The following table lists unplanned and planned production
outages at U.S. refineries as reported by Dow Jones Newswires. The
information is compiled from both official and unofficial refining
sources and doesn't purport to be a comprehensive list.
On Saturday, Valero Energy Corp. (VLO) reported to state
environmental regulators that a power failure caused flaring at its
Texas City, Texas refinery. The report did not say if production
was impacted.
Exxon Mobil Corp. (XOM) reported in an early Monday filing that
flaring was caused when one of its furnances was restarted. "This
event has ended. No impact to supply," the refinery said in the
filing.
In a Thursday evening filing, Exxon said that a pump failure at
its Baytown, Texas refinery resulted in a loss of cooling water
supply resulting in the shut down of some units. Exxon said that
production was not impacted and all customer needs were being met,
according to the state environmental report.
A fire early Thursday at Lion Oil Company's El Dorado, Arkansas,
oil refinery has reduced crude oil throughput to about 60% of
capacity, company spokesman Wallace Moody said.
Repairs to electrical instrumentation and insulation damaged by
the fire are underway; crude throughput is expected to return to
normal rates by Saturday, he added.
The El Dorado refinery is able to process up to 70,000 barrels
of crude oil a day and will be shutting down in September for
60-days of plant-wide turnaround maintenance, Moody said.
Total S.A. (TOT) restarted an unnamed unit at its Port Arthur,
Texas Refinery, according to a report issued June 22.
Tesoro Corp. (TSO) said it expects its Kenai, Alaska and
Martinez, Calif. refineries to be processing at normal capacity
rates by the end of the week, a company spokesman said June 22.
On June 4, two units at the Alaska refinery were shut down
because of a power failure. The refinery has a capacity to process
up to 72,000 barrels a day.
In May, the hydrocracker and reformer at the Golden Eagle
refinery in Martinez were shut down for planned maintenance. The
refinery can process up to 166,000 barrels a day. Valero Energy
Corp. (VLO) said on June 15 that the restart of a crude unit,
vacuum unit and coker at its Norco, La., refinery is a least three
weeks away. The units were shut due to a minor fire on June 9.
Also on June 15, Valero said it would delay the plant-wide
shutdown of its Aruba refinery to mid-July rather than early July.
The process of shutting down the units will begin in early
July.
For more detailed information, search Dow Jones Newswires using
the code N/REF.
Operator Refinery Capacity Description Restart
(in 000s
bbl/day)
UNPLANNED
CANADA
EAST COAST
CARIBBEAN
GULF COAST
Delek Tyler, TX 58.0 SCOT unit shut June 9 Jun 14
for approximately four
days of unplanned work.
Exxon Baytown, TX 567.0 Hydrocracking unit no. 1 n/a
shut June 17. No restart
timing available. Boiler
hit snags, restarted June 23.
Exxon shuts down some units n/a
after loss of cooling water
supply June 24. No production impact, co said.
Total Port Arthur 232.0 SCOT unit shutdown June 17 n/a
for unknown reason.
Valero Norco, LA 185.0 Crude, vacuum, coker unit shut Jul 5
to restart in 3 weeks following (est.)
June 9 minor fire.
Valero Texas City Power failure disrupts plant
June 27.
MIDWEST
ROCKY MOUNTAINS
BP Whiting, IN 410.0 Distillate desulfruization June 17
shut June 16 due to leak in
compressor; restart seen in
24-36 hours.
WEST COAST
Alon Paramount, 53.0 Naphtha hydrotreater Early
CA shut April 23 due to an July
explosion will take 10
weeks to restart, the
co. said on May 7. The
refinery has been at re-
duced rates since Apr. 23.
PetroStar Valdez, AK 48.0 Refinery shut due to Dec. Jun/Jul
28 fire; expected to re- 2010
start in June/July 2010.
Tesoro Kenai, AK 72.0 Power failure shuts hy- June
drocracking and isomeri- 26-27
zation unit on June 4;
restart seen some time
next week. Will return to
normal rates by June 26, 27
PLANNED
CANADA
CARIBBEAN
Valero Aruba 235.0 The refinery will be shuttered Sep/Oct
for economic reasons by mid-
July. Restart will be re-
evaluated in two to three
months.
EAST COAST
Sunoco Philadelphia, 340.0 Reformer unit shut in Girard n/a
PA Point section in early Oct.
for economic reasons. Shutdown
to last one to six months.
GULF COAST
Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010
Miss. conversion project delayed
from 2008 to 2010 due to
economic factors.
Citgo Corpus 156.0 SCOT unit shut June 8 to Jun 14
Christi, Tx remove fouling and to
quench tower and exchangers.
Flint Corpus 288.1 West Plant Coking Unit in re-
Hills Christi, TX start mode on June 3; unit
shut June 1 for planned
maintenance.
$250 mil. project for new Spr
diesel desulfurization, 2010
sulfur recovery unit to begin
in Fall 2008. Construction
to last 18 months.
Marathon Garyville 245.0 Project to increase crude oil 4Q
LA refining capacity by 180,000- 2009
b/d 85% complete, the Co. said
on Apr. 30. New units expected
start up in 4th-quarter, 2009.
Motiva Port Arthur 285.0 Expansion project to increase 1st-Q
TX throughput capacity by 325,000 2012
b/d, to 610,000-b/d, slowed.
Completion now seen in 1st-
quarter 2012, from 2010.
Valero Corpus 340.0 Coker Unit shutdown for econo- n/a
Christi, TX mic reasons and planned work;
delayed to June 19 from June
12. The 20,000-b/d unit will
remain off-line through July
but could restart at any time
if margins improve, the Co.
said.
20,000-b/d FCCU in East n/a
Plant shut; West Plant
50,000-b/d FCCU at reduced
rates since mid-Dec. for
economic reasons.
Valero Norco, LA 250.0 Upgrade project to build 2012
a new diesel hydrotreater
unit moved from 2010 to
4th-quarter 2012, the Co.
said on Jan. 27.
Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a
TX rates since mid-Dec. for
economic reasons. Mainte-
is planned at a hydrotreater
unit, the company said on
April 17; no details were
given.
Valero Norco, LA Turnaround at coker unit 1/Q
delayed until the first 2010
quarter of 2010 from fourth
quarter 2009, the Co. said
on Apr. 28.
Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
rates since mid-Dec. for
economic reasons.
Valero Three Rivers 95.0 24,000-b/d FCCU at reduced n/a
TX rates since mid-Dec. for
economic reasons.
Plant-wide 24-day turnaround Sep
to begin in Sept., the Co.
said on Apr. 28.
Western El Paso, TX 122.0 Crude unit shut May 24 week Jun 3
for 10-days maintenance.
WRB Borger, TX 152.0 Gas Oil Hydrodesulfurization Jun
unit will be restart some 6-14
time between June 6 and 14.
It is unclear when then unit
was taken out of service.
Planned maintenance at Unit Jul 12
29 FCCU electrostatic precipi-
tators starts May 31. Work
will conclude on July 12.
MID-WEST
BP Whiting 410.0 Restart pf FCCU shut in April 2nd-
IN for Spring turnaround mainte- Half
nance delayed to 2nd-half Jun
June from mid-May.
Frontier El Dorado 130.0 A coker turnaround and expan- Mid-
KS sion project was delayed until Aug.
Mid-July, and subsequently
delayed until August.
Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012
for completion in 2009 has been
shifted to 2012, the Co. said
on Jan. 27.
ROCKY MOUNTAINS
Conoco Billings, 61.0 On Mar. 5 the Co. delayed for Jan.
MT one year an expansion project 2010
which will increase capacity
to 71,000 bbls. Construction of
a new crude unit is now scheduled
to begin in January 2010.
Frontier Cheyenne 52.0 The refinery is operating at n/a
WY reduced rates for economic
reasons.
WEST COAST
Alon Paramount 55.0 Hydrocracker project post-
CA poned indefinitely, the Co.
said on Feb. 4
Chevron Richmond, 243.0 Hydrocracking Unit and re- Jun 27
CA former shut May 28 for 30-
days planned maintenance.
Exxon Torrance 155.0 Maintenance will begin in July July
Mobil at one of two 26,000-b/d coker
units, traders said on May 22.
Flint North Pole 210.0 One of three processing n/a
Hills AK units has been shut due
to low jet fuel demand,
the co. confirmed on Mar.
19.
Shell Martinez 155.0 Crude Unit and Coker Unit Aug 15
CA to shut for planned main-
tenance on July 10; re-
start seen Aug. 15.
Tesoro Golden Eagle 166.0 Hydrocracker/reformer Mid
Martinez, CA shut for planned mainte- June
nance May 9-10. Units to
return to service by mid-
June. Normal rates by June 26-27.
Tesoro Wilmington, 97.0 39-days of turnaround main-
CA tenance is planned for
fourth-quarter 2009.
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call
1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call
1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call
1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call
1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call
1-888-301-0513