/t Au &
94.5% CN Rec
4.57m @ 13.67g/t Au &
94.5% CN Rec
PS24-01 16.76 39.62 22.9 N/C 0.21 56.2 4.91 Oxide        
RBN24-01 1.52 3.05 1.5 N/C 0.19 62.8 0.29 Oxide        
RBN24-01 22.86 38.10 15.2 N/C 0.17 65.4 2.62 Oxide        
RBN24-01 54.86 60.96 6.1 N/C 0.20 57.7 1.20 Oxide        
RBN24-01 71.63 77.72 6.1 N/C 0.17 72.4 1.06 Oxide        
RBN24-02 74.68 76.20 1.5 N/C 0.22 67.3 0.34 Oxide        
RBN24-03 112.78 114.30 1.5 N/C 0.23 52.9 0.35 Oxide        
RBN24-05 15.24 16.76 1.5 N/C 0.30 73.6 0.46 Oxide        
RBN24-05 24.38 33.53 9.1 N/C 0.46 64.9 4.22 Oxide 4.57m @ 0.59g/t Au &
64.9% CN Rec
1.52m @ 1.06g/t Au &
79.6% CN Rec
   
RBN24-05 45.72 62.48 16.8 N/C 0.21 71.2 3.49 Oxide        
RBN24-06 28.96 30.48 1.5 N/C 0.18 87.4 0.28 Oxide        
RBN24-06 38.10 44.20 6.1 N/C 0.21 85.2 1.26 Oxide        
RBN24-06 64.01 68.58 4.6 N/C 0.21 86.9 0.94 Oxide        
RBN24-07 10.67 16.76 6.1 N/C 0.18 55.1 1.13 Oxide        
RBN24-08 1.52 4.57 3.0 N/C 0.20 91.9 0.61 Oxide        
RBN24-08 48.77 50.29 1.5 N/C 0.26 95.8 0.40 Oxide        
RBN24-08 59.44 60.96 1.5 N/C 0.19 99.0 0.29 Oxide        
RBN24-08 179.83 181.36 1.5 N/C 0.18 98.9 0.28 Oxide        
RR24-02 35.05 36.58 1.5 N/C 1.92 0.8 2.92 Sulphide   1.52m @ 1.92g/t Au &
0.8% CN Rec
   
RR24-02 123.44 128.02 4.6 N/C 0.94 1.7 4.31 Sulphide   1.52m @ 1.22g/t Au &
1.2% CN Rec
   
RR24-03 152.40 193.55 41.1 N/C 1.89 5.7 77.88 Sulphide   33.53m @ 2.17g/t Au &
5.9% CN Rec
21.34m @ 2.28g/t Au &
6.2% CN Rec
3.05m @ 2.09g/t Au &
3.6% CN Rec
 
ST24-01 7.62 9.14 1.5 N/C 0.23 80.0 0.34 Oxide        
ST24-02 1.52 3.05 1.5 N/C 0.28 96.8 0.43 Oxide        
ST24-03 9.14 56.39 47.2 N/C 0.19 78.6 8.88 Oxide        
ST24-06 64.01 65.53 1.5 N/C 0.20 97.4 0.30 Oxide        
ST24-06 67.06 68.58 1.5 N/C 0.17 87.7 0.26 Oxide        
ST24-06 77.72 79.25 1.5 N/C 0.20 95.0 0.30 Oxide        
ST24-06 83.82 85.34 1.5 N/C 0.17 87.7 0.26 Oxide        
ST24-06 86.87 88.39 1.5 N/C 0.17 92.0 0.27 Oxide        
ST24-07 38.10 39.62 1.5 N/C 0.21 84.1 0.33 Oxide        
ST24-07 42.67 44.20 1.5 N/C 0.17 74.7 0.27 Oxide        
ST24-07 45.72 47.24 1.5 N/C 0.22 64.2 0.33 Oxide        
ST24-07 83.82 85.34 1.5 N/C 0.18 66.3 0.28 Oxide        
ST24-07 88.39 89.92 1.5 N/C 0.46 77.8 0.71 Oxide        
ST24-10 16.76 42.67 25.9 N/C 0.28 85.1 7.26 Oxide 1.52m @ 0.67g/t Au &
84.1% CN Rec
1.52m @ 0.93g/t Au &
85.7% CN Rec
     
ST24-10 56.39 57.91 1.5 N/C 0.23 82.6 0.35 Oxide        
ST24-11 19.81 21.34 1.5 N/C 0.28 60.5 0.43 Oxide        
ST24-11 32.00 38.10 6.1 N/C 0.17 64.0 1.06 Oxide        
ST24-11 70.10 71.63 1.5 N/C 0.38 75.5 0.59 Oxide        
ST24-11 85.34 99.06 13.7 N/C 0.64 83.8 8.76 Oxide 9.14m @ 0.78g/t Au & 
84.3% CN Rec
1.52m @ 1.2g/t Au &
74.2% CN Rec
   

 

Criteria: Cut off grade Ox/Tr 0.17g/t Au & Sx 0.50g/t Au, minimum length 1.5m, maximum consecutive internal waste 6m
N/C : not calculated due to insufficent control on orientation of mineralization

 


Table 2: Skarn Target Drill Results

HOLE-ID From
(m)
To
(m)
Core
Length
(m)
Au g/t Ag g/t Cu
%
Pb
%
Zn
%
Mo
ppm
Including & Including & Including
RRB24-01 1.52 57.91 56.4 0.03 21.1 0.22 0.10 0.39 134 36.6m @ 0.04g/t Au,
30.9g/t Ag, 0.33% Cu,
0.15% Pb, 0.58% Zn,
188ppm Mo
 1.5m @ 0.03g/t Au,
68.4g/t Ag, 0.12% Cu,
0.47% Pb, 0.36% Zn,
911ppm Mo
 9.1m @ 0.09g/t Au,
75.5g/t Ag, 1.12% Cu,
0.27% Pb, 1.65% Zn,
240ppm Mo
 1.5m @ 0.12g/t Au, 354g/t Ag,
4.55% Cu, 0.59% Pb,
1.46% Zn, 751ppm Mo
RRB24-03 30.48 33.53 3.0 0.02 3.9 0.06 <0.005 0.04 2      
RRB24-03 54.86 64.01 9.1 0.00 3.1 0.06 0.01 0.11 3      
RRB24-03 73.15 100.58 27.4 0.01 9.6 0.11 0.03 0.12 8  9.1m @ 0.01g/t Au,
16g/t Ag, 0.2% Cu,
0.05% Pb, 0.24% Zn,
3ppm Mo
   
RRB24-03 118.87 128.02 9.1 0.01 4.5 0.13 0.01 0.05 11      
RRB24-03 451.10 461.16 10.1 0.05 3.6 0.02 0.09 0.08 22      


 

Table 3: South Carlin Complex Drill Hole Collars

Drillhole Target Hole type Grid Easting Northing Elevation Azimuth Dip Depth
(m)
AP24-01 Appaloosa RC NAD27 / UTM zone 11N 587127.5 4468346.38 2164.1 160.0 -60.0 198.1
AP24-02 Appaloosa RC NAD27 / UTM zone 11N 587015.9 469312.57 215.4 180.0 -50.0 268.2
AP24-03 Appaloosa RC NAD27 / UTM zone 11N 587211.2 4468458.64 2153.0 300.0 -60.0 198.1
AP24-04 Appaloosa RC NAD27 / UTM zone 11N 586928.5 4469108.94 2214.9 90.0 -60.0 202.7
AP24-05 Appaloosa RC NAD27 / UTM zone 11N 587018.2 4469314.39 2215.3 55.0 -60.0 213.4
AP24-06 Appaloosa RC NAD27 / UTM zone 11N 587011.5 4469310.70 2215.5 245.0 -60.0 213.4
BW24-01 Bowl RC NAD27 / UTM zone 11N 586296.6 4466953.96 2180.2 210.0 -70.0 228.6
DS24-07 Dark Star RC NAD27 / UTM zone 11N 588265.8 4480330.97 1987.1 270.0 -60.0 365.8
DS24-08 Dark Star RC NAD27 / UTM zone 11N 588300.6 4480146.54 1978.6 270.0 -60.0 320.0
DS24-09 Dark Star RC NAD27 / UTM zone 11N 588198.6 4480352.21 2001.3 270.0 -60.0 335.3
DS24-10 Dark Star RC NAD27 / UTM zone 11N 588169.7 4479972.49 2003.3 242.0 -65.0 335.3
DS24-11 Dark Star RC NAD27 / UTM zone 11N 587505.1 4479481.19 2033.5 85.0 -55.0 243.8
DS24-12 Dark Star RC NAD27 / UTM zone 11N 587501.3 4479481.51 2033.5 40.0 -63.0 365.8
DSC24-01 Dark Star DD NAD27 / UTM zone 11N 588298.7 4480219.28 1983.6 270.0 -60.0 356.6
DSC24-02 Dark Star DD NAD27 / UTM zone 11N 588172.9 4479973.98 2002.7 270.0 -70.0 320.0
DSC24-03 Dark Star DD NAD27 / UTM zone 11N 587705.6 4479637.52 2029.6 77.0 -55.0 289.6
DSC24-04 Dark Star DD NAD27 / UTM zone 11N 587704.5 4479638.91 2029.7 180.0 -80.0 289.6
ELT24-01 Elliot Dome RC NAD27 / UTM zone 11N 586011.1 4473779.44 2617.7 270.0 -60.0 237.7
ELT24-02 Elliot Dome RC NAD27 / UTM zone 11N 586169.1 4473651.96 2610.5 270.0 -60.0 254.5
ELT24-03 Elliot Dome RC NAD27 / UTM zone 11N 586186.4 4472948.05 2610.1 270.0 -60.0 313.9
ELT24-04 Elliot Dome RC NAD27 / UTM zone 11N 586249.8 4474044.38 2596.4 270.0 -60.0 176.8
JW24-01 Jasperoid Wash RC NAD27 / UTM zone 11N 585300.9 4473619.82 2431.9 230.0 -60.0 198.1
JW24-02 Jasperoid Wash RC NAD27 / UTM zone 11N 585389.4 4473742.67 2467.5 230.0 -60.0 198.1
JW24-03 Jasperoid Wash RC NAD27 / UTM zone 11N 585400.0 4473744.77 2467.8 50.0 -60.0 198.1
JW24-04 Jasperoid Wash RC NAD27 / UTM zone 11N 585596.5 4473835.12 2548.2 135.0 -60.0 88.4
JW24-05 Jasperoid Wash RC NAD27 / UTM zone 11N 585567.8 4473582.43 2540.4 135.0 -60.0 129.5
JW24-06 Jasperoid Wash RC NAD27 / UTM zone 11N 585561.7 4473596.46 2539.7 305.0 -60.0 198.1
JW24-07 Jasperoid Wash RC NAD27 / UTM zone 11N 585531.4 4473168.30 2542.2 45.0 -70.0 91.4
JW24-08 Jasperoid Wash RC NAD27 / UTM zone 11N 585231.4 4472944.54 2454.1 45.0 -70.0 91.4
JW24-09 Jasperoid Wash RC NAD27 / UTM zone 11N 585216.1 4473053.78 2463.8 45.0 -70.0 91.4
JW24-10 Jasperoid Wash RC NAD27 / UTM zone 11N 585186.9 4472861.45 2418.2 45.0 -70.0 91.4
JW24-11 Jasperoid Wash RC NAD27 / UTM zone 11N 585151.2 4472943.29 2419.5 45.0 -70.0 91.4
JW24-12 Jasperoid Wash RC NAD27 / UTM zone 11N 585141.3 4473063.19 2437.3 45.0 -70.0 91.4
JW24-13 Jasperoid Wash RC NAD27 / UTM zone 11N 585085.5 4473060.05 2409.0 45.0 -70.0 91.4
JW24-14 Jasperoid Wash RC NAD27 / UTM zone 11N 585124.0 4473408.41 2424.9 45.0 -70.0 91.4
JW24-15 Jasperoid Wash RC NAD27 / UTM zone 11N 585092.9 4472851.66 2381.5 45.0 -70.0 91.4
JW24-16 Jasperoid Wash RC NAD27 / UTM zone 11N 585089.2 4472941.39 2392.1 45.0 -70.0 91.4
JW24-17 Jasperoid Wash RC NAD27 / UTM zone 11N 585009.2 4473053.21 2377.2 45.0 -70.0 91.4
JW24-18 Jasperoid Wash RC NAD27 / UTM zone 11N 585001.5 4472940.51 2358.0 45.0 -70.0 91.4
JW24-19 Jasperoid Wash RC NAD27 / UTM zone 11N 584997.5 4472844.62 2342.6 45.0 -70.0 91.4
MU24-01 Mustang RC NAD27 / UTM zone 11N 587109.1 4470099.37 2243.0 80.0 -50.0 298.7
MU24-02 Mustang RC NAD27 / UTM zone 11N 586669.8 4470507.25 2360.6 235.0 -45.0 65.5
MU24-03 Mustang RC NAD27 / UTM zone 11N 586856.6 4470281.99 2289.3 235.0 -55.0 243.8
PC24-02 Pinion DD NAD27 / UTM zone 11N 585197.0 4478681.72 2087.4 345.0 -78.0 228.6
PRMW24-01 Pinion PZ NAD27 / UTM zone 11N 584510.3 4479225.52 2130.8 0.0 -90.0 142.6
PRMW24-02 Pinion PZ NAD27 / UTM zone 11N 584349.4 4479486.77 2093.7 0.0 -90.0 126.5
PRMW24-03 Pinion PZ NAD27 / UTM zone 11N 585012.5 4479336.60 2200.0 0.0 -90.0 187.5
PRMW24-03A Pinion RC NAD27 / UTM zone 11N 584975.4 4479408.26 2200.9 0.0 -90.0 193.5
PS24-01 Pony Spur RC NAD27 / UTM zone 11N 584761.3 4468777.83 2027.9 320.0 -65.0 74.7
PS24-02 Pony Spur RC NAD27 / UTM zone 11N 584868.0 4468312.86 2047.3 200.0 -60.0 149.4
PS24-03 Pony Spur RC NAD27 / UTM zone 11N 584342.5 4468821.19 2032.7 30.0 -50.0 149.4
PS24-04 Pony Spur RC NAD27 / UTM zone 11N 584579.9 4468960.56 1982.6 220.0 -50.0 152.4
PTR24-01 Porter RC NAD27 / UTM zone 11N 587576.9 4473293.70 2315.5 90.0 -60.0 301.8
PTR24-02 Porter RC NAD27 / UTM zone 11N 587841.4 4473342.36 2270.0 45.0 -50.0 6.1
PTR24-02A Porter RC NAD27 / UTM zone 11N 587835.7 4473344.42 2270.5 45.0 -50.0 24.4
PTR24-02B Porter RC NAD27 / UTM zone 11N 587835.7 4473344.42 2270.5 45.0 -50.0 301.8
RBN24-01 Robinson RC NAD27 / UTM zone 11N 585285.0 4471679.02 2203.0 65.0 -60.0 198.1
RBN24-02 Robinson RC NAD27 / UTM zone 11N 585289.3 4471680.19 2203.0 240.0 -70.0 301.8
RBN24-03 Robinson RC NAD27 / UTM zone 11N 585828.0 4471418.77 2265.0 240.0 -70.0 128.0
RBN24-03B Robinson RC NAD27 / UTM zone 11N 585828.0 4471418.77 2265.0 240.0 -70.0 326.1
RBN24-04 Robinson RC NAD27 / UTM zone 11N 585836.4 4471417.47 2264.6 65.0 -60.0 198.1
RBN24-05 Robinson RC NAD27 / UTM zone 11N 585578.9 4471244.95 2204.8 240.0 -70.0 274.3
RBN24-06 Robinson RC NAD27 / UTM zone 11N 585590.5 4471248.27 2205.9 65.0 -60.0 198.1
RBN24-07 Robinson RC NAD27 / UTM zone 11N 585087.7 4471538.98 2155.4 235.0 -60.0 198.1
RBN24-08 Robinson RC NAD27 / UTM zone 11N 585092.9 4471543.21 2155.7 65.0 -60.0 198.1
RR24-01 North Bullion RC NAD27 / UTM zone 11N 584858.8 4488442.50 2064.3 314.0 -65.0 249.9
RR24-02 North Bullion RC NAD27 / UTM zone 11N 584863.5 4488606.85 2028.3 335.0 -68.0 249.9
RR24-03 North Bullion RC NAD27 / UTM zone 11N 584865.8 4488606.94 2028.4 165.7 -56.0 231.6
RRB24-01 Skarn RC NAD27 / UTM zone 11N 583570.2 4485519.84 2413.1 260.0 -65.0 659.9
RRB24-02 Skarn RC NAD27 / UTM zone 11N 581088.0 4486319.93 2340.2 220.0 -65.0 396.2
RRB24-03 Skarn RC NAD27 / UTM zone 11N 583135.6 4484606.97 2276.4 162.0 -60.0 461.2
RRC24-01 North Bullion RC/DD NAD27 / UTM zone 11N 584889.6 4489054.09 1968.6 230.0 -60.0 279.5
RRC24-02 North Bullion RC/DD NAD27 / UTM zone 11N 584887.8 4489054.18 1968.7 200.0 -80.0 213.4
ST24-01 Stallion Bowl RC NAD27 / UTM zone 11N 585860.9 4469469.35 2178.9 90.0 -60.0 198.1
ST24-02 Stallion Bowl RC NAD27 / UTM zone 11N 585883.6 4469607.74 2130.7 60.0 -60.0 249.9
ST24-03 Stallion RC NAD27 / UTM zone 11N 585796.1 4470125.21 2171.5 120.0 -50.0 149.4
ST24-04 Stallion RC NAD27 / UTM zone 11N 586031.6 4470268.59 2303.6 250.0 -60.0 173.7
ST24-05 Stallion RC NAD27 / UTM zone 11N 586047.1 4470069.15 2235.5 280.0 -68.0 118.9
ST24-06 Stallion RC NAD27 / UTM zone 11N 586064.5 4469941.61 2177.5 280.0 -60.0 198.1
ST24-07 Stallion RC NAD27 / UTM zone 11N 585802.4 4469984.67 2130.4 90.0 -50.0 198.1
ST24-08 Stallion RC NAD27 / UTM zone 11N 585836.2 4469826.44 2101.7 90.0 -60.0 198.1
ST24-09 Stallion Bowl RC NAD27 / UTM zone 11N 586181.9 4467850.68 2209.3 90.0 -60.0 198.1
ST24-10 Stallion Bowl RC NAD27 / UTM zone 11N 586275.8 4468031.32 2261.5 90.0 -60.0 198.1
ST24-11 Stallion Bowl RC NAD27 / UTM zone 11N 586196.8 4468686.25 2310.6 90.0 -60.0 198.1

 

SOURCE Orla Mining Ltd.

 

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2025/25/c2900.html

%CIK: 0001680056

For further information: For further information, please contact: Jason Simpson, President & Chief Executive Officer; Andrew Bradbury, Vice President, Investor Relations & Corporate Development, www.orlamining.com, infoatorlamining.com

CO: Orla Mining Ltd.

CNW 06:00e 25-FEB-25


Orla Mining (AMEX:ORLA)
Historical Stock Chart
From Feb 2025 to Mar 2025 Click Here for more Orla Mining Charts.
Orla Mining (AMEX:ORLA)
Historical Stock Chart
From Mar 2024 to Mar 2025 Click Here for more Orla Mining Charts.